1. DOD is not doneDOD is not done
Kris Buytaert
@krisbuytaert
2. Kris BuytaertKris Buytaert
● I used to be a Dev,I used to be a Dev,
● Then Became an OpThen Became an Op
● Chief Trolling Officer and Open SourceChief Trolling Officer and Open Source
Consultant @inuits.euConsultant @inuits.eu
● Everything is an effing DNS ProblemEverything is an effing DNS Problem
● Building Clouds since before the bookstoreBuilding Clouds since before the bookstore
● Some books, some papers, some blogsSome books, some papers, some blogs
● Evangelizing devopsEvangelizing devops
3. DOD ?DOD ?
● DevOpsDaysDevOpsDays
● Department of DefenseDepartment of Defense
● Do or dieDo or die
● Definition of DoneDefinition of Done
● Dead on DeliveryDead on Delivery
● Drink or DieDrink or Die
● CENSOREDCENSORED
4. DOD in ScrumDOD in Scrum
•
DoD is a checklist of valuable activities requiredDoD is a checklist of valuable activities required
to produce software.to produce software.
•
Definition of Done is a simple list of activitiesDefinition of Done is a simple list of activities
(writing code, coding comments, unit testing,(writing code, coding comments, unit testing,
integration testing, release notes, designintegration testing, release notes, design
documents, etc.) that adddocuments, etc.) that add
verifiable/demonstrable value to the product.verifiable/demonstrable value to the product.
•
DoD is the primary reporting mechanism forDoD is the primary reporting mechanism for
team members.team members.
5. DOD in ScrumDOD in Scrum
•
DoD is a checklist of valuable activities requiredDoD is a checklist of valuable activities required
to produce software.to produce software.
•
Definition of Done is a simple list of activitiesDefinition of Done is a simple list of activities
(writing code, coding comments, unit testing,(writing code, coding comments, unit testing,
integration testing, release notes, designintegration testing, release notes, design
documents, etc.) that adddocuments, etc.) that add
verifiable/demonstrable value to the product.verifiable/demonstrable value to the product.
•
DoD is the primary reporting mechanism forDoD is the primary reporting mechanism for
team members.team members.
6. DoD in Scrum (2)DoD in Scrum (2)
a tool for bringing transparency to the work aa tool for bringing transparency to the work a
Scrum Team is performing. It is related more toScrum Team is performing. It is related more to
the quality of a product, rather than itsthe quality of a product, rather than its
functionality.functionality.
11. If it isn't monitored it isn't inIf it isn't monitored it isn't in
productionproduction
Done = In production andDone = In production and
MonitoredMonitored