Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Mechanical Systems Installation for a Commercial Office Project in North Carolina

53 views

Published on

McKenney’s installed mechanical systems at an office building in downtown Charlotte. Read more at https://www.mckenneys.com/experiences/creating-a-showstopper-in-charlotte/

Published in: Business
  • Be the first to comment

  • Be the first to like this

Mechanical Systems Installation for a Commercial Office Project in North Carolina

  1. 1. Project Name 615 South College Street Commercial Office Tower Project Location Charlotte, NC Project Team Specializations Markets Owner: Portman Holdings Commercial Offices General Contractor: Holder Construction Company Subcontractor: McKenney’s, Inc. Design/Assist LEED Certification Project Completion May 2017 Hospitality
  2. 2. McKenney’s installed mechanical systems at an office building in downtown Charlotte.
  3. 3. The Challenge The McKenney’s team worked with the general contractor and a team of subs to bring a signature high-rise office building—with its unique design, unbeatable location and high-profile neighbors—to life. The key mechanical equipment needed to be installed towards the end of construction which meant the schedule would be tight, startup and commissioning would need to be condensed and the team needed to be creative about finding a solution to the compacted timeline. In addition, equipment issues impacted the ability to fly materials to various floors and the team was spread throughout the building, hampering workflow and negatively impacting overall schedule control. The content of this document is not intended as an endorsement.
  4. 4. The Solution Extensive planning, sequencing of the work and coordinating with the controls contractor put the project schedule back on track and the team moved towards startup and commissioning within the tight timeline. Finally, a finishing crew tied up loose ends after installation. The content of this document is not intended as an endorsement. The Results The project was delivered on time—allowing the owners to lease space on schedule.
  5. 5. 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 sales@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 Atlanta Office: Charlotte Office: www.mckenneys.com

×