Twisted Pair Installation Considerations



                 NEXT
               Attenuation
               Return Loss
                PSNEXT
                ELFEXT




                                           2
Tensile Load/Installation Pull




                                 3
Tensile Load/Installation Pull Guidelines

• Limit 90º bends in conduit to 2
• Cable should not be pulled through a length of
  conduit exceeding 30m (100 ft)
• Support cables every 4 - 5 ft (1200mm - 1500mm)
• Avoid sharp objects, turns and corners
• Use a pulley or a third man at turns and corners
• Do not “jerk” cable
• Pull around obstructions (HVAC) as required


                                                     4
Bend Radius

      UTP                                  STP
 no less than 4x                       no less than
10x (multi-pair)                 7.5cm (3”) non-plenum
                                    15cm (6”) plenum




                                                         5
Compression


              Correct




              Incorrect




                          6
EMI




      7
Optical Fiber Installation Considerations



                  NEXT
                Attenuation
               Return Loss
                 PSNEXT
                 ELFEXT




                                            8
Optical Fiber Installation Guidelines



                               15/20x=pulling
                                 10x=static

   50lbs.




            @700% greater than CAT5




                                                9
Polarization



B A                  B A
        Number 1


        Number 2
A B                  A B




                           10
Cable Management - Rack Rear




                               11
Cable Management - Rack Front




                                12
Cable Management - “Towel Bar”




                                 13
Cable Management - Cable Ties




                                14
Slack - Outlet




                 15
Slack - Rack




               16
Horizontal Pathways
•   Underfloor Duct
•   Cellular Floor
•   Conduit
•   Raised/Access Floor
•   Cable Trays and Wireways
•   Ceiling Pathways
•   Perimeter Pathways
•   Furniture Pathways

                                  17
Underfloor Duct




                  18
Cellular Floor




                 19
Conduit 1




            20
Conduit 2




TC



                 1”        1-1/2”



                      1-1/2”
     Pull Tape                      Innerduct

                                                21
Ducts and Conduit Guidelines
• Fiber and copper pulled in separate conduit
    − Use innerduct if in same conduit
• Clear internal obstructions, ream conduit ends, and use bushings
•   Pull all cable at same time, if possible
•   Use a partner at the entry point
•   Use lubricants if necessary (do not use petroleum-based)
•   Pull in a continuous manner without stopping
•   Do not pull a pull line through at the same time as the cable
•   Do not pull a terminated cable through the conduit
• If pull boxes are used, pull to the first box, coil up the cable, then
  feed it back into the pull box and then pull through to the next one
                                                                           22
Raised/Access Floor




                      23
Ceiling Pathways
             J         J       J       J
(4-5 ft/1220-1525mm)
       T        T          T   T   T            T




                                       11 ft/
                                       3.4m
                                       max




                                                    24
Cabling Installations in
Ceilings and Access Floors




                             25
Cable Trays & Wireways



    Channel
     Ladder
  Solid-Bottom
Ventilated/Trough
    Wireway




                                    26
Furniture Pathways & Installation




                                    27
Perimeter Pathways




                     28
Vertical Pathway Cabling Installations
                                           3-bolt Clamp



                                   (Shoe or Pulley)
               D-Rings or Straps


              Conduit Sleeve



                                      Conduit Sleeve


              (Firestop)




                                             Strand


                                                          29
IDC and Color Coding




      White/ Blue/ White/ Orange/ White/ Green/ White/ Brown/
      Blue White Orange White Green White Brown White


          Pair 1       Pair 2        Pair 3        Pair 4

                        25 pair Color Code
                              White            Wires with predominant
5th pair = Slate                Red            family color are tip.
                               Black           Wires with predominant
                              Yellow           pair color are ring.
                               Violet
                                                                        30
Interconnection Hardware Installation




                                        31
Wiring Patterns

                     2                                            3

    3                1                4           2               1               4

2       2   3    4       5   6    7       8   2       2   3   4       5   6   7       8


1       2   3   4        5   6    7       8   1       2   3   4       5   6   7       8




                T568A                                       T568B/
                                                          AT&T 258A


                                                                                          32
Wiring Patterns

Pin/Pair Assignment - T568A                            Pin/Pair Assignment - T568B

                                Pair 1, (Blue)                                             Pair 1, (Blue)
   Pair 2, (Orange)                                         Pair 3, (Green)

Pair 3, (Green)                     Pair 4, (Brown)                                           Pair 4, (Brown)
                                                      Pair 2, (Orange)




                  1 2 3 4 5 6 7 8
                                                                         1 2 3 4 5 6 7 8




                                                                                                                33
T568A Wiring Pattern
                  Pin 1    White/Green
         Pair 3
                  Pin 2         Green

                  Pin 3   White/Orange

                  Pin 4           Blue
Pair 2   Pair 1
                  Pin 5     White/Blue

                  Pin 6        Orange

                  Pin 7   White/Brown
         Pair 4
                  Pin 8         Brown


                                         34
T568B Wiring Pattern
                  Pin 1   White/Orange
         Pair 2
                  Pin 2        Orange

                  Pin 3    White/Green

                  Pin 4           Blue
Pair 3   Pair 1
                  Pin 5     White/Blue

                  Pin 6         Green

                  Pin 7   White/Brown
         Pair 4
                  Pin 8         Brown


                                         35
Untwist and Jacket Removal




                             36

More Related Content

What's hot (20)

Fiberhome Smart ODN Solution
Fiberhome Smart ODN SolutionFiberhome Smart ODN Solution
Fiberhome Smart ODN Solution
 
Fttx ftth cabling system
Fttx ftth cabling systemFttx ftth cabling system
Fttx ftth cabling system
 
GPON-FTTx Training
GPON-FTTx TrainingGPON-FTTx Training
GPON-FTTx Training
 
FTTx Basics & Its Network Basics
FTTx Basics & Its Network BasicsFTTx Basics & Its Network Basics
FTTx Basics & Its Network Basics
 
FTTH
FTTHFTTH
FTTH
 
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
 
PON design considerations for FTTH FTTx
PON design considerations for FTTH FTTxPON design considerations for FTTH FTTx
PON design considerations for FTTH FTTx
 
Vhdl教程
Vhdl教程Vhdl教程
Vhdl教程
 
Fttx
FttxFttx
Fttx
 
Huawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware StructureHuawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware Structure
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training
 
Wcdma ran protocols and procedures
Wcdma ran protocols and proceduresWcdma ran protocols and procedures
Wcdma ran protocols and procedures
 
GPON Introduction
GPON IntroductionGPON Introduction
GPON Introduction
 
Optical Network Unit - ONU
Optical Network Unit - ONUOptical Network Unit - ONU
Optical Network Unit - ONU
 
Mw training slide
Mw training slideMw training slide
Mw training slide
 
FTTX with Passive Optical Networks
FTTX with Passive Optical NetworksFTTX with Passive Optical Networks
FTTX with Passive Optical Networks
 
Networking Basics
Networking BasicsNetworking Basics
Networking Basics
 
Huawei GPON Fundamentals
Huawei GPON FundamentalsHuawei GPON Fundamentals
Huawei GPON Fundamentals
 
Gpon
GponGpon
Gpon
 
GPON-Fundamentals_Huawei.pdf
GPON-Fundamentals_Huawei.pdfGPON-Fundamentals_Huawei.pdf
GPON-Fundamentals_Huawei.pdf
 

Viewers also liked

Pertemuan 06 Black Box Testing
Pertemuan 06      Black Box  TestingPertemuan 06      Black Box  Testing
Pertemuan 06 Black Box TestingMrirfan
 
Pengertian Etika
Pengertian EtikaPengertian Etika
Pengertian EtikaMrirfan
 
1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling SystemMrirfan
 
Pertemuan 04 Software Testing Techniques 2
Pertemuan 04     Software  Testing  Techniques  2Pertemuan 04     Software  Testing  Techniques  2
Pertemuan 04 Software Testing Techniques 2Mrirfan
 
Pertemuan 04 Software Testing Techniques
Pertemuan 04     Software  Testing  TechniquesPertemuan 04     Software  Testing  Techniques
Pertemuan 04 Software Testing TechniquesMrirfan
 
Fire alarm 3-b-protected_premises_fire_alarm_system
Fire alarm 3-b-protected_premises_fire_alarm_systemFire alarm 3-b-protected_premises_fire_alarm_system
Fire alarm 3-b-protected_premises_fire_alarm_systemgrantlerc
 
Saudi aramco presentation
Saudi aramco presentationSaudi aramco presentation
Saudi aramco presentationbukeivan
 

Viewers also liked (8)

Pertemuan 06 Black Box Testing
Pertemuan 06      Black Box  TestingPertemuan 06      Black Box  Testing
Pertemuan 06 Black Box Testing
 
Pengertian Etika
Pengertian EtikaPengertian Etika
Pengertian Etika
 
1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System
 
Pertemuan 04 Software Testing Techniques 2
Pertemuan 04     Software  Testing  Techniques  2Pertemuan 04     Software  Testing  Techniques  2
Pertemuan 04 Software Testing Techniques 2
 
Pertemuan 04 Software Testing Techniques
Pertemuan 04     Software  Testing  TechniquesPertemuan 04     Software  Testing  Techniques
Pertemuan 04 Software Testing Techniques
 
PDU Demystified
PDU DemystifiedPDU Demystified
PDU Demystified
 
Fire alarm 3-b-protected_premises_fire_alarm_system
Fire alarm 3-b-protected_premises_fire_alarm_systemFire alarm 3-b-protected_premises_fire_alarm_system
Fire alarm 3-b-protected_premises_fire_alarm_system
 
Saudi aramco presentation
Saudi aramco presentationSaudi aramco presentation
Saudi aramco presentation
 

Similar to 5 Installing Premises Cabling System

2 Basic Principal Of Utp Installation
2 Basic Principal Of Utp Installation2 Basic Principal Of Utp Installation
2 Basic Principal Of Utp InstallationMrirfan
 
1603175957466-TELECOM CABLES .pdf
1603175957466-TELECOM   CABLES .pdf1603175957466-TELECOM   CABLES .pdf
1603175957466-TELECOM CABLES .pdfIlaiyarajaS1
 
Data Comm | Making Ethernet Cable
Data Comm | Making Ethernet CableData Comm | Making Ethernet Cable
Data Comm | Making Ethernet CableMaulen Bale
 
3. UTP AND FIBER CABLING.pptx
3. UTP AND FIBER CABLING.pptx3. UTP AND FIBER CABLING.pptx
3. UTP AND FIBER CABLING.pptxChellepia
 
Cnlab ex.no.1
Cnlab ex.no.1Cnlab ex.no.1
Cnlab ex.no.1ISTEJCE
 
Creating A Network Cable.ppt
Creating A Network Cable.pptCreating A Network Cable.ppt
Creating A Network Cable.pptRjayGuinto2
 
Uc Power System Presentation Rev4 Web
Uc Power System Presentation Rev4 WebUc Power System Presentation Rev4 Web
Uc Power System Presentation Rev4 Webus056444
 
cablecrimping-150219125046-conversion-gate01.pptx
cablecrimping-150219125046-conversion-gate01.pptxcablecrimping-150219125046-conversion-gate01.pptx
cablecrimping-150219125046-conversion-gate01.pptxANISHTP
 
4. RJ45 Wiring Guide Diagram.ppt
4. RJ45 Wiring Guide Diagram.ppt4. RJ45 Wiring Guide Diagram.ppt
4. RJ45 Wiring Guide Diagram.pptChellepia
 

Similar to 5 Installing Premises Cabling System (20)

2 Basic Principal Of Utp Installation
2 Basic Principal Of Utp Installation2 Basic Principal Of Utp Installation
2 Basic Principal Of Utp Installation
 
7.3.2.6 lab build and test network cables
7.3.2.6 lab   build and test network cables7.3.2.6 lab   build and test network cables
7.3.2.6 lab build and test network cables
 
Network Cabling
Network CablingNetwork Cabling
Network Cabling
 
1603175957466-TELECOM CABLES .pdf
1603175957466-TELECOM   CABLES .pdf1603175957466-TELECOM   CABLES .pdf
1603175957466-TELECOM CABLES .pdf
 
Data Comm | Making Ethernet Cable
Data Comm | Making Ethernet CableData Comm | Making Ethernet Cable
Data Comm | Making Ethernet Cable
 
3. UTP AND FIBER CABLING.pptx
3. UTP AND FIBER CABLING.pptx3. UTP AND FIBER CABLING.pptx
3. UTP AND FIBER CABLING.pptx
 
Cnlab ex.no.1
Cnlab ex.no.1Cnlab ex.no.1
Cnlab ex.no.1
 
Utp & fiber 1
Utp & fiber 1Utp & fiber 1
Utp & fiber 1
 
Creating A Network Cable.ppt
Creating A Network Cable.pptCreating A Network Cable.ppt
Creating A Network Cable.ppt
 
Cabling
CablingCabling
Cabling
 
Pullbox sizing
Pullbox sizingPullbox sizing
Pullbox sizing
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptx
 
Uc Power System Presentation Rev4 Web
Uc Power System Presentation Rev4 WebUc Power System Presentation Rev4 Web
Uc Power System Presentation Rev4 Web
 
Network Cabling Guide | Cat5, Cat6, Cat7
Network Cabling Guide | Cat5, Cat6, Cat7  Network Cabling Guide | Cat5, Cat6, Cat7
Network Cabling Guide | Cat5, Cat6, Cat7
 
cablecrimping-150219125046-conversion-gate01.pptx
cablecrimping-150219125046-conversion-gate01.pptxcablecrimping-150219125046-conversion-gate01.pptx
cablecrimping-150219125046-conversion-gate01.pptx
 
Cable crimping
Cable crimpingCable crimping
Cable crimping
 
Network cabling
Network cablingNetwork cabling
Network cabling
 
Crimping - RJ45.pptx
Crimping - RJ45.pptxCrimping - RJ45.pptx
Crimping - RJ45.pptx
 
Network_Cabling.ppt
Network_Cabling.pptNetwork_Cabling.ppt
Network_Cabling.ppt
 
4. RJ45 Wiring Guide Diagram.ppt
4. RJ45 Wiring Guide Diagram.ppt4. RJ45 Wiring Guide Diagram.ppt
4. RJ45 Wiring Guide Diagram.ppt
 

More from Mrirfan

Teori Etika Keperawatan
Teori Etika KeperawatanTeori Etika Keperawatan
Teori Etika KeperawatanMrirfan
 
M K P L Pertemuan5
M K P L  Pertemuan5M K P L  Pertemuan5
M K P L Pertemuan5Mrirfan
 
Pertemuan 3
Pertemuan 3Pertemuan 3
Pertemuan 3Mrirfan
 
Pertemuan 06 Black Box Testing
Pertemuan 06     Black Box TestingPertemuan 06     Black Box Testing
Pertemuan 06 Black Box TestingMrirfan
 
Ratnasuhartiniunairbab4
Ratnasuhartiniunairbab4Ratnasuhartiniunairbab4
Ratnasuhartiniunairbab4Mrirfan
 
Pertemuan 04 Software Testing Techniques 2
Pertemuan 04    Software Testing Techniques  2Pertemuan 04    Software Testing Techniques  2
Pertemuan 04 Software Testing Techniques 2Mrirfan
 
Pertemuan 04 Software Testing Techniques
Pertemuan 04    Software Testing TechniquesPertemuan 04    Software Testing Techniques
Pertemuan 04 Software Testing TechniquesMrirfan
 
Mkpl Pertemuan5
Mkpl Pertemuan5Mkpl Pertemuan5
Mkpl Pertemuan5Mrirfan
 
Pertemuan 3
Pertemuan 3Pertemuan 3
Pertemuan 3Mrirfan
 
04 Testing Perangkat Lunak
04 Testing Perangkat Lunak04 Testing Perangkat Lunak
04 Testing Perangkat LunakMrirfan
 
Strategi Pengujian Perangkat Lunak Mg Ke 8 Lanj
Strategi Pengujian Perangkat Lunak Mg Ke 8 LanjStrategi Pengujian Perangkat Lunak Mg Ke 8 Lanj
Strategi Pengujian Perangkat Lunak Mg Ke 8 LanjMrirfan
 
Kel2 Data Warehouse
Kel2 Data WarehouseKel2 Data Warehouse
Kel2 Data WarehouseMrirfan
 
Kel2 Data Warehouse 2
Kel2 Data Warehouse 2Kel2 Data Warehouse 2
Kel2 Data Warehouse 2Mrirfan
 
Modul 16 Perc7 Bluetooth
Modul 16 Perc7 BluetoothModul 16 Perc7 Bluetooth
Modul 16 Perc7 BluetoothMrirfan
 
Wireless Lan 2004 Antennas
Wireless Lan 2004   AntennasWireless Lan 2004   Antennas
Wireless Lan 2004 AntennasMrirfan
 
4 Structure Cabling System Design
4 Structure Cabling System Design4 Structure Cabling System Design
4 Structure Cabling System DesignMrirfan
 
1 Klasifikasi Jaringan
1 Klasifikasi Jaringan1 Klasifikasi Jaringan
1 Klasifikasi JaringanMrirfan
 
7 Keamanan Jaringan 1
7 Keamanan Jaringan 17 Keamanan Jaringan 1
7 Keamanan Jaringan 1Mrirfan
 
6 Wan Kinerja Tinggi 1
6 Wan Kinerja Tinggi 16 Wan Kinerja Tinggi 1
6 Wan Kinerja Tinggi 1Mrirfan
 
5 Wide Area Network (Wan)
5 Wide Area Network (Wan)5 Wide Area Network (Wan)
5 Wide Area Network (Wan)Mrirfan
 

More from Mrirfan (20)

Teori Etika Keperawatan
Teori Etika KeperawatanTeori Etika Keperawatan
Teori Etika Keperawatan
 
M K P L Pertemuan5
M K P L  Pertemuan5M K P L  Pertemuan5
M K P L Pertemuan5
 
Pertemuan 3
Pertemuan 3Pertemuan 3
Pertemuan 3
 
Pertemuan 06 Black Box Testing
Pertemuan 06     Black Box TestingPertemuan 06     Black Box Testing
Pertemuan 06 Black Box Testing
 
Ratnasuhartiniunairbab4
Ratnasuhartiniunairbab4Ratnasuhartiniunairbab4
Ratnasuhartiniunairbab4
 
Pertemuan 04 Software Testing Techniques 2
Pertemuan 04    Software Testing Techniques  2Pertemuan 04    Software Testing Techniques  2
Pertemuan 04 Software Testing Techniques 2
 
Pertemuan 04 Software Testing Techniques
Pertemuan 04    Software Testing TechniquesPertemuan 04    Software Testing Techniques
Pertemuan 04 Software Testing Techniques
 
Mkpl Pertemuan5
Mkpl Pertemuan5Mkpl Pertemuan5
Mkpl Pertemuan5
 
Pertemuan 3
Pertemuan 3Pertemuan 3
Pertemuan 3
 
04 Testing Perangkat Lunak
04 Testing Perangkat Lunak04 Testing Perangkat Lunak
04 Testing Perangkat Lunak
 
Strategi Pengujian Perangkat Lunak Mg Ke 8 Lanj
Strategi Pengujian Perangkat Lunak Mg Ke 8 LanjStrategi Pengujian Perangkat Lunak Mg Ke 8 Lanj
Strategi Pengujian Perangkat Lunak Mg Ke 8 Lanj
 
Kel2 Data Warehouse
Kel2 Data WarehouseKel2 Data Warehouse
Kel2 Data Warehouse
 
Kel2 Data Warehouse 2
Kel2 Data Warehouse 2Kel2 Data Warehouse 2
Kel2 Data Warehouse 2
 
Modul 16 Perc7 Bluetooth
Modul 16 Perc7 BluetoothModul 16 Perc7 Bluetooth
Modul 16 Perc7 Bluetooth
 
Wireless Lan 2004 Antennas
Wireless Lan 2004   AntennasWireless Lan 2004   Antennas
Wireless Lan 2004 Antennas
 
4 Structure Cabling System Design
4 Structure Cabling System Design4 Structure Cabling System Design
4 Structure Cabling System Design
 
1 Klasifikasi Jaringan
1 Klasifikasi Jaringan1 Klasifikasi Jaringan
1 Klasifikasi Jaringan
 
7 Keamanan Jaringan 1
7 Keamanan Jaringan 17 Keamanan Jaringan 1
7 Keamanan Jaringan 1
 
6 Wan Kinerja Tinggi 1
6 Wan Kinerja Tinggi 16 Wan Kinerja Tinggi 1
6 Wan Kinerja Tinggi 1
 
5 Wide Area Network (Wan)
5 Wide Area Network (Wan)5 Wide Area Network (Wan)
5 Wide Area Network (Wan)
 

Recently uploaded

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 

Recently uploaded (20)

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 

5 Installing Premises Cabling System

  • 2. Twisted Pair Installation Considerations NEXT Attenuation Return Loss PSNEXT ELFEXT 2
  • 4. Tensile Load/Installation Pull Guidelines • Limit 90º bends in conduit to 2 • Cable should not be pulled through a length of conduit exceeding 30m (100 ft) • Support cables every 4 - 5 ft (1200mm - 1500mm) • Avoid sharp objects, turns and corners • Use a pulley or a third man at turns and corners • Do not “jerk” cable • Pull around obstructions (HVAC) as required 4
  • 5. Bend Radius UTP STP no less than 4x no less than 10x (multi-pair) 7.5cm (3”) non-plenum 15cm (6”) plenum 5
  • 6. Compression Correct Incorrect 6
  • 7. EMI 7
  • 8. Optical Fiber Installation Considerations NEXT Attenuation Return Loss PSNEXT ELFEXT 8
  • 9. Optical Fiber Installation Guidelines 15/20x=pulling 10x=static 50lbs. @700% greater than CAT5 9
  • 10. Polarization B A B A Number 1 Number 2 A B A B 10
  • 11. Cable Management - Rack Rear 11
  • 12. Cable Management - Rack Front 12
  • 13. Cable Management - “Towel Bar” 13
  • 14. Cable Management - Cable Ties 14
  • 17. Horizontal Pathways • Underfloor Duct • Cellular Floor • Conduit • Raised/Access Floor • Cable Trays and Wireways • Ceiling Pathways • Perimeter Pathways • Furniture Pathways 17
  • 20. Conduit 1 20
  • 21. Conduit 2 TC 1” 1-1/2” 1-1/2” Pull Tape Innerduct 21
  • 22. Ducts and Conduit Guidelines • Fiber and copper pulled in separate conduit − Use innerduct if in same conduit • Clear internal obstructions, ream conduit ends, and use bushings • Pull all cable at same time, if possible • Use a partner at the entry point • Use lubricants if necessary (do not use petroleum-based) • Pull in a continuous manner without stopping • Do not pull a pull line through at the same time as the cable • Do not pull a terminated cable through the conduit • If pull boxes are used, pull to the first box, coil up the cable, then feed it back into the pull box and then pull through to the next one 22
  • 24. Ceiling Pathways J J J J (4-5 ft/1220-1525mm) T T T T T T 11 ft/ 3.4m max 24
  • 25. Cabling Installations in Ceilings and Access Floors 25
  • 26. Cable Trays & Wireways Channel Ladder Solid-Bottom Ventilated/Trough Wireway 26
  • 27. Furniture Pathways & Installation 27
  • 29. Vertical Pathway Cabling Installations 3-bolt Clamp (Shoe or Pulley) D-Rings or Straps Conduit Sleeve Conduit Sleeve (Firestop) Strand 29
  • 30. IDC and Color Coding White/ Blue/ White/ Orange/ White/ Green/ White/ Brown/ Blue White Orange White Green White Brown White Pair 1 Pair 2 Pair 3 Pair 4 25 pair Color Code White Wires with predominant 5th pair = Slate Red family color are tip. Black Wires with predominant Yellow pair color are ring. Violet 30
  • 32. Wiring Patterns 2 3 3 1 4 2 1 4 2 2 3 4 5 6 7 8 2 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 T568A T568B/ AT&T 258A 32
  • 33. Wiring Patterns Pin/Pair Assignment - T568A Pin/Pair Assignment - T568B Pair 1, (Blue) Pair 1, (Blue) Pair 2, (Orange) Pair 3, (Green) Pair 3, (Green) Pair 4, (Brown) Pair 4, (Brown) Pair 2, (Orange) 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 33
  • 34. T568A Wiring Pattern Pin 1 White/Green Pair 3 Pin 2 Green Pin 3 White/Orange Pin 4 Blue Pair 2 Pair 1 Pin 5 White/Blue Pin 6 Orange Pin 7 White/Brown Pair 4 Pin 8 Brown 34
  • 35. T568B Wiring Pattern Pin 1 White/Orange Pair 2 Pin 2 Orange Pin 3 White/Green Pin 4 Blue Pair 3 Pair 1 Pin 5 White/Blue Pin 6 Green Pin 7 White/Brown Pair 4 Pin 8 Brown 35
  • 36. Untwist and Jacket Removal 36