PMOs and
Complexity
Management
Tathagat Varma
Strategy & Operations,
Walmart Global Tech
Doctoral Scholar,
Indian School of Business
Evolution of PMOs
Darling & Whitty (2016) note the definition of the PMO's function has
evolved over time:
• The 1800s project office was a type of national governance of the
agricultural industry
• 1939 appears as the earliest instance of the term 'project
management office' being published
• The 1950s concept of the PMO is representative of what a
contemporary PMO looks like
• Today the PMO is a dynamic entity used to solve specific issues[1]
https://en.wikipedia.org/wiki/Project_management_office
Stages of PMO Evolution
Hill, G. M. (2004). Evolving the project management office: A competency continuum.
Information systems management, 21(4), 45-51.
These five PMO stages
represent a progressive
competency and
advancement of functionality
that can be attained
to meet the needs of the
project management
environment and the
associated business objectives
of the relevant organization.
Not every organization needs
to have a PMO at Stage 5. In
fact, for most organizations,
the Stage 3 standard PMO is
probably more than adequate.
The Design
Squiggle
https://thedesignsquiggle.com/
Limitations of the extant PMO approach
The DNA of Strategy Execution: Next Generation Project Management and PMO – Jack Duggal, 2018
“The conventional approach to implement project
management or PMO is based on the mechanical view
and deterministic methods of classic project
management with a heavy emphasis on the linear
scope, plan, execute, and control (SPEC) processes. But
reductionist plans based on sequential tasks and
dependencies do not seem to hold in a nonlinear,
changing, and unpredictable project reality.”
So, what is the problem?
With a staggering 25% of PMOs shut down after one
year, 50% after two years, and 75% after three years,
organizations must take care in establishing a PMO
that will deliver on its promise and produce the
intended value for the organization. As such, it must
put an emphasis on people skills, leadership, trust
building and motivation, so it becomes and is
perceived to be a trusted partner to all stakeholders
and project managers in particular.
Schibi, O. (2013). Why PMOs do not deliver to their potential. Paper presented at PMI® Global Congress 2013—North America, New Orleans, LA. Newtown Square,
PA: Project Management Institute. https://www.pmi.org/learning/library/project-management-failure-to-deliver-5883
Influence of Complexity on PMO
performance
Darling & Whitty (2016) found there is complexity of
interconnections in PMO intellectual capital and though often the
rationale for PMO establishment is to enhance stakeholder satisfaction
with projects often the establishment of the PMO leads to significant
dissatisfaction by senior management.
“Working with people or PMOs adds tremendous variability; some would say
complexity, which makes “best practice” an inappropriate term. Similarly to IT,
engineers no longer operate solely in the research and design capability. Often
engineers focus on compliance with standards, thus “best practice” also
becomes one of the engineers “constants” and when applying compliance
mindset to PMO practice staff with an engineering background seeks
standards or “best practice” in a field which does not have “best practice”.
https://en.wikipedia.org/wiki/Project_management_office
The Complexity Continuum
Simple Complicated Complex Edge of Chaos Chaos
The DNA of Strategy Execution: Next Generation Project Management and PMO – Jack Duggal, 2018
Simple
• easy to understand or do
• not difficult
Complicated
• Lot of intricately combined parts
• Difficult or confusing to analyze, understand, do or
explain
Pic: https://www.gentlemansgazette.com/watch-parts-terms-functions-guide/
Complex
• Lot of different interrelated parts
• Hard to separate, analyze, understand, do or explain
Pic: http://crispme.com/25-stunning-photographs-of-geometry-and-fractals-in-nature/
Simple vs Complicated vs. Complex
Simple Complicated Complex
Number and nature of
parts
Small number of elements
are generally “atomic” and
remain “static”
Medium – Large number of
simple elements
High – Very High Multiplicity of
heterogenous autonomous agents that
can learn and adapt
Interconnectedness
and Interactions
Low, and linear interactions Medium-high and linear
interactions
High, Non-linear, Dynamic and “Chaotic”
local interactions but essentially based on
a small number of rules
Order Pre-defined,
Superimposed. Single path
to a pre-defined single
answer
Top-down, Superimposed.
Multiple paths to a pre-defined
single answer
Bottom-up, Emergent order. Multiple
paths to emergent multiple answers
Nature of systems Deterministic and certain Deterministic rules ensure
predictable responses knowing
the starting conditions
Adaptive and evolving. Hindsight doesn’t
lead to foresight.
Events and Landscape Commonplace events,
Small and Static Landscape
Relatively less commonplace,
Vast but still largely Static
landscape
Rare to Very Rare, Dynamic (Dancing)
Landscape
Examples Simple machines (wheel,
pulley, lever), Simple
objects (pencil sharpener,
traffic light), Pavlovian
conditioning, etc.
Mechanical watch (~130 parts),
Car (~30,000 parts), Boeing 747
(~6 Million parts!), Social rituals
such as Graduation Ceremony, or
Olympics Opening Ceremony
Collection of drones, etc.
Ant colony, Bee hive, Swarm, Human
brain, Cities, Stock markets, Organizations,
Universe, Amazon rainforest ecosystems,
Culture, Human conflicts, Financial
Meltdown, 9/11, Social rituals like an Indian
wedding, etc.
Complex System
“A system in which large networks of
components with no central control and
simple rules of operation give rise to
complex collective behavior, sophisticated
information processing, and adaptation via
learning or evolution.” – Complexity,
Melanie Mitchell
From VUCA to DANCE
“The reality of the world and today's business environment can be best characterized by
the acronym DANCE: Dynamic and changing, Ambiguous and uncertain; Nonlinear,
Complex, and Emergent and unpredictable—
• Dynamic and constant change, driven by disruptive factors and shifting stakeholder needs and
priorities.
• There is ambiguity and uncertainty, the situation is ambiguous or not clear and can be
interpreted in different ways, and it is uncertain which way it will go. The direction is not clear,
and there is a lot of uncertainty about the future.
• Unlike stable environments, where things are linear and expected, in a nonlinear world it is hard
to ascertain the cause and effect, the output is not “proportional to the change in the input, and it
is therefore, hard to plan or manage the unexpected.
• The environment is complex because of the multiplicity of stakeholders involved, the number of
interactions, and the sheer number of linkages and dependencies. It is not clear who all the
stakeholders are, and the identified stakeholders are indecisive—they do not know what they
want.
• Scope, requirements, solutions, and stakeholders are emergent and unpredictable ßfrom the
bottom-up, and it can be hard to plan top-down in a continually shifting landscape.”
The DNA of Strategy Execution: Next Generation Project Management and PMO – Jack Duggal, 2018
The
Complexity
Continuum
and the PMO
Cynefin
Framework
Cynefin Framework: Categorization
• A Categorization and Sensemaking framework created by
Dave Snowden
• Simple and complicated contexts assume an ordered
universe, where cause-and-effect relationships are
perceptible, and right answers can be determined based on
the facts.
• Complex and chaotic contexts are unordered—there is no
immediately apparent relationship between cause and
effect, and the way forward is determined based on
emerging patterns.
• The ordered world is the world of fact-based management;
the unordered world represents pattern-based management.
• As knowledge increases, there is a clockwise drift from
chaotic to complex to complicated to simple.
• The drift from obvious to chaotic is not very obvious, but
represents extreme vulnerability.
https://hbr.org/2007/11/a-leaders-framework-for-decision-making
Cynefin framework: Sensemaking
• Simple / Obvious / Clear (Known Knowns): Sense-
Categorize-Respond
• Complicated (Known Unknowns, or Knowables):
Sense-Analyze-Respond
• Complex (Unknown Unknowns): Probe-Sense-Respond
• Chaotic (Unknowables): Act-Sense-Respond
• The very nature of the fifth context—disorder—makes
it particularly difficult to recognize when one is in it.
Here, multiple perspectives jostle for prominence,
factional leaders argue with one another, and
cacophony rules. The way out of this realm is to break
down the situation into constituent parts and assign
each to one of the other four realms.
Recap
RISING COMPLEXITY TRADITIONAL
APPROACH INEFFECTIVE
DESIGN NEW
SOLUTIONS

More Related Content

What's hot

Agile Program Management
Agile Program ManagementAgile Program Management
Agile Program ManagementSudipta Lahiri
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOLaura Barnard, PMP
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMOTURKI , PMP
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - FundamentalsJulen Mohanty
 
Digital Transformation and the Business Analyst
Digital Transformation and the Business AnalystDigital Transformation and the Business Analyst
Digital Transformation and the Business AnalystMatthew W. Bowers
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of ExcellenceProject Management CoE
 
Standard For Program Management Changes
Standard For Program Management ChangesStandard For Program Management Changes
Standard For Program Management Changesgryasam
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMOBusiness Beam
 
How to Assess the Maturity of your PMO
How to Assess the Maturity of your PMOHow to Assess the Maturity of your PMO
How to Assess the Maturity of your PMOAmerico Pinto
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life CycleReema
 
The IT PMO - A Handbook for Federal Programs
The IT PMO - A Handbook for Federal ProgramsThe IT PMO - A Handbook for Federal Programs
The IT PMO - A Handbook for Federal ProgramsVergys
 
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Liana Underwood
 
PMO Presentation
PMO PresentationPMO Presentation
PMO PresentationTURKI , PMP
 

What's hot (20)

Agile Program Management
Agile Program ManagementAgile Program Management
Agile Program Management
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMO
 
Project management office value
Project management office valueProject management office value
Project management office value
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - Fundamentals
 
Digital Transformation and the Business Analyst
Digital Transformation and the Business AnalystDigital Transformation and the Business Analyst
Digital Transformation and the Business Analyst
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
 
Pmo Why?
Pmo Why?Pmo Why?
Pmo Why?
 
Standard For Program Management Changes
Standard For Program Management ChangesStandard For Program Management Changes
Standard For Program Management Changes
 
PMO as a service
PMO as a servicePMO as a service
PMO as a service
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
What is a PMO
What is a PMOWhat is a PMO
What is a PMO
 
How to Assess the Maturity of your PMO
How to Assess the Maturity of your PMOHow to Assess the Maturity of your PMO
How to Assess the Maturity of your PMO
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
Program Management Deployment Concept Consulting
Program Management Deployment Concept ConsultingProgram Management Deployment Concept Consulting
Program Management Deployment Concept Consulting
 
The Next Generation PMO
The Next Generation PMOThe Next Generation PMO
The Next Generation PMO
 
The IT PMO - A Handbook for Federal Programs
The IT PMO - A Handbook for Federal ProgramsThe IT PMO - A Handbook for Federal Programs
The IT PMO - A Handbook for Federal Programs
 
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
 
Benefits Realization Management إدارة تحقيق المنافع
Benefits Realization Management  إدارة تحقيق المنافعBenefits Realization Management  إدارة تحقيق المنافع
Benefits Realization Management إدارة تحقيق المنافع
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 

Similar to PMOs and Complexity Management: Navigating the Cynefin Framework

Diane Dromgold - 2011 AGMS paper
Diane Dromgold - 2011 AGMS paperDiane Dromgold - 2011 AGMS paper
Diane Dromgold - 2011 AGMS paperRNC
 
CH 3- The Human Side of Project Management.ppt
CH 3- The Human Side of Project Management.pptCH 3- The Human Side of Project Management.ppt
CH 3- The Human Side of Project Management.pptamanuel236786
 
The Truth Of Project Management in Government
The Truth Of Project Management in Government The Truth Of Project Management in Government
The Truth Of Project Management in Government Line of Sight
 
17Chapter 2Managing Projects With High Complexity.docx
17Chapter 2Managing Projects With High Complexity.docx17Chapter 2Managing Projects With High Complexity.docx
17Chapter 2Managing Projects With High Complexity.docxdrennanmicah
 
Jerry Walker - without a plan
Jerry Walker - without a planJerry Walker - without a plan
Jerry Walker - without a planPaul Ellarby
 
Accountability rocks soccnx2
Accountability rocks soccnx2Accountability rocks soccnx2
Accountability rocks soccnx2Keith Brooks
 
Final year project (standardized factors)
Final year project (standardized factors)Final year project (standardized factors)
Final year project (standardized factors)Anaam Shafique
 
Future forecasting
Future forecastingFuture forecasting
Future forecastingKimmo Haapea
 
Measuring social media as a complex, adaptive system, presented by Gerald Kane
Measuring social media as a complex, adaptive system, presented by Gerald KaneMeasuring social media as a complex, adaptive system, presented by Gerald Kane
Measuring social media as a complex, adaptive system, presented by Gerald KaneSocialMedia.org
 
Project Estimating Paper
Project Estimating PaperProject Estimating Paper
Project Estimating PaperCamella Taylor
 
Collaboration strategy how-to
Collaboration strategy how-toCollaboration strategy how-to
Collaboration strategy how-toGordon Vala-Webb
 
Why is project management so hard?
Why is project management so hard?Why is project management so hard?
Why is project management so hard?Glen Alleman
 
1.Why is RTI an important tool for teachers2.How is R.docx
1.Why is RTI an important tool for teachers2.How is R.docx1.Why is RTI an important tool for teachers2.How is R.docx
1.Why is RTI an important tool for teachers2.How is R.docxdurantheseldine
 
Mindset of Prog Mgr v0.1
Mindset of Prog Mgr v0.1Mindset of Prog Mgr v0.1
Mindset of Prog Mgr v0.1Stewart Rapley
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxcpatriciarpatricia
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxdeanmtaylor1545
 

Similar to PMOs and Complexity Management: Navigating the Cynefin Framework (20)

Diane Dromgold - 2011 AGMS paper
Diane Dromgold - 2011 AGMS paperDiane Dromgold - 2011 AGMS paper
Diane Dromgold - 2011 AGMS paper
 
CH 3- The Human Side of Project Management.ppt
CH 3- The Human Side of Project Management.pptCH 3- The Human Side of Project Management.ppt
CH 3- The Human Side of Project Management.ppt
 
The Truth Of Project Management in Government
The Truth Of Project Management in Government The Truth Of Project Management in Government
The Truth Of Project Management in Government
 
17Chapter 2Managing Projects With High Complexity.docx
17Chapter 2Managing Projects With High Complexity.docx17Chapter 2Managing Projects With High Complexity.docx
17Chapter 2Managing Projects With High Complexity.docx
 
Jerry Walker - without a plan
Jerry Walker - without a planJerry Walker - without a plan
Jerry Walker - without a plan
 
Accountability rocks soccnx2
Accountability rocks soccnx2Accountability rocks soccnx2
Accountability rocks soccnx2
 
Final year project (standardized factors)
Final year project (standardized factors)Final year project (standardized factors)
Final year project (standardized factors)
 
Future forecasting
Future forecastingFuture forecasting
Future forecasting
 
Measuring social media as a complex, adaptive system, presented by Gerald Kane
Measuring social media as a complex, adaptive system, presented by Gerald KaneMeasuring social media as a complex, adaptive system, presented by Gerald Kane
Measuring social media as a complex, adaptive system, presented by Gerald Kane
 
Coordinating pm os and executives
Coordinating pm os and executivesCoordinating pm os and executives
Coordinating pm os and executives
 
Project Estimating Paper
Project Estimating PaperProject Estimating Paper
Project Estimating Paper
 
Collaboration strategy how-to
Collaboration strategy how-toCollaboration strategy how-to
Collaboration strategy how-to
 
Ch02
Ch02Ch02
Ch02
 
Governance Rochester 2021
Governance Rochester 2021Governance Rochester 2021
Governance Rochester 2021
 
P070 a simple_view_of_complexity
P070 a simple_view_of_complexityP070 a simple_view_of_complexity
P070 a simple_view_of_complexity
 
Why is project management so hard?
Why is project management so hard?Why is project management so hard?
Why is project management so hard?
 
1.Why is RTI an important tool for teachers2.How is R.docx
1.Why is RTI an important tool for teachers2.How is R.docx1.Why is RTI an important tool for teachers2.How is R.docx
1.Why is RTI an important tool for teachers2.How is R.docx
 
Mindset of Prog Mgr v0.1
Mindset of Prog Mgr v0.1Mindset of Prog Mgr v0.1
Mindset of Prog Mgr v0.1
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docx
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docx
 

More from Tathagat Varma

Can AI finally "cure" the Marketing Myopia?
Can AI finally "cure" the Marketing Myopia?Can AI finally "cure" the Marketing Myopia?
Can AI finally "cure" the Marketing Myopia?Tathagat Varma
 
AI in Manufacturing: Opportunities & Challenges
AI in Manufacturing: Opportunities & ChallengesAI in Manufacturing: Opportunities & Challenges
AI in Manufacturing: Opportunities & ChallengesTathagat Varma
 
Preparing for the next ________?
Preparing for the next ________?Preparing for the next ________?
Preparing for the next ________?Tathagat Varma
 
AI in Business: Opportunities & Challenges
AI in Business: Opportunities & ChallengesAI in Business: Opportunities & Challenges
AI in Business: Opportunities & ChallengesTathagat Varma
 
Leadership Agility Mindsets
Leadership Agility MindsetsLeadership Agility Mindsets
Leadership Agility MindsetsTathagat Varma
 
Building an AI Startup
Building an AI StartupBuilding an AI Startup
Building an AI StartupTathagat Varma
 
Agility in an AI / DS / ML Project
Agility in an AI / DS / ML ProjectAgility in an AI / DS / ML Project
Agility in an AI / DS / ML ProjectTathagat Varma
 
AI Technology Delivering Business Value
AI Technology Delivering Business Value AI Technology Delivering Business Value
AI Technology Delivering Business Value Tathagat Varma
 
Nurturing Innovation Mindset
Nurturing Innovation MindsetNurturing Innovation Mindset
Nurturing Innovation MindsetTathagat Varma
 
An Introduction to the Systematic Inventive Thinking (SIT) Method
An Introduction to the Systematic Inventive Thinking (SIT) MethodAn Introduction to the Systematic Inventive Thinking (SIT) Method
An Introduction to the Systematic Inventive Thinking (SIT) MethodTathagat Varma
 
I blog...therefore I am!
I blog...therefore I am!I blog...therefore I am!
I blog...therefore I am!Tathagat Varma
 
Bridging the gap between Education and Learning
Bridging the gap between Education and LearningBridging the gap between Education and Learning
Bridging the gap between Education and LearningTathagat Varma
 
Is my iceberg melting?
Is my iceberg melting?Is my iceberg melting?
Is my iceberg melting?Tathagat Varma
 
Digital Business Model Innovation
Digital Business Model InnovationDigital Business Model Innovation
Digital Business Model InnovationTathagat Varma
 
25 Years of Evolution of Software Product Management: A practitioner's perspe...
25 Years of Evolution of Software Product Management: A practitioner's perspe...25 Years of Evolution of Software Product Management: A practitioner's perspe...
25 Years of Evolution of Software Product Management: A practitioner's perspe...Tathagat Varma
 
Agility from First Principles
Agility from First PrinciplesAgility from First Principles
Agility from First PrinciplesTathagat Varma
 
Why the world needs more rebels like you?
Why the world needs more rebels like you?Why the world needs more rebels like you?
Why the world needs more rebels like you?Tathagat Varma
 

More from Tathagat Varma (20)

Can AI finally "cure" the Marketing Myopia?
Can AI finally "cure" the Marketing Myopia?Can AI finally "cure" the Marketing Myopia?
Can AI finally "cure" the Marketing Myopia?
 
AI in Manufacturing: Opportunities & Challenges
AI in Manufacturing: Opportunities & ChallengesAI in Manufacturing: Opportunities & Challenges
AI in Manufacturing: Opportunities & Challenges
 
Preparing for the next ________?
Preparing for the next ________?Preparing for the next ________?
Preparing for the next ________?
 
AI in Business: Opportunities & Challenges
AI in Business: Opportunities & ChallengesAI in Business: Opportunities & Challenges
AI in Business: Opportunities & Challenges
 
Leadership Agility Mindsets
Leadership Agility MindsetsLeadership Agility Mindsets
Leadership Agility Mindsets
 
Building an AI Startup
Building an AI StartupBuilding an AI Startup
Building an AI Startup
 
Agility in an AI / DS / ML Project
Agility in an AI / DS / ML ProjectAgility in an AI / DS / ML Project
Agility in an AI / DS / ML Project
 
Cognitive Chasms
Cognitive ChasmsCognitive Chasms
Cognitive Chasms
 
AI Technology Delivering Business Value
AI Technology Delivering Business Value AI Technology Delivering Business Value
AI Technology Delivering Business Value
 
Nurturing Innovation Mindset
Nurturing Innovation MindsetNurturing Innovation Mindset
Nurturing Innovation Mindset
 
Thought Leadership
Thought LeadershipThought Leadership
Thought Leadership
 
An Introduction to the Systematic Inventive Thinking (SIT) Method
An Introduction to the Systematic Inventive Thinking (SIT) MethodAn Introduction to the Systematic Inventive Thinking (SIT) Method
An Introduction to the Systematic Inventive Thinking (SIT) Method
 
Agile at Scale
Agile at ScaleAgile at Scale
Agile at Scale
 
I blog...therefore I am!
I blog...therefore I am!I blog...therefore I am!
I blog...therefore I am!
 
Bridging the gap between Education and Learning
Bridging the gap between Education and LearningBridging the gap between Education and Learning
Bridging the gap between Education and Learning
 
Is my iceberg melting?
Is my iceberg melting?Is my iceberg melting?
Is my iceberg melting?
 
Digital Business Model Innovation
Digital Business Model InnovationDigital Business Model Innovation
Digital Business Model Innovation
 
25 Years of Evolution of Software Product Management: A practitioner's perspe...
25 Years of Evolution of Software Product Management: A practitioner's perspe...25 Years of Evolution of Software Product Management: A practitioner's perspe...
25 Years of Evolution of Software Product Management: A practitioner's perspe...
 
Agility from First Principles
Agility from First PrinciplesAgility from First Principles
Agility from First Principles
 
Why the world needs more rebels like you?
Why the world needs more rebels like you?Why the world needs more rebels like you?
Why the world needs more rebels like you?
 

Recently uploaded

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 

Recently uploaded (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 

PMOs and Complexity Management: Navigating the Cynefin Framework

  • 1. PMOs and Complexity Management Tathagat Varma Strategy & Operations, Walmart Global Tech Doctoral Scholar, Indian School of Business
  • 2. Evolution of PMOs Darling & Whitty (2016) note the definition of the PMO's function has evolved over time: • The 1800s project office was a type of national governance of the agricultural industry • 1939 appears as the earliest instance of the term 'project management office' being published • The 1950s concept of the PMO is representative of what a contemporary PMO looks like • Today the PMO is a dynamic entity used to solve specific issues[1] https://en.wikipedia.org/wiki/Project_management_office
  • 3. Stages of PMO Evolution Hill, G. M. (2004). Evolving the project management office: A competency continuum. Information systems management, 21(4), 45-51. These five PMO stages represent a progressive competency and advancement of functionality that can be attained to meet the needs of the project management environment and the associated business objectives of the relevant organization. Not every organization needs to have a PMO at Stage 5. In fact, for most organizations, the Stage 3 standard PMO is probably more than adequate.
  • 5. Limitations of the extant PMO approach The DNA of Strategy Execution: Next Generation Project Management and PMO – Jack Duggal, 2018 “The conventional approach to implement project management or PMO is based on the mechanical view and deterministic methods of classic project management with a heavy emphasis on the linear scope, plan, execute, and control (SPEC) processes. But reductionist plans based on sequential tasks and dependencies do not seem to hold in a nonlinear, changing, and unpredictable project reality.”
  • 6. So, what is the problem? With a staggering 25% of PMOs shut down after one year, 50% after two years, and 75% after three years, organizations must take care in establishing a PMO that will deliver on its promise and produce the intended value for the organization. As such, it must put an emphasis on people skills, leadership, trust building and motivation, so it becomes and is perceived to be a trusted partner to all stakeholders and project managers in particular. Schibi, O. (2013). Why PMOs do not deliver to their potential. Paper presented at PMI® Global Congress 2013—North America, New Orleans, LA. Newtown Square, PA: Project Management Institute. https://www.pmi.org/learning/library/project-management-failure-to-deliver-5883
  • 7. Influence of Complexity on PMO performance Darling & Whitty (2016) found there is complexity of interconnections in PMO intellectual capital and though often the rationale for PMO establishment is to enhance stakeholder satisfaction with projects often the establishment of the PMO leads to significant dissatisfaction by senior management. “Working with people or PMOs adds tremendous variability; some would say complexity, which makes “best practice” an inappropriate term. Similarly to IT, engineers no longer operate solely in the research and design capability. Often engineers focus on compliance with standards, thus “best practice” also becomes one of the engineers “constants” and when applying compliance mindset to PMO practice staff with an engineering background seeks standards or “best practice” in a field which does not have “best practice”. https://en.wikipedia.org/wiki/Project_management_office
  • 8. The Complexity Continuum Simple Complicated Complex Edge of Chaos Chaos The DNA of Strategy Execution: Next Generation Project Management and PMO – Jack Duggal, 2018
  • 9. Simple • easy to understand or do • not difficult
  • 10. Complicated • Lot of intricately combined parts • Difficult or confusing to analyze, understand, do or explain Pic: https://www.gentlemansgazette.com/watch-parts-terms-functions-guide/
  • 11. Complex • Lot of different interrelated parts • Hard to separate, analyze, understand, do or explain Pic: http://crispme.com/25-stunning-photographs-of-geometry-and-fractals-in-nature/
  • 12. Simple vs Complicated vs. Complex Simple Complicated Complex Number and nature of parts Small number of elements are generally “atomic” and remain “static” Medium – Large number of simple elements High – Very High Multiplicity of heterogenous autonomous agents that can learn and adapt Interconnectedness and Interactions Low, and linear interactions Medium-high and linear interactions High, Non-linear, Dynamic and “Chaotic” local interactions but essentially based on a small number of rules Order Pre-defined, Superimposed. Single path to a pre-defined single answer Top-down, Superimposed. Multiple paths to a pre-defined single answer Bottom-up, Emergent order. Multiple paths to emergent multiple answers Nature of systems Deterministic and certain Deterministic rules ensure predictable responses knowing the starting conditions Adaptive and evolving. Hindsight doesn’t lead to foresight. Events and Landscape Commonplace events, Small and Static Landscape Relatively less commonplace, Vast but still largely Static landscape Rare to Very Rare, Dynamic (Dancing) Landscape Examples Simple machines (wheel, pulley, lever), Simple objects (pencil sharpener, traffic light), Pavlovian conditioning, etc. Mechanical watch (~130 parts), Car (~30,000 parts), Boeing 747 (~6 Million parts!), Social rituals such as Graduation Ceremony, or Olympics Opening Ceremony Collection of drones, etc. Ant colony, Bee hive, Swarm, Human brain, Cities, Stock markets, Organizations, Universe, Amazon rainforest ecosystems, Culture, Human conflicts, Financial Meltdown, 9/11, Social rituals like an Indian wedding, etc.
  • 13. Complex System “A system in which large networks of components with no central control and simple rules of operation give rise to complex collective behavior, sophisticated information processing, and adaptation via learning or evolution.” – Complexity, Melanie Mitchell
  • 14. From VUCA to DANCE “The reality of the world and today's business environment can be best characterized by the acronym DANCE: Dynamic and changing, Ambiguous and uncertain; Nonlinear, Complex, and Emergent and unpredictable— • Dynamic and constant change, driven by disruptive factors and shifting stakeholder needs and priorities. • There is ambiguity and uncertainty, the situation is ambiguous or not clear and can be interpreted in different ways, and it is uncertain which way it will go. The direction is not clear, and there is a lot of uncertainty about the future. • Unlike stable environments, where things are linear and expected, in a nonlinear world it is hard to ascertain the cause and effect, the output is not “proportional to the change in the input, and it is therefore, hard to plan or manage the unexpected. • The environment is complex because of the multiplicity of stakeholders involved, the number of interactions, and the sheer number of linkages and dependencies. It is not clear who all the stakeholders are, and the identified stakeholders are indecisive—they do not know what they want. • Scope, requirements, solutions, and stakeholders are emergent and unpredictable ßfrom the bottom-up, and it can be hard to plan top-down in a continually shifting landscape.” The DNA of Strategy Execution: Next Generation Project Management and PMO – Jack Duggal, 2018
  • 17. Cynefin Framework: Categorization • A Categorization and Sensemaking framework created by Dave Snowden • Simple and complicated contexts assume an ordered universe, where cause-and-effect relationships are perceptible, and right answers can be determined based on the facts. • Complex and chaotic contexts are unordered—there is no immediately apparent relationship between cause and effect, and the way forward is determined based on emerging patterns. • The ordered world is the world of fact-based management; the unordered world represents pattern-based management. • As knowledge increases, there is a clockwise drift from chaotic to complex to complicated to simple. • The drift from obvious to chaotic is not very obvious, but represents extreme vulnerability. https://hbr.org/2007/11/a-leaders-framework-for-decision-making
  • 18. Cynefin framework: Sensemaking • Simple / Obvious / Clear (Known Knowns): Sense- Categorize-Respond • Complicated (Known Unknowns, or Knowables): Sense-Analyze-Respond • Complex (Unknown Unknowns): Probe-Sense-Respond • Chaotic (Unknowables): Act-Sense-Respond • The very nature of the fifth context—disorder—makes it particularly difficult to recognize when one is in it. Here, multiple perspectives jostle for prominence, factional leaders argue with one another, and cacophony rules. The way out of this realm is to break down the situation into constituent parts and assign each to one of the other four realms.
  • 19. Recap RISING COMPLEXITY TRADITIONAL APPROACH INEFFECTIVE DESIGN NEW SOLUTIONS