Ch.8 Project Quality
Management
Pages 226 - 254 of PMBOK Guide 5th
Edition
Ch.8 Project Quality Management
Quality Management includes creating and following policies and procedures to
ensure that a project meet the defined needs (from the customer’s perspective).
Quality definitions and conceptsQuality definitions and concepts
Prevention is the better than control. Do it right the
first time. Zero Defects is the goal of quality. Philip
Crosby
Prevention is the better than control. Do it right the
first time. Zero Defects is the goal of quality. Philip
Crosby
Quality is defined as the degree to which the project
fulfills requirements. Or quality means fitness for
use. Joseph Juran
Quality is defined as the degree to which the project
fulfills requirements. Or quality means fitness for
use. Joseph Juran
Quality relates to continues improvement of people
and procedures. Kaizan
Quality relates to continues improvement of people
and procedures. Kaizan
Quality relates to processes
and procedures not people. Or
quality is the management’s
problem. Management needs
to provide the procedures and
resources for the employees
to produce quality product.
Edwards Deming
Quality relates to processes
and procedures not people. Or
quality is the management’s
problem. Management needs
to provide the procedures and
resources for the employees
to produce quality product.
Edwards Deming
Quality Management is
applying the processes that
will ensure the project will
meet the needs for which it
was undertaken
Quality Management is
applying the processes that
will ensure the project will
meet the needs for which it
was undertaken
Quality Vs Grade Vs Gold Plating?Quality Vs Grade Vs Gold Plating?
Quality is the degree to which
a set of inherent characteristics fulfill
requirements” (ISO 9000)
Quality is the degree to which
a set of inherent characteristics fulfill
requirements” (ISO 9000)
Ch.8 Processes of Quality Management
• The process of identifying project’s quality requirements and how the
these requirements will be met.
8.1 Plan Quality Management
• Here we apply the quality requirements and audit results from quality
control process to ensure proper procedures are applied.
8.2 Perform Quality Assurance
• In this process we measure and record quality requirements to ensure
quality is achieved and recommend changes if needed.
8.3 Control Quality
8.1 Plan Quality Management: ITTOs
1. Project Management
Plan
2. Stakeholder register
3. Risk Register
4. Requirements
documentation
6. EEF/OPA
1. Cost benefit analysis
2. Cost of Quality (CoQ)
3. Benchmarking
4. Design of experiments
5. Statistical sampling
6. Additional quality planning tools
7. Meetings
8. Seven basic quality techniques
1. Quality
management plan
2. Quality metrics
3. Quality checklists
4. Process
improvement plan
5. Project document
updates
Input Tools & Techniques Output
The process of identifying quality requirement and/or standards for the
project and product and documenting how the project will demonstrate
compliance.
What is quality for this project ? How will we ensure it?
8.1 Plan Quality Management: Data Flow Diagram
• Scope Baseline: The Scope Statement of Scope Baseline gives us important
information related to project quality. The scope statements contains
project deliverables and acceptance criteria for these deliverable.
• The acceptance criteria can greatly affect the project quality requirements
hence cost of quality or cost of project as a whole.
• Other elements of the PMP used for planning the quality are the Schedule
Baseline and Cost Baseline which tells us when the work is needed to be
done and when the money is going to be spent.
8.1.1.1 Project Management Plan
• It tells us about the stakeholder that are concerned with quality aspect of
the project
8.1.1.2 Stakeholder Register
8.1 Plan Quality Management: Inputs
• It contains information about the risks that may affect the quality of the
project
8.1.1.3 Risk Register
• The requirements documentation includes stakeholder requirements about the
project, product, and quality of the product.
• Requirements documentation will help us better plan Control Quality Process
8.1.1.4 Requirements Documentation
• Government Regulations, Industry Standards, Policies and Procedures, Historical
Information etc
8.1.1.5 EEF/OPA
8.1 Plan Quality Management: Inputs
• The main reason behind maintaining quality is to have less rework, lower costs, higher
productivity, and higher costumer satisfaction
• In Cost Benefit Analysis we compare benefits versus the cost of meeting quality requirements
8.1.2.1 Cost Benefit Analysis
• Looking at what the cost of conformance and nonconformance to quality and creating an
appropriate balance
8.1.2.1 Cost of Quality
8.1.2 Plan Quality Management: T&Ts
Should be
less than
<
• The 7QC tools as they are called, are used in within the context of Plan-Do-
Check-Act (PDCA) cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
The problem (the Effect) is placed at the head of
fish and the possible source of the problem (the
Cause) is sought after in the four factors
(Machine, Man, Methods, and Materials).
The whole process is conduct in brainstorming
sessions. The steps involved are as follow:
1. Identify the problem.
2. Work out the major factors involved.
3. Identify possible causes.
4. Analyze your diagram
You can also add factors such as Environment,
and Materials or any other factor deemed
related.
Major causes are further investigated. At the end the whole
diagram is analyzed and possible cause or causes are identified.
1. Cause-and-effect Diagram: Cause-and-effect diagram or fishbone diagram
or Ishikawa diagram is used to find possible causes of a problem or failure
• The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA)
cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
Flowchart shows logical relationship
between different process.
Flowchart helps us in better
understanding the process
Flowchart is also a good
communication which shows what
really happens in process or what
should happen.
Flowchart will help us in better
understanding the costs related to
quality requirements
Flowcharts also shows decision
points in a process
2. Flowcharts: Also called process maps, because flowcharts display sequence
of steps. The flowchart transforms one or more input to one or more outputs.
• The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA)
cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
2. Flowcharts: Also called process maps, because flowcharts display sequence
of steps. The flowchart transforms one or more input to one or more outputs.
• The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA)
cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
2. Flowcharts: Also called process maps, because flowcharts display sequence
of steps. The flowchart transforms one or more input to one or more outputs.
• The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA)
cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
Checksheets
tells us about a
problem and its
frequency of
occurrence.
Diagrams.
Data obtained
through
Checksheets are
often used for
generating
Pareto
Diagrams.
3. Checksheet: Checksheets or tally sheet are used to collect used to collect
useful data about a problem or its attributes when performing inspections.
Cheeksheets can also be used checklist.
• The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA)
cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
Pareto Diagram
is a special type
of vertical bar
chart that shows
frequency of the
sources of a
problem and
cumulative
percentage of all
vital sources
The bars show
each source and
the line shows
commutative
total
4. Pareto Diagrams: Pareto thought 80 percent of the quality related problems
are effects of 20 percent of the causes.
• The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA)
cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
In this example the
distribution of data is
based on a bell curve.
The name comes from
it shape which like a
bell.
In this example the
highest frequency of
the measurement was
between 20 and 22.
The
occurrence/frequency
for this measurement
is close to 28 times.
5. Histograms: Histograms are special types of bar charts that show central
tendency, dispersion, and shape of statistical distribution.
• The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA)
cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
If we get 7 results on the
either side of the mean, we
conclude that the process is
out of control, see 4. Also if a
measurement is out of control
limits we conclude that the
process is out of control, see
3.
Control Charts are also used
to determine if a management
process is in control by
measuring factors like
schedule or cost variances, or
the frequency of changes into
scope etc.
1.Upper control limit
2. Lower
control limit
3. Out of control
5.Specification limit: is point determines by
customer, not calculated based on control chart
4. Rule of seven: Out of control if 7
measurements are above or below the mean
6. Normal and
expected variation
Usually 3 or 6 sigma
6. Control Charts: Control Charts are used to know whether a process is stable or
has the desired performance. Control Charts are used for repetitive process e.g
manufacturing
• The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA)
cycle to solve quality related problems
8.1.2.3 Seven basic quality tools
8.1.2 Plan Quality Management: T&Ts
Once we know that there is a
correlation between the two
variables then we can
estimate how changes to
independent variable can
result in a change in the
dependent variable.
Graph a, b, c, and d show
different correlation that may
exist between two variables.
For example in graph b the Y
axis may show number of
iteration and X axis may
show number of bugs found
in the software.
7. Scatter Diagram: Scatter Diagram is used to check for correlation between
two variables
• Comparing the project in hand with similar projects completed in the past in order to identify
best practices, and generate new ideas.
8.1.2.4 Benchmarking
• DOE is used to identify factors that can influence different variables of the product or process
• DOE is used in Plan Quality Management to determine the number and type of tests needed
to achieve the required quality
8.1.2.5 Design of Experiment
8.1 Plan Quality Management: T&Ts
In DOE we can change multiple variables at a
time. In doing so we find optimal condition for
product or process.
Imagine the example on the left is about
producing brick under different conditions or with
an input of different proportions of the materials
Once we know that various factors can influence
our product in various ways, we will develop
tests or quality check list for them.
• Statistical Sampling refers to choosing few items as a sample from a larger group of items.
• Here we do not do the actual sampling but decide on how we will do how sampling in the
coming quality processes
• This will help us in correctly determining the cost of quality.
8.1.2.6 Statistical Sampling
• Brainstorming: Used for generating ideas
• Force Field Analysis: Diagrams of forces for and against change
• Nominal Group Technique: In this technique we vote for ideas to be further discussed by a
larger group of people
• Quality Control and Management Tools: This tools will be explained in the next process.
These tools are used to link and sequence the tools of the project.
8.1.2.7 Other Quality Tools
• Quality related meetings are attended by the project sponsor, project management, selected
project team member, selected stakeholders, team members that are responsible for quality of
the project.
8.1.2.8 Meetings
8.1 Plan Quality Management: T&Ts
8.1 Plan Quality Management: T&Ts
Below is an example of force-field diagram
In the force-field you
basically identify the force
that will support or oppose a
planned work which usually
is something related to
change.
In the force-field you
basically identify the force
the will support or oppose
the change. This will help
you better understand the
situation and plan you
quality accordingly.
• Quality management plans explains how organizations quality policies will be implemented.
• Depending on the project, the plan can be very detailed or simple.
8.1.3.1 Quality Management Plan
• Process Improvement Plan is part of the PMP
• This plan details the steps that will help as in improving various process in our project.
• The plan is developed in the Plan Quality Management Process and implemented in the QA
and QC processes
8.1.3.2 Process Improvement Plan
8.1 Plan Quality Management: Outputs
Areas included in the Process Improvement Plan are as follow:
1. Process Boundaries: The propose of the process, the start and end date, the inputs
and outputs of the process
2. Process Configuration: Graphical depiction of the process
3. Process Metric: Used for measuring process efficiency
4. Targets for Improved Performance: Targets for improvement
• It describes the project or product attributes and how the quality control process will measure
it.
• Examples of quality metrics are finishing the project within the budget and time, the frequency
of defects, failure rate, etc.
• The metrics and the tolerance level for variation is set in Plan Quality
• The attributes are measured in control quality
8.1.3.3 Quality Metrics
• Based on the product requirements a checklist is developed
• The checklist will list the steps to be followed to achieve the desired quality for the product
• The checklist should also contain the product requirements
8.1.3.4 Quality Checklists
• Risk Register, Requirement Traceability Matrix, and WBS dictionary are updated
8.1.3.5 Document Update
8.1 Plan Quality Management: Outputs
8.2 Perform Quality Assurance: ITTOs
1. Quality Management Plan
2. Process Improvement
Plan
Quality metrics
3.Quality control
measurement
4. Project Documents
1. Quality Management and
Control Tools
2. Quality audits
3. Process analysis
1.Change Requests
2. Project management
plan updates
3. Project document
updates
4. OPA updates
Input Tools & Techniques Output
In Quality Assurance we ensure the proper quality related procedures are
followed. We do this by auditing the quality requirements and results received
from Quality Control Process
8.2 Perform Quality Assurance: Data Flow
Diagram
8.2.1 Perform Quality Assurance: Inputs
• It contains plan for quality assurance and process improvement
8.2.1.1 Quality Management Plan
• This will tell us about the project’s process improvement plan which needs to be
aligned with quality assurance process.
8.2.1.2 Process Improvement Plan
• This will tells what we need to measure and what are the allowable variation for our
measurements.
8.2.1.3 Quality Metrics
• These are the measurements taken in the Control Quality Process
• The measurements are used fed back to Quality Assurance in order to evaluate the
effectiveness of quality assurance procedures/processes
8.2.1.4 Quality Control Measurements
8.2.2 Perform Quality Assurance: T&Ts
• Beside other available tools, in quality assurance we us all the tools that are used in
Plan Quality Management and Control Quality Processes
8.2.2.1 Quality Management and Control Tools
Affinity Diagram……?
• Classifying large number of ideas into groups
8.2.2 Perform Quality Assurance: T&Ts
• Beside other available tools, in quality assurance we us all the tools that are used in
Plan Quality Management and Control Quality Processes
8.2.2.1 Quality Management and Control Tools
Process Decision Program Chart (PDPC)
PDPC systematically identifies what might go wrong in a plan under development.
1. You divided in and subdivide a complex
plan into more simple steps
3. You identify possible problems that will
hinder implementing the plan.
4. You identify possible problems that will
hinder implementing the plan.
5. You put O in front of the solutions that are
practical and you put X in front of the
solutions that are not practical
At the end you either change your plan where there is no practical
solution or prepare yourself accordingly
8.2.2 Perform Quality Assurance: T&Ts
• Beside other available tools, in quality assurance we us all the tools that are used in
Plan Quality Management and Control Quality Processes
8.2.2.1 Quality Management and Control Tools
Interrelationship Digraph
It is used for problem identification and problem solving in complex systems
Interrelationship Digraph is usually used after
Case-and-effect diagram, idea mind mapping,
affinity diagram.
Here we construct how different problems are
related to each other.
After constructing the Digraph we start
interpreting it.
Interpretation can be as:
1. An item with large number of outputs e. g “Poor Scheduling
Practice” can be cause of many effect
2. An item with large number of inputs e. g “Poor Scheduling
of Trucker” can be source of Quality metrics.
8.2.2 Perform Quality Assurance: T&Ts
• Beside other available tools, in quality assurance we us all the tools that are used in
Plan Quality Management and Control Quality Processes
8.2.2.1 Quality Management and Control Tools
Tree Diagram
It is used to show how the general plan is related to specific parts e. g in WBS. Also it is used to
see the results of different decision that we might be making in our project.
Through Tree Diagram we learn how different
decision can affect our project. How doing a
process in different way can have an effect on
our product. Or
Tree Diagram will help us in better
understanding of the situation and our future
decisions.
8.2.2 Perform Quality Assurance: T&Ts
• Beside other available tools, in quality assurance we us all the tools that are used in
Plan Quality Management and Control Quality Processes
8.2.2.1 Quality Management and Control Tools
Network Diagram: Network Diagram shows
how activates are connected to each other. It
helps us understand when are we going to
apply our quality procedures
Matrix Diagram: The matrix diagram shows
relationship between factors, causes, and
objectives.
8.2.2 Perform Quality Assurance: T&Ts
• Quality audits are independent reviews of the quality processes and procedures of
an organization.
• Quality audits can done randomly or on scheduled bases and can be carried
externally or internally.
• Quality audits can confirm implementation of approved changes, corrective actions,
preventive action, or defect repairs.
8.2.2.2 Quality Audits
• In Process Analysis we implemented the plan outlined as “Process Improvement
Plan” which was an output to Plan Quality Management process
• Here we use root-cause analysis which will help us identify problems in our
processes and take preventive actions.
8.2.2.3 Process Analysis
• Change requests related to corrective, preventive, and defect repair are made.
8.2.3.1 Change Requests
• Quality Management Plan, Scope Management Plan, Schedule Management Plan, and Cost
Management Plan are updated.
8.2.3.2 Project Management Plan updates
• Audit Reports, Training Plans, and Process Documentation are updated.
8.2.3.3 Project Document Update
• Organization quality standards and quality management systems are updated
8.2.3.4 OPA Updates
8.2.3 Perform Quality Assurance: Outputs
8.3 Control Quality: ITTOs
1. Project Management
Plan
2. Quality Metrics
3. Quality Checklists
4. Work Performance
Data
5. Approved Change
Requests
6. Deliverables
7. Project Documents
8. OPA
1. Seven Basic
Quality Tools
2. Statistical
Sampling
3. Inspection
4. Approved change
requests review
1. Quality Control
Measurements
2. Validated changes
3. Verified deliverables
4. Work Perf Info
5. Change Requests
6. Project Doc updates
7. Project Mangtm Plan
updates
8. OPA updates
Input Tools & Techniques Output
In Control Quality we monitor and record results from executing the quality
activities. We do this mainly for two reason:
1. To identify the cause for poor quality and request change, and 2 Validate the
deliverables to be accepted by stakeholders.
8.3 Control Quality
More Quality Concepts
Prevention Vs
Inspection
Prevention is about
keeping errors out of
process, and
Inspection is about
keeping errors out of
hands of the
customer
Tolerance Vs Control
Limits
Tolerance is a
specified range of
acceptable results,
and Control Limits is
about specifying
boundaries for a
stable process
Attribute Sampling
Vs Variable Sampling
The result of an
attribute either
conforms or does not
conforms, and the
result of variable is
on continue scale
with a degree
conformity
• Quality Management Plan of the Project Management Plan is used
8.3.1.1 Project Management Plan
• It describes project or products attributes and how they will be measured.
• Some examples are: Function Points, Mean Time Between Failure (MTBF), and Mean Time to
Repair (MTTR)
8.3.1.2 Quality Metrics
8.3.1 Control Quality: Inputs
Function Points: In IT, Function Points are used a unit of measurement to count the
number of function an information system providing to a business. The same as we use
hours to measure time.
MTBF: it shows the reliability of product. It specifies the time between two failures that a
product can have. For example an hard disk will have a failure after 300,000 hours.
MTTR: is the average amount of time a device or product will need to be repaired for a
given failure.
• A list that will help us verify that our work will fulfill the requirements of the product.
8.3.1.3 Quality Checklists
• The data gather from actual which can include planned Vs actual schedule performance, cost
performance and technical performance
8.3.1.4 Work Performance Data
• The changes requested may include defect repairs which needs to quality controlled and
verified
8.1.3.5 Approved Change Requests
8.3 Control Quality: Inputs
• Deliverables are validated in Control Quality process.
8.3.1.6 Deliverables
• Agreements, quality audit documents, training plans and their assessment, process
documentation
8.3.1.7 Project Documents
• Organization’s quality policies, defect reporting procedure, and communication policy
8.3.1.8 OPA
8.3 Control Quality: Inputs
• These were explained in 8.1.2.3
8.3.2.1 The Seven Basic Quality Tools
• As defined in the Quality Management Plan, samples are selected and tested
8.3.2.2 Statistical Sampling
• Inspection refers to the examination of the product in order to determine whether it according
to the documented standards.
• Inspection can be related to a single activity, part of product, or the whole product.
• Inspection are also called, review, peer reviews, audits, or walkthroughs.
• Inspections are also used to validate defect repairs.
8.3.2.3 Inspection
• All the approved change requests are reviewed to verify they are implemented as approved.
8.3.2.4 Approved Change Request Reviews
8.3.2 Control Quality: T&Ts
• Control Quality Measurements are the results of Control Quality process
• These are input to Perform Quality Assurance process
8.3.3.1 Control Quality Measurements
• When a product is changed or repaired after approved changes are implemented, the change
or repair is validated in Control Quality process.
• This is done using Review Approved Change Requests technique
• The change or repaired done is either validated or rejected
8.3.3.2 Validated Changes
• Of the goals of Control Quality is to verify the correctness of deliverables
• Thus deliverables are either verified or rejected for repair or change
• The verified deliverables becomes input to Validate Scope process where they are formally
accepted or rejected.
8.3.3.3 Verified Deliverables
8.3.3 Control Quality: Outputs
• WPI is performance related data that is output to many monitoring and controlling
processes
• In this process WPI will show projects achievement of the requirements, information
about rejections and reasons for the rejections, also rework required and need for
change in quality processes
8.3.3.4. Work Performance Information
• Change requests in the form of rework, repair, change to management plan etc are made.
8.3.3.5 Change Requests
• Quality Management Plan, and
• Process Improvement Plans might be updated
8.3.3.6 Project Management Plan Updates
8.3.3 Control Quality: Outputs
• Agreements, quality audit documents, training plans and their assessment,
process documentation
8.3.3.7 Project Document Updates
• Completed Checklists: When checklists are used, the documented
checklist becomes part of project document and OPA
• Lesson Learned Doc: The causes of variances, the reasoning behind the
corrective action selected, and other types of lessons learned stored as
OPA
8.3.3.8 OPA updates
8.3.3 Control Quality: Outputs

More Related Content

What's hot

Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management - dyaksa hanindito
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality ManagementMartin Sillaots
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpointDjamadaMuhamedKAGUSU
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOKArief Rahmana
 
Project Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaProject Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaEdureka!
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Agus Suhanto
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Agus Suhanto
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Agus Suhanto
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management toolsNathan Petralia
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMarkos Mulat G
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 

What's hot (20)

Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
Project Procurement Management
Project Procurement ManagementProject Procurement Management
Project Procurement Management
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Project Quality Management - PMBOK
Project Quality Management - PMBOKProject Quality Management - PMBOK
Project Quality Management - PMBOK
 
Project Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaProject Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | Edureka
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
 
Project Resource Management
Project Resource ManagementProject Resource Management
Project Resource Management
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 

Similar to Project quality management

projectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxprojectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxHamzaKhawar4
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management proceduresselinasimpson1201
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptAhtashamArshad4
 
Quality management in project management
Quality management in project managementQuality management in project management
Quality management in project managementselinasimpson0501
 
Product quality management
Product quality managementProduct quality management
Product quality managementSunil Meena
 
Quality management slides
Quality management slidesQuality management slides
Quality management slidesSaba Afaq
 
Quality management strategy template
Quality management strategy templateQuality management strategy template
Quality management strategy templateselinasimpson2701
 
L07 quality management
L07 quality managementL07 quality management
L07 quality managementAsa Chan
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaGlobalSkillup
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part threeHossam Maghrabi
 
Quality assurance
Quality assuranceQuality assurance
Quality assuranceSahil Shah
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Managementmzedan
 
A lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsA lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsSonata Software
 

Similar to Project quality management (20)

Project quality management
Project quality managementProject quality management
Project quality management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
projectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxprojectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptx
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management procedures
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
Quality management in project management
Quality management in project managementQuality management in project management
Quality management in project management
 
Product quality management
Product quality managementProduct quality management
Product quality management
 
Quality management slides
Quality management slidesQuality management slides
Quality management slides
 
Pmb
PmbPmb
Pmb
 
Quality management strategy template
Quality management strategy templateQuality management strategy template
Quality management strategy template
 
L07 quality management
L07 quality managementL07 quality management
L07 quality management
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part three
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
8.2 Manage Quality
8.2 Manage Quality8.2 Manage Quality
8.2 Manage Quality
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
A lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsA lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projects
 
Prince2 quality management
Prince2 quality managementPrince2 quality management
Prince2 quality management
 

More from Mohammad Ashraf Khan, PMP (11)

Selecting the Right Project Management Software
Selecting the Right Project Management SoftwareSelecting the Right Project Management Software
Selecting the Right Project Management Software
 
PM FrameWork: Module 4
PM FrameWork: Module 4PM FrameWork: Module 4
PM FrameWork: Module 4
 
PM FrameWork: Module 3
PM FrameWork: Module 3PM FrameWork: Module 3
PM FrameWork: Module 3
 
PM FrameWork: Module 2
PM FrameWork: Module 2PM FrameWork: Module 2
PM FrameWork: Module 2
 
PM FrameWork: Module 1
PM FrameWork: Module 1PM FrameWork: Module 1
PM FrameWork: Module 1
 
Project cost management
Project cost managementProject cost management
Project cost management
 
Project time management 3 final
Project time management 3 finalProject time management 3 final
Project time management 3 final
 
Project time management 2 final
Project time management 2 finalProject time management 2 final
Project time management 2 final
 
Project time management 1 final
Project time management 1 finalProject time management 1 final
Project time management 1 final
 
Project scope management 2
Project scope management 2Project scope management 2
Project scope management 2
 
Project scope management 1
Project scope management 1Project scope management 1
Project scope management 1
 

Recently uploaded

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 

Recently uploaded (20)

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 

Project quality management

  • 1. Ch.8 Project Quality Management Pages 226 - 254 of PMBOK Guide 5th Edition
  • 2. Ch.8 Project Quality Management Quality Management includes creating and following policies and procedures to ensure that a project meet the defined needs (from the customer’s perspective). Quality definitions and conceptsQuality definitions and concepts Prevention is the better than control. Do it right the first time. Zero Defects is the goal of quality. Philip Crosby Prevention is the better than control. Do it right the first time. Zero Defects is the goal of quality. Philip Crosby Quality is defined as the degree to which the project fulfills requirements. Or quality means fitness for use. Joseph Juran Quality is defined as the degree to which the project fulfills requirements. Or quality means fitness for use. Joseph Juran Quality relates to continues improvement of people and procedures. Kaizan Quality relates to continues improvement of people and procedures. Kaizan Quality relates to processes and procedures not people. Or quality is the management’s problem. Management needs to provide the procedures and resources for the employees to produce quality product. Edwards Deming Quality relates to processes and procedures not people. Or quality is the management’s problem. Management needs to provide the procedures and resources for the employees to produce quality product. Edwards Deming Quality Management is applying the processes that will ensure the project will meet the needs for which it was undertaken Quality Management is applying the processes that will ensure the project will meet the needs for which it was undertaken Quality Vs Grade Vs Gold Plating?Quality Vs Grade Vs Gold Plating? Quality is the degree to which a set of inherent characteristics fulfill requirements” (ISO 9000) Quality is the degree to which a set of inherent characteristics fulfill requirements” (ISO 9000)
  • 3. Ch.8 Processes of Quality Management • The process of identifying project’s quality requirements and how the these requirements will be met. 8.1 Plan Quality Management • Here we apply the quality requirements and audit results from quality control process to ensure proper procedures are applied. 8.2 Perform Quality Assurance • In this process we measure and record quality requirements to ensure quality is achieved and recommend changes if needed. 8.3 Control Quality
  • 4. 8.1 Plan Quality Management: ITTOs 1. Project Management Plan 2. Stakeholder register 3. Risk Register 4. Requirements documentation 6. EEF/OPA 1. Cost benefit analysis 2. Cost of Quality (CoQ) 3. Benchmarking 4. Design of experiments 5. Statistical sampling 6. Additional quality planning tools 7. Meetings 8. Seven basic quality techniques 1. Quality management plan 2. Quality metrics 3. Quality checklists 4. Process improvement plan 5. Project document updates Input Tools & Techniques Output The process of identifying quality requirement and/or standards for the project and product and documenting how the project will demonstrate compliance. What is quality for this project ? How will we ensure it?
  • 5. 8.1 Plan Quality Management: Data Flow Diagram
  • 6. • Scope Baseline: The Scope Statement of Scope Baseline gives us important information related to project quality. The scope statements contains project deliverables and acceptance criteria for these deliverable. • The acceptance criteria can greatly affect the project quality requirements hence cost of quality or cost of project as a whole. • Other elements of the PMP used for planning the quality are the Schedule Baseline and Cost Baseline which tells us when the work is needed to be done and when the money is going to be spent. 8.1.1.1 Project Management Plan • It tells us about the stakeholder that are concerned with quality aspect of the project 8.1.1.2 Stakeholder Register 8.1 Plan Quality Management: Inputs
  • 7. • It contains information about the risks that may affect the quality of the project 8.1.1.3 Risk Register • The requirements documentation includes stakeholder requirements about the project, product, and quality of the product. • Requirements documentation will help us better plan Control Quality Process 8.1.1.4 Requirements Documentation • Government Regulations, Industry Standards, Policies and Procedures, Historical Information etc 8.1.1.5 EEF/OPA 8.1 Plan Quality Management: Inputs
  • 8. • The main reason behind maintaining quality is to have less rework, lower costs, higher productivity, and higher costumer satisfaction • In Cost Benefit Analysis we compare benefits versus the cost of meeting quality requirements 8.1.2.1 Cost Benefit Analysis • Looking at what the cost of conformance and nonconformance to quality and creating an appropriate balance 8.1.2.1 Cost of Quality 8.1.2 Plan Quality Management: T&Ts Should be less than <
  • 9. • The 7QC tools as they are called, are used in within the context of Plan-Do- Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts The problem (the Effect) is placed at the head of fish and the possible source of the problem (the Cause) is sought after in the four factors (Machine, Man, Methods, and Materials). The whole process is conduct in brainstorming sessions. The steps involved are as follow: 1. Identify the problem. 2. Work out the major factors involved. 3. Identify possible causes. 4. Analyze your diagram You can also add factors such as Environment, and Materials or any other factor deemed related. Major causes are further investigated. At the end the whole diagram is analyzed and possible cause or causes are identified. 1. Cause-and-effect Diagram: Cause-and-effect diagram or fishbone diagram or Ishikawa diagram is used to find possible causes of a problem or failure
  • 10. • The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts Flowchart shows logical relationship between different process. Flowchart helps us in better understanding the process Flowchart is also a good communication which shows what really happens in process or what should happen. Flowchart will help us in better understanding the costs related to quality requirements Flowcharts also shows decision points in a process 2. Flowcharts: Also called process maps, because flowcharts display sequence of steps. The flowchart transforms one or more input to one or more outputs.
  • 11. • The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts 2. Flowcharts: Also called process maps, because flowcharts display sequence of steps. The flowchart transforms one or more input to one or more outputs.
  • 12. • The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts 2. Flowcharts: Also called process maps, because flowcharts display sequence of steps. The flowchart transforms one or more input to one or more outputs.
  • 13. • The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts Checksheets tells us about a problem and its frequency of occurrence. Diagrams. Data obtained through Checksheets are often used for generating Pareto Diagrams. 3. Checksheet: Checksheets or tally sheet are used to collect used to collect useful data about a problem or its attributes when performing inspections. Cheeksheets can also be used checklist.
  • 14. • The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts Pareto Diagram is a special type of vertical bar chart that shows frequency of the sources of a problem and cumulative percentage of all vital sources The bars show each source and the line shows commutative total 4. Pareto Diagrams: Pareto thought 80 percent of the quality related problems are effects of 20 percent of the causes.
  • 15. • The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts In this example the distribution of data is based on a bell curve. The name comes from it shape which like a bell. In this example the highest frequency of the measurement was between 20 and 22. The occurrence/frequency for this measurement is close to 28 times. 5. Histograms: Histograms are special types of bar charts that show central tendency, dispersion, and shape of statistical distribution.
  • 16. • The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts If we get 7 results on the either side of the mean, we conclude that the process is out of control, see 4. Also if a measurement is out of control limits we conclude that the process is out of control, see 3. Control Charts are also used to determine if a management process is in control by measuring factors like schedule or cost variances, or the frequency of changes into scope etc. 1.Upper control limit 2. Lower control limit 3. Out of control 5.Specification limit: is point determines by customer, not calculated based on control chart 4. Rule of seven: Out of control if 7 measurements are above or below the mean 6. Normal and expected variation Usually 3 or 6 sigma 6. Control Charts: Control Charts are used to know whether a process is stable or has the desired performance. Control Charts are used for repetitive process e.g manufacturing
  • 17. • The 7QC tools as they are called, are used in within the context of Plan-Do-Check-Act (PDCA) cycle to solve quality related problems 8.1.2.3 Seven basic quality tools 8.1.2 Plan Quality Management: T&Ts Once we know that there is a correlation between the two variables then we can estimate how changes to independent variable can result in a change in the dependent variable. Graph a, b, c, and d show different correlation that may exist between two variables. For example in graph b the Y axis may show number of iteration and X axis may show number of bugs found in the software. 7. Scatter Diagram: Scatter Diagram is used to check for correlation between two variables
  • 18. • Comparing the project in hand with similar projects completed in the past in order to identify best practices, and generate new ideas. 8.1.2.4 Benchmarking • DOE is used to identify factors that can influence different variables of the product or process • DOE is used in Plan Quality Management to determine the number and type of tests needed to achieve the required quality 8.1.2.5 Design of Experiment 8.1 Plan Quality Management: T&Ts In DOE we can change multiple variables at a time. In doing so we find optimal condition for product or process. Imagine the example on the left is about producing brick under different conditions or with an input of different proportions of the materials Once we know that various factors can influence our product in various ways, we will develop tests or quality check list for them.
  • 19. • Statistical Sampling refers to choosing few items as a sample from a larger group of items. • Here we do not do the actual sampling but decide on how we will do how sampling in the coming quality processes • This will help us in correctly determining the cost of quality. 8.1.2.6 Statistical Sampling • Brainstorming: Used for generating ideas • Force Field Analysis: Diagrams of forces for and against change • Nominal Group Technique: In this technique we vote for ideas to be further discussed by a larger group of people • Quality Control and Management Tools: This tools will be explained in the next process. These tools are used to link and sequence the tools of the project. 8.1.2.7 Other Quality Tools • Quality related meetings are attended by the project sponsor, project management, selected project team member, selected stakeholders, team members that are responsible for quality of the project. 8.1.2.8 Meetings 8.1 Plan Quality Management: T&Ts
  • 20. 8.1 Plan Quality Management: T&Ts Below is an example of force-field diagram In the force-field you basically identify the force that will support or oppose a planned work which usually is something related to change. In the force-field you basically identify the force the will support or oppose the change. This will help you better understand the situation and plan you quality accordingly.
  • 21. • Quality management plans explains how organizations quality policies will be implemented. • Depending on the project, the plan can be very detailed or simple. 8.1.3.1 Quality Management Plan • Process Improvement Plan is part of the PMP • This plan details the steps that will help as in improving various process in our project. • The plan is developed in the Plan Quality Management Process and implemented in the QA and QC processes 8.1.3.2 Process Improvement Plan 8.1 Plan Quality Management: Outputs Areas included in the Process Improvement Plan are as follow: 1. Process Boundaries: The propose of the process, the start and end date, the inputs and outputs of the process 2. Process Configuration: Graphical depiction of the process 3. Process Metric: Used for measuring process efficiency 4. Targets for Improved Performance: Targets for improvement
  • 22. • It describes the project or product attributes and how the quality control process will measure it. • Examples of quality metrics are finishing the project within the budget and time, the frequency of defects, failure rate, etc. • The metrics and the tolerance level for variation is set in Plan Quality • The attributes are measured in control quality 8.1.3.3 Quality Metrics • Based on the product requirements a checklist is developed • The checklist will list the steps to be followed to achieve the desired quality for the product • The checklist should also contain the product requirements 8.1.3.4 Quality Checklists • Risk Register, Requirement Traceability Matrix, and WBS dictionary are updated 8.1.3.5 Document Update 8.1 Plan Quality Management: Outputs
  • 23. 8.2 Perform Quality Assurance: ITTOs 1. Quality Management Plan 2. Process Improvement Plan Quality metrics 3.Quality control measurement 4. Project Documents 1. Quality Management and Control Tools 2. Quality audits 3. Process analysis 1.Change Requests 2. Project management plan updates 3. Project document updates 4. OPA updates Input Tools & Techniques Output In Quality Assurance we ensure the proper quality related procedures are followed. We do this by auditing the quality requirements and results received from Quality Control Process
  • 24. 8.2 Perform Quality Assurance: Data Flow Diagram
  • 25. 8.2.1 Perform Quality Assurance: Inputs • It contains plan for quality assurance and process improvement 8.2.1.1 Quality Management Plan • This will tell us about the project’s process improvement plan which needs to be aligned with quality assurance process. 8.2.1.2 Process Improvement Plan • This will tells what we need to measure and what are the allowable variation for our measurements. 8.2.1.3 Quality Metrics • These are the measurements taken in the Control Quality Process • The measurements are used fed back to Quality Assurance in order to evaluate the effectiveness of quality assurance procedures/processes 8.2.1.4 Quality Control Measurements
  • 26. 8.2.2 Perform Quality Assurance: T&Ts • Beside other available tools, in quality assurance we us all the tools that are used in Plan Quality Management and Control Quality Processes 8.2.2.1 Quality Management and Control Tools Affinity Diagram……? • Classifying large number of ideas into groups
  • 27. 8.2.2 Perform Quality Assurance: T&Ts • Beside other available tools, in quality assurance we us all the tools that are used in Plan Quality Management and Control Quality Processes 8.2.2.1 Quality Management and Control Tools Process Decision Program Chart (PDPC) PDPC systematically identifies what might go wrong in a plan under development. 1. You divided in and subdivide a complex plan into more simple steps 3. You identify possible problems that will hinder implementing the plan. 4. You identify possible problems that will hinder implementing the plan. 5. You put O in front of the solutions that are practical and you put X in front of the solutions that are not practical At the end you either change your plan where there is no practical solution or prepare yourself accordingly
  • 28. 8.2.2 Perform Quality Assurance: T&Ts • Beside other available tools, in quality assurance we us all the tools that are used in Plan Quality Management and Control Quality Processes 8.2.2.1 Quality Management and Control Tools Interrelationship Digraph It is used for problem identification and problem solving in complex systems Interrelationship Digraph is usually used after Case-and-effect diagram, idea mind mapping, affinity diagram. Here we construct how different problems are related to each other. After constructing the Digraph we start interpreting it. Interpretation can be as: 1. An item with large number of outputs e. g “Poor Scheduling Practice” can be cause of many effect 2. An item with large number of inputs e. g “Poor Scheduling of Trucker” can be source of Quality metrics.
  • 29. 8.2.2 Perform Quality Assurance: T&Ts • Beside other available tools, in quality assurance we us all the tools that are used in Plan Quality Management and Control Quality Processes 8.2.2.1 Quality Management and Control Tools Tree Diagram It is used to show how the general plan is related to specific parts e. g in WBS. Also it is used to see the results of different decision that we might be making in our project. Through Tree Diagram we learn how different decision can affect our project. How doing a process in different way can have an effect on our product. Or Tree Diagram will help us in better understanding of the situation and our future decisions.
  • 30. 8.2.2 Perform Quality Assurance: T&Ts • Beside other available tools, in quality assurance we us all the tools that are used in Plan Quality Management and Control Quality Processes 8.2.2.1 Quality Management and Control Tools Network Diagram: Network Diagram shows how activates are connected to each other. It helps us understand when are we going to apply our quality procedures Matrix Diagram: The matrix diagram shows relationship between factors, causes, and objectives.
  • 31. 8.2.2 Perform Quality Assurance: T&Ts • Quality audits are independent reviews of the quality processes and procedures of an organization. • Quality audits can done randomly or on scheduled bases and can be carried externally or internally. • Quality audits can confirm implementation of approved changes, corrective actions, preventive action, or defect repairs. 8.2.2.2 Quality Audits • In Process Analysis we implemented the plan outlined as “Process Improvement Plan” which was an output to Plan Quality Management process • Here we use root-cause analysis which will help us identify problems in our processes and take preventive actions. 8.2.2.3 Process Analysis
  • 32. • Change requests related to corrective, preventive, and defect repair are made. 8.2.3.1 Change Requests • Quality Management Plan, Scope Management Plan, Schedule Management Plan, and Cost Management Plan are updated. 8.2.3.2 Project Management Plan updates • Audit Reports, Training Plans, and Process Documentation are updated. 8.2.3.3 Project Document Update • Organization quality standards and quality management systems are updated 8.2.3.4 OPA Updates 8.2.3 Perform Quality Assurance: Outputs
  • 33. 8.3 Control Quality: ITTOs 1. Project Management Plan 2. Quality Metrics 3. Quality Checklists 4. Work Performance Data 5. Approved Change Requests 6. Deliverables 7. Project Documents 8. OPA 1. Seven Basic Quality Tools 2. Statistical Sampling 3. Inspection 4. Approved change requests review 1. Quality Control Measurements 2. Validated changes 3. Verified deliverables 4. Work Perf Info 5. Change Requests 6. Project Doc updates 7. Project Mangtm Plan updates 8. OPA updates Input Tools & Techniques Output In Control Quality we monitor and record results from executing the quality activities. We do this mainly for two reason: 1. To identify the cause for poor quality and request change, and 2 Validate the deliverables to be accepted by stakeholders.
  • 34. 8.3 Control Quality More Quality Concepts Prevention Vs Inspection Prevention is about keeping errors out of process, and Inspection is about keeping errors out of hands of the customer Tolerance Vs Control Limits Tolerance is a specified range of acceptable results, and Control Limits is about specifying boundaries for a stable process Attribute Sampling Vs Variable Sampling The result of an attribute either conforms or does not conforms, and the result of variable is on continue scale with a degree conformity
  • 35. • Quality Management Plan of the Project Management Plan is used 8.3.1.1 Project Management Plan • It describes project or products attributes and how they will be measured. • Some examples are: Function Points, Mean Time Between Failure (MTBF), and Mean Time to Repair (MTTR) 8.3.1.2 Quality Metrics 8.3.1 Control Quality: Inputs Function Points: In IT, Function Points are used a unit of measurement to count the number of function an information system providing to a business. The same as we use hours to measure time. MTBF: it shows the reliability of product. It specifies the time between two failures that a product can have. For example an hard disk will have a failure after 300,000 hours. MTTR: is the average amount of time a device or product will need to be repaired for a given failure.
  • 36. • A list that will help us verify that our work will fulfill the requirements of the product. 8.3.1.3 Quality Checklists • The data gather from actual which can include planned Vs actual schedule performance, cost performance and technical performance 8.3.1.4 Work Performance Data • The changes requested may include defect repairs which needs to quality controlled and verified 8.1.3.5 Approved Change Requests 8.3 Control Quality: Inputs
  • 37. • Deliverables are validated in Control Quality process. 8.3.1.6 Deliverables • Agreements, quality audit documents, training plans and their assessment, process documentation 8.3.1.7 Project Documents • Organization’s quality policies, defect reporting procedure, and communication policy 8.3.1.8 OPA 8.3 Control Quality: Inputs
  • 38. • These were explained in 8.1.2.3 8.3.2.1 The Seven Basic Quality Tools • As defined in the Quality Management Plan, samples are selected and tested 8.3.2.2 Statistical Sampling • Inspection refers to the examination of the product in order to determine whether it according to the documented standards. • Inspection can be related to a single activity, part of product, or the whole product. • Inspection are also called, review, peer reviews, audits, or walkthroughs. • Inspections are also used to validate defect repairs. 8.3.2.3 Inspection • All the approved change requests are reviewed to verify they are implemented as approved. 8.3.2.4 Approved Change Request Reviews 8.3.2 Control Quality: T&Ts
  • 39. • Control Quality Measurements are the results of Control Quality process • These are input to Perform Quality Assurance process 8.3.3.1 Control Quality Measurements • When a product is changed or repaired after approved changes are implemented, the change or repair is validated in Control Quality process. • This is done using Review Approved Change Requests technique • The change or repaired done is either validated or rejected 8.3.3.2 Validated Changes • Of the goals of Control Quality is to verify the correctness of deliverables • Thus deliverables are either verified or rejected for repair or change • The verified deliverables becomes input to Validate Scope process where they are formally accepted or rejected. 8.3.3.3 Verified Deliverables 8.3.3 Control Quality: Outputs
  • 40. • WPI is performance related data that is output to many monitoring and controlling processes • In this process WPI will show projects achievement of the requirements, information about rejections and reasons for the rejections, also rework required and need for change in quality processes 8.3.3.4. Work Performance Information • Change requests in the form of rework, repair, change to management plan etc are made. 8.3.3.5 Change Requests • Quality Management Plan, and • Process Improvement Plans might be updated 8.3.3.6 Project Management Plan Updates 8.3.3 Control Quality: Outputs
  • 41. • Agreements, quality audit documents, training plans and their assessment, process documentation 8.3.3.7 Project Document Updates • Completed Checklists: When checklists are used, the documented checklist becomes part of project document and OPA • Lesson Learned Doc: The causes of variances, the reasoning behind the corrective action selected, and other types of lessons learned stored as OPA 8.3.3.8 OPA updates 8.3.3 Control Quality: Outputs