Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Mech project list
1. 1 Mechanical Projects List | EasyElectronics
EasyElectronics Mobile: +91-9878956626,
www.easyelectronics.co.in +91- 9872888416
krishnamalhotra1993@gmail.com
#3864, Sector 32-D, Chandigarh
*Contact Us for Any Customized Project Idea or Any Project from the List Given Below.
* Message for Project Pics on Whatsapp or Email.
Sr.No Project Title Price
(In
INR)
Available
In
Mechanical Projects
M101. Four Wheel Steering 8,500 4-5 Days
M102. Button Operated Gear Shifting 8,000 4-5 Days
M103. Hydraulic And Pneumatic Lift 6,000 4-5 Days
M104. Hydraulic Break 5,000 4-5 Days
M105. Hydraulic Bridge 4,000 4-5 Days
M106. Hydraulic Crane 4,400 4-5 Days
M107. Hydraulic Power Generation 5,000 4-5 Days
M108. Magnetic Break 7,000 4-5 Days
M109. Magnetic Clutch 7,000 4-5 Days
M110. Regeneration Braking System 6,500 4-5 Days
M111. Shrimp Robot (Stair Robot) 8,000 4-5 Days
M112. Six Leg Robot 7,000 4-5 Days
M113. Six Leg Robot with Crane 9,000 4-5 Days
M114. Solar Car 3,500 4-5 Days
M115. Hovercraft 6,000 4-5 Days
M116. Pipe Inspection Robot 8,500 4-5 Days
M117. Speed Breaker 3,000 4-5 Days
2. 2 Mechanical Projects List | EasyElectronics
M118. Can Crusher ( Motorized) 10,000 4-5 Days
M119. Can Crusher ( Pneumatic) 18,000 4-5 Days
M120. Electricity generation From Shoe 6,000 4-5 Days
M122. Automatic Stand Retrieval 6,000 4-5 Days
M123. Button Operated Hydraulic Jack 6,000 4-5 Days
M124. Multiple Nut Bolt Remover (Manual) 6,000 4-5 Days
M125. Multiple Nut Bolt Remover (Motorized) 8,000 4-5 Days
M126. Pedal Powered Hacksaw Machine 6,500 4-5 Days
M127. Pneumatic Break 7,000 4-5 Days
M128. Stair Aid 5,000 4-5 Days
M129. Unidirectional Gear Box 6,000 4-5 Days
M130. Vending Machine 6,000 4-5 Days
M131. Electricity Generation From Footstep 6,500 4-5 Days
M132. Electric Jack 4,500 4-5 Days
M133. Grass Cutter Using Solar Energy 9,000 4-5 Days
M134. Pedal Operated Washing Machine 12,000 4-5 Days
M135. Self-Start LPG Based Bike Engine 25,000 10-15 Days
M136. Hydrogen Gas based bike Engine Set-Up 25,000 10-15 Days
M137. Compressed Air Vehicle 45,000 25-30 Days
M138. Compressed Air Engine 35,000 10-15 Days
M139. Duel Fuel Bike Engine Set up (LPG+Petrol) 25,000 10-15 Days
M140. Duel Fuel Bike Engine Set up
(Hydrogen+Petrol)
35,000 15-17 Days
M140. Four Wheel Steering With Frame And Drive 25,000 7-8 Days
M141. Gantry Robot XYZ Movement 15,500 7-8 Days
M142. Chainless Bicycle 13,500 7-8 Days
M143. Pneumatic Car With 2 Cylinders 22,000 7-8 Days
M144. Robo War(War Robot Pushing bot)-20kgs 15000 7-8 Days
M145. Robo War(War Robot Pushing bot)-60kgs 25000 7-8 Days
M146. Rocker Bogie Mechanism 15,000 7-8 Days
M147. Sag Way Project 23,500 7-8 Days
M148. Solar Based Reciprocating Pump 15,500 7-8 Days
M149. Hand operated Can Crusher 8,000 7-8 Days
M150. Road Roller Machine 23,000 7-8 Days
3. 3 Mechanical Projects List | EasyElectronics
M151. Sectional Garage Project Development 17,000 7-8 Days
M152. Electric Crane 17,000 7-8 Days
M153. Automatic Railway Track And Pit Clearing
Machine
______ 7-8 Days
M154. Automatic Multilevel Car Parking System 15,000 7-8 Days
M155. Hybrid Chimney 5,000 3-4 Days
M156. Automatic Car Wipers System On Rain
Detection
______ 3-4 Days
M157. Automatic Paint Machine ______ 7-8 Days