SlideShare a Scribd company logo
1 of 31
CONSTRUCTION MANAGEMENT 
BCM 544 
(CONSTRUCTION TECHNOLOGY IV) 
AP246 5P(PLK) 
PREPARED FOR: 
EN. MUHAMMAD KAMAL BIN AHMAD 
Prepared by: 
MUHAMMAD SADDAM BIN HUSSIN 2013187865 
EZMEEL ASRIL BIN KAMARULZAMAN 2013513717 
MOHD IZWAN FAZLY BIN ISMAIL 
2013795881 
AHMAD KHAIR BIN YAHAYA 2013109191
1.1 OBJECTIVE OF STUDY 
The purpose we do this assignment and case study is to achieve this following objective: 
1 To study the types of intelligent building dimension used at the building 
2 To study the intelligent building system operation and process 
1.2 MATHOD OF STUDY 
1.2.1 Primary Data 
i. Observation 
Observation that carried out of those building which is used system of the intelligent building 
ii. Case study 
To obtain a simple explanation by using a case from studies, to be acquired. Case study carried out in those building and also from 
contractors who managed the facilities by gathering all information through observation and interview. 
iii. Interview 
With interview skilled and experienced individual on report subject. 
1.2.2 Secondary Data 
a. Reading source 
Reading resources from book or article that have relevance in intelligent building system 
b. Electronic media 
Obtain information through internet from related website. , this method use to obtain information particularly on theoretical 
part.
Kompleks Kerja Raya (KKR 2) 
Kompleks Kerja Raya 2 (KKR2) is a 6-block office complex master plan on 
an existing 1 million sq ft site, strategically located at Jalan Sultan Salahuddin, 
Kuala Lumpur. 
KKR Tower provides 37-levels of accommodation for Jabatan Kerja Raya 
(JKR). The tower creates a centralized location for JKR’s growing workforce 
while uplifting JKR’s image. The ‘diamond’ facade concept represents 
Kompleks Kerja Raya’s role as ‘a diamond in the crown of the Malaysian 
construction industry’ by being a ‘Diamond in KL City’.
Summary of Project
Location of Construction Building
Design Principles and Characteristic
Design Parameters 
The ‘diamond’ façade concept represents Kompleks Kerja raya’s role as ‘diamond in th 
crown of the Malaysian construction industry’. KKR2 tower comprises three facades. ‘A’ & 
‘B’ are mirrored with ‘C’ at rear.
Design & Construction Consideration 
Orientation sun 
These rectangular frames are also split diagonally 
resulting in upper and lower triangular glass components 
6284 numbers including upper level roof angled pieces. 
Tilting these triangles inwards within frame allows an 
incremental response to the shifting geometry, level 
by level to create a curve facade. These triangular 
insulated glazing units comprise 3 pieces of glass at top 
and bottom. 
East west glazing orientation, facade A&B enables 
this play to façade design allowing natural sun shading by 
glazing detail and the external mounted ‘fin’ elements 
1600 unique numbers 6.4 km long. Each fin acts as both 
shading and design feature expressing curvature and 
verticality.
Design Elements Of KKR 2 Building 
Terraced roof garden 
Two building components create the ‘roof’ a terraced roof garden 
between level 32 & 35 and independent canopy above. Respectively 
they are key factors within the GBI initiative. The green roof, 
accessible at each level, enjoys fantastic views while sun shading is 
provided by louvered canopy above both canopy and 50% open 
glazing at front facades A&B allows both airflow and weather protection 
for visitors to arguable Kuala Lumpur highest garden.
Crane for maintenance 
Mean while at level 37 a centrally located building 
maintenance unit crane has a telescopic reach of 32 
meters one of the longest in Asia.
Front columns A1 &B1 are the straightest whereas 
A11 & B11 are the most angled to meet this 
curvature facade ‘C’ design curve facade C design 
curves in two planes a parabolic geometry. That 
structural design evolved from original structural 
design concept where columns were square, 
enabling a smooth currying geometry. A slip form 
reinforced structural core construction remains 
constant while the adjoining finger beams to 
slating columns shifts at every level, a further 
outer ring beam near slab edge, connects columns. 
A minimum of 600mm glazing zone between 
column and slab edge receives the 450mm depth 
glazing units. 
Columns of building
Design Process And Tools 
The Kompleks Kerja Raya 2 (KKR 2) building used a 
skeleton frame because the system is commonly used in 
Malaysia and it is more suitable for a tall building. Even 
the skeleton frame is difficult to construct due to many 
structures members but the construction process is 
more faster because the project is used a formwork 
systems. The installation of formwork systems is easy to 
dismantle and used back for a next floor level with a 
short time period. Therefore, this site used 2 unit of 
supported static tower crane to make sure the material 
and tool easy to lifted. Besides that, during construction, 
concrete pump also have used to pump the concrete to 
above level with fast.
Design Elements Of KKR 2 Tall Building 
Each level is unique as unique as 
incrementally the geometry 
shifts upward the triangular 
footprint tapers upward into 
‘leaf shaped upper levels. There 
are 10 circular columns slating in 
two directions, mirrored at each 
side A&B of tower ranging from 
a 1400mm diameter at low levels 
to 800mm at highest.
Key Component Of The Structure
Rigid Frame and Core at Kompleks Kerja Raya 2 (KKR 2) 
Rigid frame system as to achieving lateral 
stability in areas of low seismic activities, 
or somewhat less in height in areas of 
greater seismic activity Rigid frame 
structures may be less attractive option 
due to greater difficulty of their 
fabrication because of many 
structures member and the increased size 
of the beams and columns required. It 
combines with core structures to increase 
the lateral resistance. Core structures are 
the most commonly used system to 
stabilize tall buildings
Foundation structure 
Bored pile and pile cap 
Kompleks Kerja Raya 2 (KKR 2) used bored piles as a 
foundation for the building. The construction for bored 
pile work took 6 months. There are two elements for 
bored piles which pile cap and the pile. Bored piles can 
be constructed using a number of methods. The 
simplest method is using an auger to remove the soil 
and replace it with concrete and reinforcement.
Vertical and Horizontal Loading Systems 
Skeleton Frame System- Reinforced concrete 
One of the great technological changes of the 
nineteenth century was the introduction of skeleton 
framing as the common method of supporting large 
buildings. Skeleton frames, which use a system of 
columns and beams to support a building’s interior 
floors and exterior walls. Skeleton frame system is 
commonly used in Malaysia. The Kompleks Kerja 
Raya 2 (KKR 2) building used a skeleton frame because 
the system is commonly used in Malaysia and it is more 
suitable for a tall building. Even the skeleton frame is 
difficult to construct due to many structures members 
but the construction process is more faster because the 
project is used a formwork systems
Roof Steel structures 
The structure component used roof at Kompleks Kerja 
Raya (KKR 2) is steel structure. The members of steel 
structure are made of steel and are joined by welding, 
riveting and bolting. Because of the high strength of 
steel, these structures are reliable and require less 
material than other types of structures. Fabrication and 
installation of steel structures are realized through 
industrial methods.
Façade of the Building
Main Materials And Finishes
Planning And Controlling
kkr 2
kkr 2
kkr 2
kkr 2
kkr 2

More Related Content

What's hot

IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORTNATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORTAtiqah Ghazali
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara MaybankSheau Hui Tan
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportjolynnTJL
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMFarah Sham
 
Heritage building analysis _ Royal Mosque of Sultan Sulaiman
Heritage building analysis _ Royal Mosque of Sultan SulaimanHeritage building analysis _ Royal Mosque of Sultan Sulaiman
Heritage building analysis _ Royal Mosque of Sultan SulaimanJannah Jailani
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSDigital Space Consultancy Ltd
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)Prince Pathania
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case StudyLovie Tey
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towersmatsrock
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services ReportJoanne Yunn Tze
 
Architecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web bookArchitecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web bookWinnie Ang
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsCarmen Chan
 
Stadium Negara Culture report
Stadium Negara Culture report Stadium Negara Culture report
Stadium Negara Culture report Clara Lee
 
Culture and History 2: National Mosque
Culture and History 2: National MosqueCulture and History 2: National Mosque
Culture and History 2: National Mosqueaarenneoone
 
Dewan Tunku Canselor Final Report
Dewan Tunku Canselor Final ReportDewan Tunku Canselor Final Report
Dewan Tunku Canselor Final Reportjisunfoo
 

What's hot (20)

IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORTNATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
NATIONAL MOSQUE - CULTURE AND HISTORY 2 REPORT
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara Maybank
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis Report
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Heritage building analysis _ Royal Mosque of Sultan Sulaiman
Heritage building analysis _ Royal Mosque of Sultan SulaimanHeritage building analysis _ Royal Mosque of Sultan Sulaiman
Heritage building analysis _ Royal Mosque of Sultan Sulaiman
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case Study
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towers
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services Report
 
Architecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web bookArchitecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web book
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building Systems
 
Stadium Negara Culture report
Stadium Negara Culture report Stadium Negara Culture report
Stadium Negara Culture report
 
Culture and History 2: National Mosque
Culture and History 2: National MosqueCulture and History 2: National Mosque
Culture and History 2: National Mosque
 
Dewan Tunku Canselor Final Report
Dewan Tunku Canselor Final ReportDewan Tunku Canselor Final Report
Dewan Tunku Canselor Final Report
 

Similar to kkr 2

CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...IRJET Journal
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013engineeringwatch
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1Gertrude Lee
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Yee Len Wan
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingAnupama Krishnan
 
munjushreeshindepapaer.doc
munjushreeshindepapaer.docmunjushreeshindepapaer.doc
munjushreeshindepapaer.docff2403522
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniquekvijay31
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....MSulmanSarwar
 
The technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeThe technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeSmee Kaem Chann
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down methodDarshan Parakhiya
 
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...IRJET Journal
 
B tech project 2
B tech project 2B tech project 2
B tech project 2Pei Di
 
Ct3 steel space frame roof
Ct3 steel space frame roofCt3 steel space frame roof
Ct3 steel space frame roofMELVIN tan
 

Similar to kkr 2 (20)

Internship report
Internship reportInternship report
Internship report
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Aldar Headqaurter
Aldar Headqaurter  Aldar Headqaurter
Aldar Headqaurter
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
Btech
BtechBtech
Btech
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal Building
 
munjushreeshindepapaer.doc
munjushreeshindepapaer.docmunjushreeshindepapaer.doc
munjushreeshindepapaer.doc
 
MIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction techniqueMIVAN-A Versite aluminium firmwork construction technique
MIVAN-A Versite aluminium firmwork construction technique
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....
 
The technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeThe technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquake
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down method
 
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
Optimization of Circular RC Frame Structure by Using Shear Wall at a Differen...
 
B tech project 2
B tech project 2B tech project 2
B tech project 2
 
Mod. 1.pptx
Mod. 1.pptxMod. 1.pptx
Mod. 1.pptx
 
Ct3 steel space frame roof
Ct3 steel space frame roofCt3 steel space frame roof
Ct3 steel space frame roof
 

Recently uploaded

call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...Delhi Call girls
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...amitlee9823
 
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Availabledollysharma2066
 
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...Nitya salvi
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja Nehwal
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...nirzagarg
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation decktbatkhuu1
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证eeanqy
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Websitemark11275
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxbingyichin04
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...sonalitrivedi431
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLHingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLNitya salvi
 
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service AvailableCall Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service AvailableNitya salvi
 

Recently uploaded (20)

call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
 
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Nagpur Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
 
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLHingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
 
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service AvailableCall Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
Call Girls Jalgaon Just Call 8617370543Top Class Call Girl Service Available
 

kkr 2

  • 1. CONSTRUCTION MANAGEMENT BCM 544 (CONSTRUCTION TECHNOLOGY IV) AP246 5P(PLK) PREPARED FOR: EN. MUHAMMAD KAMAL BIN AHMAD Prepared by: MUHAMMAD SADDAM BIN HUSSIN 2013187865 EZMEEL ASRIL BIN KAMARULZAMAN 2013513717 MOHD IZWAN FAZLY BIN ISMAIL 2013795881 AHMAD KHAIR BIN YAHAYA 2013109191
  • 2. 1.1 OBJECTIVE OF STUDY The purpose we do this assignment and case study is to achieve this following objective: 1 To study the types of intelligent building dimension used at the building 2 To study the intelligent building system operation and process 1.2 MATHOD OF STUDY 1.2.1 Primary Data i. Observation Observation that carried out of those building which is used system of the intelligent building ii. Case study To obtain a simple explanation by using a case from studies, to be acquired. Case study carried out in those building and also from contractors who managed the facilities by gathering all information through observation and interview. iii. Interview With interview skilled and experienced individual on report subject. 1.2.2 Secondary Data a. Reading source Reading resources from book or article that have relevance in intelligent building system b. Electronic media Obtain information through internet from related website. , this method use to obtain information particularly on theoretical part.
  • 3. Kompleks Kerja Raya (KKR 2) Kompleks Kerja Raya 2 (KKR2) is a 6-block office complex master plan on an existing 1 million sq ft site, strategically located at Jalan Sultan Salahuddin, Kuala Lumpur. KKR Tower provides 37-levels of accommodation for Jabatan Kerja Raya (JKR). The tower creates a centralized location for JKR’s growing workforce while uplifting JKR’s image. The ‘diamond’ facade concept represents Kompleks Kerja Raya’s role as ‘a diamond in the crown of the Malaysian construction industry’ by being a ‘Diamond in KL City’.
  • 6. Design Principles and Characteristic
  • 7. Design Parameters The ‘diamond’ façade concept represents Kompleks Kerja raya’s role as ‘diamond in th crown of the Malaysian construction industry’. KKR2 tower comprises three facades. ‘A’ & ‘B’ are mirrored with ‘C’ at rear.
  • 8. Design & Construction Consideration Orientation sun These rectangular frames are also split diagonally resulting in upper and lower triangular glass components 6284 numbers including upper level roof angled pieces. Tilting these triangles inwards within frame allows an incremental response to the shifting geometry, level by level to create a curve facade. These triangular insulated glazing units comprise 3 pieces of glass at top and bottom. East west glazing orientation, facade A&B enables this play to façade design allowing natural sun shading by glazing detail and the external mounted ‘fin’ elements 1600 unique numbers 6.4 km long. Each fin acts as both shading and design feature expressing curvature and verticality.
  • 9. Design Elements Of KKR 2 Building Terraced roof garden Two building components create the ‘roof’ a terraced roof garden between level 32 & 35 and independent canopy above. Respectively they are key factors within the GBI initiative. The green roof, accessible at each level, enjoys fantastic views while sun shading is provided by louvered canopy above both canopy and 50% open glazing at front facades A&B allows both airflow and weather protection for visitors to arguable Kuala Lumpur highest garden.
  • 10. Crane for maintenance Mean while at level 37 a centrally located building maintenance unit crane has a telescopic reach of 32 meters one of the longest in Asia.
  • 11. Front columns A1 &B1 are the straightest whereas A11 & B11 are the most angled to meet this curvature facade ‘C’ design curve facade C design curves in two planes a parabolic geometry. That structural design evolved from original structural design concept where columns were square, enabling a smooth currying geometry. A slip form reinforced structural core construction remains constant while the adjoining finger beams to slating columns shifts at every level, a further outer ring beam near slab edge, connects columns. A minimum of 600mm glazing zone between column and slab edge receives the 450mm depth glazing units. Columns of building
  • 12. Design Process And Tools The Kompleks Kerja Raya 2 (KKR 2) building used a skeleton frame because the system is commonly used in Malaysia and it is more suitable for a tall building. Even the skeleton frame is difficult to construct due to many structures members but the construction process is more faster because the project is used a formwork systems. The installation of formwork systems is easy to dismantle and used back for a next floor level with a short time period. Therefore, this site used 2 unit of supported static tower crane to make sure the material and tool easy to lifted. Besides that, during construction, concrete pump also have used to pump the concrete to above level with fast.
  • 13. Design Elements Of KKR 2 Tall Building Each level is unique as unique as incrementally the geometry shifts upward the triangular footprint tapers upward into ‘leaf shaped upper levels. There are 10 circular columns slating in two directions, mirrored at each side A&B of tower ranging from a 1400mm diameter at low levels to 800mm at highest.
  • 14. Key Component Of The Structure
  • 15. Rigid Frame and Core at Kompleks Kerja Raya 2 (KKR 2) Rigid frame system as to achieving lateral stability in areas of low seismic activities, or somewhat less in height in areas of greater seismic activity Rigid frame structures may be less attractive option due to greater difficulty of their fabrication because of many structures member and the increased size of the beams and columns required. It combines with core structures to increase the lateral resistance. Core structures are the most commonly used system to stabilize tall buildings
  • 16. Foundation structure Bored pile and pile cap Kompleks Kerja Raya 2 (KKR 2) used bored piles as a foundation for the building. The construction for bored pile work took 6 months. There are two elements for bored piles which pile cap and the pile. Bored piles can be constructed using a number of methods. The simplest method is using an auger to remove the soil and replace it with concrete and reinforcement.
  • 17. Vertical and Horizontal Loading Systems Skeleton Frame System- Reinforced concrete One of the great technological changes of the nineteenth century was the introduction of skeleton framing as the common method of supporting large buildings. Skeleton frames, which use a system of columns and beams to support a building’s interior floors and exterior walls. Skeleton frame system is commonly used in Malaysia. The Kompleks Kerja Raya 2 (KKR 2) building used a skeleton frame because the system is commonly used in Malaysia and it is more suitable for a tall building. Even the skeleton frame is difficult to construct due to many structures members but the construction process is more faster because the project is used a formwork systems
  • 18. Roof Steel structures The structure component used roof at Kompleks Kerja Raya (KKR 2) is steel structure. The members of steel structure are made of steel and are joined by welding, riveting and bolting. Because of the high strength of steel, these structures are reliable and require less material than other types of structures. Fabrication and installation of steel structures are realized through industrial methods.
  • 19. Façade of the Building
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Main Materials And Finishes