Insuring Risk
In Construction Projects
Lecture by:
Laina Chan, Barrister
Nine Wentworth Chambers, Sydney
For: University of Melbourne
Financiers
Developers
Head Contractor
Design Consultant Sub-Contractors
Economic viability
Cash flow can be impacted upon by
delays
Claims against the contractor
Insolvency of major parties
Design risk which can be laid off to design sub-consultants
Unforseen site conditions
Construction risk in terms of defects supervision
Responsibility for the work of subcontractors
Specified, defect and warranty obligations
Delay, penalties and liquidated damages claims
Monitor and ensure compliance with insurance requirementsNegligence and defective design
Job delivered late
Job delivered with defects
Increased costs
Risk Diagram
Types of Insurance
– Contractors’ All Risk policies;
– Industrial Special Risk policies which take over
insurance of the project once the works are complete;
– Professional Indemnity;
– Public liability insurance;
– Workers’ Compensation;
– Compulsory third party
motor vehicle; and
– Marine cargo or transit.
Trident General Insurance Co Ltd v
McNiece Bros Pty Ltd (1988) 165 CLR 107
Applicable in the context of public liability
insurance and property insurance.
Common law exception to the rules of privity
of contract and consideration;
Insurance Contracts Act 1984
48(1) Where a person who is not a party to a contract of
general insurance is specified or referred to in the
contract, whether by name or otherwise, as a person to
whom the insurance cover provided by the contract
extends, that person has a right to recover the amount of
the person’s loss from the insurer in accordance with the
contract notwithstanding that the person is not a party to
the contract.
16(1) A contract of general insurance is not void by reason only that the insured did not
have, at the time when the contract was entered into, an interest in a subject-matter of the
contract.
17(1) Where the insured under a contract of general
insurance has suffered a pecuniary or economic loss
by reason that property the subject-matter of the
contract has been damaged or destroyed, the insurer
is not relieved of liability under the contract by reason
only that, at the time of the loss, the insured did not
have an interest at law or in equity in the property.
Contract Works Policies
No cover for defective workmanship and design
But what does this mean?
Graham Evans & Co (Qld) Pty Limited v
Vanguard Insurance Company Limited
(1987) 4 ANZ Insurance Cases 60-772
“…all risks of physical loss of or damage to property of every kind and
description (including the whole of the Contract Plant, Equipment, Materials
and Supplies up to but not exceeding the respective sums insured in the
Schedule owned by the Insured or for which the Insured may be responsible
or, prior to any occurrence for which may be made hereunder, assumed
responsibility, used or to be used
in part of or incidental to the
Insured’s Contracting Operations
detailed in the Schedule.”
Chalmers Leask Underwriting Agencies v
May Nicholas Limited (1983) 155 CLR 279
“…loss or damage directly caused by
defective workmanship, material or
design or wear and tear or mechanical
breakdown or normal upkeep or normal
making good but so that this exclusion
shall be limited to the part immediately
affected and shall not apply to any other
part or parts lost or damage in
consequence thereof…”
Vehicles passing over a coffer dam damaged the coffer dam (which was alleged
to be defective). Flood waters breaching the coffer dam and caused damage to
the construction works including leaving behind deposits of silt and debris.
Q: Is the cost of rectifying the damage to the construction works
(but not the cost of repair of the coffer dam) insured under the policy?
Walkers Civil Engineering v Sun Alliance & London
Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61-
418
• Similar exclusion clause to clause construed in Chalmers Leask
• The insuring clause provided:
“This section, subject to the limitations, exclusions, terms and
conditions hereinafter mentioned, is to insure in respect of occurrences
happening during the period stated in the Schedule against all risks of
physical loss of or damage to property of every kind and description
(including the whole of the contract plant, equipment, materials and
supplies up to but not exceeding the respective sums Insured in the
Schedule) owned by the insured or for which the Insured may be
responsible or, prior to any occurrence for which claim may be made
hereunder, have assumed responsibility, use or to be used in part of or
incidental to the “Insured’s Contracting Operations” detailed in the
Schedule wherever the said property may be located in Australia or
whilst in transit within and between any place or places therein.”
Exclusion 2(c) provided:
Walkers Civil Engineering v Sun Alliance & London
Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61-
418
“This insurance does not cover loss or damage directly caused by
defective workmanship, construction or design or wear and tear or
mechanical breakdown or normal upkeep or normal making good
but this exclusion shall be limited to the part which is defective and
shall not apply to any other part or parts lost or damaged in
consequence thereof.”
• Three sewerage treatment plants
• Cement poured onto fibreglass sewerage tanks to counter hydrostatic
ground pressure
• Fibreglass tanks defective
• Rectification works included the removal of the concrete
Q: Is the insured entitled to indemnity for the cost of the removal
of the concrete?
Walkers Civil Engineering v Sun Alliance & London
Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61-
418
Cementation Piling & Foundations Limited v
Aegon Insurance Co Limited and Commercial Union
Insurance Co PLC [1995] 1 Lloyd’s Rep 97
(1) Rectification of the gaps and/or voids in the walls;
(2) Removal of the sand fill from the dock bed; and
(3) Grouting and filling behind the walls of the voids from which the
sand fill had escaped.
The losses suffered by Cementation fell into three distinct areas:
“… (2) the cost of replacing or rectifying defects in design, materials or
workmanship unless the property insured suffers actual loss,
destruction or damage as a result of such defects.
Cementation Piling & Foundations Limited v
Aegon Insurance Co Limited and Commercial Union
Insurance Co PLC [1995] 1 Lloyd’s Rep 97
The policy excludes:
However, initial costs of introducing
improvements, betterments or
corrections in the rectification of the
design, material or workmanship
causing such loss or damage shall
always be excluded.”
In deciding whether the costs of rectifying the gaps and voids in the wall
(category 1) were covered by the policy, the court looked at the exclusion
clauses in the policy:
Cementation Piling & Foundations Limited v
Aegon Insurance Co Limited and Commercial Union
Insurance Co PLC [1995] 1 Lloyd’s Rep 97
“It is common ground that an exception clause
cannot extend the cover from which the exception is
made. It is also, however, common ground that the
terms of an exception clause may provide material
from which the Court can discern that the first
possible meaning of the indemnity clause is to be
preferred to another or second possible meaning.”
Cross Liability Clauses
• What do they mean?
• What is the defence of circuity?
Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;
Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors
(2003) 12 ANZ Insurance Cases 61-547
The policy had three sections:
Section C set out various
terms and conditions.
Section B covered legal liability under the
terms of any contract maintenance or defects
liability clauses for loss and/or damage in
identified circumstances
Section A provided insurance for loss or
damage to property owned by the insured or
for which the insured may have been
responsible.
Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;
Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors
(2003) 12 ANZ Insurance Cases 61-547
W&D Elliot
Earthmoving Pty
Ltd (Elliot)
DN Pearce &
Maintenance Pty
Ltd (Pearce)
Connell Wagner Coffey
Transfield
(Head Contractor)
Transfield Bouygues JV
Transfield Holdings
Pty Ltd
JV to construct a
section of railway
Subcontracted
with
(a) Pay on behalf of the Insured all sums which the
Insured shall become legally obligated to pay as
compensation for:
…
(2) loss of and/or damage to and/or destruction of property and/or the Loss of Use
thereof; in respect of and/or arising out of Occurrences happening anywhere in the
Geographical Limits during the Period of Insurance in connection with the
Construction Operation and/or Other Business Operations and/or Products
Liability/Completed Operations and/or Property Insured detailed in the Schedule.”
The Insuring Clause provided relevantly:
“The Insurers hereby agree, subject to the
limitations, terms and conditions hereafter mentioned,
that they will:
Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;
Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors
(2003) 12 ANZ Insurance Cases 61-547
“Exclusions applicable to Section C
This section shall not apply to liability:
…
for damage to property owned by the insured”
Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;
Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors
(2003) 12 ANZ Insurance Cases 61-547
The cross liability clause provided:
• “Each of the persons comprising the Insured shall for the purposes of this
policy be considered a separate and distinct unit and the words “the
Insured” shall be considered as applying to each of such persons in the
same manner as if a separate policy had been issued to each of them in his
name alone and the Insurers waive all rights of subrogation or action which
they may have or acquire against any of such persons. Provided that
nothing in this clause shall be deemed to increase the limit of the Insurers’
liability under this policy in respect of any one occurrence.
Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors;
Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors
(2003) 12 ANZ Insurance Cases 61-547
Waiver of Subrogation
How wide is too ?
Does a waiver of subrogation clause only
apply to claims covered by the policy?
GPS Power Pty Ltd v Gardiner Willis Associates Pty Ltd
[2000] QSC 075
• The insurers agreed that “in the event of the insurers indemnifying or
making a payment to any insured(s), the insurers shall not exercise any
rights of subrogation against any other insured(s) hereunder.”
• The insurers also agreed “to waive any rights and remedies or relief to
which they may become entitled by subrogation against … [a]ny insured
named or described by this policy.”
Larson-Juhl Australia LLC v Jaywest International
Pty Ltd (2000) 11 ANZ Ins Cases 61-472 and 61-500
The New South Wales Court of appeal affirmed the decision of Master
MacReady who construed the following clause literally and held that there was
nothing in the clause to confine the generality of the phrase “shall waive any
rights and remedies or relief” :
1. Any co-insured (including its directors, officers and employees);
2. Any corporation or entity (including its directors, officers and
employees) owned or controlled by any insured or against any
co-owner of the property insured.”
“14.8.1 The insurer shall waive any rights and remedies or relief to which it is
or may become entitled by subrogation against:
Thiess Contractors Pty Ltd v Norcon Pty Ltd
(2001) 11 ANZ Ins cases 61-509
Should a plaintiff who had suffered loss as a result of a
defendant’s negligence,
but is the beneficiary of an insurance policy covering that
loss,
have the sum that it has received from the insurer taken into
account to reduce the damages recoverable from the
defendant?
“5. Further or alternatively, if the second third party [the respondent] breached clause
8.04 of the Norcon Subcontract as alleged or at all, which is not admitted, then:-
(a) at all material times the first third party [the appellant] had taken out its own public
liability policy of insurance (‘the Policy’), the further particulars of which the
second third party is not presently aware;
(b) the first third party has made a claim, or is entitled to make a claim, pursuant to
the Policy with respect to any liability that it has in these proceedings;
(c) further or alternatively to subparagraph (b) above, the first third party has been
granted indemnity pursuant to, or is entitled to be granted indemnity pursuant to,
the Policy;
(d) by reason of the matters pleaded above, there is no loss or liability in respect of
which the first third party is entitled to claim indemnity pursuant to any other
policy of insurance;
(e) the insurer or insurers on the Policy are not entitled to exercise a right of
subrogation so as to claim pursuant to another policy of insurance on behalf of
the first third party;
(f) the first third party has suffered no loss by reason of any breach by the second
third party of clause 8.04 of the Norcon Subcontract.”
In its defence, Norcon denied that it was a joint tortfeasor with Thiess Contractors.
It also pleaded the following paragraph:
Thiess Contractors Pty Ltd v Norcon Pty Ltd
(2001) 11 ANZ Ins cases 61-509

More Related Content

What's hot

Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction WorkAdiirfan Che-ani
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
International construction contract
International construction contractInternational construction contract
International construction contractGlobal Negotiator
 
time bar clauses
time bar clausestime bar clauses
time bar clausesAMILA GAYAN
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingila vamsi krishna
 
Contracts and their types
Contracts and their typesContracts and their types
Contracts and their typesTouqeer1
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.Gebeyehu Worku
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer마 이환
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017DarrenTofu
 
Project management in construction
Project management in constructionProject management in construction
Project management in constructionNAVNEET KUMAR JHA
 
Civil Quantity Survey and Estimation
Civil Quantity Survey and EstimationCivil Quantity Survey and Estimation
Civil Quantity Survey and EstimationGide India
 

What's hot (20)

Epc contractor
Epc contractorEpc contractor
Epc contractor
 
Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction Work
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
International construction contract
International construction contractInternational construction contract
International construction contract
 
PROTECTION METHODS.pptx
PROTECTION METHODS.pptxPROTECTION METHODS.pptx
PROTECTION METHODS.pptx
 
time bar clauses
time bar clausestime bar clauses
time bar clauses
 
Changes in construction
Changes in constructionChanges in construction
Changes in construction
 
Planning and cost analysis of the commercial building
Planning and cost analysis of the commercial buildingPlanning and cost analysis of the commercial building
Planning and cost analysis of the commercial building
 
Contracts and their types
Contracts and their typesContracts and their types
Contracts and their types
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Construction process
Construction processConstruction process
Construction process
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Construction site supervision aalecture one.
Construction site supervision aalecture one.Construction site supervision aalecture one.
Construction site supervision aalecture one.
 
Cost Plus Contract
Cost Plus ContractCost Plus Contract
Cost Plus Contract
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
 
Construction industry
Construction industryConstruction industry
Construction industry
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Civil Quantity Survey and Estimation
Civil Quantity Survey and EstimationCivil Quantity Survey and Estimation
Civil Quantity Survey and Estimation
 

Viewers also liked

Security for Performance
Security for PerformanceSecurity for Performance
Security for PerformanceLaina Chan
 
The Law of Penalties - ANZ v Andrews and beyond
The Law of Penalties - ANZ v Andrews and beyond The Law of Penalties - ANZ v Andrews and beyond
The Law of Penalties - ANZ v Andrews and beyond Laina Chan
 
Rob Harper SC & Laina Chan How to brief counsel and Why
Rob Harper SC & Laina Chan   How to brief counsel and WhyRob Harper SC & Laina Chan   How to brief counsel and Why
Rob Harper SC & Laina Chan How to brief counsel and WhyLaina Chan
 
Powerpoint for New York State Bar Lecture
Powerpoint for New York State Bar LecturePowerpoint for New York State Bar Lecture
Powerpoint for New York State Bar LectureLaina Chan
 
Power Point for Contract Damages
Power Point for Contract DamagesPower Point for Contract Damages
Power Point for Contract DamagesLaina Chan
 
Risk Mgmnt&Pl 08 Dba Pr
Risk Mgmnt&Pl 08 Dba PrRisk Mgmnt&Pl 08 Dba Pr
Risk Mgmnt&Pl 08 Dba Prguestc27cff2
 
Managing Risk in Construction Contracts and Projects - 2016 Brochure
Managing Risk in Construction Contracts and Projects - 2016 BrochureManaging Risk in Construction Contracts and Projects - 2016 Brochure
Managing Risk in Construction Contracts and Projects - 2016 BrochureAngelin Soosaipillai, LL.B.
 
GENEVA CONSTRUCTION AND RISK (GCR)
GENEVA CONSTRUCTION AND RISK (GCR)GENEVA CONSTRUCTION AND RISK (GCR)
GENEVA CONSTRUCTION AND RISK (GCR)Aamir chouhan
 
Construction Risk Summit "benefit and pits of Construction Risk Management"
Construction Risk Summit   "benefit and pits of Construction Risk Management"Construction Risk Summit   "benefit and pits of Construction Risk Management"
Construction Risk Summit "benefit and pits of Construction Risk Management"bfriday
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk managementIQPC
 
Risk and uncertainty in construction projects
Risk and uncertainty in construction projectsRisk and uncertainty in construction projects
Risk and uncertainty in construction projectsSameer Nawab
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”Ary Jamil
 
Risk mangement
Risk mangementRisk mangement
Risk mangementcollege
 
Risk Management
Risk ManagementRisk Management
Risk Managementcgeorgeo
 

Viewers also liked (19)

Security for Performance
Security for PerformanceSecurity for Performance
Security for Performance
 
The Law of Penalties - ANZ v Andrews and beyond
The Law of Penalties - ANZ v Andrews and beyond The Law of Penalties - ANZ v Andrews and beyond
The Law of Penalties - ANZ v Andrews and beyond
 
Rob Harper SC & Laina Chan How to brief counsel and Why
Rob Harper SC & Laina Chan   How to brief counsel and WhyRob Harper SC & Laina Chan   How to brief counsel and Why
Rob Harper SC & Laina Chan How to brief counsel and Why
 
Powerpoint for New York State Bar Lecture
Powerpoint for New York State Bar LecturePowerpoint for New York State Bar Lecture
Powerpoint for New York State Bar Lecture
 
Power Point for Contract Damages
Power Point for Contract DamagesPower Point for Contract Damages
Power Point for Contract Damages
 
constructin booklet
constructin bookletconstructin booklet
constructin booklet
 
Risk Mgmnt&Pl 08 Dba Pr
Risk Mgmnt&Pl 08 Dba PrRisk Mgmnt&Pl 08 Dba Pr
Risk Mgmnt&Pl 08 Dba Pr
 
Managing Risk in Construction Contracts and Projects - 2016 Brochure
Managing Risk in Construction Contracts and Projects - 2016 BrochureManaging Risk in Construction Contracts and Projects - 2016 Brochure
Managing Risk in Construction Contracts and Projects - 2016 Brochure
 
GENEVA CONSTRUCTION AND RISK (GCR)
GENEVA CONSTRUCTION AND RISK (GCR)GENEVA CONSTRUCTION AND RISK (GCR)
GENEVA CONSTRUCTION AND RISK (GCR)
 
Construction Risk Summit "benefit and pits of Construction Risk Management"
Construction Risk Summit   "benefit and pits of Construction Risk Management"Construction Risk Summit   "benefit and pits of Construction Risk Management"
Construction Risk Summit "benefit and pits of Construction Risk Management"
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk management
 
Risk and uncertainty in construction projects
Risk and uncertainty in construction projectsRisk and uncertainty in construction projects
Risk and uncertainty in construction projects
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”
 
Construction Accident Risk Management
Construction Accident Risk ManagementConstruction Accident Risk Management
Construction Accident Risk Management
 
Types of-risk
Types of-riskTypes of-risk
Types of-risk
 
Risk mangement
Risk mangementRisk mangement
Risk mangement
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk types
Risk  typesRisk  types
Risk types
 

Similar to Insuring Risk in Construction Projects

Civil Engineering Completed Risks or Completed Construction Insurance
Civil Engineering Completed Risks  or Completed Construction InsuranceCivil Engineering Completed Risks  or Completed Construction Insurance
Civil Engineering Completed Risks or Completed Construction InsuranceLajpat Ray Chandnani
 
Texas anti indemnity
Texas anti indemnity Texas anti indemnity
Texas anti indemnity julielennon
 
Introduction to Insurance Adamjee Insurance Company Ltd
Introduction to Insurance Adamjee Insurance Company LtdIntroduction to Insurance Adamjee Insurance Company Ltd
Introduction to Insurance Adamjee Insurance Company LtdAsjad Asjad
 
Introduction to insurance AICL
Introduction to insurance AICLIntroduction to insurance AICL
Introduction to insurance AICLAsjad Asjad
 
Avn 98 aviation products grounding and other aviation liabilities insurance
Avn 98 aviation products grounding and other aviation liabilities insuranceAvn 98 aviation products grounding and other aviation liabilities insurance
Avn 98 aviation products grounding and other aviation liabilities insuranceRidwan Ichsan
 
Mib 3.6 marine insurance on 09 10 12 copy
Mib 3.6 marine insurance  on 09 10 12   copyMib 3.6 marine insurance  on 09 10 12   copy
Mib 3.6 marine insurance on 09 10 12 copySanjeev Patel
 
Engineering insurance
Engineering insuranceEngineering insurance
Engineering insurancePRASOON VERMA
 
Forcemajeureclausesrevisited
ForcemajeureclausesrevisitedForcemajeureclausesrevisited
ForcemajeureclausesrevisitedLinhNguyen988
 
Professional Indemnity-Financial & Legal
Professional Indemnity-Financial & LegalProfessional Indemnity-Financial & Legal
Professional Indemnity-Financial & LegalVenkatesh Sundaramurthy
 
Insuring Large Construction Projects.pptx
Insuring Large Construction Projects.pptxInsuring Large Construction Projects.pptx
Insuring Large Construction Projects.pptxAnwar Ahmadabidin
 
AIG v ACIG Merriwether Occurrence Order MSJ
AIG v ACIG Merriwether Occurrence Order MSJAIG v ACIG Merriwether Occurrence Order MSJ
AIG v ACIG Merriwether Occurrence Order MSJSeth Row
 
ENGINEERING INSURANCE
ENGINEERING INSURANCEENGINEERING INSURANCE
ENGINEERING INSURANCEKrishna Burli
 
Group Builders Update - Tred Eyerly, Esq. www.insurancelawhawaii.com
Group Builders Update - Tred Eyerly, Esq. www.insurancelawhawaii.comGroup Builders Update - Tred Eyerly, Esq. www.insurancelawhawaii.com
Group Builders Update - Tred Eyerly, Esq. www.insurancelawhawaii.cominversecondemnation
 

Similar to Insuring Risk in Construction Projects (20)

Civil Engineering Completed Risks or Completed Construction Insurance
Civil Engineering Completed Risks  or Completed Construction InsuranceCivil Engineering Completed Risks  or Completed Construction Insurance
Civil Engineering Completed Risks or Completed Construction Insurance
 
Engineering insurance 1
Engineering insurance 1Engineering insurance 1
Engineering insurance 1
 
Engineering insurance
Engineering insuranceEngineering insurance
Engineering insurance
 
Defect exclusions
Defect exclusionsDefect exclusions
Defect exclusions
 
Texas anti indemnity
Texas anti indemnity Texas anti indemnity
Texas anti indemnity
 
GENERAL GROUP INSURANCE
GENERAL GROUP INSURANCEGENERAL GROUP INSURANCE
GENERAL GROUP INSURANCE
 
Introduction to Insurance Adamjee Insurance Company Ltd
Introduction to Insurance Adamjee Insurance Company LtdIntroduction to Insurance Adamjee Insurance Company Ltd
Introduction to Insurance Adamjee Insurance Company Ltd
 
Introduction to insurance AICL
Introduction to insurance AICLIntroduction to insurance AICL
Introduction to insurance AICL
 
Construction Insurance
Construction InsuranceConstruction Insurance
Construction Insurance
 
Avn 98 aviation products grounding and other aviation liabilities insurance
Avn 98 aviation products grounding and other aviation liabilities insuranceAvn 98 aviation products grounding and other aviation liabilities insurance
Avn 98 aviation products grounding and other aviation liabilities insurance
 
Mib 3.6 marine insurance on 09 10 12 copy
Mib 3.6 marine insurance  on 09 10 12   copyMib 3.6 marine insurance  on 09 10 12   copy
Mib 3.6 marine insurance on 09 10 12 copy
 
Engineering insurance
Engineering insuranceEngineering insurance
Engineering insurance
 
Forcemajeureclausesrevisited
ForcemajeureclausesrevisitedForcemajeureclausesrevisited
Forcemajeureclausesrevisited
 
Professional Indemnity-Financial & Legal
Professional Indemnity-Financial & LegalProfessional Indemnity-Financial & Legal
Professional Indemnity-Financial & Legal
 
Cargo clauses09
Cargo clauses09Cargo clauses09
Cargo clauses09
 
Insuring Large Construction Projects.pptx
Insuring Large Construction Projects.pptxInsuring Large Construction Projects.pptx
Insuring Large Construction Projects.pptx
 
Professional Indemnity
Professional IndemnityProfessional Indemnity
Professional Indemnity
 
AIG v ACIG Merriwether Occurrence Order MSJ
AIG v ACIG Merriwether Occurrence Order MSJAIG v ACIG Merriwether Occurrence Order MSJ
AIG v ACIG Merriwether Occurrence Order MSJ
 
ENGINEERING INSURANCE
ENGINEERING INSURANCEENGINEERING INSURANCE
ENGINEERING INSURANCE
 
Group Builders Update - Tred Eyerly, Esq. www.insurancelawhawaii.com
Group Builders Update - Tred Eyerly, Esq. www.insurancelawhawaii.comGroup Builders Update - Tred Eyerly, Esq. www.insurancelawhawaii.com
Group Builders Update - Tred Eyerly, Esq. www.insurancelawhawaii.com
 

More from Laina Chan

Construction Law Intensive - UNSW Edge
Construction Law Intensive - UNSW EdgeConstruction Law Intensive - UNSW Edge
Construction Law Intensive - UNSW EdgeLaina Chan
 
Handout pillar 1 regulatory reforms - laina chan bar cpd 9 march 2021
Handout   pillar 1 regulatory reforms - laina chan bar cpd 9 march 2021Handout   pillar 1 regulatory reforms - laina chan bar cpd 9 march 2021
Handout pillar 1 regulatory reforms - laina chan bar cpd 9 march 2021Laina Chan
 
Mediation, Adjudication and Arbitration - What gets the job done?
Mediation, Adjudication and Arbitration  - What gets the job done?Mediation, Adjudication and Arbitration  - What gets the job done?
Mediation, Adjudication and Arbitration - What gets the job done?Laina Chan
 
Doing deals and avoiding squeals
Doing deals and avoiding squealsDoing deals and avoiding squeals
Doing deals and avoiding squealsLaina Chan
 
Powerpoint for Legalwise Annual Property Seminar March 2016
Powerpoint for Legalwise Annual Property Seminar March 2016Powerpoint for Legalwise Annual Property Seminar March 2016
Powerpoint for Legalwise Annual Property Seminar March 2016Laina Chan
 
When Conveyances Go Wrong - Purchaser’s Remedies for Vendor Breaches
When Conveyances Go Wrong - Purchaser’s Remedies for Vendor BreachesWhen Conveyances Go Wrong - Purchaser’s Remedies for Vendor Breaches
When Conveyances Go Wrong - Purchaser’s Remedies for Vendor BreachesLaina Chan
 
Ethics Presentation
Ethics PresentationEthics Presentation
Ethics PresentationLaina Chan
 

More from Laina Chan (7)

Construction Law Intensive - UNSW Edge
Construction Law Intensive - UNSW EdgeConstruction Law Intensive - UNSW Edge
Construction Law Intensive - UNSW Edge
 
Handout pillar 1 regulatory reforms - laina chan bar cpd 9 march 2021
Handout   pillar 1 regulatory reforms - laina chan bar cpd 9 march 2021Handout   pillar 1 regulatory reforms - laina chan bar cpd 9 march 2021
Handout pillar 1 regulatory reforms - laina chan bar cpd 9 march 2021
 
Mediation, Adjudication and Arbitration - What gets the job done?
Mediation, Adjudication and Arbitration  - What gets the job done?Mediation, Adjudication and Arbitration  - What gets the job done?
Mediation, Adjudication and Arbitration - What gets the job done?
 
Doing deals and avoiding squeals
Doing deals and avoiding squealsDoing deals and avoiding squeals
Doing deals and avoiding squeals
 
Powerpoint for Legalwise Annual Property Seminar March 2016
Powerpoint for Legalwise Annual Property Seminar March 2016Powerpoint for Legalwise Annual Property Seminar March 2016
Powerpoint for Legalwise Annual Property Seminar March 2016
 
When Conveyances Go Wrong - Purchaser’s Remedies for Vendor Breaches
When Conveyances Go Wrong - Purchaser’s Remedies for Vendor BreachesWhen Conveyances Go Wrong - Purchaser’s Remedies for Vendor Breaches
When Conveyances Go Wrong - Purchaser’s Remedies for Vendor Breaches
 
Ethics Presentation
Ethics PresentationEthics Presentation
Ethics Presentation
 

Recently uploaded

Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
Indore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfIndore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfSaviRakhecha1
 
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure servicePooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...dipikadinghjn ( Why You Choose Us? ) Escorts
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdfFinTech Belgium
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...dipikadinghjn ( Why You Choose Us? ) Escorts
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfGale Pooley
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfGale Pooley
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfMichael Silva
 

Recently uploaded (20)

Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
Indore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfIndore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdf
 
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdf
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 

Insuring Risk in Construction Projects

  • 1. Insuring Risk In Construction Projects Lecture by: Laina Chan, Barrister Nine Wentworth Chambers, Sydney For: University of Melbourne
  • 2. Financiers Developers Head Contractor Design Consultant Sub-Contractors Economic viability Cash flow can be impacted upon by delays Claims against the contractor Insolvency of major parties Design risk which can be laid off to design sub-consultants Unforseen site conditions Construction risk in terms of defects supervision Responsibility for the work of subcontractors Specified, defect and warranty obligations Delay, penalties and liquidated damages claims Monitor and ensure compliance with insurance requirementsNegligence and defective design Job delivered late Job delivered with defects Increased costs Risk Diagram
  • 3. Types of Insurance – Contractors’ All Risk policies; – Industrial Special Risk policies which take over insurance of the project once the works are complete; – Professional Indemnity; – Public liability insurance; – Workers’ Compensation; – Compulsory third party motor vehicle; and – Marine cargo or transit.
  • 4. Trident General Insurance Co Ltd v McNiece Bros Pty Ltd (1988) 165 CLR 107 Applicable in the context of public liability insurance and property insurance. Common law exception to the rules of privity of contract and consideration;
  • 5. Insurance Contracts Act 1984 48(1) Where a person who is not a party to a contract of general insurance is specified or referred to in the contract, whether by name or otherwise, as a person to whom the insurance cover provided by the contract extends, that person has a right to recover the amount of the person’s loss from the insurer in accordance with the contract notwithstanding that the person is not a party to the contract. 16(1) A contract of general insurance is not void by reason only that the insured did not have, at the time when the contract was entered into, an interest in a subject-matter of the contract. 17(1) Where the insured under a contract of general insurance has suffered a pecuniary or economic loss by reason that property the subject-matter of the contract has been damaged or destroyed, the insurer is not relieved of liability under the contract by reason only that, at the time of the loss, the insured did not have an interest at law or in equity in the property.
  • 6. Contract Works Policies No cover for defective workmanship and design But what does this mean?
  • 7. Graham Evans & Co (Qld) Pty Limited v Vanguard Insurance Company Limited (1987) 4 ANZ Insurance Cases 60-772 “…all risks of physical loss of or damage to property of every kind and description (including the whole of the Contract Plant, Equipment, Materials and Supplies up to but not exceeding the respective sums insured in the Schedule owned by the Insured or for which the Insured may be responsible or, prior to any occurrence for which may be made hereunder, assumed responsibility, used or to be used in part of or incidental to the Insured’s Contracting Operations detailed in the Schedule.”
  • 8. Chalmers Leask Underwriting Agencies v May Nicholas Limited (1983) 155 CLR 279 “…loss or damage directly caused by defective workmanship, material or design or wear and tear or mechanical breakdown or normal upkeep or normal making good but so that this exclusion shall be limited to the part immediately affected and shall not apply to any other part or parts lost or damage in consequence thereof…” Vehicles passing over a coffer dam damaged the coffer dam (which was alleged to be defective). Flood waters breaching the coffer dam and caused damage to the construction works including leaving behind deposits of silt and debris. Q: Is the cost of rectifying the damage to the construction works (but not the cost of repair of the coffer dam) insured under the policy?
  • 9. Walkers Civil Engineering v Sun Alliance & London Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61- 418 • Similar exclusion clause to clause construed in Chalmers Leask • The insuring clause provided: “This section, subject to the limitations, exclusions, terms and conditions hereinafter mentioned, is to insure in respect of occurrences happening during the period stated in the Schedule against all risks of physical loss of or damage to property of every kind and description (including the whole of the contract plant, equipment, materials and supplies up to but not exceeding the respective sums Insured in the Schedule) owned by the insured or for which the Insured may be responsible or, prior to any occurrence for which claim may be made hereunder, have assumed responsibility, use or to be used in part of or incidental to the “Insured’s Contracting Operations” detailed in the Schedule wherever the said property may be located in Australia or whilst in transit within and between any place or places therein.”
  • 10. Exclusion 2(c) provided: Walkers Civil Engineering v Sun Alliance & London Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61- 418 “This insurance does not cover loss or damage directly caused by defective workmanship, construction or design or wear and tear or mechanical breakdown or normal upkeep or normal making good but this exclusion shall be limited to the part which is defective and shall not apply to any other part or parts lost or damaged in consequence thereof.”
  • 11. • Three sewerage treatment plants • Cement poured onto fibreglass sewerage tanks to counter hydrostatic ground pressure • Fibreglass tanks defective • Rectification works included the removal of the concrete Q: Is the insured entitled to indemnity for the cost of the removal of the concrete? Walkers Civil Engineering v Sun Alliance & London Insurance PLC & Ors (1999) 10 ANZ Ins Cases 61- 418
  • 12. Cementation Piling & Foundations Limited v Aegon Insurance Co Limited and Commercial Union Insurance Co PLC [1995] 1 Lloyd’s Rep 97 (1) Rectification of the gaps and/or voids in the walls; (2) Removal of the sand fill from the dock bed; and (3) Grouting and filling behind the walls of the voids from which the sand fill had escaped. The losses suffered by Cementation fell into three distinct areas:
  • 13. “… (2) the cost of replacing or rectifying defects in design, materials or workmanship unless the property insured suffers actual loss, destruction or damage as a result of such defects. Cementation Piling & Foundations Limited v Aegon Insurance Co Limited and Commercial Union Insurance Co PLC [1995] 1 Lloyd’s Rep 97 The policy excludes: However, initial costs of introducing improvements, betterments or corrections in the rectification of the design, material or workmanship causing such loss or damage shall always be excluded.”
  • 14. In deciding whether the costs of rectifying the gaps and voids in the wall (category 1) were covered by the policy, the court looked at the exclusion clauses in the policy: Cementation Piling & Foundations Limited v Aegon Insurance Co Limited and Commercial Union Insurance Co PLC [1995] 1 Lloyd’s Rep 97 “It is common ground that an exception clause cannot extend the cover from which the exception is made. It is also, however, common ground that the terms of an exception clause may provide material from which the Court can discern that the first possible meaning of the indemnity clause is to be preferred to another or second possible meaning.”
  • 15. Cross Liability Clauses • What do they mean? • What is the defence of circuity?
  • 16. Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors; Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors (2003) 12 ANZ Insurance Cases 61-547 The policy had three sections: Section C set out various terms and conditions. Section B covered legal liability under the terms of any contract maintenance or defects liability clauses for loss and/or damage in identified circumstances Section A provided insurance for loss or damage to property owned by the insured or for which the insured may have been responsible.
  • 17. Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors; Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors (2003) 12 ANZ Insurance Cases 61-547 W&D Elliot Earthmoving Pty Ltd (Elliot) DN Pearce & Maintenance Pty Ltd (Pearce) Connell Wagner Coffey Transfield (Head Contractor) Transfield Bouygues JV Transfield Holdings Pty Ltd JV to construct a section of railway Subcontracted with
  • 18. (a) Pay on behalf of the Insured all sums which the Insured shall become legally obligated to pay as compensation for: … (2) loss of and/or damage to and/or destruction of property and/or the Loss of Use thereof; in respect of and/or arising out of Occurrences happening anywhere in the Geographical Limits during the Period of Insurance in connection with the Construction Operation and/or Other Business Operations and/or Products Liability/Completed Operations and/or Property Insured detailed in the Schedule.” The Insuring Clause provided relevantly: “The Insurers hereby agree, subject to the limitations, terms and conditions hereafter mentioned, that they will: Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors; Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors (2003) 12 ANZ Insurance Cases 61-547
  • 19. “Exclusions applicable to Section C This section shall not apply to liability: … for damage to property owned by the insured” Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors; Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors (2003) 12 ANZ Insurance Cases 61-547
  • 20. The cross liability clause provided: • “Each of the persons comprising the Insured shall for the purposes of this policy be considered a separate and distinct unit and the words “the Insured” shall be considered as applying to each of such persons in the same manner as if a separate policy had been issued to each of them in his name alone and the Insurers waive all rights of subrogation or action which they may have or acquire against any of such persons. Provided that nothing in this clause shall be deemed to increase the limit of the Insurers’ liability under this policy in respect of any one occurrence. Transfield Pty Limited v National Vulcan Engineering Ins Group Ltd & Ors; Connell Wagner Pty Ltd National Vulcan Engineering Ins Group Ltd & Ors (2003) 12 ANZ Insurance Cases 61-547
  • 21. Waiver of Subrogation How wide is too ? Does a waiver of subrogation clause only apply to claims covered by the policy?
  • 22. GPS Power Pty Ltd v Gardiner Willis Associates Pty Ltd [2000] QSC 075 • The insurers agreed that “in the event of the insurers indemnifying or making a payment to any insured(s), the insurers shall not exercise any rights of subrogation against any other insured(s) hereunder.” • The insurers also agreed “to waive any rights and remedies or relief to which they may become entitled by subrogation against … [a]ny insured named or described by this policy.”
  • 23. Larson-Juhl Australia LLC v Jaywest International Pty Ltd (2000) 11 ANZ Ins Cases 61-472 and 61-500 The New South Wales Court of appeal affirmed the decision of Master MacReady who construed the following clause literally and held that there was nothing in the clause to confine the generality of the phrase “shall waive any rights and remedies or relief” : 1. Any co-insured (including its directors, officers and employees); 2. Any corporation or entity (including its directors, officers and employees) owned or controlled by any insured or against any co-owner of the property insured.” “14.8.1 The insurer shall waive any rights and remedies or relief to which it is or may become entitled by subrogation against:
  • 24. Thiess Contractors Pty Ltd v Norcon Pty Ltd (2001) 11 ANZ Ins cases 61-509 Should a plaintiff who had suffered loss as a result of a defendant’s negligence, but is the beneficiary of an insurance policy covering that loss, have the sum that it has received from the insurer taken into account to reduce the damages recoverable from the defendant?
  • 25. “5. Further or alternatively, if the second third party [the respondent] breached clause 8.04 of the Norcon Subcontract as alleged or at all, which is not admitted, then:- (a) at all material times the first third party [the appellant] had taken out its own public liability policy of insurance (‘the Policy’), the further particulars of which the second third party is not presently aware; (b) the first third party has made a claim, or is entitled to make a claim, pursuant to the Policy with respect to any liability that it has in these proceedings; (c) further or alternatively to subparagraph (b) above, the first third party has been granted indemnity pursuant to, or is entitled to be granted indemnity pursuant to, the Policy; (d) by reason of the matters pleaded above, there is no loss or liability in respect of which the first third party is entitled to claim indemnity pursuant to any other policy of insurance; (e) the insurer or insurers on the Policy are not entitled to exercise a right of subrogation so as to claim pursuant to another policy of insurance on behalf of the first third party; (f) the first third party has suffered no loss by reason of any breach by the second third party of clause 8.04 of the Norcon Subcontract.” In its defence, Norcon denied that it was a joint tortfeasor with Thiess Contractors. It also pleaded the following paragraph: Thiess Contractors Pty Ltd v Norcon Pty Ltd (2001) 11 ANZ Ins cases 61-509