Definitions:
1. Daily Average Movement is the same as average sales per day, calculated by dividing the sum of
Item fulfillments in any period of time by the total number of days in the same period.
2. Safety Stock in Quantity is the least level of stock and we cannot go below than this level at any cost.
Also know as buffer stock. In our example it is stock for 15 days in Pcs/Qty.
3. Re-order Level Quantity is the level of current stock where if we will not place an order with supplier
then we will not be able to keep even buffer/safety stock till the new stock arrives.
4. Upper Inventory Cap helps us to order that optimum level which will not let the stock to exceed from a
particular level
Note: Above stated calculation can be seen in the report “Test-Inventory Cap Report for 90 Days”
5. Maximum Permissible Qty is the total quantity of current stock and new orders to control the
maximum stock level anytime in our warehouse
6. Lead Time is the total time required to arrange the shipment from placing order till it arrives in W.H
7. Maximum Allowed Stock in Days is as per management’s instructions.
Inventory Caps Project
Let’s Suppose:
a) Sum of Item Fulfilment in Qty for 90 Days = 90 Pcs
b) Safety Stock in Days = 15 Days
c) Lead Time in Days = 45 Days
d) Maximum Permissible Quantity in Days = 120 Days
e) Pending or Open Purchase Order placed with Supplier = 0 Qty
f) New Ordering Qty what not yet placed with supplier = 19 pcs
Inventory Caps Project
Formulas:
1. Daily Average Movement = Sum of Item Fulfilment (for 30,60,90 Days)
No. of Days (30,60,90)
2. Safety Stock in Quantity = Daily Average Movement * Safety Stock in Days
Daily Average Movement: = 90 Pcs = 1 Pc
90 Days
Safety Stock in Quantity = 1 Pc * 15 Days = 15 Pcs
3. Re-order Level Quantity = (Lead Time in Days * Daily Average Movement ) + Safety Stock Qty
Re-order Level Quantity = (45 Days* 1 Pc) + 15 Pcs = 60 Pcs
4. Upper Inventory Cap Qty = Daily Average Movement * Max Permissible Qty in Days
Upper Inventory Cap Qty = 1 Pc * 120 Days = 120 Pcs
Inventory Caps Project
Inventory Caps Project
Reminders/Notifications; If below conditions do not fulfilled
1. Always Upper Inventory Cap Qty ≥ (Current Stock + Pending/Open P.O + New Ordering Qty )
Upper Inventory Cap Qty, 120 Pcs ≥ (100 Pcs + O Pcs + 19 Pcs)
If we increase new ordering Quantity from 19 Pcs to 20 Pcs, then reminder/notification will be
received
2. Always Re-Order Level Qty ≤ (Current Stock + Pending/Open P.O)
Re-Order Level Qty, 60 Pcs ≤ (100 Pcs + O Pcs)
If current stock reduced from 100 Pcs to 60 Pcs, then reminder/notification will be received
3. Always Current Stock ≥ Safety Stock in Qty
Current Stock in Pcs ≥ (15 Pcs)
If current stock reduced to 15 Pcs, then reminder/notification will be received
Inventory Caps Project
Current Stock, 100 Pcs
Reorder Level, 60 Pcs
Safety Stock, 15 Pcs
Present
Day
After 40
Days
Just before
reaching
the Stock
After
Stock
arrives in
W.H
After replenishment Current Stock is 75 Pcs (60+15)
Which is Maximum Stock Allowed to be have in W.H
At the
time
Order
Placed
Re Order Quantity Model
Maximum Inventory Cap Stock for 120 Days which is 120 Pcs
Virtual Stock Level
Inventory Caps Project
“Next move towards value addition”

More Related Content

Similar to Inventory Caps Project

Inventory Control and Management
Inventory Control and ManagementInventory Control and Management
Inventory Control and ManagementNicolo Yu
 
Selling Essentials Inventory and Orders Management
Selling Essentials Inventory and Orders ManagementSelling Essentials Inventory and Orders Management
Selling Essentials Inventory and Orders ManagementSellOnFlipkart
 
4. good -inventory-management-ppt
4. good  -inventory-management-ppt4. good  -inventory-management-ppt
4. good -inventory-management-pptshahidch44
 
Store Order Point System
Store Order Point SystemStore Order Point System
Store Order Point SystemHasibul Islam
 
Material(stock levels) 1
Material(stock levels) 1Material(stock levels) 1
Material(stock levels) 1LeenaKP
 

Similar to Inventory Caps Project (8)

Inventory Control and Management
Inventory Control and ManagementInventory Control and Management
Inventory Control and Management
 
Inventory control
Inventory controlInventory control
Inventory control
 
Inventory & Risk Pooling.pdf
Inventory & Risk Pooling.pdfInventory & Risk Pooling.pdf
Inventory & Risk Pooling.pdf
 
Selling Essentials Inventory and Orders Management
Selling Essentials Inventory and Orders ManagementSelling Essentials Inventory and Orders Management
Selling Essentials Inventory and Orders Management
 
4. good -inventory-management-ppt
4. good  -inventory-management-ppt4. good  -inventory-management-ppt
4. good -inventory-management-ppt
 
B2 - Cash convertion cycle
B2 - Cash convertion cycleB2 - Cash convertion cycle
B2 - Cash convertion cycle
 
Store Order Point System
Store Order Point SystemStore Order Point System
Store Order Point System
 
Material(stock levels) 1
Material(stock levels) 1Material(stock levels) 1
Material(stock levels) 1
 

Inventory Caps Project

  • 1. Inventory Caps Project Proposed & Presented by; Mudasser Khan Bungish
  • 2. Definitions: 1. Daily Average Movement is the same as average sales per day, calculated by dividing the sum of Item fulfillments in any period of time by the total number of days in the same period. 2. Safety Stock in Quantity is the least level of stock and we cannot go below than this level at any cost. Also know as buffer stock. In our example it is stock for 15 days in Pcs/Qty. 3. Re-order Level Quantity is the level of current stock where if we will not place an order with supplier then we will not be able to keep even buffer/safety stock till the new stock arrives. 4. Upper Inventory Cap helps us to order that optimum level which will not let the stock to exceed from a particular level Note: Above stated calculation can be seen in the report “Test-Inventory Cap Report for 90 Days” 5. Maximum Permissible Qty is the total quantity of current stock and new orders to control the maximum stock level anytime in our warehouse 6. Lead Time is the total time required to arrange the shipment from placing order till it arrives in W.H 7. Maximum Allowed Stock in Days is as per management’s instructions. Inventory Caps Project
  • 3. Let’s Suppose: a) Sum of Item Fulfilment in Qty for 90 Days = 90 Pcs b) Safety Stock in Days = 15 Days c) Lead Time in Days = 45 Days d) Maximum Permissible Quantity in Days = 120 Days e) Pending or Open Purchase Order placed with Supplier = 0 Qty f) New Ordering Qty what not yet placed with supplier = 19 pcs Inventory Caps Project
  • 4. Formulas: 1. Daily Average Movement = Sum of Item Fulfilment (for 30,60,90 Days) No. of Days (30,60,90) 2. Safety Stock in Quantity = Daily Average Movement * Safety Stock in Days Daily Average Movement: = 90 Pcs = 1 Pc 90 Days Safety Stock in Quantity = 1 Pc * 15 Days = 15 Pcs 3. Re-order Level Quantity = (Lead Time in Days * Daily Average Movement ) + Safety Stock Qty Re-order Level Quantity = (45 Days* 1 Pc) + 15 Pcs = 60 Pcs 4. Upper Inventory Cap Qty = Daily Average Movement * Max Permissible Qty in Days Upper Inventory Cap Qty = 1 Pc * 120 Days = 120 Pcs Inventory Caps Project
  • 5. Inventory Caps Project Reminders/Notifications; If below conditions do not fulfilled 1. Always Upper Inventory Cap Qty ≥ (Current Stock + Pending/Open P.O + New Ordering Qty ) Upper Inventory Cap Qty, 120 Pcs ≥ (100 Pcs + O Pcs + 19 Pcs) If we increase new ordering Quantity from 19 Pcs to 20 Pcs, then reminder/notification will be received 2. Always Re-Order Level Qty ≤ (Current Stock + Pending/Open P.O) Re-Order Level Qty, 60 Pcs ≤ (100 Pcs + O Pcs) If current stock reduced from 100 Pcs to 60 Pcs, then reminder/notification will be received 3. Always Current Stock ≥ Safety Stock in Qty Current Stock in Pcs ≥ (15 Pcs) If current stock reduced to 15 Pcs, then reminder/notification will be received
  • 6. Inventory Caps Project Current Stock, 100 Pcs Reorder Level, 60 Pcs Safety Stock, 15 Pcs Present Day After 40 Days Just before reaching the Stock After Stock arrives in W.H After replenishment Current Stock is 75 Pcs (60+15) Which is Maximum Stock Allowed to be have in W.H At the time Order Placed Re Order Quantity Model Maximum Inventory Cap Stock for 120 Days which is 120 Pcs Virtual Stock Level
  • 7. Inventory Caps Project “Next move towards value addition”