HYDRO-ELECTRIC POWER PLANT
Kiranmoy Samanta
Contents
 Introduction
 Classification of hydro power plants.
 Factors affecting site selection for hydro-power project.
 Major components of hydroelectric plant
 Power generation
 Advantages and disadvantages of hydroelectric power.
Introduction
 Hydroelectric Power refers to energy or electricity generated by the
energy of falling or flowing water, the potential energy of water due
to its high location is converted into electrical energy.
 Hydroelectric Power obtained from the generators coupled to water
turbines which converts the hydraulic or fluid energy Electrical
energy.
 The total power generation capacity of the hydroelectric power
plants depends on the head of water and volume of water flowing
towards the water turbine.
• 25% of electricity generation capacity in world is provided by hydel
power plant.
• 4% of the total hydel energy potential in world is in India.
• In India 25.32% of total electricity generation capacity is produced by
hydel power.
Classification Of Hydro Power
Plants
 Hydropower Plants may be classified according to different
considerations as follows:
 Based on storage characteristics
 Based on head
 Based on plant capacity
 Based on nature of project
Based on Storage
Characteristics
 Run-off river plants
 Storage Plants
 Pumped storage Plants
 Tidal Plants
Run-off River Plants
 Run-off plants are those in which any storage
facilities is not provided and which utilize the
river flow to generate electricity.
 Generally such type of hydro plants is set up
where adequate discharge is available
throughout the year
 A weir or barrage is constructed across the
river close to the power plant to maintain a
given water level.
Storage Plants
 Storage plants are plants where necessarily
storage provision is required, so a dam is
constructed across the river.
 Storage is done during the wet season when
flow is in excess of demand to maintain
continuous power generation.
 The demand should fulfill from storage
during low supply period.
Pumped Storage Plants
 Pumped Storage plants generates power as usual but during the off
peak hours, water is pumped back from tail water pool to the head.
 As during off peak hours the power itself from that power plant
utilized in pumping to head so additional cost can be saved.
 So no water is wasted in such power plants and provision such as
reversible pump turbines which can function both as turbine + pump.
Tidal Plant
 Tidal plants are the recent innovation in the field of hydropower
generation.
 Tidal plants are designed to make use of high tides occurring in the
sea.
 Water at the time of high tides stored in a basin which can be
utilized during the low tides.
Based on Head
 Operating Head is the difference of the water level in the fore bay
and that in the tail race.
 Based on Operating Head Classification can be done as follows:
 Low Head Plants
 Medium Head Plants
 High Head Plants
Low- Head Plants
 Low Head Plants applications use river current or tidal flows of 30
meters (approximately 100 feet) or less to produce energy.
 These power plants do not need to dam or retain water to create
Hydraulic head it uses the current of river or the naturally occurring
tidal flow to create electricity.
 As Low Head Power Plants generates electricity from river currents
it is renewable energy and it affect less to environment.
Medium Head Plants
 If the operating head is between 30 m and 250 m, it is usually
classified as a medium-head plant.
 In Medium Head Plant construction of high dam across the river is
necessary to create required head by storing sufficient water for
power generation.
 It is the most common hydro power plant used in India.
High Head Plants
 If the operating head on the plant is greater than 250m, it is usually
classified as High Head Plants.
 A dam of sufficient height is, therefore required to be constructed,
so as to store water on the upstream side to utilize that water for
electricity generation.
 The common example is Bhakra dam in Punjab, Rihand dam in U.P.
Based on Plant Capacity
 Based on hydro plant capacity another classification of power plant
is done.
 Micro-hydel Plants
 Medium Capacity Plants
 High Capacity Plants
 Super Hydro Plants
Cont..
 Micro-Hydel Plants:
 A micro hydel plant is the one which has a capacity less than 5
MW.
 Medium Capacity Plants:
 A medium capacity plant is the one which has a capacity in the
range of 5 to 100 MW. Most of the hydropower plants in India are
medium capacity plants.
 High Capacity Plants:
 A high capacity plant is one which has a capacity in the range of
101 to 1000 MW.
 Super Hydro Plants:
 A super hydro plant has a capacity greater than 1000 MW.
Based On Nature of Project
 On the basis of nature of project hydro-power plant is classified as
 Power Project: In mountainous regions, hydro electric stations
are constructed only for power generation.
 Multi-Purpose Project: in multipurpose project, power is
generated besides other functions such as irrigation, water
supply, flood control etc.
Factors affecting site
selection
 General available topography of the area.
 Available head
 Available flow
 Political influences of the area
 Location of power house
 Economy
Components Of Hydro-electric
Plant
 The principle components of a hydro-electric power plant are as
described
 Dam Or Weir
 Reservoir
 Fore bay
 Intake Structure
 Penstocks
 SurgeTank
 Turbines
 Power House
 DraftTube
 Tail Race
Fore-Bay
 Fore-Bay is generally provided in case of run-off river plants & where
Power Plant is located far from Dam-Reservoir and through channel
water is stored here.
 It’s main Function is to temporarily store water which is rejected by
plant due to reduced load during off peak hours, and also to meet
instantaneous demand when the load is suddenly increased.
 It is provided just front of the penstocks.
 If power house is located nearby then requirement of fore-bay is not
necessary.
Intake Structure
 The water is conveyed from the fore-bay to the penstocks through
the intake structure.
 The main components of Intake structure are trash racks and gates.
 The trash rack is provided to prevent the entry of debris into the
water passage.
Pen-stocks
 Pen-stocks are the pipes of huge diameter usually made of steel,
reinforced concrete which carry water from storage to turbines.
 As penstocks are directly subjected to water hammer pressure it is
provided with surge tank to absorb water hammer pressure.
 Penstocks are provide with head gates which dominates the water
flow.
Surge tanks
 SurgeTank is a cylindrical storage tank which is connected to
penstocks at a suitable point.
 It is provided near downstream end of the long penstocks to relieve
excess pressure caused by sudden closure of valve.
 Basically the surge tank is provided to reduce the water hammer
pressure.
Turbines
 HydraulicTurbines convert hydraulic energy into mechanical energy.
 And the Mechanical energy developed by turbine is used in running
an electric generator which is coupled to shaft of the turbine.
 The water flows through the turbine consist of a wheel with
designed blades and makes it rotate.
 This rotation of turbine wheel is coupled with generator and it
generates electricity which is known as hydro electricity.
 HydraulicTurbines may be classified under 2 Heads
 ImpulseTurbines
 ReactionTurbines
Power House
 A power house is a building consisting of a
substructure to support the hydraulic and electrical
equipments and a superstructure to house and protect
there equipments.
 The sub-structure of the power house mainly consist of
foundation block of concrete extending from the
foundation to the generator floor with waterways
formed within it.
 Superstructure is the main building of the power house
which is constructed above the generator floor.
 Superstructure mainly contains transformers,
switching devices and control units.
Draft Tube
 DraftTube is a pipe or passage of gradually increasing c/s which
connects the runner exit to the tail race.
 It reduces the high velocity of the water discharged by the turbine by
enlarging the c/s and thus converts the Kinetic energy of water into
mechanical energy.
Tail Race
 Tail race is the channel into which the water is discharge after
passing through the turbines.
 When river is far off from the power house, one may have to
construct a channel of considerable length between the power
house and the river which is known as tail race.
Power generation
Advantages of hydro electric
plant
• Water is a renewable energy source.
• Maintenance and operation charges are very low.
• The efficiency of the plant does not change with age.
• In addition to power generation, hydro-electric power plants are also
useful for flood control, irrigation purposes, fishery and recreation.
• Have a longer life(100 to 125 years) as they operate at atmospheric
temperature.
• Water stored in the hydro-electric power plants can also be used for
domestic water supply.
Disadvantages
• The initial cost of the plant is very high.
• Since they are located far away from the load centre, cost of
transmission lines and transmission losses will be more.
• During drought season the power production may be reduced or even
stopped due to insufficient water in the reservoir.
• Water in the reservoir is lost by evaporation.
HYDRO-ELECTRIC POWER PLANT

More Related Content

What's hot

PUMPED STORAGE PLANT
PUMPED STORAGE PLANTPUMPED STORAGE PLANT
PUMPED STORAGE PLANTNilanjana Sen
 
Pumped storage hydro power plant
Pumped storage hydro power plantPumped storage hydro power plant
Pumped storage hydro power plantCraZzy Shubh
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentationram sundar singh
 
Hydropower
HydropowerHydropower
Hydropowerfscseema
 
Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Ryan Triadhitama
 
Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plantRatan Debnath
 
Tidal power plants
Tidal power plantsTidal power plants
Tidal power plantstonygracious
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantsnelkoli
 
Classification of hydro power plant
Classification of hydro power plantClassification of hydro power plant
Classification of hydro power plantSatish Taji
 
Hydro power ppt
Hydro power pptHydro power ppt
Hydro power pptsrgirlsdk
 
Hydroelectric power plant
Hydroelectric power plant Hydroelectric power plant
Hydroelectric power plant Ravindra Kolhe
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecturec3b2a1
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantDr. Ramesh B
 
Hydroelectric powerplant
Hydroelectric powerplantHydroelectric powerplant
Hydroelectric powerplantGurkirat Singh
 

What's hot (20)

Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
PUMPED STORAGE PLANT
PUMPED STORAGE PLANTPUMPED STORAGE PLANT
PUMPED STORAGE PLANT
 
Pumped storage hydro power plant
Pumped storage hydro power plantPumped storage hydro power plant
Pumped storage hydro power plant
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
 
Hydropower
HydropowerHydropower
Hydropower
 
Hydro power presentation
Hydro power presentationHydro power presentation
Hydro power presentation
 
Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)
 
Hydropower
HydropowerHydropower
Hydropower
 
Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plant
 
Tidal power plants
Tidal power plantsTidal power plants
Tidal power plants
 
Micro hydro power plant
Micro hydro power plantMicro hydro power plant
Micro hydro power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Classification of hydro power plant
Classification of hydro power plantClassification of hydro power plant
Classification of hydro power plant
 
Hydro Power Plants
Hydro Power PlantsHydro Power Plants
Hydro Power Plants
 
Hydro power ppt
Hydro power pptHydro power ppt
Hydro power ppt
 
Hydroelectric power plant
Hydroelectric power plant Hydroelectric power plant
Hydroelectric power plant
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecture
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydroelectric powerplant
Hydroelectric powerplantHydroelectric powerplant
Hydroelectric powerplant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 

Similar to HYDRO-ELECTRIC POWER PLANT

Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Pratik Diyora
 
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaHYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaMayurjyotiNeog
 
Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.Salman Jailani
 
Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.Salman Jailani
 
Hydroelectric power Plants.ppt
Hydroelectric power Plants.pptHydroelectric power Plants.ppt
Hydroelectric power Plants.pptFarhan573170
 
Hydro power plants
Hydro power plants Hydro power plants
Hydro power plants FAHAD KHAN
 
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
369353488-Hydropower-PPT-Water-Resources-Engineering.pptxWajidMalik27
 
HS presentation .doc
HS presentation .docHS presentation .doc
HS presentation .docEdenBekele5
 
Unit_ii_Power plants_Pumbed storage plant.pdf
Unit_ii_Power plants_Pumbed storage plant.pdfUnit_ii_Power plants_Pumbed storage plant.pdf
Unit_ii_Power plants_Pumbed storage plant.pdfNAVEENM849290
 
Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Yashwadhan Sahi
 

Similar to HYDRO-ELECTRIC POWER PLANT (20)

Hydro plant.docx
Hydro plant.docxHydro plant.docx
Hydro plant.docx
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaHYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
 
Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.
 
Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.
 
Naveen
NaveenNaveen
Naveen
 
Hydroelectric powerplant
Hydroelectric powerplant Hydroelectric powerplant
Hydroelectric powerplant
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
 
Hydro power
Hydro powerHydro power
Hydro power
 
Hydro-Electric Power
Hydro-Electric PowerHydro-Electric Power
Hydro-Electric Power
 
Hydro Power Plants
Hydro Power PlantsHydro Power Plants
Hydro Power Plants
 
waris.pptx
waris.pptxwaris.pptx
waris.pptx
 
Hydroelectric power Plants.ppt
Hydroelectric power Plants.pptHydroelectric power Plants.ppt
Hydroelectric power Plants.ppt
 
Hydro power plants
Hydro power plants Hydro power plants
Hydro power plants
 
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
 
science project.pptx
science project.pptxscience project.pptx
science project.pptx
 
HS presentation .doc
HS presentation .docHS presentation .doc
HS presentation .doc
 
Unit_ii_Power plants_Pumbed storage plant.pdf
Unit_ii_Power plants_Pumbed storage plant.pdfUnit_ii_Power plants_Pumbed storage plant.pdf
Unit_ii_Power plants_Pumbed storage plant.pdf
 
Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01Presentaionofrajfinal 140214103437-phpapp01
Presentaionofrajfinal 140214103437-phpapp01
 

Recently uploaded

An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 

Recently uploaded (20)

An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 

HYDRO-ELECTRIC POWER PLANT

  • 2. Contents  Introduction  Classification of hydro power plants.  Factors affecting site selection for hydro-power project.  Major components of hydroelectric plant  Power generation  Advantages and disadvantages of hydroelectric power.
  • 3. Introduction  Hydroelectric Power refers to energy or electricity generated by the energy of falling or flowing water, the potential energy of water due to its high location is converted into electrical energy.  Hydroelectric Power obtained from the generators coupled to water turbines which converts the hydraulic or fluid energy Electrical energy.  The total power generation capacity of the hydroelectric power plants depends on the head of water and volume of water flowing towards the water turbine.
  • 4. • 25% of electricity generation capacity in world is provided by hydel power plant. • 4% of the total hydel energy potential in world is in India. • In India 25.32% of total electricity generation capacity is produced by hydel power.
  • 5. Classification Of Hydro Power Plants  Hydropower Plants may be classified according to different considerations as follows:  Based on storage characteristics  Based on head  Based on plant capacity  Based on nature of project
  • 6. Based on Storage Characteristics  Run-off river plants  Storage Plants  Pumped storage Plants  Tidal Plants
  • 7. Run-off River Plants  Run-off plants are those in which any storage facilities is not provided and which utilize the river flow to generate electricity.  Generally such type of hydro plants is set up where adequate discharge is available throughout the year  A weir or barrage is constructed across the river close to the power plant to maintain a given water level.
  • 8. Storage Plants  Storage plants are plants where necessarily storage provision is required, so a dam is constructed across the river.  Storage is done during the wet season when flow is in excess of demand to maintain continuous power generation.  The demand should fulfill from storage during low supply period.
  • 9. Pumped Storage Plants  Pumped Storage plants generates power as usual but during the off peak hours, water is pumped back from tail water pool to the head.  As during off peak hours the power itself from that power plant utilized in pumping to head so additional cost can be saved.  So no water is wasted in such power plants and provision such as reversible pump turbines which can function both as turbine + pump.
  • 10.
  • 11. Tidal Plant  Tidal plants are the recent innovation in the field of hydropower generation.  Tidal plants are designed to make use of high tides occurring in the sea.  Water at the time of high tides stored in a basin which can be utilized during the low tides.
  • 12.
  • 13. Based on Head  Operating Head is the difference of the water level in the fore bay and that in the tail race.  Based on Operating Head Classification can be done as follows:  Low Head Plants  Medium Head Plants  High Head Plants
  • 14. Low- Head Plants  Low Head Plants applications use river current or tidal flows of 30 meters (approximately 100 feet) or less to produce energy.  These power plants do not need to dam or retain water to create Hydraulic head it uses the current of river or the naturally occurring tidal flow to create electricity.  As Low Head Power Plants generates electricity from river currents it is renewable energy and it affect less to environment.
  • 15.
  • 16. Medium Head Plants  If the operating head is between 30 m and 250 m, it is usually classified as a medium-head plant.  In Medium Head Plant construction of high dam across the river is necessary to create required head by storing sufficient water for power generation.  It is the most common hydro power plant used in India.
  • 17.
  • 18. High Head Plants  If the operating head on the plant is greater than 250m, it is usually classified as High Head Plants.  A dam of sufficient height is, therefore required to be constructed, so as to store water on the upstream side to utilize that water for electricity generation.  The common example is Bhakra dam in Punjab, Rihand dam in U.P.
  • 19.
  • 20. Based on Plant Capacity  Based on hydro plant capacity another classification of power plant is done.  Micro-hydel Plants  Medium Capacity Plants  High Capacity Plants  Super Hydro Plants
  • 21. Cont..  Micro-Hydel Plants:  A micro hydel plant is the one which has a capacity less than 5 MW.  Medium Capacity Plants:  A medium capacity plant is the one which has a capacity in the range of 5 to 100 MW. Most of the hydropower plants in India are medium capacity plants.  High Capacity Plants:  A high capacity plant is one which has a capacity in the range of 101 to 1000 MW.  Super Hydro Plants:  A super hydro plant has a capacity greater than 1000 MW.
  • 22. Based On Nature of Project  On the basis of nature of project hydro-power plant is classified as  Power Project: In mountainous regions, hydro electric stations are constructed only for power generation.  Multi-Purpose Project: in multipurpose project, power is generated besides other functions such as irrigation, water supply, flood control etc.
  • 23. Factors affecting site selection  General available topography of the area.  Available head  Available flow  Political influences of the area  Location of power house  Economy
  • 24. Components Of Hydro-electric Plant  The principle components of a hydro-electric power plant are as described  Dam Or Weir  Reservoir  Fore bay  Intake Structure  Penstocks  SurgeTank  Turbines  Power House  DraftTube  Tail Race
  • 25.
  • 26. Fore-Bay  Fore-Bay is generally provided in case of run-off river plants & where Power Plant is located far from Dam-Reservoir and through channel water is stored here.  It’s main Function is to temporarily store water which is rejected by plant due to reduced load during off peak hours, and also to meet instantaneous demand when the load is suddenly increased.  It is provided just front of the penstocks.  If power house is located nearby then requirement of fore-bay is not necessary.
  • 27. Intake Structure  The water is conveyed from the fore-bay to the penstocks through the intake structure.  The main components of Intake structure are trash racks and gates.  The trash rack is provided to prevent the entry of debris into the water passage.
  • 28. Pen-stocks  Pen-stocks are the pipes of huge diameter usually made of steel, reinforced concrete which carry water from storage to turbines.  As penstocks are directly subjected to water hammer pressure it is provided with surge tank to absorb water hammer pressure.  Penstocks are provide with head gates which dominates the water flow.
  • 29.
  • 30. Surge tanks  SurgeTank is a cylindrical storage tank which is connected to penstocks at a suitable point.  It is provided near downstream end of the long penstocks to relieve excess pressure caused by sudden closure of valve.  Basically the surge tank is provided to reduce the water hammer pressure.
  • 31.
  • 32. Turbines  HydraulicTurbines convert hydraulic energy into mechanical energy.  And the Mechanical energy developed by turbine is used in running an electric generator which is coupled to shaft of the turbine.  The water flows through the turbine consist of a wheel with designed blades and makes it rotate.  This rotation of turbine wheel is coupled with generator and it generates electricity which is known as hydro electricity.  HydraulicTurbines may be classified under 2 Heads  ImpulseTurbines  ReactionTurbines
  • 33.
  • 34. Power House  A power house is a building consisting of a substructure to support the hydraulic and electrical equipments and a superstructure to house and protect there equipments.  The sub-structure of the power house mainly consist of foundation block of concrete extending from the foundation to the generator floor with waterways formed within it.  Superstructure is the main building of the power house which is constructed above the generator floor.  Superstructure mainly contains transformers, switching devices and control units.
  • 35. Draft Tube  DraftTube is a pipe or passage of gradually increasing c/s which connects the runner exit to the tail race.  It reduces the high velocity of the water discharged by the turbine by enlarging the c/s and thus converts the Kinetic energy of water into mechanical energy.
  • 36. Tail Race  Tail race is the channel into which the water is discharge after passing through the turbines.  When river is far off from the power house, one may have to construct a channel of considerable length between the power house and the river which is known as tail race.
  • 38. Advantages of hydro electric plant • Water is a renewable energy source. • Maintenance and operation charges are very low. • The efficiency of the plant does not change with age. • In addition to power generation, hydro-electric power plants are also useful for flood control, irrigation purposes, fishery and recreation. • Have a longer life(100 to 125 years) as they operate at atmospheric temperature. • Water stored in the hydro-electric power plants can also be used for domestic water supply.
  • 39. Disadvantages • The initial cost of the plant is very high. • Since they are located far away from the load centre, cost of transmission lines and transmission losses will be more. • During drought season the power production may be reduced or even stopped due to insufficient water in the reservoir. • Water in the reservoir is lost by evaporation.