5400 Westheimer Court
Houston, TX 77056-5310
713.627.5400 main
Mailing Address:
P.O. Box 1642
Houston, TX 77251-1642
December 16, 2016
Ms. Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426
Re: Monthly Progress Report
Algonquin Gas Transmission, LLC
Access Northeast Project - Docket No. PF16-1-000
Dear Ms. Bose:
On November 17, 2015, the Director of the Office of Energy Projects issued a letter in
the above-referenced docket approving the request of Algonquin Gas Transmission, LLC
(“Algonquin”) to commence the Federal Energy Regulatory Commission’s (“Commission”)
Pre-Filing Review Process for its proposed Access Northeast Project (“Project”). Pursuant to
Section 157.21(f)(6) of the Commission’s regulations,1
Algonquin herewith submits its monthly
progress report for the Project for the period October 1, 2016 through October 31, 2016.
Should you have any questions regarding this filing, please contact the undersigned at
(713) 627-4515 or Chris Harvey, Director, Rates & Certificates at (713) 627-5113.
/s/ Leanne Sidorkewicz
Leanne Sidorkewicz
Project Director, Rates & Certificates
Attachments
cc: John Peconom (FERC)
Harry Jeudy (FERC)
1
18 C.F.R. § 157.21(f)(6) (2016).
1
Algonquin Gas Transmission, LLC
Access Northeast Project - FERC Docket No. PF16-1-000
FERC Pre-Filing Process
MONTHLY PROGRESS REPORT
Period Ending: October 31, 2016 Report No. 11
By letter order dated November 17, 2015, Algonquin Gas Transmission, LLC (“Algonquin”) was
granted approval by the Federal Energy Regulatory Commission (“FERC”) to utilize FERC’s Pre-
Filing Review Process for the Access Northeast Project (the “Project”) with facilities proposed in
New Jersey, New York, Connecticut, Rhode Island, and Massachusetts. The Project has been
assigned Docket No. PF16-1-000.
This Monthly Progress Report provides a brief summary of significant Project activities or changes
to Project facilities that have occurred from October 1, 2016 to October 31, 2016. Activities and
milestones covered in this report associated with the FERC Pre-Filing Review Process, landowner
survey permission, field surveys, agency and stakeholder outreach are also provided below.
1.0 FERC NEPA REVIEW
Algonquin is continuing its comprehensive analysis of the Access Northeast Project and remains
fully committed to providing a regional solution for more reliable and affordable energy service
for the benefit of New England’s consumers and to meet each state's energy and environmental
goals and policies. The Independent System Operator for New England (ISO-New England) who
is responsible for operating the electric grid frequently reiterates that pipeline capacity within the
New England region is a major concern, stating that “ultimately, improving the natural-gas
delivery infrastructure in New England… will have the most impact on addressing the reliability,
price volatility, and negative emission impacts during winter.” [1]
Additionally, Gordon van Welie,
President and CEO of ISO-NE, recently commented that New England’s power generation
situation is precarious during the winter time, ISO-NE is concerned that beyond 2019 it may
become unsustainable during extreme cold conditions. [2]
Algonquin believes it is prudent to take additional time to solidify the commercial foundation for
critically needed infrastructure and to complete its analysis of the Access Northeast facilities. As
such, Algonquin expects limited activity on the FERC docket while this evaluation is ongoing.
Algonquin will re-engage with FERC Staff, agencies and other interested stakeholders through
pre-filing activities during the first half of 2017. Algonquin anticipates filing draft Resource
Reports by mid-2017 followed by the FERC Application in late 2017. Algonquin appreciates the
diligent work that has been accomplished to date on the project through the FERC pre-filing
process by the FERC Staff, agencies and other interested stakeholders. Algonquin will resume
providing updates in the monthly progress reports in 2017 as the Project advances.
[1]
ISO New England 2016 Regional Electricity Outlook (available at: https://www.iso-ne.com/static-
assets/documents/2016/03/2016_reo.pdf)
[2]
New England Council Regional Energy Meeting Presentation Sept. 28, 2016 (available at: https://www.iso-
ne.com/static-assets/documents/2016/09/gvw__nec_9_28_2016.pdf)
2
2.0 PROJECT ROUTING AND FACILITIES
Algonquin continues to conduct an evaluation of the proposed routes and new above-ground
facilities. In addition, Algonquin will continue to coordinate with stakeholders with respect to
developing appropriate route variations and will provide the FERC with any alignment revisions
as they are developed.
3.0 LANDOWNER SURVEY PERMISSION
Table 3.1 summarizes the status of landowner survey permission for the Access Northeast Project.
Aboveground facilities that are owned in fee by Algonquin are not included in the table below.
Table 3.1: Status of Survey Permission for the Access Northeast Project
Facility
Survey Permission Granted
(%)
Pipeline Facilities
Hanover 42-inch Take-up and Relay 95
Stony Point 42-inch Take-up and Relay 75
Southeast 42-inch Take-up and Relay 89
Oxford 42-inch Take-up and Relay 93
Cromwell 36-inch Loop 81
Chaplin 36-inch Loop 88
Q-1 30-inch Loop 76
I-8 30-inch Loop 75
West Boylston 16-inch Lateral 83
Acushnet 24-inch Connector 34
New Aboveground Facilities
Rehoboth Compressor Station 100
West Boylston M&R Station 100
Acushnet M&R Station 100
Access Northeast LNG Facility 100
4.0 FIELD SURVEYS
A summary of the field survey status is presented below.
4.1.1 Civil Surveys
Algonquin has completed approximately 92 percent of the centerline survey for the Project
pipelines. No detailed pipeline or aboveground pipeline facility survey has been completed at this
time. Algonquin is in the process of obtaining survey permission for the remaining parcels that
have not yet been surveyed.
3
4.1.2 Biological Field Surveys and Consultations
Algonquin has concluded its wetland and waterbody field survey efforts for 2016 for the Access
Northeast Project. The wetland and waterbody field surveys for the Project commenced in August
2015 and are now complete for all properties where landowner access has been obtained. Overall,
approximately 113 miles of the 123 total miles (92 percent) associated with the Project have been
surveyed.
Wetland Delineation Survey Status
• Hanover 42-inch Take-up and Relay (Ramapo), NY – 100 percent complete.
• Stony Point 42-inch Take-up and Relay (Somers to Southeast), NY – 87 percent
complete.
• Southeast 42-inch Take-up and Relay (Danbury to Oxford), CT – 95 percent complete.
• Oxford 42-inch Take-up and Relay (Oxford to Cheshire), CT – 98 percent complete.
• Cromwell 36-inch Loop (Rocky Hill to Andover), CT – 100 percent complete.
• Chaplin 36-inch Loop (Eastford to Pomfret), CT – 100 percent complete.
• Q-1 30-inch Loop (Medway to Canton), MA – 88 percent complete.
• I-8 30-inch Loop (Braintree to Weymouth), MA – 86 percent complete.
• West Boylston 16-inch Lateral (Medway to West Boylston), MA – 87 percent complete.
• Acushnet 24-inch Connector (Freetown to Acushnet), MA – 96 percent complete.
• Access Northeast LNG Facility – 100 percent complete.
• Other Aboveground Facilities – 100 percent complete.
4.1.3 Cultural Resource Field Surveys and Consultations
The cultural resource identification field surveys for the Project (including informal
communication with Indian tribes), archaeological identification survey, and historic architectural
properties identification survey, is largely complete where landowner access has been obtained.
The cultural resource field surveys for the Project commenced in August 2015 and were completed
in October 2016 where landowner access has been obtained. Archaeological evaluation (Phase II)
fieldwork, for known sites potentially eligible for listing in the National Register of Historic
Places, commenced in August 2016 and was performed through October 2016 on select sites in
New York, Connecticut, and Massachusetts. Cultural resource field activities are currently on hold
and will resume when Algonquin determines a path forward for the Access Northeast Project. A
summary of stakeholder communications is included in Appendix A.
Cultural Resource Identification (Phase I) Surveys
• Hanover 42-inch Take-up and Relay (Ramapo), NY – 100 percent complete.
• Stony Point 42-inch Take-up and Relay (Somers to Southeast), NY – 69 percent complete.
• Southeast 42-inch Take-up and Relay (Danbury to Oxford), CT – 92 percent complete.
• Oxford 42-inch Take-up and Relay (Oxford to Cheshire), CT – 97 percent complete.
• Cromwell 36-inch Loop (Rocky Hill to Andover), CT – 99 percent complete.
• Chaplin 36-inch Loop (Eastford to Pomfret), CT – 98 percent complete.
• Q-1 30-inch Loop (Medway to Canton), MA – 99 percent complete.
4
• I-8 30-inch Loop (Braintree to Weymouth), MA – 76 percent complete.
• West Boylston 16-inch Lateral (Medway to West Boylston), MA – 85 percent complete.
• Acushnet 24-inch Connector (Freetown to Acushnet), MA – 41 percent complete.
• Access Northeast LNG Facility – 100 percent complete.
• Other Aboveground Facilities – 99 percent complete.
Archaeological Evaluation (Phase II) Investigations
• Hanover 42-inch Take-up and Relay (Ramapo), NY – 100 percent complete.
• Stony Point 42-inch Take-up and Relay (Somers to Southeast), NY – 50 percent complete.
• Southeast 42-inch Take-up and Relay (Danbury to Oxford), CT – 22 percent complete.
• Oxford 42-inch Take-up and Relay (Oxford to Cheshire), CT – 0 percent complete.
• Cromwell 36-inch Loop (Rocky Hill to Andover), CT – 0 percent complete.
• Chaplin 36-inch Loop (Eastford to Pomfret), CT – 0 percent complete.
• Q-1 30-inch Loop (Medway to Canton), MA – 45 percent complete.
• I-8 30-inch Loop (Braintree to Weymouth), MA – TBD.
• West Boylston 16-inch Lateral (Medway to West Boylston), MA – 0 percent complete.
• Acushnet 24-inch Connector (Freetown to Acushnet), MA – 0 percent complete.
• Access Northeast LNG Facility – 100 percent complete.
• Other Aboveground Facilities – 100 percent complete.
4.1.4 Geotechnical Surveys
Horizontal Directional Drilling Evaluation
Algonquin is currently collecting geotechnical borings to document existing subsurface conditions
and bedrock properties along 15 proposed HDD alignments currently under consideration. Table
3.2 below provides the status of the geotechnical boring investigations at each location.
Table 3.2: Status of HDD Geotechnical Boring Investigation
State, Facility, HDD Name County Municipality
Borings
Proposed
Borings
Complete
%
Complete
NEW YORK
Stony Point 42-inch Take-up and Relay
East Branch Croton River Putnam Southeast 3 3 100
CONNECTICUT
Southeast 42-inch Take-up and Relay
Route 7 Fairfield Danbury 5 5 100
Housatonic River Fairfield/ New
Haven
Newtown/
Southbury
7 6 86
Cromwell 36-inch Loop
Silvermine Brook (Beaver Brook) Windham Eastford 3 0 0
MASSACHUSETTS
Q-1 30-inch Loop
Charles River Norfolk Bellingham/
Franklin
1 0 0
Charles River Norfolk Medway 2 0 0
5
Table 3.2: Status of HDD Geotechnical Boring Investigation
State, Facility, HDD Name County Municipality
Borings
Proposed
Borings
Complete
%
Complete
Charles River Norfolk Millis/Norfolk 1 0 0
West Boylston 16-inch Lateral
Route 16 Worcester Milford 4 0 0
Route 495 Worcester Milford 5 0 0
Fisherville Pond Worcester Grafton 4 0 0
Route 90 Worcester Millbury 2 0 0
Flint Pond/Route 20 Worcester Grafton/
Shrewsbury
5 0 0
Mill Pond Worcester Shrewsbury 4 0 0
Route 290 Worcester Shrewsbury 5 0 0
Newton Pond Worcester Shrewsbury/
Boylston
4 0 0
TOTAL: 55 14 25
Geotechnical reports and HDD feasibility analyses will be developed once the geotechnical data
has been collected and analyzed.
Access Northeast LNG Facility
FEED level geotechnical and seismic studies have been completed for the proposed LNG facility
site in Acushnet, Massachusetts. The results of these studies are discussed in Algonquin’s Pre-
Filing Draft Resource Report 13, which was submitted to the FERC on May 31, 2016.
Ongoing plot plan optimization efforts will likely result in modifications to the site plan
arrangement for the LNG Facility. Such modifications may result in a need for additional
geotechnical data to complete the FEED efforts and to finalize Resource Report 13. Algonquin is
working with its contractors at this time to determine any additional geotechnical investigations at
the LNG Facility site and will consult further with FERC and other participating agencies, as
appropriate, prior to executing such investigations.
Other Access Northeast Project Aboveground Facilities
Algonquin is currently preparing a geotechnical survey plan to document existing subsurface
conditions and bedrock properties at Project compressor and meter station facilities. As the plans
for these facilities are developed, an assessment as to the geotechnical surveys required at each
location will be developed and progress will be summarized in future monthly reports.
4.1.5 Rare, Threatened & Endangered Species Surveys
Algonquin has initiated informal consultations with federal and state resource agencies to identify
the known locations of federal- or state-listed threatened or endangered species and species of
special concern that could potentially be affected by construction or operation of the Project.
Algonquin is consulting with the U.S. Fish and Wildlife Service, National Marine Fisheries
Service, New Jersey Department of Environmental Protection, New York State Department of
6
Environmental Conservation, Connecticut Department of Energy and Environmental Protection,
Rhode Island Department of Environmental Management, Massachusetts Department of
Environmental Protection, and State Natural Heritage Programs regarding the presence of
protected animal and plant species, and their habitats. Algonquin has initiated field surveys for
rare, threatened, and endangered species as follows.
Rare, Threatened, and Endangered Species Survey Status
• Bald Eagle – 100 percent complete.
• Vernal Pools – 83 percent complete.
• Bog Turtle Phase 1 – 99 percent complete.
• Bog Turtle Phase 2 – 98 percent complete.
• Indiana/Northern Long-eared Bat – 100 percent complete.
• Timber Rattle Snake – 100 percent complete.
• Wood/Box Turtle – 100 percent complete.
• Plants – 100 percent complete.
Several potential vernal pools have been identified that will require surveys in April/May of 2017.
The remaining wetlands where bog turtle Phase 1 and 2 surveys are required are currently located
on parcels with no access permission.
5.0 STAKEHOLDER OUTREACH
Algonquin has been meeting with governmental stakeholders since June 2015 after the Access
Northeast Project Open Season was announced and before Algonquin commenced landowner
notifications in New Jersey, New York, Connecticut, Rhode Island and Massachusetts in August
2015. Algonquin has been interacting with and informing the public and receiving feedback on
the Project through public meetings, landowner informational meetings, one-on-one discussions,
written materials and other means of communication.
The following meetings were held during the period covered by this report: (October 2016):
Connecticut
• October 11, 2016 - Richard Kehoe, District Director to U.S. Senator Richard
Blumenthal.
Massachusetts
• October 4, 2016 – Grafton, MA Conservation Commission – Request for Determination
of Applicability hearing to conduct geotechnical investigation.
• October 18, 2016 – Shrewsbury, MA Conservation Commission – Request for
Determination of Applicability hearing to conduct geotechnical investigation.
No meetings are currently scheduled or anticipated to occur in the next reporting period (November
2016).
7
Algonquin continues to work with stakeholders, including landowners, government agencies and
community leaders to refine the Access Northeast Project.
6.0 AGENCY CONTACTS
In addition to stakeholder outreach efforts with landowners and public officials, Algonquin has
been consulting with federal, state, and local regulatory agencies. Algonquin began contacting
federal and state regulatory agencies in New Jersey, New York, Connecticut, Rhode Island, and
Massachusetts in July 2015 to discuss the relevant permitting requirements for the Project. Since
that time, Algonquin has continued its outreach efforts with the key permitting agencies. The
consultations involve briefings, meetings, letter requests for resource information, telephone
discussions, and emails.
In recognition of the Pipeline and Hazardous Materials Safety Administration (“PHMSA”) process
for review of design spill criteria associated with a proposed FERC-jurisdictional LNG facility,
Algonquin also has initiated consultation with the PHMSA regarding the Access Northeast LNG
Facility.
During the period covered by this report the following meeting was held with agencies in the
Project area:
• October 4, 2016 – Grafton, MA Conservation Commission.
The following meeting is currently scheduled or anticipated to occur in the next reporting period
(November 2016):
• November 15, 2016 – Shrewsbury, MA Conservation Commission.
An updated Non-Landowners Federal, State, and Local Agency Contacts table is provided as
Attachment A.
ATTACHMENT A
Access Northeast Project Stakeholder List –
Non-Landowners Federal, State, and Local Agency Contacts
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
FEDERAL
U.S. Army Corps
of Engineers
(USACE)
New England
District, Regulatory
Division
Robert Desista,
Deputy Chief,
Regulatory Division
(978) 318-8338 robert.j.desista@nae02.usace.a
rmy.mil
696 Virginia Road
Concord, MA 01742
August 2015- Initial
notification call. Meeting
held on November 6th
.
No letter submitted.
Joint meeting with the
USEPA held on April 19,
2016.
Consultation
ongoing.
Cori Rose,
Senior Project
Manager
(978) 318-8306 Cori.M.Rose@usace.army.mi See above See above
USACE New York District ,
Regulatory Division
Jodi McDonald,
Section Chief,
Regulatory Branch
(917) 790-8420 jodi.m.mcdonald@usace.army.
mil
Jacob K. Javits Federal
Building
26 Federal Plaza, Room
2109
New York, NY 10278-
0090
September 2015- Initial
notification call. To be
coordinated with NE
Division meeting. No
letter submitted.
Consultation
ongoing.
U.S.
Environmental
Protection
Agency (USEPA)
Region 1 Timothy
Timmerman,
Region 1 Prime
Contact (NEPA)
(617) 918-1025 timmermann.timothy@
epa.gov
5 Post Office Square,
Suite 100
Boston, MA 02109-3912
September 2015- Initial
notification call. Mike
Marsh participated in
USACE meeting. No
letter submitted. Joint
meeting with the
USACE held on April
19, 2016.
Consultation
ongoing.
Anne Arnold,
Manager, Air
Program Branch
(617) 918-0047 arnold.anne@epa.gov See above See above
USEPA Region 2 Lingard Knutson,
Region 2 Prime
Contact (NEPA)
(212) 637-3747 knutson.lingard@epamail.epa.g
ov
290 Broadway
New York, NY 10007-
1866
September 2015- Initial
notification call. No letter
submitted.
Consultation
ongoing.
Steve Riva,
Air Programs
Branch,
- contact for air
permits
(212) 637-4074 riva.steven@epa.gov See above See above
National Marine
Fisheries
Service (NMFS) -
NOAA Fisheries
NMFS Northeast
Regional Office
Chris Boelke,
Field Office
Supervisor,
Habitat
Conservation
Division
(978) 281-9131 christopher.boelke@noaa.gov 55 Great Republic Drive
Gloucester, MA 01930
October 2015- Initial
notification call made.
Meeting held on April 8,
2016. Information
request letter submitted
in May 5, 2016.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Kimberly Damon-
Randall,
Assistant Regional
Administrator,
Protected
Resources Division
(978) 282-8485 kimberly.damon-
randall@noaa.gov
See above See above
Alison T. Verkade
Environmental
Specialist EFH
Consultation
(978) 281-9266 alison.verkade@noaa.gov See above See above. Email
response to letter
received April 7,
2016.
U.S. Fish and
Wildlife Service
(USFWS)
New England Field
Office
Anthony (Tony)
Tur,
Endangered
Species Biologist
(603) 223-2541
ext. 24
anthony_tur@fws.gov 70 Commercial Street,
Suite 300
Concord, NH 03301-
5087
September 2015- Initial
notification call. Meeting
attended October 30th
(NE Field Office will
coordinate with NY Field
Office). Information
request letter submitted
November 2, 2015.
Consultation
ongoing.
Response to letter
pending.
USFWS New York Field
Office
Tim Sullivan (607) 753-9334 tim_r_sullivan@fws.gov 3817 Luker Road,
Cortland, NY 13045
See above. Project
notification letter
submitted January 25,
2016.
Consultation
ongoing.
USFWS New Jersey Field
Office
Wendy Walsh,
Senior Fish and
Wildlife Biologist
(609) 646-9310
ext. 5274
Wendy_Walsh@fws.gov Atlantic Professional
Park, 4 East Jimmie
Leeds Road
Galloway, New Jersey
08205
Project introduction and
information request
letter to be submitted
July 2016.
Consultation
ongoing.
Response to letter
pending.
STATE OF NEW JERSEY
New Jersey
Department of
Environmental
Protection
(NJDEP)
Division of Parks
and Forestry, State
Forestry Service,
Office of Natural
Lands
Management,
Natural Heritage
Program
Larry Miller (609) 984-1339 Larry.Miller@dep.nj.gov P.O. Box 420, Trenton,
NJ 08625-0420
May 17, 2016 – Letter
requesting information
on rare, threatened, and
endangered species in
NJ.
Response letter
dated May 26,
2016.
Division of Fish
and Wildlife,
Endangered and
Nongame Species
Program
Kris Schantz (908) 638-4381 Kris.Schantz@dep.nj.gov 1 VanSyckels Road,
Clinton, NJ 08809
See above Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
NJDEP Historic
Preservation Office
Katherine J.
Marcopul
Deputy State
Historic Preservation
Officer
(609) 984-5816 Kate.marcopul@dep.nj.gov P.O. Box 420, Trenton,
NJ 08625-0420
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Historic
Preservation Office
Vincent Maresca
Senior Historic
Preservation
Specialist
(609) 633-2395 Vincent.maresca@dep.nj.gov P.O. Box 420, Trenton,
NJ 08625-0420
See above See above
STATE OF NEW YORK
New York State
Department of
Environmental
Conservation
(NYSDEC)
Division of
Environmental
Permits
Chris Hogan (518) 402-9151 cmhogan@gw.dec.state.ny.us 625 Broadway
4th Floor
Albany, NY 12233
July 15, 2015 – Email
communication, general
information notification.
Provided agency with
copies of landowner
letters. Conference call
with NYSDEC (Mike
Higgins) held October
29, 2015. Reviewed
status of AGT Projects.
Face-to-face meeting
held on January 12,
2016. No letter
submitted.
Consultation
ongoing.
Mike Higgins,
Project Manager
(518) 402-9179 michael.higgins@gw.dec.state.
ny.us
See above See above
NYSDEC Division of
Environmental
Permits Region 3
Daniel Whitehead,
Region 3 Permits
Administrator
(845) 256-3054 r3dep@gw.dec.state.ny.us 21 South Putt Corners
Road
New Paltz, NY 12561
See above See above
NYSDEC Bureau of Habitat,
Division of Fish,
Wildlife & Marine
Resources
Mr. Timothy Post,
Freshwater
Wetlands Program
Manager
(518) 402-8903 tjpost@gw.dec.state.ny.us 625 Broadway
5th Floor,
Albany, NY 12233-4756
See above See above
NYSDEC Division of Water
Bureau of Water
Permits
David Gasper, P.E.
SPDES Permits
(518) 402-8114 djgasper@gw.dec.state.ny.us 625 Broadway
4th Floor,
Albany, NY 12233-1750
See above See above
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
NYSDEC Division of Fish,
Wildlife, & Marine
Services
Bureau of Wildlife
Gordon Batcheller,
Chief, Bureau of
Wildlife
(518) 408-8832 625 Broadway
Albany, NY 12233-4754
See above See above
NYSDEC Division of Air
Resources,
Bureau of
Stationary Sources
George Sweikert,
DEC Region 3
(845) 256-3185 George.sweikert@
dec.ny.gov
21 South Putt Corners
Rd.
New Paltz, NY 12561
See above See above
NYSDEC Division of Fish,
Wildlife, & Marine
Services
New York Natural
Heritage Program
Ms. Tara Seoane,
Information Services
(518) 402-8935 nathert@gw.dec.state.ny.us 625 Broadway
5th Floor,
Albany, NY 12233-4757
See above. Information
request letter submitted
January 25, 2016.
Consultation
ongoing.
Response to letter
received February
12, 2016 listing
state-listed
species in vicinity
of Project.
NYSDEC Division of Fish,
Wildlife, & Marine
Services
Bureau of Habitat
Ms. Heather
Gierloff,
Biologist
(845) 256-3086 heather.gierloff@dec.ny.gov 21 South Putt Corners
Road
New Paltz, NY 12561
See above. Information
request letter submitted
January 25, 2016.
Follow up request
submitted via email on
March 31, 2016.
Consultation
ongoing.
Response to letter
pending.
New York City
DEP
Bureau of Water
Supply
Watershed
Protection
Programs
Mary Galasso,
Supervisor, Storm
Water Programs
(914) 773-4440 mgalasso@dep.nyc.gov 465 Columbus Avenue
Valhalla, NY 10595
October 2015 - Initial
notification. Brief
introduction meeting
held on December 2,
2015. No letter
submitted.
Consultation
ongoing.
NY State Historic
Preservation
Office (SHPO)
NYS Office of
Parks Recreation
and Historic
Preservation Field
Services Bureau
Ruth Pierpont,
Director
(518) 237-8643
ext. 3269
ruth.pierpont@oprhp.state.ny.us NY State Historic
Preservation
Peebles Island
Resource Center
P.O. Box 189
Waterford, NY 12188-
0189
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Tim Lloyd, Historic
Preservation
Specialist
(518) 268-2186 timothy.lloyd@parks.ny.gov See above See above
NY State Office
of Parks
Recreation and
Historic
Preservation
--
(845) 889-4100 State Parks-Taconic
Regional Office
PO Box 308
9 Old Post Road
Contact Pending Pending
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Staatsburg, NY 12580
STATE OF CONNECTICUT
Connecticut
Department of
Energy and
Environmental
Protection
(CTDEEP)
Bureau of Water
Protection and
Land Reuse
Frederick L. Riese,
Senior
Environmental
Analyst
(860) 424-4110 frederick.riese@ct.gov 79 Elm Street
Hartford, CT 06106-
5127
July 13, 2015 – Email
communication, general
information notification.
Provided agency with
copies of landowner
letters. Conference call
with CTDEEP (Fred
Riese) held October 29,
2015. Reviewed status
of AGT Projects. Face-
to-face meeting held on
December 16, 2015.
Consultation
ongoing.
Denise Ruzicka,
Director, Planning
and Standards
Division
(860) 424-3853 denise.ruzicka@ct.gov See above See above
Cheryl Chase,
Director, Inland
Water Resources
Division
(860) 424-3706 cheryl.chase@ct.gov See above See above
CTDEEP Office of Long
Island Sound
Program
Brian
Golembiewski,
Supervising
Environmental
Analyst
(860) 424-3867 brian.golembiewski@ct.gov 79 Elm Street
Hartford, CT 06106-
5127
See above See above
CTDEEP Engineering &
Enforcement
Section
Bureau of Air
Management
Lidia J. Howard, Air
Pollution Control
Engineer
(860) 424-3539 lidia.howard@ct.gov 79 Elm Street
Hartford, CT 06106-
5127
See above See above
CTDEEP Bureau of Materials
Management and
Compliance
Assurance
Water Permitting &
Enforcement
Division
Donald Gonyea,
Environmental
Analyst
(860) 424-3827 donald.gonyea@ct.gov 79 Elm Street
Hartford, CT 06106-
5127
See above See above
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
CTDEEP Inland Fisheries
Division
Headquarters
Mr. Donald
Mysling, Senior
Fisheries Habitat
Biologist
(860) 424-3474 79 Elm Street
Hartford, CT 06106
See above. Information
request letter submitted
on March 8, 2016.
Follow-up request
submitted on May 2,
2016.
See above.
Response to letter
pending.
CTDEEP Inland Fisheries
Division, Eastern
District
Headquarters
Mr. Brian D.
Murphy, Senior
Fisheries Habitat
Biologist
(860) 295-9523 209 Hebron Road
Marlborough, CT 06437
See above See above.
CTDEEP Wildlife Division -
Natural Diversity
Data Base
Dawn McKay (860) 424-3592 dawn.mckay@ct.gov 79 Elm Street, 6th Floor
Hartford, CT 06106-
5127
See above. Information
request letter submitted
November 3, 2015.
Follow up requests sent
via email on December
18, 2015, January 19,
2016, and March 15,
2016.
Consultation
ongoing. Partial
response
received on
March 14, 2016
for several State
owned parcels.
Response to letter
pending.
Jenny Dickson,
Supervising Wildlife
Biologist
(860) 424-3114 Jenny.Dickson@ct.gov DEEP Wildlife Diversity
and Outreach
Programs, Session
Woods WMA, P.O. Box
1550, Burlington, CT
06013
May 17, 2016 – Initial
contact by phone
regarding proposed bat
survey study plan.
Meeting anticipated in
June 2016.
Consultation
ongoing.
Connecticut
Siting Council
Melanie Bachman,
Acting Director
(860) 827-2935 10 Franklin Square
New Britain, CT 06051
July 2015 - Initial
telephone contact with
Acting Director. Site
visits to be scheduled in
early 2016 once FERC’s
Pre-Filing Process
commences.
Consultation
ongoing.
Connecticut
Department of
Economic and
Community
Development
Catherine Labadia,
Deputy State
Historic Preservation
Officer and Staff
Archaeologist
(860) 256-2764 catherine.labadia@ct.gov One Constitution Plaza
Second Floor
Hartford, CT 06103
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Comments on
submitted reports
and UDP are
pending.
Connecticut
Office of the
State
Archaeologist
Dr. Brian Jones,
State Archaeologist
(860) 486-5248 brian.jones@uconn.edu Connecticut
Archaeology Center
2019 Hillside Road,
Unit 1023
Storrs, CT 06269-1023
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Connecticut
Native American
Heritage
Advisory
Council
Ruth Torres, Chair (860) 918-6688 67 Treasure Road
Narragansett, RI 02882
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Connecticut
Department of
Agriculture
Office of the
Commissioner
Jason Bowsza (860) 713-2526 Jason.Bowsza@ct.gov 165 Capitol Avenue
Suite 161
Hartford, CT 06106
August 18, 2015.
Meeting scheduled for
May 9, 2016.
Consultation
ongoing.
Bureau of
Agricultural
Development and
Resource
Preservation
Linda Piotrowicz,
Bureau Director
(860) 713-2533 Linda.piotrowicz@ct.gov Meeting, May 9, 2016.
Cameron Weimar,
Director of Farmland
Preservation
(860) 713-2552 cam.weimar@ct.gov See above See above
Connecticut Municipal Inland Wetlands and Watercourse Agencies
Andover Inland
Wetlands and
Watercourses
Commission
John Valente
Inland Wetlands
Agent
(860) 742-4036 a209@mindspring.com
or
andoverbuilding@comcast.net
Town Hall
17 School Road
Andover 06232
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Bethel Inland
Wetlands
Commission
Beth Cavagna
Inland Wetlands
Agent
(203) 794-8578 cavagnab@bethel-ct.gov or
landuse@bethel-ct.gov
1 School Street
Bethel, CT 06801
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Brookfield
Inland Wetlands
Commission
Alice Dew AICP
Inland Wetlands
Enforcement Officer
203-775-7316 ADew@Brookfieldct.gov 100 Pocono Road
Brookfield, CT 06804
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Chaplin Inland
Wetlands
Commission
Scott Mathies
Chairman
(860) 455-0073 assistant@chaplinct.org Chaplin Town Hall
495 Phoenixville Road
Chaplin, CT 06235
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Cheshire Inland
Wetlands and
Watercourses
Commission
Suzanne M.
Simone
Environmental
Planner
(203) 271-6670 ssimone@cheshirect.org 84 South Main Street
Cheshire, CT 06410
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Cromwell Inland
Wetlands and
Watercourses
Agency
Fred Curtin
Zoning & Wetlands
Compliance Officer
(860) 632-3422 fcurtin@cromwellct.com Town Hall
41 West Street
Cromwell, CT 06416
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Danbury
Environmental
Impact
Commission
Daniel L. Baroody
Senior Inspector,
Environmental
Impact Commission
(203) 797-4625 d.baroody@ci.danbury.ct.us City Hall
155 Deer Hill
Danbury, CT 06810
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Eastford Inland
Wetlands and
Watercourses
Commission
Susan Yorgensen
Inland Wetlands
Agent
(860) 429-8960 jyorgensen@hotmail.com Town Office Building
P.O. Box 98
Eastford, CT 06242
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Glastonbury
Inland Wetlands
and
Watercourses
Agency
Tom Mocko
Environmental
Planner
(860) 652-7514 thomas.mocko@glastonbury-
ct.gov
Town Hall
PO Box 6523
Glastonbury, CT 06033
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Hebron
Conservation
Commission
John A. Soderberg
Wetlands Agent
(860) 228-5971
ext. 139
15 Gilead Street
Hebron, CT 06248
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Middlebury
Conservation
Commission
Deborah Seavey
Wetland
Enforcement Officer
(203) 577-4162 wetlandsoffice@middlebury-
ct.org
1212 Whittemore Road
Middlebury, CT 06762
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Naugatuck
Inland Wetlands
and Watercourse
Commission
Keith D. Rosenfeld
Wetland
Enforcement Officer
(203) 720-7042 krosenfeld@naugatuck-ct.gov Town Hall
229 Church Street
Naugatuck, CT 06770
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Newtown
Inland Wetlands
Commission
Rob Sibley
Deputy Director of
Planning & Land
Use
(203) 270-4276 Rob.Sibley@newtown-ct.gov Newtown Municipal
Center
3 Primrose Street,
Newtown, CT 06470
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Oxford
Conservation
Commission &
Inland Wetlands
Agency
Andrew Ferrillo Jr.
Inland Wetlands
Enforcement Officer
(203) 888-2546
ext. 3038
IWOfficer@Oxford-ct.gov 486 Oxford Road
Oxford, CT 06478
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Pomfret Inland
Wetlands and
Watercourses
Commission
Ryan Brais
Wetlands
Enforcement Officer
(860) 974-9135 rbrais301@hotmail.com P.O. Box 286
Five Haven Road
Pomfret Center, CT
06259
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Prospect Inland
Wetlands
Commission
William Donovan
Land Use Inspector,
IW Agent
(203) 758-4461 landuse01@yahoo.com 36 Center Street
Prospect, CT 06712
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Rocky Hill Open
Space and
Conservation
Commission
Bob Alvarado
Engineering
(860) 258-2734 balvardo@rockyhillct.gov 761 Old Main Street
Rocky Hill, CT 06067
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Southbury
Inland Wetlands
Commission
Mark Massoud
Inland Wetlands
Enforcement Officer
(202) 262-0624 landuse@southbury-ct.gov 501 Main Street South
Southbury, CT 06488
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Waterbury
Inland Wetlands
and
Watercourses
Commission
James A. Sequin,
AICP
City Planner
(203) 574-6817 jsequin@waterburyct.org 185 South Main Street,
5th Floor, One Jefferson
Square
Waterbury, CT 06702
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
STATE OF RHODE ISLAND
Rhode Island
Department of
Environmental
Management
(RIDEM)
Office of Water
Resources
Terrence Gray, PE,
Associate Director
for Environmental
Protection
(401) 222-4700
ext. 2412
235 Promenade Street
Providence, RI 02908-
5767
Week of July 23, 2015 -
Initial notification to
RIDEM Director.
Consultation
ongoing.
Alicia Good, PE,
Assistant Director of
Water Resources
(401) 222-3961
ext. 7214
See above See above
Janet Coit, Director See above See above
RIDEM Office of Air
Resources
Doug McVay,
Chief, Office of Air
Resources
(401) 222-2808
ext. 7011
Doug.mcvay@dem.ri.gov 235 Promenade Street
Providence, RI 02908-
5767
Contact Pending.
Meeting to be scheduled
in May 2016.
Consultation
ongoing.
Rhode Island
Coastal
Resource
Management
Council
Rhode Island
Coastal Resource
Management
Council
Grover Fugate,
Executive Director
(401) 783-3370 Stedman Government
Center Suite 3
4808 Tower Hill Road,
Wakefield, RI 02879-
1900
Week of July 27, 2015 -
Initial telephone
notification to Executive
Director. Meeting
attended November 2,
2015. Project overview
presented. Letter
submitted on February
18, 2016.
Consultation
ongoing.
Response letter
received on May
3, 2016 providing
CZMA
consistency
determination.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Rhode Island
Division of
Planning and
Development
Natural Heritage
Program
Paul Jordan,
Supervising GIS
Specialist
(401) 222-2776
x4315
235 Promenade Street
Providence, RI 02908
Information request
letter submitted
November 3, 2015.
Follow up submission
sent on January 6,
2016.
Email response
received on
January 6, 2016
stating no impact
on species.
Consultation
ongoing.
Rhode Island
Historic
Preservation &
Heritage
Commission
Historic
Preservation &
Heritage
Commission
Edward
Sanderson, Director
and Deputy State
Historic Preservation
Officer
(401) 222-2678 Old State House
150 Benefit Street
Providence, RI 02903
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Charlotte Taylor,
Archaeologist
(401) 222-4140 ctaylor@preservation.ri.gov Notification letter sent
on August 18, 2015.
Consultation
ongoing.
COMMONWEALTH OF MASSACHUSETTS
MA Executive
Office of Energy
and
Environmental
Affairs (EOEEA)
Massachusetts
Environmental
Protection Act
(MEPA) Office
Deirdre Buckley,
Director
(617) 626-1044 Deirdre.Buckley@state.ma.us 100 Cambridge Street,
Suite 900
Boston, MA 02114
July 22, 2015 - Initial
telephone contact.
Meeting held in August
2015.
Consultation
ongoing.
Massachusetts
Office of Coastal
Zone
Management
Bruce K. Carlisle,
Director
(617) 626-1200 czm@state.ma.us 251 Causeway Street,
Suite 800
Boston, MA 02114
Week of July 27, 2015 –
Initial telephone contact.
Meeting targeted for
June 2016.
Consultation
ongoing.
Massachusetts
Department of
Environmental
Protection
(MassDEP)
Marty Suuberg,
Commissioner
(617) 292-5915 One Winter Street
Boston, MA 02114
July 24, 2015 - Initial
telephone contact.
MassDEP meeting at
Commissioner level held
in August 2015.
Consultation
ongoing.
Kate Kerigan -
Permit Ombudsman
(617) 556-1181 Kathleen.kerigan@state.ma.us See above See above
MassDEP Southeast Region
Office
Millie Garcia-
Serrano, Regional
Director
(508) 946-2700
Permit
Assistance:
(508) 946-2714
20 Riverside Drive
Lakeville, MA 02347
(Oversees Towns of
Freetown, Acushnet,
Sharon, Canton,
Walpole, Stoughton,
Braintree, and
Weymouth)
July 24, 2015 - Initial
telephone contact.
MassDEP meeting at
Commissioner level held
in August 2015. Meeting
at the SERO held on
December 3, 2015.
Consultation
ongoing.
Tom Cushing, Air
Permitting Chief for
MassDEP Southeast
(508) 946-2824 Thomas.cushing@state.ma.us See above See above
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Marty Suuberg,
Commissioner
See above See above
Paul M. Cavanagh,
Regional Planner
(508) 866-2580
x122
Paul.Cavanagh@state.ma.us Resource Management
Planning Program
Department of
Conservation and
Recreation
Southeast Region
Headquarters
PO Box 66
194 Cranberry Road
South Carver, MA
02366
March 8, 2016
telephone contact.
Copies of survey
permission request
letters for DCR owned
properties submitted via
email on March 15,
2016 along with
shapefiles of proposed
facilities in
Massachusetts. Meeting
held May 19, 2016.
Consultation
ongoing.
MassDEP Central Region
Office
MaryJude Pigsley,
Regional Director
(508) 792-7650
Service Center:
(508) 792-7683
Permit
Assistance:
(508) 767-2734
Maryjude.Pigsley@state.ma.us 8 New Bond Street
Worcester, MA 01606
(Oversees Towns of
Medway, Milford, Upton,
Sutton, Millbury,
Grafton, Shrewsbury,
Boylston, West Boylston,
Franklin, Millis, and
Norfolk )
July 24, 2015 - Initial
telephone contact.
MassDEP meeting at
Commissioner level held
in August 2015. Meeting
at the CERO held on
December 4, 2015.
Consultation
ongoing.
Massachusetts
EEA Energy
Facilities Siting
Board (EFSB)
Andrew Greene,
Director
(617) 305-3526 Andrew.Greene@state.ma.us One South Station,
Fifth Floor
Boston, MA 02110
July, 2015 - Initial
telephone contact.
Technical meeting
currently being
scheduled for June
2016.
Consultation
ongoing.
Massachusetts
Energy and
Environmental
Affairs (EEA)
Mr. Leo Roy,
Commissioner
Department of
Conservation and
Recreation
(617) 626-1250 leo.roy@massmail.state.ma.us 251 Causeway Street,
Suite 900
Boston, MA 02114-2104
Contact Pending.
Meeting targeted for
June 2016.
Consultation
ongoing.
Ellen Berkland
Archaeologist
Department of
Conservation and
Recreation
(617) 626-1377 ellen.berkland@state.ma.us 251 Causeway Street,
Suite 900
Boston, MA 02114-2104
Contact Pending.
Notification targeted for
April 2016.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Natural Heritage &
Endangered
Species Program
Thomas French,
Assistant Director
(508) 389-6355 tom.french@state.ma.us Natural Heritage &
Endangered Species
Program
Massachusetts Division
of Fisheries & Wildlife
1 Rabbit Hill Road
Westborough, MA
01581
August 2015 – Initial
notification call. Meeting
attended October 26,
2015.
Consultation
ongoing.
Eve Schluter
Chief of Regulatory
Review
(508) 389-6346 eve.schluter@state.ma.us See above. Information
request letter submitted
November 4, 2015.
Meeting held on
February 22, 2016.
Email responses
received on
November 5 and
December 16,
2015 and January
27, 2016. Letter
responses
received on
October 30 and
December 4,
2015.
Consultation
ongoing.
Division of
Fisheries and
Wildlife
Dr. Caleb Slater 1 Rabbit Hill Road
Westborough, MA
01581
Information request
letter submitted on
March 8, 2016.
Consultation
ongoing.
Response to letter
pending.
Massachusetts
Historical
Commission
Massachusetts
State Historic
Preservation Office
Brona Simon,
State Historic
Preservation Officer
(617) 727-8470 The Massachusetts
Archives Building
220 Morrissey
Boulevard
Boston, MA 02125
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Jonathan K.
Patton,
Preservation
Planner/Archaeologi
st
(617) 727-8470 Jonathan.patton2@state.ma.us See above See above.
Massachusetts
Commission on
Indian Affairs
John A. Peters,
Executive Director
(617) 573-1291 100 Cambridge Street,
Suite 300
Boston, MA 02125
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Massachusetts Municipal Conservation Commissions
Acushnet
Conservation
Commission
Merilee Kelly
Conservation Agent
(508) 998-0202 122 Main Street,
Acushnet, MA 02743
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Bellingham
Conservation
Commission
Clifford Matthews,
Chairman c/o
Anne Matthews,
Conservation
Administrator
(508) 657-2858 AMatthews@BellinghamMA.org 2 Maple St.
Bellingham 02019
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
Boylston
Conservation
Commission
Melanie Rich
Administrative
Assistant
(508) 869-6127 conservation@boylston-ma.gov 221 Main Street
Boylston, MA 01505
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
Town of
Braintree
Department of
Planning and
Community
Development
Christine Stickney,
Director
(781) 794-8232 cstickney@braintreema.gov 1 JFK Memorial Dr.
Braintree, MA 02184
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Elizabeth Schaffer,
Administrative
Assistant
(781) 794-8235 eschaffer@braintreema.gov Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Canton
Conservation
Commission
Cynthia B.
O’Connell,
Conservation Agent
(781) 821-5000 coconnell@town.canton.ma.us 801 Washington St.
Canton, MA 02021
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Franklin
Conservation
Commission
Kathleen Celorier
Conservation Office
Secretary
(508) 520-4929 kcelorier@franklin.ma.us or
conservation@franklin.ma.us
Municipal Building
355 E. Central Street
Franklin, MA 02038
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
Freetown
Conservation
Commission
(508) 644-2201
ext. 7
conservation@freetownma.gov 3 North Main Street
Assonet, MA 02702
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Grafton
Conservation
Commission
Linda Dettloff
Conservation Agent
(508) 839-5335
ext. 1138
concom@grafton-ma.gov 30 Providence Road
Grafton, MA 01519
Meeting held on April 8,
2016 to discuss
proposed geotechnical
investigation.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Medway
Conservation
Commission
Bridget Graziano
Conservation Agent
(508) 533-3292 bgraziano@townofmedway.org 155 Village Street,
Medway MA 02053
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
Milford
Conservation
Commission
Joseph Zacchilli (508) 634-2314 jzacchilli@townofmilford.com Town Hall
52 Main Street, Milford,
MA
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
Vonnie Reis P.E. (508) 634-2317 vreis@townofmilford.com Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Millbury
Conservation
Commission
Michelle Desorcy
Clerk
(508) 865-5411 conservation@townofmillbury.n
et
127 Elm Street
Millbury, MA 01527
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
Millis
Conservation
Commission
Dr. James Lederer
Chairman
(508) 376-7045 conservation@millis.net 900 Main Street
Millis, MA 02054
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Camille Standley
Administrative
Assistant
508) 376-7045 Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Norfolk
Conservation
Commission
Janet Delonga
Agent
(508) 541-8455 jdelonga@virtualnorfolk.org 1 Liberty Lane
Norfolk, MA 02056
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
Rehoboth
Conservation
Commission
Leeann Bradley,
Agent
(508) 252-6891 lbradley@Town.Rehoboth.MA.
US
148 Peck Street
Rehoboth, MA 02769
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Sharon
Conservation
Commission
Gregory Meister
Conservation
Commission
Administrator
(781) 784-1511 sharonconcom@yahoo.com Sharon Community
Center
1 Community Center
Drive
Mailing Address:
219 Massapoag Ave.
Sharon, MA 02067
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Shrewsbury
Conservation
Commission
Kenneth Polito
Conservation
Commission and
Lake Quinsigamond
Commission
Representative
(508) 841-8502 bstone@shrewsburyma.gov 100 Maple Ave
Shrewsbury, MA 01545
Contact made on April
11, 2016 regarding
proposed geotechnical
investigation program.
Consultation
ongoing.
Stoughton
Conservation
Commission
James B. Conlon,
PWS, MS, RS,
CHO, MACSE
Environmental
Affairs Officer &
Agent of the
Conservation
Commission
(781) 341-1300
x9262
jconlon@stoughton-ma.gov 2nd Floor 10 Pearl
Street
Stoughton, MA
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Sutton
Conservation
Commission
Wanda M. Bien
Secretary
(508) 865-8728 w.bien@town.sutton.ma.us 4 Uxbridge Road
Sutton, MA
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Upton
Conservation
Commission
Christine Scott
Chairperson
(508) 529-6286 conservationmember@uptonma
.gov
1 Main Street, Box 9
Upton, MA 01568
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Matt Selby
Conservation Agent
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Walpole
Conservation
Commission
Pam Smith
Admin. Board
Secretary
(508) 660-7268 Town Hall
135 School Street
Walpole, MA 02081
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Landis Hershey
Conservation Agent
(508) 660-7253 See above. See above.
West Boylston
Conservation
Commission
Toby Goldstein
Assistant to the
Conservation
Commission
(774) 261-4071 concomm@westboylston-
ma.gov
140 Worcester Street
West Boylston, MA
01583
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Weymouth
Conservation
Commission
Mary Ellen Schloss (781) 340-5007 75 Middle Street,
Weymouth, MA 02189
Contact Pending.
Meetings to be
scheduled upon
request.
Consultation
ongoing.
Massachusetts Municipal Historical Commissions
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Acushnet
Historical
Commission
Pauline Teixeira
Chairperson
(508) 998-0280 bellhistoric@bellinghamma.org 122 Main Street
Acushnet, MA 02743
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Bellingham
Historical
Commission
Marcia A. Crooks
Chairperson
(508) 883-8358 3 Common Street
Bellingham, MA 02019
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Boylston
Historical
Commission
Bruce Symonds
Chairperson
221 Main Street
Boylston, MA 02505
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Braintree
Historical
Commission
Elizabeth Mees
Chairperson
(718) 794-8230 cstickney@braintreema.gov 1 JFK Memorial Drive
Braintree, MA 02184
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Canton
Historical
Commission
Sepp
Bergschneider
Chairperson
histcomm@town.canton.ma.us Pequitside Farm
79 Pleasant Street
Canton, MA 02021
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Franklin
Historical
Commission
Mary Olsson
Chairperson
(508) 520-9187 maryolsson1@verizon.net 355 East Central Street
Franklin, MA 02038
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Freetown
Historical
Commission
Mary E. Rezendes-
Brown
Chairperson
(508) 644-2201 3 North Main Street
Freetown, MA 02702
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Grafton
Historical
Commission
Ruth Anderson
Chairperson
(508) 839-5335
x1195
Grafton Memorial
Municipal Center
30 Providence Road
Grafton, MA 01519
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Medway
Historical
Commission
Jeanne Johnson
Chairperson and
Acting Secretary
(508) 533-3200 HistoricalCom@townofmedway.
org
Medway Historical
Society Building
223 Main Street
Medway, MA 02053
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Milford
Historical
Commission
Robert Andreola
Chairperson
Memorial Hall
30 School Street
Milford, MA 01757
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Marilyn M. Lovell
Secretary
(508) 473-7327 jhlovell@verizon.net Memorial Hall
30 School Street
Milford, MA 01757
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Millbury
Historical
Commission
Cynthia K. Burr
Chairperson
(508) 865-4710 millburyhistoricalcommission@y
ahoo.com
127 Elm Street
Millbury, MA 01527
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Millis Historical
Commission
Nathan Maltinsky
Chairperson
(508) 376-3730 cnbigbarn@hotmail.com 410 Exchange Street
Millis, MA 02054
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Norfolk
Historical
Commission
Betsy Pyne
Chairperson
(508) 528-2604 nhc@virtualnorfolk.org 1 Liberty Lane
Norfolk, MA 02056
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Rehoboth
Historical
Commission
Rebecca Smith 148R Peck Street
Rehoboth, MA 02769
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Sharon
Historical
Commission
Bruce Rosenbaum
Chairperson
(781) 784-1500 90 South Main Street
Sharon, MA 02067
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Shrewsbury
Historical
Commission
J. Kevin Samara
Chairperson
(508) 842-6133 100 Maple Avenue
Shrewsbury, MA 01545
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Stoughton
Historical
Commission
Dwight MacKerron
Chairperson
(781) 341-1300 10 Pearl Street
Stoughton, MA 02072
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Sutton Historical
Commission
Keith Downer
Chairperson
(508) 865-8725 revwar1775@hotmail.com Municipal Center, 3rd
Floor
4 Uxbridge Road
Sutton, MA 01590
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Upton Historical
Commission
Donna Desjardin
Chairperson
(508) 529-3565 One Main Street
Upton, MA 01568
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Walpole
Historical
Commission
Mark Almeda
Chairperson
(508) 668-6221 135 School Street
Walpole, MA 02081
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
West Boylston
Historical
Commission
Beverly Goodale
Chairperson
(774) 261-4010 historical.society@wbhistory.org 140 Worcester Street
West Boylston, MA
01583
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Weymouth
Historical
Commission
Ed Walker
Chairperson
(781) 335-2000 75 Middle Street
Weymouth, MA 02189
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
FEDERALLY-RECOGNIZED INDIAN TRIBES
Delaware Nation
of Oklahoma
Jason Ross,
Section 106 Projects
Coordinator
405-247-8903 jross@delawarenation.com Tribal Historic
Preservation Office
31064 State Highway
281
Anadarko, OK 73005
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Delaware Tribe
of Indians
Tribal Historic
Preservation
Office
Susan Bachor temple@delawaretribe.org Temple University,
Department of
Anthropology
Gladfelter Hall, Rm. 207
1115 W. Polett Walk
Philadelphia, PA 19122
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Mashantucket
Pequot Tribal
Nation
Marissa Turnbull,
Tribal Historic
Preservation Officer
860-235-7294 mturnbull@mptn-nsn.gov Natural Resources
Protection & Regulatory
Affairs
550 Trolley Line Blvd.
Mashantucket, CT
06338
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Mashpee
Wampanoag
Indian Tribe
Ramona Peters,
Tribal Historic
Preservation Officer
508-477-6186 rpeters@mwtribe.com 766 Falmouth Road
Madaket Place Office
A3
Mashpee, MA 02649
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
David Weeden,
Deputy Tribal
Historic Preservation
Officer
See above. dweeden@mwtribe.com See above. See above. See above.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Mohegan Indian
Tribe
James Quinn,
Tribal Historic
Preservation Officer
860-917-8255 jquinn@moheganmail.com 13 Crow Hill Road
Uncasville, CT 06382
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Elaine Thomas,
Deputy Tribal
Historic Preservation
Officer
860-862-6393 ethomas@moheganmail.com See above. See above. See above.
Narragansett
Indian Tribe
John Brown, III,
Tribal Historic
Preservation Officer
brwnjbb123@aol.com Narragansett Indian
Longhouse
4425D South County
Trail
Charlestown, RI 02813
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Doug Harris,
Deputy Tribal
Historic Preservation
Officer
401-474-5907 dhnithpo@gmail.com See above. See above. See above.
St. Regis
Mohawk Tribe
Randy Hart,
Chief
518-358-2272 412 State Route 37
Akwesane, NY 13665
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Arnold Printup,
Tribal Historic
Preservation Officer
518-358-2272 Arnold.printup@srmt-nsn.gov See above. See above. See above.
Stockbridge-
Munsee
Community
Band of Mohican
Indians
Bonney Hartley,
Tribal Historic
Preservation Officer
518-888-6641 bonney.hartley@mohican-
nsn.gov
P.O. Box 718
Troy, NY 12181
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Wampanoag
Tribe of Gay
Head (Aquinnah)
Bettina M.
Washington,
Tribal Historic
Preservation Officer
508-560-9014 bettina@wampanoagtribe.net 20 Black Brook Road
Aquinnah, MA 02535
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Mark Andrews,
Tribal Cultural
Resource Monitor
508-264-1698 mark@wampanoagtribe.net See above. See above. See above.
NON FEDERALLY-RECOGNIZED INDIAN TRIBES
Eastern Pequot
Tribal Nation
James A. Cunha,
Jr., Chair
P.O. Box 208
North Stonington, CT
06359
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
December 12, 2016
ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response
Date/type
Golden Hill
Paugussett Tribe
Golden Hill
Reservation
Shoran Piper 427 Shelton Road
Trumbull, CT 06611
Previous
communications
summarized in earlier
monthly reports
Consultation
ongoing.
Massachusetts
Ponkapoag Tribe
Guilford Solomon,
Chief Sachem
508-697-2941 neponsett@comcast.net 41 Marianne Drive
Bridgewater, MA 02324
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Nipmuc Tribal
Nation
Cheryll Holley,
Tribal Chief
508-334-1182 wrwritings@aol.com 78 Randolph Road
Worcester, MA 01606
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Ramapough
Lenape Indian
Nation
Dwaine Petty,
Chief
lunaape1@gmail.com c/o Ramapough
Conservancy
189 Stag Hill Road
Mahwah, NJ 07430
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.
Vincent Mann,
Sub-Chief
chiefmaanis@gmail.com See above. See above. See above.
Judith J. Sullivan,
Ramapough
Conservancy
973-204-6844 judithjoansullivan@gmail.com See above. See above. See above.
Schaghticoke
Tribal Nation
Richard Velky,
Chief
101 Elizabeth Street,
2nd Floor
Derby, CT 06418
Previous
communications
summarized in earlier
monthly reports.
Consultation
ongoing.

More Related Content

What's hot

ALLENERGY2015_6515
ALLENERGY2015_6515ALLENERGY2015_6515
ALLENERGY2015_6515Peter Bruce
 
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Fairfax County
 
AtoP Pipeline fro linked in
AtoP Pipeline fro linked inAtoP Pipeline fro linked in
AtoP Pipeline fro linked inHelen Simpson
 
SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816Adina Levin
 
Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County Wastewater Collection Asset Management Program  Oct 2020Fairfax County Wastewater Collection Asset Management Program  Oct 2020
Fairfax County Wastewater Collection Asset Management Program Oct 2020Fairfax County
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission hydrologywebsite1
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewSteve Williams
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardSteve Williams
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014hydrologywebsite1
 
Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015JGNelson
 
Cape Cod Commission 208 plan update
Cape Cod Commission 208 plan updateCape Cod Commission 208 plan update
Cape Cod Commission 208 plan updateCCIAOR
 
Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Brad Keithley
 

What's hot (20)

ALLENERGY2015_6515
ALLENERGY2015_6515ALLENERGY2015_6515
ALLENERGY2015_6515
 
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018
 
AtoP Pipeline fro linked in
AtoP Pipeline fro linked inAtoP Pipeline fro linked in
AtoP Pipeline fro linked in
 
SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816
 
Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County Wastewater Collection Asset Management Program  Oct 2020Fairfax County Wastewater Collection Asset Management Program  Oct 2020
Fairfax County Wastewater Collection Asset Management Program Oct 2020
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
 
WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Suzanne Fontenot-Williams Resume
Suzanne Fontenot-Williams ResumeSuzanne Fontenot-Williams Resume
Suzanne Fontenot-Williams Resume
 
Phosphorus index & topo swat weld
Phosphorus index & topo swat   weldPhosphorus index & topo swat   weld
Phosphorus index & topo swat weld
 
Roy Wilson
Roy WilsonRoy Wilson
Roy Wilson
 
Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015
 
Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report
 
WHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIPWHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIP
 
Cape Cod Commission 208 plan update
Cape Cod Commission 208 plan updateCape Cod Commission 208 plan update
Cape Cod Commission 208 plan update
 
Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)
 
Masters Project
Masters ProjectMasters Project
Masters Project
 
Performance testing and specifications
Performance testing and specificationsPerformance testing and specifications
Performance testing and specifications
 

Viewers also liked

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongMarcellus Drilling News
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingMarcellus Drilling News
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Marcellus Drilling News
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesMarcellus Drilling News
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateMarcellus Drilling News
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesMarcellus Drilling News
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Marcellus Drilling News
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015Marcellus Drilling News
 
Columbia Pipeline Group Open Season Notices for Leach Xpress & Rayne Xpress P...
Columbia Pipeline Group Open Season Notices for Leach Xpress & Rayne Xpress P...Columbia Pipeline Group Open Season Notices for Leach Xpress & Rayne Xpress P...
Columbia Pipeline Group Open Season Notices for Leach Xpress & Rayne Xpress P...Marcellus Drilling News
 
Quinnipiac University Public Opinion Poll: Marcellus Drilling in New York
Quinnipiac University Public Opinion Poll: Marcellus Drilling in New YorkQuinnipiac University Public Opinion Poll: Marcellus Drilling in New York
Quinnipiac University Public Opinion Poll: Marcellus Drilling in New YorkMarcellus Drilling News
 
Delaware Riverkeeper Articles of Incorporation
Delaware Riverkeeper Articles of IncorporationDelaware Riverkeeper Articles of Incorporation
Delaware Riverkeeper Articles of IncorporationMarcellus Drilling News
 
PPA Commonwealth Court Case Ruling New Chapter 78a Drilling Rules are Cleared...
PPA Commonwealth Court Case Ruling New Chapter 78a Drilling Rules are Cleared...PPA Commonwealth Court Case Ruling New Chapter 78a Drilling Rules are Cleared...
PPA Commonwealth Court Case Ruling New Chapter 78a Drilling Rules are Cleared...Marcellus Drilling News
 
EPA: Control Techniques Guidelines for the Oil and Natural Gas Industry
EPA: Control Techniques Guidelines for the Oil and Natural Gas IndustryEPA: Control Techniques Guidelines for the Oil and Natural Gas Industry
EPA: Control Techniques Guidelines for the Oil and Natural Gas IndustryMarcellus Drilling News
 
Pipeline Safety Alert: PHMSA Releases Emergency Order Interim Final Rule
Pipeline Safety Alert: PHMSA Releases Emergency Order Interim Final RulePipeline Safety Alert: PHMSA Releases Emergency Order Interim Final Rule
Pipeline Safety Alert: PHMSA Releases Emergency Order Interim Final RuleMarcellus Drilling News
 
Maryland Register - Nov 14, 2016 - New Fracking Rules
Maryland Register - Nov 14, 2016 - New Fracking RulesMaryland Register - Nov 14, 2016 - New Fracking Rules
Maryland Register - Nov 14, 2016 - New Fracking RulesMarcellus Drilling News
 
PennEast Pipeline Response to NJDRC Comments Against Pipeline Project
PennEast Pipeline Response to NJDRC Comments Against Pipeline ProjectPennEast Pipeline Response to NJDRC Comments Against Pipeline Project
PennEast Pipeline Response to NJDRC Comments Against Pipeline ProjectMarcellus Drilling News
 
WV Supreme Court Decision Disallowing Survey Access for Mountain Valley Pipeline
WV Supreme Court Decision Disallowing Survey Access for Mountain Valley PipelineWV Supreme Court Decision Disallowing Survey Access for Mountain Valley Pipeline
WV Supreme Court Decision Disallowing Survey Access for Mountain Valley PipelineMarcellus Drilling News
 
MSC Lawsuit Filed in PA Commonwealth Court Against Chapter 78a Drilling Regul...
MSC Lawsuit Filed in PA Commonwealth Court Against Chapter 78a Drilling Regul...MSC Lawsuit Filed in PA Commonwealth Court Against Chapter 78a Drilling Regul...
MSC Lawsuit Filed in PA Commonwealth Court Against Chapter 78a Drilling Regul...Marcellus Drilling News
 
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...Marcellus Drilling News
 
US Court of Appeals for the Third Circuit - Pollock v Energy Corporation of A...
US Court of Appeals for the Third Circuit - Pollock v Energy Corporation of A...US Court of Appeals for the Third Circuit - Pollock v Energy Corporation of A...
US Court of Appeals for the Third Circuit - Pollock v Energy Corporation of A...Marcellus Drilling News
 

Viewers also liked (20)

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strong
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. Manufacturing
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final Certificate
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental Externalities
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
 
Columbia Pipeline Group Open Season Notices for Leach Xpress & Rayne Xpress P...
Columbia Pipeline Group Open Season Notices for Leach Xpress & Rayne Xpress P...Columbia Pipeline Group Open Season Notices for Leach Xpress & Rayne Xpress P...
Columbia Pipeline Group Open Season Notices for Leach Xpress & Rayne Xpress P...
 
Quinnipiac University Public Opinion Poll: Marcellus Drilling in New York
Quinnipiac University Public Opinion Poll: Marcellus Drilling in New YorkQuinnipiac University Public Opinion Poll: Marcellus Drilling in New York
Quinnipiac University Public Opinion Poll: Marcellus Drilling in New York
 
Delaware Riverkeeper Articles of Incorporation
Delaware Riverkeeper Articles of IncorporationDelaware Riverkeeper Articles of Incorporation
Delaware Riverkeeper Articles of Incorporation
 
PPA Commonwealth Court Case Ruling New Chapter 78a Drilling Rules are Cleared...
PPA Commonwealth Court Case Ruling New Chapter 78a Drilling Rules are Cleared...PPA Commonwealth Court Case Ruling New Chapter 78a Drilling Rules are Cleared...
PPA Commonwealth Court Case Ruling New Chapter 78a Drilling Rules are Cleared...
 
EPA: Control Techniques Guidelines for the Oil and Natural Gas Industry
EPA: Control Techniques Guidelines for the Oil and Natural Gas IndustryEPA: Control Techniques Guidelines for the Oil and Natural Gas Industry
EPA: Control Techniques Guidelines for the Oil and Natural Gas Industry
 
Pipeline Safety Alert: PHMSA Releases Emergency Order Interim Final Rule
Pipeline Safety Alert: PHMSA Releases Emergency Order Interim Final RulePipeline Safety Alert: PHMSA Releases Emergency Order Interim Final Rule
Pipeline Safety Alert: PHMSA Releases Emergency Order Interim Final Rule
 
Maryland Register - Nov 14, 2016 - New Fracking Rules
Maryland Register - Nov 14, 2016 - New Fracking RulesMaryland Register - Nov 14, 2016 - New Fracking Rules
Maryland Register - Nov 14, 2016 - New Fracking Rules
 
PennEast Pipeline Response to NJDRC Comments Against Pipeline Project
PennEast Pipeline Response to NJDRC Comments Against Pipeline ProjectPennEast Pipeline Response to NJDRC Comments Against Pipeline Project
PennEast Pipeline Response to NJDRC Comments Against Pipeline Project
 
WV Supreme Court Decision Disallowing Survey Access for Mountain Valley Pipeline
WV Supreme Court Decision Disallowing Survey Access for Mountain Valley PipelineWV Supreme Court Decision Disallowing Survey Access for Mountain Valley Pipeline
WV Supreme Court Decision Disallowing Survey Access for Mountain Valley Pipeline
 
MSC Lawsuit Filed in PA Commonwealth Court Against Chapter 78a Drilling Regul...
MSC Lawsuit Filed in PA Commonwealth Court Against Chapter 78a Drilling Regul...MSC Lawsuit Filed in PA Commonwealth Court Against Chapter 78a Drilling Regul...
MSC Lawsuit Filed in PA Commonwealth Court Against Chapter 78a Drilling Regul...
 
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
Decision by NH PUC to Deny Request by Eversource Energy to Strike a Long-Term...
 
US Court of Appeals for the Third Circuit - Pollock v Energy Corporation of A...
US Court of Appeals for the Third Circuit - Pollock v Energy Corporation of A...US Court of Appeals for the Third Circuit - Pollock v Energy Corporation of A...
US Court of Appeals for the Third Circuit - Pollock v Energy Corporation of A...
 

Similar to Access Northeast Pipeline Project - Dec 2016 Update

Public meeting # 1 for website
Public meeting # 1   for websitePublic meeting # 1   for website
Public meeting # 1 for websitepixellence
 
Williams Slide Presentation for Northeast Supply Enhancement Project
Williams Slide Presentation for Northeast Supply Enhancement ProjectWilliams Slide Presentation for Northeast Supply Enhancement Project
Williams Slide Presentation for Northeast Supply Enhancement ProjectMarcellus Drilling News
 
Spectra Energy Pipeline Proposal for Maine Public Utilities Commission
Spectra Energy Pipeline Proposal for Maine Public Utilities CommissionSpectra Energy Pipeline Proposal for Maine Public Utilities Commission
Spectra Energy Pipeline Proposal for Maine Public Utilities CommissionMarcellus Drilling News
 
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Dean Rist
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Crosstown TO
 
2015 Cuyahoga County Natural Resources Assistance Council Applicant Workshop
2015 Cuyahoga County Natural Resources Assistance Council Applicant Workshop2015 Cuyahoga County Natural Resources Assistance Council Applicant Workshop
2015 Cuyahoga County Natural Resources Assistance Council Applicant WorkshopCuyahoga County Planning Commission
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Crosstown TO
 
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - Novembe...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - Novembe...Brentcliffe to Victoria Park Construction Liaison Committee Meeting - Novembe...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - Novembe...Crosstown TO
 
Final Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectFinal Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectMarcellus Drilling News
 
Pre SOQ Workshop
Pre SOQ WorkshopPre SOQ Workshop
Pre SOQ Workshopmsialaska
 
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...Marcellus Drilling News
 
Pennsylvania Gas Outlook Report - June 2015
Pennsylvania Gas Outlook Report - June 2015Pennsylvania Gas Outlook Report - June 2015
Pennsylvania Gas Outlook Report - June 2015Marcellus Drilling News
 
Highbank Resources Updates SPN Work & Comments on an estimated $154 Billion i...
Highbank Resources Updates SPN Work & Comments on an estimated $154 Billion i...Highbank Resources Updates SPN Work & Comments on an estimated $154 Billion i...
Highbank Resources Updates SPN Work & Comments on an estimated $154 Billion i...Follow me on Twitter @Stockshaman
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12cityofevanston
 
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...Crosstown TO
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Crosstown TO
 

Similar to Access Northeast Pipeline Project - Dec 2016 Update (20)

Public meeting # 1 for website
Public meeting # 1   for websitePublic meeting # 1   for website
Public meeting # 1 for website
 
Williams Slide Presentation for Northeast Supply Enhancement Project
Williams Slide Presentation for Northeast Supply Enhancement ProjectWilliams Slide Presentation for Northeast Supply Enhancement Project
Williams Slide Presentation for Northeast Supply Enhancement Project
 
Spectra Energy Pipeline Proposal for Maine Public Utilities Commission
Spectra Energy Pipeline Proposal for Maine Public Utilities CommissionSpectra Energy Pipeline Proposal for Maine Public Utilities Commission
Spectra Energy Pipeline Proposal for Maine Public Utilities Commission
 
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
 
2015 Cuyahoga County Natural Resources Assistance Council Applicant Workshop
2015 Cuyahoga County Natural Resources Assistance Council Applicant Workshop2015 Cuyahoga County Natural Resources Assistance Council Applicant Workshop
2015 Cuyahoga County Natural Resources Assistance Council Applicant Workshop
 
NRAC Round 11 Applicant Workshop
NRAC Round 11 Applicant WorkshopNRAC Round 11 Applicant Workshop
NRAC Round 11 Applicant Workshop
 
NW Natural Report
NW Natural ReportNW Natural Report
NW Natural Report
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - Novembe...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - Novembe...Brentcliffe to Victoria Park Construction Liaison Committee Meeting - Novembe...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - Novembe...
 
St lucias energy transition
St lucias energy transitionSt lucias energy transition
St lucias energy transition
 
Final Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectFinal Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission Project
 
Pre SOQ Workshop
Pre SOQ WorkshopPre SOQ Workshop
Pre SOQ Workshop
 
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
Tuscarora Lateral Project - Open House Presentation on New 17-Mile Pipeline i...
 
Pennsylvania Gas Outlook Report - June 2015
Pennsylvania Gas Outlook Report - June 2015Pennsylvania Gas Outlook Report - June 2015
Pennsylvania Gas Outlook Report - June 2015
 
Highbank Resources Updates SPN Work & Comments on an estimated $154 Billion i...
Highbank Resources Updates SPN Work & Comments on an estimated $154 Billion i...Highbank Resources Updates SPN Work & Comments on an estimated $154 Billion i...
Highbank Resources Updates SPN Work & Comments on an estimated $154 Billion i...
 
Presentation_Niraj_Final
Presentation_Niraj_Final Presentation_Niraj_Final
Presentation_Niraj_Final
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
Brentcliffe to Victoria Park Construction Liaison Committee Meeting - January...
 
Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017Chaplin Station Open House - March 2017
Chaplin Station Open House - March 2017
 

More from Marcellus Drilling News

U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015Marcellus Drilling News
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsMarcellus Drilling News
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...Marcellus Drilling News
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...Marcellus Drilling News
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsMarcellus Drilling News
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookMarcellus Drilling News
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideMarcellus Drilling News
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditMarcellus Drilling News
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Marcellus Drilling News
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportMarcellus Drilling News
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectMarcellus Drilling News
 
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Marcellus Drilling News
 
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Marcellus Drilling News
 
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and CountiesReport: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and CountiesMarcellus Drilling News
 
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...Marcellus Drilling News
 
Study: Fault activation by hydraulic fracturing in western Canada
Study: Fault activation by hydraulic fracturing in western CanadaStudy: Fault activation by hydraulic fracturing in western Canada
Study: Fault activation by hydraulic fracturing in western CanadaMarcellus Drilling News
 
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...Marcellus Drilling News
 
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)Marcellus Drilling News
 
World Energy Outlook 2016 - Executive Summary
World Energy Outlook 2016 - Executive SummaryWorld Energy Outlook 2016 - Executive Summary
World Energy Outlook 2016 - Executive SummaryMarcellus Drilling News
 
NJDRC Response to PennEast's Critical Comments
NJDRC Response to PennEast's Critical CommentsNJDRC Response to PennEast's Critical Comments
NJDRC Response to PennEast's Critical CommentsMarcellus Drilling News
 

More from Marcellus Drilling News (20)

U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy Outlook
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical Guide
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
 
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
 
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
 
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and CountiesReport: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
 
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
 
Study: Fault activation by hydraulic fracturing in western Canada
Study: Fault activation by hydraulic fracturing in western CanadaStudy: Fault activation by hydraulic fracturing in western Canada
Study: Fault activation by hydraulic fracturing in western Canada
 
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
 
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
 
World Energy Outlook 2016 - Executive Summary
World Energy Outlook 2016 - Executive SummaryWorld Energy Outlook 2016 - Executive Summary
World Energy Outlook 2016 - Executive Summary
 
NJDRC Response to PennEast's Critical Comments
NJDRC Response to PennEast's Critical CommentsNJDRC Response to PennEast's Critical Comments
NJDRC Response to PennEast's Critical Comments
 

Recently uploaded

15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendFabwelt
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 

Recently uploaded (8)

15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming Trend
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 

Access Northeast Pipeline Project - Dec 2016 Update

  • 1. 5400 Westheimer Court Houston, TX 77056-5310 713.627.5400 main Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 December 16, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: Monthly Progress Report Algonquin Gas Transmission, LLC Access Northeast Project - Docket No. PF16-1-000 Dear Ms. Bose: On November 17, 2015, the Director of the Office of Energy Projects issued a letter in the above-referenced docket approving the request of Algonquin Gas Transmission, LLC (“Algonquin”) to commence the Federal Energy Regulatory Commission’s (“Commission”) Pre-Filing Review Process for its proposed Access Northeast Project (“Project”). Pursuant to Section 157.21(f)(6) of the Commission’s regulations,1 Algonquin herewith submits its monthly progress report for the Project for the period October 1, 2016 through October 31, 2016. Should you have any questions regarding this filing, please contact the undersigned at (713) 627-4515 or Chris Harvey, Director, Rates & Certificates at (713) 627-5113. /s/ Leanne Sidorkewicz Leanne Sidorkewicz Project Director, Rates & Certificates Attachments cc: John Peconom (FERC) Harry Jeudy (FERC) 1 18 C.F.R. § 157.21(f)(6) (2016).
  • 2. 1 Algonquin Gas Transmission, LLC Access Northeast Project - FERC Docket No. PF16-1-000 FERC Pre-Filing Process MONTHLY PROGRESS REPORT Period Ending: October 31, 2016 Report No. 11 By letter order dated November 17, 2015, Algonquin Gas Transmission, LLC (“Algonquin”) was granted approval by the Federal Energy Regulatory Commission (“FERC”) to utilize FERC’s Pre- Filing Review Process for the Access Northeast Project (the “Project”) with facilities proposed in New Jersey, New York, Connecticut, Rhode Island, and Massachusetts. The Project has been assigned Docket No. PF16-1-000. This Monthly Progress Report provides a brief summary of significant Project activities or changes to Project facilities that have occurred from October 1, 2016 to October 31, 2016. Activities and milestones covered in this report associated with the FERC Pre-Filing Review Process, landowner survey permission, field surveys, agency and stakeholder outreach are also provided below. 1.0 FERC NEPA REVIEW Algonquin is continuing its comprehensive analysis of the Access Northeast Project and remains fully committed to providing a regional solution for more reliable and affordable energy service for the benefit of New England’s consumers and to meet each state's energy and environmental goals and policies. The Independent System Operator for New England (ISO-New England) who is responsible for operating the electric grid frequently reiterates that pipeline capacity within the New England region is a major concern, stating that “ultimately, improving the natural-gas delivery infrastructure in New England… will have the most impact on addressing the reliability, price volatility, and negative emission impacts during winter.” [1] Additionally, Gordon van Welie, President and CEO of ISO-NE, recently commented that New England’s power generation situation is precarious during the winter time, ISO-NE is concerned that beyond 2019 it may become unsustainable during extreme cold conditions. [2] Algonquin believes it is prudent to take additional time to solidify the commercial foundation for critically needed infrastructure and to complete its analysis of the Access Northeast facilities. As such, Algonquin expects limited activity on the FERC docket while this evaluation is ongoing. Algonquin will re-engage with FERC Staff, agencies and other interested stakeholders through pre-filing activities during the first half of 2017. Algonquin anticipates filing draft Resource Reports by mid-2017 followed by the FERC Application in late 2017. Algonquin appreciates the diligent work that has been accomplished to date on the project through the FERC pre-filing process by the FERC Staff, agencies and other interested stakeholders. Algonquin will resume providing updates in the monthly progress reports in 2017 as the Project advances. [1] ISO New England 2016 Regional Electricity Outlook (available at: https://www.iso-ne.com/static- assets/documents/2016/03/2016_reo.pdf) [2] New England Council Regional Energy Meeting Presentation Sept. 28, 2016 (available at: https://www.iso- ne.com/static-assets/documents/2016/09/gvw__nec_9_28_2016.pdf)
  • 3. 2 2.0 PROJECT ROUTING AND FACILITIES Algonquin continues to conduct an evaluation of the proposed routes and new above-ground facilities. In addition, Algonquin will continue to coordinate with stakeholders with respect to developing appropriate route variations and will provide the FERC with any alignment revisions as they are developed. 3.0 LANDOWNER SURVEY PERMISSION Table 3.1 summarizes the status of landowner survey permission for the Access Northeast Project. Aboveground facilities that are owned in fee by Algonquin are not included in the table below. Table 3.1: Status of Survey Permission for the Access Northeast Project Facility Survey Permission Granted (%) Pipeline Facilities Hanover 42-inch Take-up and Relay 95 Stony Point 42-inch Take-up and Relay 75 Southeast 42-inch Take-up and Relay 89 Oxford 42-inch Take-up and Relay 93 Cromwell 36-inch Loop 81 Chaplin 36-inch Loop 88 Q-1 30-inch Loop 76 I-8 30-inch Loop 75 West Boylston 16-inch Lateral 83 Acushnet 24-inch Connector 34 New Aboveground Facilities Rehoboth Compressor Station 100 West Boylston M&R Station 100 Acushnet M&R Station 100 Access Northeast LNG Facility 100 4.0 FIELD SURVEYS A summary of the field survey status is presented below. 4.1.1 Civil Surveys Algonquin has completed approximately 92 percent of the centerline survey for the Project pipelines. No detailed pipeline or aboveground pipeline facility survey has been completed at this time. Algonquin is in the process of obtaining survey permission for the remaining parcels that have not yet been surveyed.
  • 4. 3 4.1.2 Biological Field Surveys and Consultations Algonquin has concluded its wetland and waterbody field survey efforts for 2016 for the Access Northeast Project. The wetland and waterbody field surveys for the Project commenced in August 2015 and are now complete for all properties where landowner access has been obtained. Overall, approximately 113 miles of the 123 total miles (92 percent) associated with the Project have been surveyed. Wetland Delineation Survey Status • Hanover 42-inch Take-up and Relay (Ramapo), NY – 100 percent complete. • Stony Point 42-inch Take-up and Relay (Somers to Southeast), NY – 87 percent complete. • Southeast 42-inch Take-up and Relay (Danbury to Oxford), CT – 95 percent complete. • Oxford 42-inch Take-up and Relay (Oxford to Cheshire), CT – 98 percent complete. • Cromwell 36-inch Loop (Rocky Hill to Andover), CT – 100 percent complete. • Chaplin 36-inch Loop (Eastford to Pomfret), CT – 100 percent complete. • Q-1 30-inch Loop (Medway to Canton), MA – 88 percent complete. • I-8 30-inch Loop (Braintree to Weymouth), MA – 86 percent complete. • West Boylston 16-inch Lateral (Medway to West Boylston), MA – 87 percent complete. • Acushnet 24-inch Connector (Freetown to Acushnet), MA – 96 percent complete. • Access Northeast LNG Facility – 100 percent complete. • Other Aboveground Facilities – 100 percent complete. 4.1.3 Cultural Resource Field Surveys and Consultations The cultural resource identification field surveys for the Project (including informal communication with Indian tribes), archaeological identification survey, and historic architectural properties identification survey, is largely complete where landowner access has been obtained. The cultural resource field surveys for the Project commenced in August 2015 and were completed in October 2016 where landowner access has been obtained. Archaeological evaluation (Phase II) fieldwork, for known sites potentially eligible for listing in the National Register of Historic Places, commenced in August 2016 and was performed through October 2016 on select sites in New York, Connecticut, and Massachusetts. Cultural resource field activities are currently on hold and will resume when Algonquin determines a path forward for the Access Northeast Project. A summary of stakeholder communications is included in Appendix A. Cultural Resource Identification (Phase I) Surveys • Hanover 42-inch Take-up and Relay (Ramapo), NY – 100 percent complete. • Stony Point 42-inch Take-up and Relay (Somers to Southeast), NY – 69 percent complete. • Southeast 42-inch Take-up and Relay (Danbury to Oxford), CT – 92 percent complete. • Oxford 42-inch Take-up and Relay (Oxford to Cheshire), CT – 97 percent complete. • Cromwell 36-inch Loop (Rocky Hill to Andover), CT – 99 percent complete. • Chaplin 36-inch Loop (Eastford to Pomfret), CT – 98 percent complete. • Q-1 30-inch Loop (Medway to Canton), MA – 99 percent complete.
  • 5. 4 • I-8 30-inch Loop (Braintree to Weymouth), MA – 76 percent complete. • West Boylston 16-inch Lateral (Medway to West Boylston), MA – 85 percent complete. • Acushnet 24-inch Connector (Freetown to Acushnet), MA – 41 percent complete. • Access Northeast LNG Facility – 100 percent complete. • Other Aboveground Facilities – 99 percent complete. Archaeological Evaluation (Phase II) Investigations • Hanover 42-inch Take-up and Relay (Ramapo), NY – 100 percent complete. • Stony Point 42-inch Take-up and Relay (Somers to Southeast), NY – 50 percent complete. • Southeast 42-inch Take-up and Relay (Danbury to Oxford), CT – 22 percent complete. • Oxford 42-inch Take-up and Relay (Oxford to Cheshire), CT – 0 percent complete. • Cromwell 36-inch Loop (Rocky Hill to Andover), CT – 0 percent complete. • Chaplin 36-inch Loop (Eastford to Pomfret), CT – 0 percent complete. • Q-1 30-inch Loop (Medway to Canton), MA – 45 percent complete. • I-8 30-inch Loop (Braintree to Weymouth), MA – TBD. • West Boylston 16-inch Lateral (Medway to West Boylston), MA – 0 percent complete. • Acushnet 24-inch Connector (Freetown to Acushnet), MA – 0 percent complete. • Access Northeast LNG Facility – 100 percent complete. • Other Aboveground Facilities – 100 percent complete. 4.1.4 Geotechnical Surveys Horizontal Directional Drilling Evaluation Algonquin is currently collecting geotechnical borings to document existing subsurface conditions and bedrock properties along 15 proposed HDD alignments currently under consideration. Table 3.2 below provides the status of the geotechnical boring investigations at each location. Table 3.2: Status of HDD Geotechnical Boring Investigation State, Facility, HDD Name County Municipality Borings Proposed Borings Complete % Complete NEW YORK Stony Point 42-inch Take-up and Relay East Branch Croton River Putnam Southeast 3 3 100 CONNECTICUT Southeast 42-inch Take-up and Relay Route 7 Fairfield Danbury 5 5 100 Housatonic River Fairfield/ New Haven Newtown/ Southbury 7 6 86 Cromwell 36-inch Loop Silvermine Brook (Beaver Brook) Windham Eastford 3 0 0 MASSACHUSETTS Q-1 30-inch Loop Charles River Norfolk Bellingham/ Franklin 1 0 0 Charles River Norfolk Medway 2 0 0
  • 6. 5 Table 3.2: Status of HDD Geotechnical Boring Investigation State, Facility, HDD Name County Municipality Borings Proposed Borings Complete % Complete Charles River Norfolk Millis/Norfolk 1 0 0 West Boylston 16-inch Lateral Route 16 Worcester Milford 4 0 0 Route 495 Worcester Milford 5 0 0 Fisherville Pond Worcester Grafton 4 0 0 Route 90 Worcester Millbury 2 0 0 Flint Pond/Route 20 Worcester Grafton/ Shrewsbury 5 0 0 Mill Pond Worcester Shrewsbury 4 0 0 Route 290 Worcester Shrewsbury 5 0 0 Newton Pond Worcester Shrewsbury/ Boylston 4 0 0 TOTAL: 55 14 25 Geotechnical reports and HDD feasibility analyses will be developed once the geotechnical data has been collected and analyzed. Access Northeast LNG Facility FEED level geotechnical and seismic studies have been completed for the proposed LNG facility site in Acushnet, Massachusetts. The results of these studies are discussed in Algonquin’s Pre- Filing Draft Resource Report 13, which was submitted to the FERC on May 31, 2016. Ongoing plot plan optimization efforts will likely result in modifications to the site plan arrangement for the LNG Facility. Such modifications may result in a need for additional geotechnical data to complete the FEED efforts and to finalize Resource Report 13. Algonquin is working with its contractors at this time to determine any additional geotechnical investigations at the LNG Facility site and will consult further with FERC and other participating agencies, as appropriate, prior to executing such investigations. Other Access Northeast Project Aboveground Facilities Algonquin is currently preparing a geotechnical survey plan to document existing subsurface conditions and bedrock properties at Project compressor and meter station facilities. As the plans for these facilities are developed, an assessment as to the geotechnical surveys required at each location will be developed and progress will be summarized in future monthly reports. 4.1.5 Rare, Threatened & Endangered Species Surveys Algonquin has initiated informal consultations with federal and state resource agencies to identify the known locations of federal- or state-listed threatened or endangered species and species of special concern that could potentially be affected by construction or operation of the Project. Algonquin is consulting with the U.S. Fish and Wildlife Service, National Marine Fisheries Service, New Jersey Department of Environmental Protection, New York State Department of
  • 7. 6 Environmental Conservation, Connecticut Department of Energy and Environmental Protection, Rhode Island Department of Environmental Management, Massachusetts Department of Environmental Protection, and State Natural Heritage Programs regarding the presence of protected animal and plant species, and their habitats. Algonquin has initiated field surveys for rare, threatened, and endangered species as follows. Rare, Threatened, and Endangered Species Survey Status • Bald Eagle – 100 percent complete. • Vernal Pools – 83 percent complete. • Bog Turtle Phase 1 – 99 percent complete. • Bog Turtle Phase 2 – 98 percent complete. • Indiana/Northern Long-eared Bat – 100 percent complete. • Timber Rattle Snake – 100 percent complete. • Wood/Box Turtle – 100 percent complete. • Plants – 100 percent complete. Several potential vernal pools have been identified that will require surveys in April/May of 2017. The remaining wetlands where bog turtle Phase 1 and 2 surveys are required are currently located on parcels with no access permission. 5.0 STAKEHOLDER OUTREACH Algonquin has been meeting with governmental stakeholders since June 2015 after the Access Northeast Project Open Season was announced and before Algonquin commenced landowner notifications in New Jersey, New York, Connecticut, Rhode Island and Massachusetts in August 2015. Algonquin has been interacting with and informing the public and receiving feedback on the Project through public meetings, landowner informational meetings, one-on-one discussions, written materials and other means of communication. The following meetings were held during the period covered by this report: (October 2016): Connecticut • October 11, 2016 - Richard Kehoe, District Director to U.S. Senator Richard Blumenthal. Massachusetts • October 4, 2016 – Grafton, MA Conservation Commission – Request for Determination of Applicability hearing to conduct geotechnical investigation. • October 18, 2016 – Shrewsbury, MA Conservation Commission – Request for Determination of Applicability hearing to conduct geotechnical investigation. No meetings are currently scheduled or anticipated to occur in the next reporting period (November 2016).
  • 8. 7 Algonquin continues to work with stakeholders, including landowners, government agencies and community leaders to refine the Access Northeast Project. 6.0 AGENCY CONTACTS In addition to stakeholder outreach efforts with landowners and public officials, Algonquin has been consulting with federal, state, and local regulatory agencies. Algonquin began contacting federal and state regulatory agencies in New Jersey, New York, Connecticut, Rhode Island, and Massachusetts in July 2015 to discuss the relevant permitting requirements for the Project. Since that time, Algonquin has continued its outreach efforts with the key permitting agencies. The consultations involve briefings, meetings, letter requests for resource information, telephone discussions, and emails. In recognition of the Pipeline and Hazardous Materials Safety Administration (“PHMSA”) process for review of design spill criteria associated with a proposed FERC-jurisdictional LNG facility, Algonquin also has initiated consultation with the PHMSA regarding the Access Northeast LNG Facility. During the period covered by this report the following meeting was held with agencies in the Project area: • October 4, 2016 – Grafton, MA Conservation Commission. The following meeting is currently scheduled or anticipated to occur in the next reporting period (November 2016): • November 15, 2016 – Shrewsbury, MA Conservation Commission. An updated Non-Landowners Federal, State, and Local Agency Contacts table is provided as Attachment A.
  • 9. ATTACHMENT A Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts
  • 10. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type FEDERAL U.S. Army Corps of Engineers (USACE) New England District, Regulatory Division Robert Desista, Deputy Chief, Regulatory Division (978) 318-8338 robert.j.desista@nae02.usace.a rmy.mil 696 Virginia Road Concord, MA 01742 August 2015- Initial notification call. Meeting held on November 6th . No letter submitted. Joint meeting with the USEPA held on April 19, 2016. Consultation ongoing. Cori Rose, Senior Project Manager (978) 318-8306 Cori.M.Rose@usace.army.mi See above See above USACE New York District , Regulatory Division Jodi McDonald, Section Chief, Regulatory Branch (917) 790-8420 jodi.m.mcdonald@usace.army. mil Jacob K. Javits Federal Building 26 Federal Plaza, Room 2109 New York, NY 10278- 0090 September 2015- Initial notification call. To be coordinated with NE Division meeting. No letter submitted. Consultation ongoing. U.S. Environmental Protection Agency (USEPA) Region 1 Timothy Timmerman, Region 1 Prime Contact (NEPA) (617) 918-1025 timmermann.timothy@ epa.gov 5 Post Office Square, Suite 100 Boston, MA 02109-3912 September 2015- Initial notification call. Mike Marsh participated in USACE meeting. No letter submitted. Joint meeting with the USACE held on April 19, 2016. Consultation ongoing. Anne Arnold, Manager, Air Program Branch (617) 918-0047 arnold.anne@epa.gov See above See above USEPA Region 2 Lingard Knutson, Region 2 Prime Contact (NEPA) (212) 637-3747 knutson.lingard@epamail.epa.g ov 290 Broadway New York, NY 10007- 1866 September 2015- Initial notification call. No letter submitted. Consultation ongoing. Steve Riva, Air Programs Branch, - contact for air permits (212) 637-4074 riva.steven@epa.gov See above See above National Marine Fisheries Service (NMFS) - NOAA Fisheries NMFS Northeast Regional Office Chris Boelke, Field Office Supervisor, Habitat Conservation Division (978) 281-9131 christopher.boelke@noaa.gov 55 Great Republic Drive Gloucester, MA 01930 October 2015- Initial notification call made. Meeting held on April 8, 2016. Information request letter submitted in May 5, 2016. Consultation ongoing.
  • 11. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Kimberly Damon- Randall, Assistant Regional Administrator, Protected Resources Division (978) 282-8485 kimberly.damon- randall@noaa.gov See above See above Alison T. Verkade Environmental Specialist EFH Consultation (978) 281-9266 alison.verkade@noaa.gov See above See above. Email response to letter received April 7, 2016. U.S. Fish and Wildlife Service (USFWS) New England Field Office Anthony (Tony) Tur, Endangered Species Biologist (603) 223-2541 ext. 24 anthony_tur@fws.gov 70 Commercial Street, Suite 300 Concord, NH 03301- 5087 September 2015- Initial notification call. Meeting attended October 30th (NE Field Office will coordinate with NY Field Office). Information request letter submitted November 2, 2015. Consultation ongoing. Response to letter pending. USFWS New York Field Office Tim Sullivan (607) 753-9334 tim_r_sullivan@fws.gov 3817 Luker Road, Cortland, NY 13045 See above. Project notification letter submitted January 25, 2016. Consultation ongoing. USFWS New Jersey Field Office Wendy Walsh, Senior Fish and Wildlife Biologist (609) 646-9310 ext. 5274 Wendy_Walsh@fws.gov Atlantic Professional Park, 4 East Jimmie Leeds Road Galloway, New Jersey 08205 Project introduction and information request letter to be submitted July 2016. Consultation ongoing. Response to letter pending. STATE OF NEW JERSEY New Jersey Department of Environmental Protection (NJDEP) Division of Parks and Forestry, State Forestry Service, Office of Natural Lands Management, Natural Heritage Program Larry Miller (609) 984-1339 Larry.Miller@dep.nj.gov P.O. Box 420, Trenton, NJ 08625-0420 May 17, 2016 – Letter requesting information on rare, threatened, and endangered species in NJ. Response letter dated May 26, 2016. Division of Fish and Wildlife, Endangered and Nongame Species Program Kris Schantz (908) 638-4381 Kris.Schantz@dep.nj.gov 1 VanSyckels Road, Clinton, NJ 08809 See above Consultation ongoing.
  • 12. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type NJDEP Historic Preservation Office Katherine J. Marcopul Deputy State Historic Preservation Officer (609) 984-5816 Kate.marcopul@dep.nj.gov P.O. Box 420, Trenton, NJ 08625-0420 Previous communications summarized in earlier monthly reports. Consultation ongoing. Historic Preservation Office Vincent Maresca Senior Historic Preservation Specialist (609) 633-2395 Vincent.maresca@dep.nj.gov P.O. Box 420, Trenton, NJ 08625-0420 See above See above STATE OF NEW YORK New York State Department of Environmental Conservation (NYSDEC) Division of Environmental Permits Chris Hogan (518) 402-9151 cmhogan@gw.dec.state.ny.us 625 Broadway 4th Floor Albany, NY 12233 July 15, 2015 – Email communication, general information notification. Provided agency with copies of landowner letters. Conference call with NYSDEC (Mike Higgins) held October 29, 2015. Reviewed status of AGT Projects. Face-to-face meeting held on January 12, 2016. No letter submitted. Consultation ongoing. Mike Higgins, Project Manager (518) 402-9179 michael.higgins@gw.dec.state. ny.us See above See above NYSDEC Division of Environmental Permits Region 3 Daniel Whitehead, Region 3 Permits Administrator (845) 256-3054 r3dep@gw.dec.state.ny.us 21 South Putt Corners Road New Paltz, NY 12561 See above See above NYSDEC Bureau of Habitat, Division of Fish, Wildlife & Marine Resources Mr. Timothy Post, Freshwater Wetlands Program Manager (518) 402-8903 tjpost@gw.dec.state.ny.us 625 Broadway 5th Floor, Albany, NY 12233-4756 See above See above NYSDEC Division of Water Bureau of Water Permits David Gasper, P.E. SPDES Permits (518) 402-8114 djgasper@gw.dec.state.ny.us 625 Broadway 4th Floor, Albany, NY 12233-1750 See above See above
  • 13. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type NYSDEC Division of Fish, Wildlife, & Marine Services Bureau of Wildlife Gordon Batcheller, Chief, Bureau of Wildlife (518) 408-8832 625 Broadway Albany, NY 12233-4754 See above See above NYSDEC Division of Air Resources, Bureau of Stationary Sources George Sweikert, DEC Region 3 (845) 256-3185 George.sweikert@ dec.ny.gov 21 South Putt Corners Rd. New Paltz, NY 12561 See above See above NYSDEC Division of Fish, Wildlife, & Marine Services New York Natural Heritage Program Ms. Tara Seoane, Information Services (518) 402-8935 nathert@gw.dec.state.ny.us 625 Broadway 5th Floor, Albany, NY 12233-4757 See above. Information request letter submitted January 25, 2016. Consultation ongoing. Response to letter received February 12, 2016 listing state-listed species in vicinity of Project. NYSDEC Division of Fish, Wildlife, & Marine Services Bureau of Habitat Ms. Heather Gierloff, Biologist (845) 256-3086 heather.gierloff@dec.ny.gov 21 South Putt Corners Road New Paltz, NY 12561 See above. Information request letter submitted January 25, 2016. Follow up request submitted via email on March 31, 2016. Consultation ongoing. Response to letter pending. New York City DEP Bureau of Water Supply Watershed Protection Programs Mary Galasso, Supervisor, Storm Water Programs (914) 773-4440 mgalasso@dep.nyc.gov 465 Columbus Avenue Valhalla, NY 10595 October 2015 - Initial notification. Brief introduction meeting held on December 2, 2015. No letter submitted. Consultation ongoing. NY State Historic Preservation Office (SHPO) NYS Office of Parks Recreation and Historic Preservation Field Services Bureau Ruth Pierpont, Director (518) 237-8643 ext. 3269 ruth.pierpont@oprhp.state.ny.us NY State Historic Preservation Peebles Island Resource Center P.O. Box 189 Waterford, NY 12188- 0189 Previous communications summarized in earlier monthly reports. Consultation ongoing. Tim Lloyd, Historic Preservation Specialist (518) 268-2186 timothy.lloyd@parks.ny.gov See above See above NY State Office of Parks Recreation and Historic Preservation -- (845) 889-4100 State Parks-Taconic Regional Office PO Box 308 9 Old Post Road Contact Pending Pending
  • 14. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Staatsburg, NY 12580 STATE OF CONNECTICUT Connecticut Department of Energy and Environmental Protection (CTDEEP) Bureau of Water Protection and Land Reuse Frederick L. Riese, Senior Environmental Analyst (860) 424-4110 frederick.riese@ct.gov 79 Elm Street Hartford, CT 06106- 5127 July 13, 2015 – Email communication, general information notification. Provided agency with copies of landowner letters. Conference call with CTDEEP (Fred Riese) held October 29, 2015. Reviewed status of AGT Projects. Face- to-face meeting held on December 16, 2015. Consultation ongoing. Denise Ruzicka, Director, Planning and Standards Division (860) 424-3853 denise.ruzicka@ct.gov See above See above Cheryl Chase, Director, Inland Water Resources Division (860) 424-3706 cheryl.chase@ct.gov See above See above CTDEEP Office of Long Island Sound Program Brian Golembiewski, Supervising Environmental Analyst (860) 424-3867 brian.golembiewski@ct.gov 79 Elm Street Hartford, CT 06106- 5127 See above See above CTDEEP Engineering & Enforcement Section Bureau of Air Management Lidia J. Howard, Air Pollution Control Engineer (860) 424-3539 lidia.howard@ct.gov 79 Elm Street Hartford, CT 06106- 5127 See above See above CTDEEP Bureau of Materials Management and Compliance Assurance Water Permitting & Enforcement Division Donald Gonyea, Environmental Analyst (860) 424-3827 donald.gonyea@ct.gov 79 Elm Street Hartford, CT 06106- 5127 See above See above
  • 15. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type CTDEEP Inland Fisheries Division Headquarters Mr. Donald Mysling, Senior Fisheries Habitat Biologist (860) 424-3474 79 Elm Street Hartford, CT 06106 See above. Information request letter submitted on March 8, 2016. Follow-up request submitted on May 2, 2016. See above. Response to letter pending. CTDEEP Inland Fisheries Division, Eastern District Headquarters Mr. Brian D. Murphy, Senior Fisheries Habitat Biologist (860) 295-9523 209 Hebron Road Marlborough, CT 06437 See above See above. CTDEEP Wildlife Division - Natural Diversity Data Base Dawn McKay (860) 424-3592 dawn.mckay@ct.gov 79 Elm Street, 6th Floor Hartford, CT 06106- 5127 See above. Information request letter submitted November 3, 2015. Follow up requests sent via email on December 18, 2015, January 19, 2016, and March 15, 2016. Consultation ongoing. Partial response received on March 14, 2016 for several State owned parcels. Response to letter pending. Jenny Dickson, Supervising Wildlife Biologist (860) 424-3114 Jenny.Dickson@ct.gov DEEP Wildlife Diversity and Outreach Programs, Session Woods WMA, P.O. Box 1550, Burlington, CT 06013 May 17, 2016 – Initial contact by phone regarding proposed bat survey study plan. Meeting anticipated in June 2016. Consultation ongoing. Connecticut Siting Council Melanie Bachman, Acting Director (860) 827-2935 10 Franklin Square New Britain, CT 06051 July 2015 - Initial telephone contact with Acting Director. Site visits to be scheduled in early 2016 once FERC’s Pre-Filing Process commences. Consultation ongoing. Connecticut Department of Economic and Community Development Catherine Labadia, Deputy State Historic Preservation Officer and Staff Archaeologist (860) 256-2764 catherine.labadia@ct.gov One Constitution Plaza Second Floor Hartford, CT 06103 Previous communications summarized in earlier monthly reports. Consultation ongoing. Comments on submitted reports and UDP are pending. Connecticut Office of the State Archaeologist Dr. Brian Jones, State Archaeologist (860) 486-5248 brian.jones@uconn.edu Connecticut Archaeology Center 2019 Hillside Road, Unit 1023 Storrs, CT 06269-1023 Previous communications summarized in earlier monthly reports. Consultation ongoing.
  • 16. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Connecticut Native American Heritage Advisory Council Ruth Torres, Chair (860) 918-6688 67 Treasure Road Narragansett, RI 02882 Previous communications summarized in earlier monthly reports. Consultation ongoing. Connecticut Department of Agriculture Office of the Commissioner Jason Bowsza (860) 713-2526 Jason.Bowsza@ct.gov 165 Capitol Avenue Suite 161 Hartford, CT 06106 August 18, 2015. Meeting scheduled for May 9, 2016. Consultation ongoing. Bureau of Agricultural Development and Resource Preservation Linda Piotrowicz, Bureau Director (860) 713-2533 Linda.piotrowicz@ct.gov Meeting, May 9, 2016. Cameron Weimar, Director of Farmland Preservation (860) 713-2552 cam.weimar@ct.gov See above See above Connecticut Municipal Inland Wetlands and Watercourse Agencies Andover Inland Wetlands and Watercourses Commission John Valente Inland Wetlands Agent (860) 742-4036 a209@mindspring.com or andoverbuilding@comcast.net Town Hall 17 School Road Andover 06232 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Bethel Inland Wetlands Commission Beth Cavagna Inland Wetlands Agent (203) 794-8578 cavagnab@bethel-ct.gov or landuse@bethel-ct.gov 1 School Street Bethel, CT 06801 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Brookfield Inland Wetlands Commission Alice Dew AICP Inland Wetlands Enforcement Officer 203-775-7316 ADew@Brookfieldct.gov 100 Pocono Road Brookfield, CT 06804 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Chaplin Inland Wetlands Commission Scott Mathies Chairman (860) 455-0073 assistant@chaplinct.org Chaplin Town Hall 495 Phoenixville Road Chaplin, CT 06235 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Cheshire Inland Wetlands and Watercourses Commission Suzanne M. Simone Environmental Planner (203) 271-6670 ssimone@cheshirect.org 84 South Main Street Cheshire, CT 06410 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Cromwell Inland Wetlands and Watercourses Agency Fred Curtin Zoning & Wetlands Compliance Officer (860) 632-3422 fcurtin@cromwellct.com Town Hall 41 West Street Cromwell, CT 06416 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing.
  • 17. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Danbury Environmental Impact Commission Daniel L. Baroody Senior Inspector, Environmental Impact Commission (203) 797-4625 d.baroody@ci.danbury.ct.us City Hall 155 Deer Hill Danbury, CT 06810 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Eastford Inland Wetlands and Watercourses Commission Susan Yorgensen Inland Wetlands Agent (860) 429-8960 jyorgensen@hotmail.com Town Office Building P.O. Box 98 Eastford, CT 06242 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Glastonbury Inland Wetlands and Watercourses Agency Tom Mocko Environmental Planner (860) 652-7514 thomas.mocko@glastonbury- ct.gov Town Hall PO Box 6523 Glastonbury, CT 06033 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Hebron Conservation Commission John A. Soderberg Wetlands Agent (860) 228-5971 ext. 139 15 Gilead Street Hebron, CT 06248 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Middlebury Conservation Commission Deborah Seavey Wetland Enforcement Officer (203) 577-4162 wetlandsoffice@middlebury- ct.org 1212 Whittemore Road Middlebury, CT 06762 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Naugatuck Inland Wetlands and Watercourse Commission Keith D. Rosenfeld Wetland Enforcement Officer (203) 720-7042 krosenfeld@naugatuck-ct.gov Town Hall 229 Church Street Naugatuck, CT 06770 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Newtown Inland Wetlands Commission Rob Sibley Deputy Director of Planning & Land Use (203) 270-4276 Rob.Sibley@newtown-ct.gov Newtown Municipal Center 3 Primrose Street, Newtown, CT 06470 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Oxford Conservation Commission & Inland Wetlands Agency Andrew Ferrillo Jr. Inland Wetlands Enforcement Officer (203) 888-2546 ext. 3038 IWOfficer@Oxford-ct.gov 486 Oxford Road Oxford, CT 06478 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Pomfret Inland Wetlands and Watercourses Commission Ryan Brais Wetlands Enforcement Officer (860) 974-9135 rbrais301@hotmail.com P.O. Box 286 Five Haven Road Pomfret Center, CT 06259 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Prospect Inland Wetlands Commission William Donovan Land Use Inspector, IW Agent (203) 758-4461 landuse01@yahoo.com 36 Center Street Prospect, CT 06712 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing.
  • 18. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Rocky Hill Open Space and Conservation Commission Bob Alvarado Engineering (860) 258-2734 balvardo@rockyhillct.gov 761 Old Main Street Rocky Hill, CT 06067 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Southbury Inland Wetlands Commission Mark Massoud Inland Wetlands Enforcement Officer (202) 262-0624 landuse@southbury-ct.gov 501 Main Street South Southbury, CT 06488 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Waterbury Inland Wetlands and Watercourses Commission James A. Sequin, AICP City Planner (203) 574-6817 jsequin@waterburyct.org 185 South Main Street, 5th Floor, One Jefferson Square Waterbury, CT 06702 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. STATE OF RHODE ISLAND Rhode Island Department of Environmental Management (RIDEM) Office of Water Resources Terrence Gray, PE, Associate Director for Environmental Protection (401) 222-4700 ext. 2412 235 Promenade Street Providence, RI 02908- 5767 Week of July 23, 2015 - Initial notification to RIDEM Director. Consultation ongoing. Alicia Good, PE, Assistant Director of Water Resources (401) 222-3961 ext. 7214 See above See above Janet Coit, Director See above See above RIDEM Office of Air Resources Doug McVay, Chief, Office of Air Resources (401) 222-2808 ext. 7011 Doug.mcvay@dem.ri.gov 235 Promenade Street Providence, RI 02908- 5767 Contact Pending. Meeting to be scheduled in May 2016. Consultation ongoing. Rhode Island Coastal Resource Management Council Rhode Island Coastal Resource Management Council Grover Fugate, Executive Director (401) 783-3370 Stedman Government Center Suite 3 4808 Tower Hill Road, Wakefield, RI 02879- 1900 Week of July 27, 2015 - Initial telephone notification to Executive Director. Meeting attended November 2, 2015. Project overview presented. Letter submitted on February 18, 2016. Consultation ongoing. Response letter received on May 3, 2016 providing CZMA consistency determination.
  • 19. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Rhode Island Division of Planning and Development Natural Heritage Program Paul Jordan, Supervising GIS Specialist (401) 222-2776 x4315 235 Promenade Street Providence, RI 02908 Information request letter submitted November 3, 2015. Follow up submission sent on January 6, 2016. Email response received on January 6, 2016 stating no impact on species. Consultation ongoing. Rhode Island Historic Preservation & Heritage Commission Historic Preservation & Heritage Commission Edward Sanderson, Director and Deputy State Historic Preservation Officer (401) 222-2678 Old State House 150 Benefit Street Providence, RI 02903 Previous communications summarized in earlier monthly reports. Consultation ongoing. Charlotte Taylor, Archaeologist (401) 222-4140 ctaylor@preservation.ri.gov Notification letter sent on August 18, 2015. Consultation ongoing. COMMONWEALTH OF MASSACHUSETTS MA Executive Office of Energy and Environmental Affairs (EOEEA) Massachusetts Environmental Protection Act (MEPA) Office Deirdre Buckley, Director (617) 626-1044 Deirdre.Buckley@state.ma.us 100 Cambridge Street, Suite 900 Boston, MA 02114 July 22, 2015 - Initial telephone contact. Meeting held in August 2015. Consultation ongoing. Massachusetts Office of Coastal Zone Management Bruce K. Carlisle, Director (617) 626-1200 czm@state.ma.us 251 Causeway Street, Suite 800 Boston, MA 02114 Week of July 27, 2015 – Initial telephone contact. Meeting targeted for June 2016. Consultation ongoing. Massachusetts Department of Environmental Protection (MassDEP) Marty Suuberg, Commissioner (617) 292-5915 One Winter Street Boston, MA 02114 July 24, 2015 - Initial telephone contact. MassDEP meeting at Commissioner level held in August 2015. Consultation ongoing. Kate Kerigan - Permit Ombudsman (617) 556-1181 Kathleen.kerigan@state.ma.us See above See above MassDEP Southeast Region Office Millie Garcia- Serrano, Regional Director (508) 946-2700 Permit Assistance: (508) 946-2714 20 Riverside Drive Lakeville, MA 02347 (Oversees Towns of Freetown, Acushnet, Sharon, Canton, Walpole, Stoughton, Braintree, and Weymouth) July 24, 2015 - Initial telephone contact. MassDEP meeting at Commissioner level held in August 2015. Meeting at the SERO held on December 3, 2015. Consultation ongoing. Tom Cushing, Air Permitting Chief for MassDEP Southeast (508) 946-2824 Thomas.cushing@state.ma.us See above See above
  • 20. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Marty Suuberg, Commissioner See above See above Paul M. Cavanagh, Regional Planner (508) 866-2580 x122 Paul.Cavanagh@state.ma.us Resource Management Planning Program Department of Conservation and Recreation Southeast Region Headquarters PO Box 66 194 Cranberry Road South Carver, MA 02366 March 8, 2016 telephone contact. Copies of survey permission request letters for DCR owned properties submitted via email on March 15, 2016 along with shapefiles of proposed facilities in Massachusetts. Meeting held May 19, 2016. Consultation ongoing. MassDEP Central Region Office MaryJude Pigsley, Regional Director (508) 792-7650 Service Center: (508) 792-7683 Permit Assistance: (508) 767-2734 Maryjude.Pigsley@state.ma.us 8 New Bond Street Worcester, MA 01606 (Oversees Towns of Medway, Milford, Upton, Sutton, Millbury, Grafton, Shrewsbury, Boylston, West Boylston, Franklin, Millis, and Norfolk ) July 24, 2015 - Initial telephone contact. MassDEP meeting at Commissioner level held in August 2015. Meeting at the CERO held on December 4, 2015. Consultation ongoing. Massachusetts EEA Energy Facilities Siting Board (EFSB) Andrew Greene, Director (617) 305-3526 Andrew.Greene@state.ma.us One South Station, Fifth Floor Boston, MA 02110 July, 2015 - Initial telephone contact. Technical meeting currently being scheduled for June 2016. Consultation ongoing. Massachusetts Energy and Environmental Affairs (EEA) Mr. Leo Roy, Commissioner Department of Conservation and Recreation (617) 626-1250 leo.roy@massmail.state.ma.us 251 Causeway Street, Suite 900 Boston, MA 02114-2104 Contact Pending. Meeting targeted for June 2016. Consultation ongoing. Ellen Berkland Archaeologist Department of Conservation and Recreation (617) 626-1377 ellen.berkland@state.ma.us 251 Causeway Street, Suite 900 Boston, MA 02114-2104 Contact Pending. Notification targeted for April 2016. Consultation ongoing.
  • 21. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Natural Heritage & Endangered Species Program Thomas French, Assistant Director (508) 389-6355 tom.french@state.ma.us Natural Heritage & Endangered Species Program Massachusetts Division of Fisheries & Wildlife 1 Rabbit Hill Road Westborough, MA 01581 August 2015 – Initial notification call. Meeting attended October 26, 2015. Consultation ongoing. Eve Schluter Chief of Regulatory Review (508) 389-6346 eve.schluter@state.ma.us See above. Information request letter submitted November 4, 2015. Meeting held on February 22, 2016. Email responses received on November 5 and December 16, 2015 and January 27, 2016. Letter responses received on October 30 and December 4, 2015. Consultation ongoing. Division of Fisheries and Wildlife Dr. Caleb Slater 1 Rabbit Hill Road Westborough, MA 01581 Information request letter submitted on March 8, 2016. Consultation ongoing. Response to letter pending. Massachusetts Historical Commission Massachusetts State Historic Preservation Office Brona Simon, State Historic Preservation Officer (617) 727-8470 The Massachusetts Archives Building 220 Morrissey Boulevard Boston, MA 02125 Previous communications summarized in earlier monthly reports. Consultation ongoing. Jonathan K. Patton, Preservation Planner/Archaeologi st (617) 727-8470 Jonathan.patton2@state.ma.us See above See above. Massachusetts Commission on Indian Affairs John A. Peters, Executive Director (617) 573-1291 100 Cambridge Street, Suite 300 Boston, MA 02125 Previous communications summarized in earlier monthly reports. Consultation ongoing.
  • 22. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Massachusetts Municipal Conservation Commissions Acushnet Conservation Commission Merilee Kelly Conservation Agent (508) 998-0202 122 Main Street, Acushnet, MA 02743 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Bellingham Conservation Commission Clifford Matthews, Chairman c/o Anne Matthews, Conservation Administrator (508) 657-2858 AMatthews@BellinghamMA.org 2 Maple St. Bellingham 02019 Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing. Boylston Conservation Commission Melanie Rich Administrative Assistant (508) 869-6127 conservation@boylston-ma.gov 221 Main Street Boylston, MA 01505 Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing. Town of Braintree Department of Planning and Community Development Christine Stickney, Director (781) 794-8232 cstickney@braintreema.gov 1 JFK Memorial Dr. Braintree, MA 02184 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Elizabeth Schaffer, Administrative Assistant (781) 794-8235 eschaffer@braintreema.gov Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Canton Conservation Commission Cynthia B. O’Connell, Conservation Agent (781) 821-5000 coconnell@town.canton.ma.us 801 Washington St. Canton, MA 02021 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Franklin Conservation Commission Kathleen Celorier Conservation Office Secretary (508) 520-4929 kcelorier@franklin.ma.us or conservation@franklin.ma.us Municipal Building 355 E. Central Street Franklin, MA 02038 Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing. Freetown Conservation Commission (508) 644-2201 ext. 7 conservation@freetownma.gov 3 North Main Street Assonet, MA 02702 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Grafton Conservation Commission Linda Dettloff Conservation Agent (508) 839-5335 ext. 1138 concom@grafton-ma.gov 30 Providence Road Grafton, MA 01519 Meeting held on April 8, 2016 to discuss proposed geotechnical investigation. Consultation ongoing.
  • 23. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Medway Conservation Commission Bridget Graziano Conservation Agent (508) 533-3292 bgraziano@townofmedway.org 155 Village Street, Medway MA 02053 Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing. Milford Conservation Commission Joseph Zacchilli (508) 634-2314 jzacchilli@townofmilford.com Town Hall 52 Main Street, Milford, MA Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing. Vonnie Reis P.E. (508) 634-2317 vreis@townofmilford.com Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Millbury Conservation Commission Michelle Desorcy Clerk (508) 865-5411 conservation@townofmillbury.n et 127 Elm Street Millbury, MA 01527 Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing. Millis Conservation Commission Dr. James Lederer Chairman (508) 376-7045 conservation@millis.net 900 Main Street Millis, MA 02054 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Camille Standley Administrative Assistant 508) 376-7045 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Norfolk Conservation Commission Janet Delonga Agent (508) 541-8455 jdelonga@virtualnorfolk.org 1 Liberty Lane Norfolk, MA 02056 Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing. Rehoboth Conservation Commission Leeann Bradley, Agent (508) 252-6891 lbradley@Town.Rehoboth.MA. US 148 Peck Street Rehoboth, MA 02769 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Sharon Conservation Commission Gregory Meister Conservation Commission Administrator (781) 784-1511 sharonconcom@yahoo.com Sharon Community Center 1 Community Center Drive Mailing Address: 219 Massapoag Ave. Sharon, MA 02067 Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing.
  • 24. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Shrewsbury Conservation Commission Kenneth Polito Conservation Commission and Lake Quinsigamond Commission Representative (508) 841-8502 bstone@shrewsburyma.gov 100 Maple Ave Shrewsbury, MA 01545 Contact made on April 11, 2016 regarding proposed geotechnical investigation program. Consultation ongoing. Stoughton Conservation Commission James B. Conlon, PWS, MS, RS, CHO, MACSE Environmental Affairs Officer & Agent of the Conservation Commission (781) 341-1300 x9262 jconlon@stoughton-ma.gov 2nd Floor 10 Pearl Street Stoughton, MA Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Sutton Conservation Commission Wanda M. Bien Secretary (508) 865-8728 w.bien@town.sutton.ma.us 4 Uxbridge Road Sutton, MA Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Upton Conservation Commission Christine Scott Chairperson (508) 529-6286 conservationmember@uptonma .gov 1 Main Street, Box 9 Upton, MA 01568 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Matt Selby Conservation Agent Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Walpole Conservation Commission Pam Smith Admin. Board Secretary (508) 660-7268 Town Hall 135 School Street Walpole, MA 02081 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Landis Hershey Conservation Agent (508) 660-7253 See above. See above. West Boylston Conservation Commission Toby Goldstein Assistant to the Conservation Commission (774) 261-4071 concomm@westboylston- ma.gov 140 Worcester Street West Boylston, MA 01583 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Weymouth Conservation Commission Mary Ellen Schloss (781) 340-5007 75 Middle Street, Weymouth, MA 02189 Contact Pending. Meetings to be scheduled upon request. Consultation ongoing. Massachusetts Municipal Historical Commissions
  • 25. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Acushnet Historical Commission Pauline Teixeira Chairperson (508) 998-0280 bellhistoric@bellinghamma.org 122 Main Street Acushnet, MA 02743 Previous communications summarized in earlier monthly reports. Consultation ongoing. Bellingham Historical Commission Marcia A. Crooks Chairperson (508) 883-8358 3 Common Street Bellingham, MA 02019 Previous communications summarized in earlier monthly reports. Consultation ongoing. Boylston Historical Commission Bruce Symonds Chairperson 221 Main Street Boylston, MA 02505 Previous communications summarized in earlier monthly reports. Consultation ongoing. Braintree Historical Commission Elizabeth Mees Chairperson (718) 794-8230 cstickney@braintreema.gov 1 JFK Memorial Drive Braintree, MA 02184 Previous communications summarized in earlier monthly reports. Consultation ongoing. Canton Historical Commission Sepp Bergschneider Chairperson histcomm@town.canton.ma.us Pequitside Farm 79 Pleasant Street Canton, MA 02021 Previous communications summarized in earlier monthly reports. Consultation ongoing. Franklin Historical Commission Mary Olsson Chairperson (508) 520-9187 maryolsson1@verizon.net 355 East Central Street Franklin, MA 02038 Previous communications summarized in earlier monthly reports. Consultation ongoing. Freetown Historical Commission Mary E. Rezendes- Brown Chairperson (508) 644-2201 3 North Main Street Freetown, MA 02702 Previous communications summarized in earlier monthly reports. Consultation ongoing. Grafton Historical Commission Ruth Anderson Chairperson (508) 839-5335 x1195 Grafton Memorial Municipal Center 30 Providence Road Grafton, MA 01519 Previous communications summarized in earlier monthly reports. Consultation ongoing. Medway Historical Commission Jeanne Johnson Chairperson and Acting Secretary (508) 533-3200 HistoricalCom@townofmedway. org Medway Historical Society Building 223 Main Street Medway, MA 02053 Previous communications summarized in earlier monthly reports. Consultation ongoing. Milford Historical Commission Robert Andreola Chairperson Memorial Hall 30 School Street Milford, MA 01757 Previous communications summarized in earlier monthly reports. Consultation ongoing.
  • 26. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Marilyn M. Lovell Secretary (508) 473-7327 jhlovell@verizon.net Memorial Hall 30 School Street Milford, MA 01757 Previous communications summarized in earlier monthly reports. Consultation ongoing. Millbury Historical Commission Cynthia K. Burr Chairperson (508) 865-4710 millburyhistoricalcommission@y ahoo.com 127 Elm Street Millbury, MA 01527 Previous communications summarized in earlier monthly reports. Consultation ongoing. Millis Historical Commission Nathan Maltinsky Chairperson (508) 376-3730 cnbigbarn@hotmail.com 410 Exchange Street Millis, MA 02054 Previous communications summarized in earlier monthly reports. Consultation ongoing. Norfolk Historical Commission Betsy Pyne Chairperson (508) 528-2604 nhc@virtualnorfolk.org 1 Liberty Lane Norfolk, MA 02056 Previous communications summarized in earlier monthly reports. Consultation ongoing. Rehoboth Historical Commission Rebecca Smith 148R Peck Street Rehoboth, MA 02769 Previous communications summarized in earlier monthly reports. Consultation ongoing. Sharon Historical Commission Bruce Rosenbaum Chairperson (781) 784-1500 90 South Main Street Sharon, MA 02067 Previous communications summarized in earlier monthly reports. Consultation ongoing. Shrewsbury Historical Commission J. Kevin Samara Chairperson (508) 842-6133 100 Maple Avenue Shrewsbury, MA 01545 Previous communications summarized in earlier monthly reports. Consultation ongoing. Stoughton Historical Commission Dwight MacKerron Chairperson (781) 341-1300 10 Pearl Street Stoughton, MA 02072 Previous communications summarized in earlier monthly reports. Consultation ongoing. Sutton Historical Commission Keith Downer Chairperson (508) 865-8725 revwar1775@hotmail.com Municipal Center, 3rd Floor 4 Uxbridge Road Sutton, MA 01590 Previous communications summarized in earlier monthly reports. Consultation ongoing. Upton Historical Commission Donna Desjardin Chairperson (508) 529-3565 One Main Street Upton, MA 01568 Previous communications summarized in earlier monthly reports. Consultation ongoing.
  • 27. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Walpole Historical Commission Mark Almeda Chairperson (508) 668-6221 135 School Street Walpole, MA 02081 Previous communications summarized in earlier monthly reports. Consultation ongoing. West Boylston Historical Commission Beverly Goodale Chairperson (774) 261-4010 historical.society@wbhistory.org 140 Worcester Street West Boylston, MA 01583 Previous communications summarized in earlier monthly reports. Consultation ongoing. Weymouth Historical Commission Ed Walker Chairperson (781) 335-2000 75 Middle Street Weymouth, MA 02189 Previous communications summarized in earlier monthly reports. Consultation ongoing. FEDERALLY-RECOGNIZED INDIAN TRIBES Delaware Nation of Oklahoma Jason Ross, Section 106 Projects Coordinator 405-247-8903 jross@delawarenation.com Tribal Historic Preservation Office 31064 State Highway 281 Anadarko, OK 73005 Previous communications summarized in earlier monthly reports. Consultation ongoing. Delaware Tribe of Indians Tribal Historic Preservation Office Susan Bachor temple@delawaretribe.org Temple University, Department of Anthropology Gladfelter Hall, Rm. 207 1115 W. Polett Walk Philadelphia, PA 19122 Previous communications summarized in earlier monthly reports. Consultation ongoing. Mashantucket Pequot Tribal Nation Marissa Turnbull, Tribal Historic Preservation Officer 860-235-7294 mturnbull@mptn-nsn.gov Natural Resources Protection & Regulatory Affairs 550 Trolley Line Blvd. Mashantucket, CT 06338 Previous communications summarized in earlier monthly reports. Consultation ongoing. Mashpee Wampanoag Indian Tribe Ramona Peters, Tribal Historic Preservation Officer 508-477-6186 rpeters@mwtribe.com 766 Falmouth Road Madaket Place Office A3 Mashpee, MA 02649 Previous communications summarized in earlier monthly reports. Consultation ongoing. David Weeden, Deputy Tribal Historic Preservation Officer See above. dweeden@mwtribe.com See above. See above. See above.
  • 28. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Mohegan Indian Tribe James Quinn, Tribal Historic Preservation Officer 860-917-8255 jquinn@moheganmail.com 13 Crow Hill Road Uncasville, CT 06382 Previous communications summarized in earlier monthly reports. Consultation ongoing. Elaine Thomas, Deputy Tribal Historic Preservation Officer 860-862-6393 ethomas@moheganmail.com See above. See above. See above. Narragansett Indian Tribe John Brown, III, Tribal Historic Preservation Officer brwnjbb123@aol.com Narragansett Indian Longhouse 4425D South County Trail Charlestown, RI 02813 Previous communications summarized in earlier monthly reports. Consultation ongoing. Doug Harris, Deputy Tribal Historic Preservation Officer 401-474-5907 dhnithpo@gmail.com See above. See above. See above. St. Regis Mohawk Tribe Randy Hart, Chief 518-358-2272 412 State Route 37 Akwesane, NY 13665 Previous communications summarized in earlier monthly reports. Consultation ongoing. Arnold Printup, Tribal Historic Preservation Officer 518-358-2272 Arnold.printup@srmt-nsn.gov See above. See above. See above. Stockbridge- Munsee Community Band of Mohican Indians Bonney Hartley, Tribal Historic Preservation Officer 518-888-6641 bonney.hartley@mohican- nsn.gov P.O. Box 718 Troy, NY 12181 Previous communications summarized in earlier monthly reports. Consultation ongoing. Wampanoag Tribe of Gay Head (Aquinnah) Bettina M. Washington, Tribal Historic Preservation Officer 508-560-9014 bettina@wampanoagtribe.net 20 Black Brook Road Aquinnah, MA 02535 Previous communications summarized in earlier monthly reports. Consultation ongoing. Mark Andrews, Tribal Cultural Resource Monitor 508-264-1698 mark@wampanoagtribe.net See above. See above. See above. NON FEDERALLY-RECOGNIZED INDIAN TRIBES Eastern Pequot Tribal Nation James A. Cunha, Jr., Chair P.O. Box 208 North Stonington, CT 06359 Previous communications summarized in earlier monthly reports. Consultation ongoing.
  • 29. December 12, 2016 ATTACHMENT A: Access Northeast Project Stakeholder List – Non-Landowners Federal, State, and Local Agency Contacts Agency Office/Division Contact Phone Email Location/Address Contact Date/type Response Date/type Golden Hill Paugussett Tribe Golden Hill Reservation Shoran Piper 427 Shelton Road Trumbull, CT 06611 Previous communications summarized in earlier monthly reports Consultation ongoing. Massachusetts Ponkapoag Tribe Guilford Solomon, Chief Sachem 508-697-2941 neponsett@comcast.net 41 Marianne Drive Bridgewater, MA 02324 Previous communications summarized in earlier monthly reports. Consultation ongoing. Nipmuc Tribal Nation Cheryll Holley, Tribal Chief 508-334-1182 wrwritings@aol.com 78 Randolph Road Worcester, MA 01606 Previous communications summarized in earlier monthly reports. Consultation ongoing. Ramapough Lenape Indian Nation Dwaine Petty, Chief lunaape1@gmail.com c/o Ramapough Conservancy 189 Stag Hill Road Mahwah, NJ 07430 Previous communications summarized in earlier monthly reports. Consultation ongoing. Vincent Mann, Sub-Chief chiefmaanis@gmail.com See above. See above. See above. Judith J. Sullivan, Ramapough Conservancy 973-204-6844 judithjoansullivan@gmail.com See above. See above. See above. Schaghticoke Tribal Nation Richard Velky, Chief 101 Elizabeth Street, 2nd Floor Derby, CT 06418 Previous communications summarized in earlier monthly reports. Consultation ongoing.