RELIABILITY
EXCELLENCE
THE POWER TO IMPROVE ASSET PERFORMANCE
INTRODUCTION TO
The Business Case for Reliability
Reliability Excellence has helped manufacturers:
Increase capacity
Increase product availability
Reduce cost of goods sold
Improve overall equipment effectiveness (OEE)
Reduce maintenance costs and spending
+
+
+
-
-
Implementing Reliability Excellence
Examples of Business Results:
CLIENT RESULTS ROI
Pharma Products Increased capacity 15%
Reduced COGS 5%
ROI > 20:1 (18 months)
Healthcare Products Increased availability >15%
Improved OEE 10%
Reduced maintenance costs 20%
ROI > 15:1 (3 years)
Primary Metals (34 Plants) Reduced maintenance spending 10%
Increased capacity (% confidential)
ROI 5:1 to 16:1 (3 years)
Metals Processing Reduced maintenance spending 20%
Increased anode capacity 10%
Increased aluminum capacity 4%
ROI 16:1 (3 years)
Steel Increased capacity through OEE
Improvements of greater than 2%
ROI > 11:1 (3 years)
Beverage Increased capacity of high speed
process >25%
Reduced COGS 10%
ROI > 20:1 (24 months to date)
By designing reliability into daily plant operations and creating a culture of prevention and improvement, plants can
operate as safer, more productive and more profitable businesses.
The Reliability Excellence Journey
The Reliability Excellence journey
requires building the foundation of
principles and culture, establishing and
optimizing the processes and procedures
that create reliability, and putting in place
the management and reporting elements
that drive sustainability and continuous
improvement.
A Three-Wave Approach to the Rx Journey
Wave 1: Education and Communication
Activities Include:
• Conducting initial strategic planning workshops
• Executive-level introduction to the principles of Rx
• Integrating reliability improvement initiative with the overall business plan
• Developing manufacturing objectives, goals and targets
• Establishing a cross-functional leadership team to sponsor the Rx
program
Wave 2: Assessment, Master Planning and Business
Case Development
Activities Include:
• Identifying key opportunities using Rx assessment methodologies
• Developing the Master Plan for Rx implementation
• Quantifying the business case for Rx implementation
• Establishing the change management structure required to support
implementation
Wave 2: Assessment Using the Reliability Excellence Model
The objective of the assessment is to
examine and evaluate current reliability
processes and practices as compared to
industry-accepted best practices. This
analysis is used to build an Rx
implementation Master Plan and a
business case that supports the plan.
Reliability Excellence Model
Founded on the values and tools of Six Sigma and incorporates the principles and strengths of Lean Manufacturing, Total Productive Maintenance, Total
Quality Management, Maintenance Excellence™ and similar programs that define best practices, into a single, holistic, continuous improvement process.
.
Wave 2: Benefits of Performing an Rx Assessment
In addition to building organizational awareness, alignment and buy-in,
the process delivers:
• Widespread understanding of the current state of operations and the
gaps that exist between the current state and Rx best practices
• Leadership commitment to the initiative
• A defined roadmap – the Master Plan – that will lead to the future state
• A cost/benefit business case that supports the financial justification to
undertake the initiative
• The identification of prospective change agents who will actively drive
and sustain the new organizational culture
Wave 3: Master Plan Implementation, Measurement
and Follow-up
Activities Include:
• Establishing leadership and focus team structure to execute the
Master Plan
• Providing Rx subject matter and leading change training to
accelerate the design process
• Supporting development of business processes with dedicated
subject-matter coaching
• Continually monitoring project progress against agreed-upon
deliverables and timeline
• Proactively managing culture change to ensure early adoption of
new business processes
Visit PoweredByRx.com to learn more about Reliability Excellence
and access more than 400 resources related to reducing risk,
improving performance and engaging employees.

More Related Content

What's hot

Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationAndy_Watson_Sim
 
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997Ricky Smith CMRP, CMRT
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Sanjeev Deshmukh
 
Asset management iso 55001: Getting more value from your assets
Asset management iso 55001: Getting more value from your assetsAsset management iso 55001: Getting more value from your assets
Asset management iso 55001: Getting more value from your assetsAlain D'Hoe
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Shutdown Turnaround and Outage Competency Improvement Program
Shutdown Turnaround and Outage Competency Improvement ProgramShutdown Turnaround and Outage Competency Improvement Program
Shutdown Turnaround and Outage Competency Improvement ProgramLife Cycle Engineering
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityRicky Smith CMRP, CMRT
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systemsAnil Mohindru
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type suresh tusia
 
Webinar decision-making - Part 3: KPI Management
Webinar decision-making - Part 3: KPI ManagementWebinar decision-making - Part 3: KPI Management
Webinar decision-making - Part 3: KPI ManagementStork
 
Reliability and Maintenance in production Management
Reliability and Maintenance in production ManagementReliability and Maintenance in production Management
Reliability and Maintenance in production ManagementNazneen sheikh
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineeringAnirudh Goyal
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenanceJames Shearer
 
Risk Based Inspection Services
Risk Based Inspection ServicesRisk Based Inspection Services
Risk Based Inspection ServicesKeel Solution
 

What's hot (20)

Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance Presentation
 
WORLD CLASS MANUFACTURING
WORLD CLASS MANUFACTURINGWORLD CLASS MANUFACTURING
WORLD CLASS MANUFACTURING
 
SHUTDOWN
SHUTDOWNSHUTDOWN
SHUTDOWN
 
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Asset management iso 55001: Getting more value from your assets
Asset management iso 55001: Getting more value from your assetsAsset management iso 55001: Getting more value from your assets
Asset management iso 55001: Getting more value from your assets
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Shutdown Turnaround and Outage Competency Improvement Program
Shutdown Turnaround and Outage Competency Improvement ProgramShutdown Turnaround and Outage Competency Improvement Program
Shutdown Turnaround and Outage Competency Improvement Program
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type
 
ISO 55000 Overview
ISO 55000 OverviewISO 55000 Overview
ISO 55000 Overview
 
Machinery Maintenance
Machinery MaintenanceMachinery Maintenance
Machinery Maintenance
 
Webinar decision-making - Part 3: KPI Management
Webinar decision-making - Part 3: KPI ManagementWebinar decision-making - Part 3: KPI Management
Webinar decision-making - Part 3: KPI Management
 
Reliability and Maintenance in production Management
Reliability and Maintenance in production ManagementReliability and Maintenance in production Management
Reliability and Maintenance in production Management
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineering
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
World Class Maintenance WebEx Slides
World Class Maintenance WebEx SlidesWorld Class Maintenance WebEx Slides
World Class Maintenance WebEx Slides
 
Risk Based Inspection Services
Risk Based Inspection ServicesRisk Based Inspection Services
Risk Based Inspection Services
 

Viewers also liked

ISO 55000: Asset Management System Workshop
ISO 55000: Asset Management System WorkshopISO 55000: Asset Management System Workshop
ISO 55000: Asset Management System WorkshopLife Cycle Engineering
 
8 Factors to Fix a Dysfunctional Storeroom
8 Factors to Fix a Dysfunctional Storeroom8 Factors to Fix a Dysfunctional Storeroom
8 Factors to Fix a Dysfunctional StoreroomLife Cycle Engineering
 
5 Biggest Risks to Effective Asset Management
5 Biggest Risks to Effective Asset Management5 Biggest Risks to Effective Asset Management
5 Biggest Risks to Effective Asset ManagementLife Cycle Engineering
 
Cybersecurity Risk Management Framework Strategy Workshop
Cybersecurity Risk Management Framework Strategy WorkshopCybersecurity Risk Management Framework Strategy Workshop
Cybersecurity Risk Management Framework Strategy WorkshopLife Cycle Engineering
 
Institute of Asset Management Certificate Workshop
Institute of Asset Management Certificate WorkshopInstitute of Asset Management Certificate Workshop
Institute of Asset Management Certificate WorkshopLife Cycle Engineering
 
Hack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Hack Warz® Cyber Attack: A Hands-On Lab for Network DefendersHack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Hack Warz® Cyber Attack: A Hands-On Lab for Network DefendersLife Cycle Engineering
 
World class factory equipment spare parts program
World class factory equipment spare parts programWorld class factory equipment spare parts program
World class factory equipment spare parts programs_bhut
 

Viewers also liked (11)

ISO 55000: Asset Management System Workshop
ISO 55000: Asset Management System WorkshopISO 55000: Asset Management System Workshop
ISO 55000: Asset Management System Workshop
 
8 Factors to Fix a Dysfunctional Storeroom
8 Factors to Fix a Dysfunctional Storeroom8 Factors to Fix a Dysfunctional Storeroom
8 Factors to Fix a Dysfunctional Storeroom
 
5 Biggest Risks to Effective Asset Management
5 Biggest Risks to Effective Asset Management5 Biggest Risks to Effective Asset Management
5 Biggest Risks to Effective Asset Management
 
Cybersecurity Risk Management Framework Strategy Workshop
Cybersecurity Risk Management Framework Strategy WorkshopCybersecurity Risk Management Framework Strategy Workshop
Cybersecurity Risk Management Framework Strategy Workshop
 
Stakeholder Risk Management
Stakeholder Risk ManagementStakeholder Risk Management
Stakeholder Risk Management
 
Institute of Asset Management Certificate Workshop
Institute of Asset Management Certificate WorkshopInstitute of Asset Management Certificate Workshop
Institute of Asset Management Certificate Workshop
 
Hack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Hack Warz® Cyber Attack: A Hands-On Lab for Network DefendersHack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
Hack Warz® Cyber Attack: A Hands-On Lab for Network Defenders
 
Competency Based Learning
Competency Based LearningCompetency Based Learning
Competency Based Learning
 
Leading high performance teams
Leading high performance teamsLeading high performance teams
Leading high performance teams
 
World class factory equipment spare parts program
World class factory equipment spare parts programWorld class factory equipment spare parts program
World class factory equipment spare parts program
 
Maintenance Management Certification
Maintenance Management CertificationMaintenance Management Certification
Maintenance Management Certification
 

Similar to Introduction to Reliability Excellence

Key changes of ISO 9001:2015
Key changes of ISO 9001:2015Key changes of ISO 9001:2015
Key changes of ISO 9001:2015Bahar Hasan
 
John Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceJohn Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceAlan LeBihan
 
Lakshya corporate prz
Lakshya corporate przLakshya corporate prz
Lakshya corporate przpradeep sale
 
Basic concepts of Total Quality Management
Basic concepts of Total Quality ManagementBasic concepts of Total Quality Management
Basic concepts of Total Quality Managementmangadynasty5
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality ManagementZia Mohi U Din
 
IRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational PerformanceIRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational PerformanceIRJET Journal
 
SSCG Automotive Manufacturing Quality Management
SSCG Automotive Manufacturing Quality ManagementSSCG Automotive Manufacturing Quality Management
SSCG Automotive Manufacturing Quality ManagementSSCG Consulting
 
CAST - Next gen sourcing for application services​
CAST - Next gen sourcing for application services​CAST - Next gen sourcing for application services​
CAST - Next gen sourcing for application services​Xavier Escudero Sabadell
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance ExcellenceDavid McDonald
 
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET-  	  Quality begets Quantity: Total Quality Management in Indian Servic...IRJET-  	  Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...IRJET Journal
 
Critical success factors of Total Quality Management implementation in Indian...
Critical success factors of Total Quality Management implementation in Indian...Critical success factors of Total Quality Management implementation in Indian...
Critical success factors of Total Quality Management implementation in Indian...IRJET Journal
 
Operational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerOperational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerAnirban Mazumdar
 
ITIL Practical Guide - Continual Service Improvement (CSI)
ITIL Practical Guide - Continual Service Improvement (CSI)ITIL Practical Guide - Continual Service Improvement (CSI)
ITIL Practical Guide - Continual Service Improvement (CSI)Axios Systems
 
SSCG Automotive Manufacturing Quality Management
SSCG Automotive Manufacturing Quality ManagementSSCG Automotive Manufacturing Quality Management
SSCG Automotive Manufacturing Quality ManagementSSCG Consulting
 

Similar to Introduction to Reliability Excellence (20)

Key changes of ISO 9001:2015
Key changes of ISO 9001:2015Key changes of ISO 9001:2015
Key changes of ISO 9001:2015
 
John Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceJohn Alan LeBihan Success and Experience
John Alan LeBihan Success and Experience
 
Lakshya corporate prz
Lakshya corporate przLakshya corporate prz
Lakshya corporate prz
 
Basic concepts of Total Quality Management
Basic concepts of Total Quality ManagementBasic concepts of Total Quality Management
Basic concepts of Total Quality Management
 
pip.ppt
pip.pptpip.ppt
pip.ppt
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
IRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational PerformanceIRJET- Total Quality Management and Organizational Performance
IRJET- Total Quality Management and Organizational Performance
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
SSCG Automotive Manufacturing Quality Management
SSCG Automotive Manufacturing Quality ManagementSSCG Automotive Manufacturing Quality Management
SSCG Automotive Manufacturing Quality Management
 
CAST - Next gen sourcing for application services​
CAST - Next gen sourcing for application services​CAST - Next gen sourcing for application services​
CAST - Next gen sourcing for application services​
 
A project report on TQM
A project report on TQMA project report on TQM
A project report on TQM
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance Excellence
 
ISO 900:2015
ISO 900:2015 ISO 900:2015
ISO 900:2015
 
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET-  	  Quality begets Quantity: Total Quality Management in Indian Servic...IRJET-  	  Quality begets Quantity: Total Quality Management in Indian Servic...
IRJET- Quality begets Quantity: Total Quality Management in Indian Servic...
 
SCM sostenibilidad
SCM sostenibilidadSCM sostenibilidad
SCM sostenibilidad
 
Critical success factors of Total Quality Management implementation in Indian...
Critical success factors of Total Quality Management implementation in Indian...Critical success factors of Total Quality Management implementation in Indian...
Critical success factors of Total Quality Management implementation in Indian...
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Operational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerOperational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturer
 
ITIL Practical Guide - Continual Service Improvement (CSI)
ITIL Practical Guide - Continual Service Improvement (CSI)ITIL Practical Guide - Continual Service Improvement (CSI)
ITIL Practical Guide - Continual Service Improvement (CSI)
 
SSCG Automotive Manufacturing Quality Management
SSCG Automotive Manufacturing Quality ManagementSSCG Automotive Manufacturing Quality Management
SSCG Automotive Manufacturing Quality Management
 

More from Life Cycle Engineering

LCE Corporate Capabilities Brief-Life Cycle Talent
LCE Corporate Capabilities Brief-Life Cycle TalentLCE Corporate Capabilities Brief-Life Cycle Talent
LCE Corporate Capabilities Brief-Life Cycle TalentLife Cycle Engineering
 
SMRP Body of Knowledge Guided Study Slide Share
SMRP Body of Knowledge Guided Study Slide ShareSMRP Body of Knowledge Guided Study Slide Share
SMRP Body of Knowledge Guided Study Slide ShareLife Cycle Engineering
 
10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea ProductionLife Cycle Engineering
 
Reliability Engineering Certification Program
Reliability Engineering Certification ProgramReliability Engineering Certification Program
Reliability Engineering Certification ProgramLife Cycle Engineering
 
ISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyLife Cycle Engineering
 
Planning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages WorkshopPlanning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages WorkshopLife Cycle Engineering
 
Leadership for Shutdowns, Turnarounds and Outages Workshop
Leadership for Shutdowns, Turnarounds and Outages WorkshopLeadership for Shutdowns, Turnarounds and Outages Workshop
Leadership for Shutdowns, Turnarounds and Outages WorkshopLife Cycle Engineering
 
Introduction to Agile Software Development
Introduction to Agile Software DevelopmentIntroduction to Agile Software Development
Introduction to Agile Software DevelopmentLife Cycle Engineering
 

More from Life Cycle Engineering (10)

LCE Corporate Capabilities Brief-Life Cycle Talent
LCE Corporate Capabilities Brief-Life Cycle TalentLCE Corporate Capabilities Brief-Life Cycle Talent
LCE Corporate Capabilities Brief-Life Cycle Talent
 
SMRP Body of Knowledge Guided Study Slide Share
SMRP Body of Knowledge Guided Study Slide ShareSMRP Body of Knowledge Guided Study Slide Share
SMRP Body of Knowledge Guided Study Slide Share
 
10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production10 Factors that May Affect the Future of Subsea Production
10 Factors that May Affect the Future of Subsea Production
 
Reliability Engineering Certification Program
Reliability Engineering Certification ProgramReliability Engineering Certification Program
Reliability Engineering Certification Program
 
ISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management Policy
 
Planning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages WorkshopPlanning for Shutdowns, Turnarounds and Outages Workshop
Planning for Shutdowns, Turnarounds and Outages Workshop
 
Leadership for Shutdowns, Turnarounds and Outages Workshop
Leadership for Shutdowns, Turnarounds and Outages WorkshopLeadership for Shutdowns, Turnarounds and Outages Workshop
Leadership for Shutdowns, Turnarounds and Outages Workshop
 
Introduction to Agile Software Development
Introduction to Agile Software DevelopmentIntroduction to Agile Software Development
Introduction to Agile Software Development
 
Lean Maintenance Training
Lean Maintenance Training Lean Maintenance Training
Lean Maintenance Training
 
Leading a Lean Implementation
Leading a Lean ImplementationLeading a Lean Implementation
Leading a Lean Implementation
 

Recently uploaded

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Recently uploaded (20)

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 

Introduction to Reliability Excellence

  • 1. RELIABILITY EXCELLENCE THE POWER TO IMPROVE ASSET PERFORMANCE INTRODUCTION TO
  • 2. The Business Case for Reliability Reliability Excellence has helped manufacturers: Increase capacity Increase product availability Reduce cost of goods sold Improve overall equipment effectiveness (OEE) Reduce maintenance costs and spending + + + - -
  • 3. Implementing Reliability Excellence Examples of Business Results: CLIENT RESULTS ROI Pharma Products Increased capacity 15% Reduced COGS 5% ROI > 20:1 (18 months) Healthcare Products Increased availability >15% Improved OEE 10% Reduced maintenance costs 20% ROI > 15:1 (3 years) Primary Metals (34 Plants) Reduced maintenance spending 10% Increased capacity (% confidential) ROI 5:1 to 16:1 (3 years) Metals Processing Reduced maintenance spending 20% Increased anode capacity 10% Increased aluminum capacity 4% ROI 16:1 (3 years) Steel Increased capacity through OEE Improvements of greater than 2% ROI > 11:1 (3 years) Beverage Increased capacity of high speed process >25% Reduced COGS 10% ROI > 20:1 (24 months to date) By designing reliability into daily plant operations and creating a culture of prevention and improvement, plants can operate as safer, more productive and more profitable businesses.
  • 4. The Reliability Excellence Journey The Reliability Excellence journey requires building the foundation of principles and culture, establishing and optimizing the processes and procedures that create reliability, and putting in place the management and reporting elements that drive sustainability and continuous improvement.
  • 5. A Three-Wave Approach to the Rx Journey
  • 6. Wave 1: Education and Communication Activities Include: • Conducting initial strategic planning workshops • Executive-level introduction to the principles of Rx • Integrating reliability improvement initiative with the overall business plan • Developing manufacturing objectives, goals and targets • Establishing a cross-functional leadership team to sponsor the Rx program
  • 7. Wave 2: Assessment, Master Planning and Business Case Development Activities Include: • Identifying key opportunities using Rx assessment methodologies • Developing the Master Plan for Rx implementation • Quantifying the business case for Rx implementation • Establishing the change management structure required to support implementation
  • 8. Wave 2: Assessment Using the Reliability Excellence Model The objective of the assessment is to examine and evaluate current reliability processes and practices as compared to industry-accepted best practices. This analysis is used to build an Rx implementation Master Plan and a business case that supports the plan. Reliability Excellence Model Founded on the values and tools of Six Sigma and incorporates the principles and strengths of Lean Manufacturing, Total Productive Maintenance, Total Quality Management, Maintenance Excellence™ and similar programs that define best practices, into a single, holistic, continuous improvement process. .
  • 9. Wave 2: Benefits of Performing an Rx Assessment In addition to building organizational awareness, alignment and buy-in, the process delivers: • Widespread understanding of the current state of operations and the gaps that exist between the current state and Rx best practices • Leadership commitment to the initiative • A defined roadmap – the Master Plan – that will lead to the future state • A cost/benefit business case that supports the financial justification to undertake the initiative • The identification of prospective change agents who will actively drive and sustain the new organizational culture
  • 10. Wave 3: Master Plan Implementation, Measurement and Follow-up Activities Include: • Establishing leadership and focus team structure to execute the Master Plan • Providing Rx subject matter and leading change training to accelerate the design process • Supporting development of business processes with dedicated subject-matter coaching • Continually monitoring project progress against agreed-upon deliverables and timeline • Proactively managing culture change to ensure early adoption of new business processes
  • 11. Visit PoweredByRx.com to learn more about Reliability Excellence and access more than 400 resources related to reducing risk, improving performance and engaging employees.