1. Mohammed Ghayoor Khan
Cell: +971-50-7130547/+971-55-9592817
Email: ghayoor_wazir@yahoo.Com
Profession: Civil Engineer
Experience: 20 years (with 9 years in the UAE)
Skills
20 years of experience in construction supervision, maintenance and
Operation, quality control & quality assurance on various projects like
substations, roads, bridges, and utilities/services like Sewerage system,
drainage, potable water, telecommunication etc. in Pakistan and United Arab
Emirates
Qualifications: B.Sc. Civil Engineering from NED University of Engineering
& Technology, Karachi Pakistan in 1994.
Membership: Pakistan Engineering Council Islamabad, Pakistan.
Computer literacy: MS Office, MS Word, Internet surfing.
Courses attended:
• 45 days survey camp in NED University of Engineering& Technology Karachi,
Pakistan.
• Quality control training by HALCROW at YAS Island Project
• Safety training by HALCROW at YAS Island Project
• Defensive Driving course
• Beyond Zero Safety training by JACOBS
Client Approval:
• Approved by ALDAR as Civil/Structural Inspector of works
• Approved by TAKREER as Construction Superintendent, Civil/Structure works
• Approved by ADSSC as Civil supervisor
• Approved by PGC
Languages:
Arabic, English, Urdu, Hindi, Pashtu.
Driving License:
UAE driving license holder
2. Responsibilities:
Earthworks: excavation, ground preparation, embankment preparation,
stabilization of existing ground, installation of dewatering system,
backfilling and various tests related to soil compactions etc.
Underground utilities: sewerage system, storm water drainage system,
portable water supply system including pipeline excavation, installation,
fittings & backfilling , different testes on pipeline, installation of manholes,
inlets chambers and catch basins, application of protective coating and
water proofing, protection of existing Utilities with concrete protection
slabs & providing split ducts.
Road Works: preparation of sub-grade, sub-base, base course, application
of wearing course, prime coat, tack coat, final finishing, road markings etc.
supervision of asphalt paving operation, checking of asphalts temperature,
control of asphalt level, thickness and compaction.
Tile Works: Installation of pedestrian Pavers, Vehicular Pavers and Quarry
tiles at sidewalks and parking.
Piling work: including pile boring, piles, different tests on piles including
like Static load test, dynamic load test, Integrity test, caliper logging test
and sonic test.
Structural works:
1. Bridges & underpasses: Rebar checking as per approved IFC drawings
concrete pouring for sub-structures and super-structures members
like piers, abutments, columns, and pile caps, R.C walls, bottom and
top slabs, header beams, internal and external webs, diaphragms,
wing walls, counter slabs, barriers etc., different testes on concrete
Also supervised the installation and supervision of Post Tensioning
ducts, strands and grouting of tendon ducts, Installation of pot bearing
for box girder bridges and elastomeric pads for pre-cast girder bridges.
2. Substations Buildings: Rebar and concrete pouring inspection, block
masonry work, finishing work including plastering, painting and tiling
work.
Traffic Signal system: construction of foundation for traffic signals & signal
controlling cabinets, installation of signals, installation of control cabinets,
feeder pillars and light poles etc.
Reports: Preparation of weekly and monthly progress reports.
Weekly meeting with Client and Contractor
Review of WMS(work method Statement) & ITP( inspection & test plan)
Review and approval of MAR (Material Approval Request) as per Project
Specification.
Full time involves in HSE activities like PTW, TBM and site related HSE
issue.
3. Experience profile:
1. Al Salaam Consultants : Feb 2016 to date
• Project: MTFP
• Client: PGC
• Contractor: Capriolle Constuction Company
• Position : Civil & Structural Engineer
The scope of the project including the excavation works, piling work &
structural work for the Master Training Facility Program including
Indoor Fire Range , Fire pump room, HVAC room, Trade waste Holding
Tank, Water tank, Office Building and related infrastructure works
including internal roads, Utilities/services( sewerage line, storm water,
drinking water) for Abu Dhabi City sewerage water.
2. Mott MacDonald Ltd: Mar 2014 to Feb 2016
• Project: STEP (Strategic Tunnel Enhancement Program)
• Client: ADSSC
• Contractor: ODEBRCHET (CNO)
• Position : Civil Engineer
The scope of the project including the excavation & structural work of
the world’s largest (50m diameter) and deepest (110m) pumping
station, VFD Building, Substation Building, Water tank, TSE tank, Office
Building, flow chamber and related infrastructure works including
internal roads, Utilities/services( sewerage line, storm water, drinking
water) for Abu Dhabi City sewerage water.
3. SK Engineering & Construction (EPC Contractor/Consultant): Jan 2012-Feb 2014
• Project: Ruwais Refinery Expansion (RRE-3)
• Client: TAKREER
• Position: Civil Engineer for infrastructure and Structural work.
The scope of the work including Pilling work, Sub-station buildings
(12Nos), Workshop buildings (4 No’s), equipment foundations, structure
foundations, internal roads and related infrastructure works,
utilities/services.
4. 4. JACOBS INTERNATIONAL HOLDING INCORPORATION: Mar 2009-Dec 2011
• Project: Ruwais Refinery Expansion (RRE-3)
• Client: TAKREER
• Position: Construction superintendent
Work of the scope including the progress and quality control of piling
works, civil and structural work including Sub-stations, work shop
buildings, internal roads and utilities.
5. HALCROW INTRNATIONAL PARTNARSHIP UAE: Dec 2005-Feb 2009:
• Project: Shahma Saadiyat Freeway, Abu Dhabi:
• Client: AL DAR Properties PJSC
• Contractor: SIX construct
• Position: Bridge/Roads /Civil Inspector
YAS Island was the site of a US$36 billion development project by Aldar
Properties. It occupies a total land area of 2,500 hectares, Phase-1
infrastructure work included not limited to; 30km of 3-4 lane
carriageways, 6 vehicular underpasses, 18 signalized intersections, 48
hectare YAS Gateway Park, hard & soft landscape, 30km long deep sewer
network with lifting station and Sewage Treatment Plant of 57,000
cum/day capacity.
6. TAISEI Corporation, Pakistan: July 2001 - Aug 2004
• Project: Kohat Tunnel & Access Roads KPK Pakistan.
• Client: Local Government
• Position: Site Engineer
• Consultant: EA Pakistan & NESPAK
The scope of the project was consisting the excavating of 1.85 Km Tunnel,
31 Km road with bridges and culverts.
7. Pakistan Drainage Consultant Pakistan: Dec 1995 - June 2001
• Project: Drainage system development at different location
• Position: Site Engineer.
Work scope including the Supervision and setting out of drainage works,
executing a general survey to locate the existing drainage line and
manhole locations and to draw a general layout of the line, supervised
changing of some damaged parts of the existing sewer line and
manholes, reinstalling the new line and construction of new manhole
structures.