OSL takes pride in the competence, professionalism and quality of our people. We currently employ more than 100 highly capable individuals, across a full spectrum of disciplines and experience, ranging from Project Directors, Principal Engineers and Testers in Charge with 20+ years of rail experience through to assistant designers, IRSE Module 5 testers and technical support staff.
2. 02 osl global
The purpose of this statement is to provide a quick reference for the capabilities
of OSL's E&P team, Capability and Capacity.
OSL Rail was established in 2010 to provide signalling and multi-disciplinary
engineering, technical and project delivery support and consultancy services
to clients in the UK and internationally. Since company formation we have
rapidly established ourselves as one of the leading independent signalling
design and testing companies in the UK market and we are currently working
towards achieving similar status outside of the UK.We have worked on a range
of major high profile rail industry projects and programmes in a variety of roles.
An exemplary track record has led to OSL becoming the delivery partner
of choice with many major rail industry companies on both the client and
supply-side.
3. 03 e&p
All of our people are experienced rail professionals
with more than 500 years of combined experience
of working across all major railway sectors including:
• Main Line;
• High Speed;
• Heavy Rail Metro;
• Light Rail and;
• Tram systems.
Whilst our focus to date has been within the
UK, our work force has extensive experience
in both the UK and in a wide range of other
countries and regions including: the Middle East,
North America, Europe, Asia and Australasia.
“OSLtakepridein
thecompetence,
professionalism
and
quality
of
our
people.”
OSL takes pride in the competence, professionalism and quality of our
people. We currently employ more than 100 highly capable individuals,
across a full spectrum of disciplines and experience, ranging from Project
Directors, Principal Engineers and Testers in Charge with 20+ years of
rail experience through to assistant designers, IRSE Module 5 testers
and technical support staff.
Development & Sustainability
One of the key elements of OSL’s strategy for
creating a sustainable business is to encourage and
support the professional development of our people.
This ranges from mentoring and coaching,sponsoring
staff through training, accreditation courses and
encouraging skill development.
Supported by approved competence management
systems, our attrition rates are far below industry
averages, allowing us to pass on the benefits of
highly experienced and cost effective resources to
our clients.
people
OSL are also an approved IRSE Assessing Agency with
a dedicated Training Academy as part of a long-term
plan to tackle industry competence shortages.
Registered
26408
4. 04 e&p
We currently have an efficient team of:
• Fifteen (15) designers
(of various status and qualifications)
• Supported by four (4) Graduates and (15)
technician Grades
• We have a growth plan and strategy to increase
to sixty (60) in our current Warrington location
alone and ten (10) both in Crewe and Swindon.
Covering (but not limited to) the following disciplines:
• Electrical,
• Mechanical,
• Civil,
• Structural,
• BIM, 2D 3D CAD
The team structure supports:
• CRE’s,
• CEM’s, that can cover across the disciplines to
manage the multi-discipline design delivery.
• Principal, Senior and Design Engineers,
• CAD and technician levels
In addition to the above,OSL are able to undertake
Building services, MEICA and process design for
Water, Waste Water, Energy from Waste and
both commercial Industrial and buildings from the
Warrington office. This allows OSL to undertake
station works and refurbishments.
Skill / Experience
Our core team has strength in EP design and
the project management of installations, with a
recent addition of installation and testing divisions.
OSL have developed a skills matrix to ensure we
are able to undertake all the areas of EP with
depth of named labour to ensure designs are fully
developed into construction drawings and not
simply just proposals.
development of resource
OSL have developed a structured training
programme to acquire and train resources of
varying skilled backgrounds directly from other
industries as well as developing apprenticeship
and graduate training schemes.
With resources situated nationwide, OSL currently undertake the majority of
all EP and fixed plant design from the Warrington office with manufacture,
installation and management capabilities based at Crewe. We also carry out
EP Design in both Swindon (Wiltshire) and Crewe (Cheshire) in support of
other discipline lead projects and to provide resource toWarrington. OSL also
plan to open an office in Stevenage (Hertfordshire) and locations to be advised
inWales, London and the East of England.
“OSL have a solid reputation for
delivery, quality, and an integrity
that results from years of building
relationships with our clients”
capability
Our long-term aim is to train up future resource from
the grass- roots to provide a stable resource pool to
the benefit of OSL and the Rail industry as a whole.
5. 05 ep
The typical survey work undertaken:
• LV and HV substations;
• Power cabling and routes, UTX/OTX;
• Power / load monitoring;
• Signalling Supply Point/ PSP;
• Auxiliary Power Supply Points;
• Functional Supply Points;
• Points heating;
• Lighting; depots, track side, stations;
• Building Services;
• CCTV.
design
The EP team has been involved at all levels of GRIP
design and covers the following areas:
• Signalling Power supplies
• Functional Supply Point cabinets
• Signalling Supply Point/ PSP, including enclosures
• Auxiliary Power Supply Points, including enclosures
• LV and HV substations
• Cables sizing and routing
• Points heating
• Lighting for; depots, track side and stations
• Building Services for; stations, switching building,
ancillary track buildings
• Lifts and escalators
• CCTV system and networks
• Minor civils for EP structures
• Integration with SCADA
• UPS Design
• DNO power supply upgrades
• REB Upgrades.
The OLE Survey capability is supported by our use of a 360-degree camera
system, which we use to provide a view unique to the site. The 360 view
assists with design and can be annotated with information and measurements
made from the view and captures used for reporting and directly importing
into BIM tools.
The ease of date interpretation results in upmost efficiency. A major benefit
of the package is the health and safety application of using it in locations to
reduce staff visits.
Installation Testing
OSL have a team that can install and test the work
designed by the EP designers either in-house design
or external design.
Our construction teams are led by –
• Two (2) construction CRE’s, and supported by
• Eighteen (18) strong team leaders and installers.
Our Test and Commission team comprise of –
• One (1) Level A,
• Two (2) Level B’s,
• Several Level C and D authorised personnel.
Enabling us to access,undertake isolations and work
on HV Substations.
We are in process of developing further Payee staff
to enable them to undertake Level B courses and
provide them (through our partners and clients)
sufficient switching experience to maintain their
logbooks and competences. Our commissioning
team of five (5) supports all of our works and are
a progressive addition to our signalling TC team.
survey
6. 06 ep
• West Coast Main Line: Managing standard for
the electrification, ME and EP
• ChannelTunnel Rail Link: (HS1) leading design
team for:
ž Fire mains; design, structural calculations and
manufacturing drawings
ž Tunnel ventilation; modelling and design
ž Track, tunnel and ground water drainage
pumping stations; modelling, design, control
and equipment selection
ž Temporary works design for; ventilation,
pumping and services.
• Aqaba, Jordan Development Project:
A condition survey of railway / port loading
yards for phosphates.
• HV AC/DC traction power supply protection
upgrade Mersey rail (15 Substation).
• Installation of DC rectifier substations on the
Manchester Airport line, also installation of 6
11Kv AC RMU/ Switchgear / HV/LV cable
routing and earthling requirements.
• 15 Cross Rail Stations - platform extensions
– Maidenhead Area. 650v Signalling Supply
upgrade / DNO upgrade.
• Sandy Station Upgrades, DNO Upgrades/
Station, Car park lighting / DOO cameras.
• Wimbledon Bogie Drop, DC Conductor Rail
Alterations / new switchgear.
• 25kVA OLE Power Design for Ardwick depot,
HV Distribution, LV Distribution, Protection
relay and SCADA interface design.
• GSMR locations in the Derby Area, – 33 new
DNO’s, sub distribution Earthing.
• Nottingham Station Footbridge Redevelopment
- Electrical Lighting scheme detailed design.
• 650V Signalling Supplies / Points heating /
New DNO’s and new REB PSPVarious
DNO upgrades, New REB installations,
cable calculations, lighting (Lux Surveys) and
calculations, use of Bender insulation monitoring
equipment, isolation transformers, UPS systems,
earthing touch potential design. CRE duties
undertaken, site visits, dilapidation reports, load
monitoring installation, electrical testing for
voltage, ELI PSCC information for calculations.
Most of the works included points heating
upgrades as part of the renewals for;
• Blackpool North No.1 Signal Box Abolition,
Chinley Doveholes, Ardmore Level Crossing
Renewals (Scotland), Glan Conway,Townley
• Level Crossing Signal Box upgrade, Garstang
Catteral, Hogton level Crossing Upgrade,
Bangor, Hest Bank, (GRIP 45), Crossfields
and Littons Mill (GRIP 45), Prescot, Huyton,
FurnessVale, Carterhouse, Croes Newydd,
Willaston, Chorley Signal Box Abolition, St
Helens, Plean, Rainhill,Todmordon and Olive
Mount Chord Scheme Wavertree Liverpool
• WCML Junction; lighting 65 sites
• Midland Main Line Junction; lighting 15 sites
• Various Station Building Services including;
Windermere,Ayreshire Platform Extension
works, Derby GSM-R Design, Glasgow Queen
Street CIS LLPA works
• User Controlled Crossings; 650 sites
• DDA upgrade schemes London Area
• Coventry Berkswell; 650V Re-signalling Scheme
• Paisley Corridor OLE EP New installation
• UPS 650V Upgrades around the Wigan Area
• Eurostar Depot Stratford, OlympicVillage
modification works
• Maryport 650V Renewals
• Southampton SC Renewals (minor works).
Our team has experience of and worked on the following projects:
relevant
experience
7. SLGlobal
www.oslglobal.com
Crewe
The Railway Exchange,Weston Road, Crewe, Cheshire, CW1 6AA
Swindon
Alexander House, 19 Fleming Way, Swindon,Wiltshire, SN1 2NG
Warrington
Webster Court, Carina Place, Gemini Business Park,Warrington,WA5 8WD
“OSL
have
a
w
ealth
of
industry
experience
gained
in
the
undertaking
of
w
orks
on
many
UK
and
Overseas
Rail
infrastructures”
contact
enquiries@
o-s-l.uk.com
tel:0044
(0)845
271
9171