IMS Systems Integration - Health Check

IMS Integrated Master Schedule
Systems Integration - Health Check
Start and Finish Dates
Baseline vs Estimated
Remaining Work - Baseline and Estimated
Performance Measurement Techniques
Percent Complete Work Complete
CWBS WBS CA WP
Control accounts
Contract Work Breakdown Structure
Work Packages

  • Login to see the comments

  • Be the first to like this

IMS Systems Integration - Health Check

  1. 1. IMS - Systems Integration Health Assessment
  2. 2. IMS Integration Summary Condition: Number of WPs with Delta/Mismatch out of 958 WPs PMT IMS vs. DB2 38 Perc. Compl Compared 86 Baseline Start IMS vs. DB2 In Days (rounded to 0 dec.) 42 Baseline Finish IMS vs. DB2 In Days (rounded to 0 dec.) 69 Estimated Start IMS vs. DB2 In Days (rounded to 0 dec.) 298 Estimated Finish IMS vs. DB2 In Days (rounded to 0 dec.) 392 Baseline Work IMS vs. DB2 in HRS BCWS 58 Remaining Work IMS vs. DB2 in HRS ETC 150 All Dates Validations 423 Validation for All Conditions For All WPs (Note: 1 WP can have 1+ conditions) 506 Schedule Integration Validation Results
  3. 3. Integration Abbreviations Navigation Interpretation Instructions Corrective Actions Legend for PMT Compared Column: Legend for PercCompl Compared column: 1 - PMT match 1 - match for C PMT type 0 - mismatch 0 - mismatch for C PMT type or WP does not exist in Cobra 2- not % Complete PMT Legend for Interpretation Columns: Green - Match Red - Mismatch Filter Column Named To get the following Results Criteria (Select from Filter list) "Validation for All Conditions for All WPs" To get WPs with all mismatched areas "Check WP" CAM To your specific CAM Cam Name - e.g."GICK" All Dates Validations To filter only date related mismatches "Check Dates" All Filter Column Named To get the following Results Button Name (CLICK) "Validation for All Conditions for All WPs" To get WPs with all mismatched areas Filter All Deltas All Dates Validations To filter only date related mismatches Filter All Dates Deltas All To get any results or to filter; Filter must be ON Filter On/Off (must be on) How to filter manually: How to filter using Buttons - Macros Must Be ENABLED To get any results or to filter; Filter must be ON (either use button "Filter On/Off" or got select headers row ther go to menu and select Data then Filter then Autofilter)
  4. 4. Check Baseline Start And Finish Dates
  5. 5. Check Estimated Start And Finish Dates
  6. 6. Check Performance Measurement Techniques And Percent Complete
  7. 7. Check BCWS and ETC Remaining Work
  8. 8. Check Baseline And Estimated Start And Finish Dates
  9. 9. Final PMT % Complete BCWS ETC Check
  10. 10. Summary for All Conditions
  11. 11. IMS - Systems Integration Health Assessment INSTRUCTIONS FOR PERFORMING INTEGRITY CHECK
  12. 12. FILTER BUTTON WILL ENABLEFILTER BUTTON WILL ENABLE LISTING ONLY WORKLISTING ONLY WORK PACKAGES SUBJECTPACKAGES SUBJECT TO CORRECTIVE ACTIONTO CORRECTIVE ACTION
  13. 13. FILTER All Dates Deltas BUTTONFILTER All Dates Deltas BUTTON WILL ENABLEWILL ENABLE LISTING ONLY WORKLISTING ONLY WORK PACKAGES with misaligned datesPACKAGES with misaligned dates SUBJECTSUBJECT TO CORRECTIVE ACTIONTO CORRECTIVE ACTION
  14. 14. BCWS and ETC Start and Finish Dates Results
  15. 15. BCWS and ETC Start and Finish Dates Results
  16. 16. FILTER All Deltas BUTTON WILL LISTFILTER All Deltas BUTTON WILL LIST ALL Misaligned WORKALL Misaligned WORK PACKAGES SUBJECTPACKAGES SUBJECT TO CORRECTIVE ACTIONTO CORRECTIVE ACTION
  17. 17. Results for All Conditions
  18. 18. PMT Technique
  19. 19. % Complete
  20. 20. Baseline Work Remaining
  21. 21. Estimated Work Remaining
  22. 22. IMS Integration Summary Condition: Number of WPs with Delta/Mismatch out of 958 WPs PMT IMS vs. DB2 38 Perc. Compl Compared 86 Baseline Start IMS vs. DB2 In Days (rounded to 0 dec.) 42 Baseline Finish IMS vs. DB2 In Days (rounded to 0 dec.) 69 Estimated Start IMS vs. DB2 In Days (rounded to 0 dec.) 298 Estimated Finish IMS vs. DB2 In Days (rounded to 0 dec.) 392 Baseline Work IMS vs. DB2 in HRS BCWS 58 Remaining Work IMS vs. DB2 in HRS ETC 150 All Dates Validations 423 Validation for All Conditions For All WPs (Note: 1 WP can have 1+ conditions) 506 Schedule Integration Validation Results

×