Design   Cost Comparison

           2B                       without beams &

                                 with beams.


         Group members:
GHULAM MUSTAFA VIRA - 136
MUHAMMAD ISMAIL YAR - 154
      FARHAN JAMEEL - 101
     JAMHOOR ALAM - 158
        NAJEEBULLAH - 194
         TARIQ AMIN - 173   Civil Engineering Dept.
                                2009 BATCH
 INTRODUCTION
 EARTHQUAKE REVIEW
BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
Concrete          STRUCTURES
  are CHEAPER AND HEAVIER than others


   but SELECTING AN   ECONOMICAL
Lateral-Force-Resisting System

 is                     difficult!
& not with
    STRUCTURAL SYSTEMS



GOOD ENGINEERING =   SAFE/SOUND
       +                   Design
To develop Models



Of an



Advantages:
          Reduces Design Time & Iterations
          Direct Cost Savings
Importance Factors (P                                  ORTLAND                 CEMENT ASSOCIATION)

                                       Importance
        Cost Effectiveness                                                                                          4.53

        Construction Time                                                                                    4.13

      Material Availability                                                                            3.95

        Design Flexibility                                                                            3.89

   Material Delivery Time                                                                         3.83

           Fire Resistance                                                                       3.78

            Seismic Loads                                                                      3.66

               Wind Loads                                                                    3.65

   Contractor Availability                                                              3.46

                Design Tie                                                            3.36

               Appearance                                                            3.31

           Ease of Design                                                       3.17

   Return on Design Fees                                                 2.87

Available Design Software                                    2.53

              Publications                                  2.48

                              0      0.5   1     1.5    2          2.5           3             3.5             4       4.5   5

                                  Mean Rating (1 = not important at all, 5 = very important)
 INTRODUCTION
 EARTHQUAKE REVIEW
BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
FACTORS AFFECTING SHAKING INTENSITY
SEISMICITY IN KARACHI
HAZARD MAP OF PAKISTAN




GSHAP Hazard map (1999)       Revised Hazard map (2006)

                          KARACHI IS ASSIGNED ZONE 2B
LOAD PATH
                                    Horizontal
Diaphragm (Floor and Roof slabs )   Elements


                                    Vertical
      Shear Walls / Frames          Elements



           Foundation


              Soil
LATERAL-FORCE-RESISTING SYSTEMS

                Moment Resisting
                                     Frames
                 Frame System


Resistance to    Building Frame
                                   Shear Wall
Lateral Loads        System

                                     Frames
                                   (25% Lateral
                                      Load)
                  Dual System

                                   Shear Wall
 INTRODUCTION
 EARTHQUAKE REVIEW
 BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
20 Stories

11 Residential   6 Podium      3 Basements
   Stories         Stories

                    Indoor
                                   Retail
                    Games

                   4 Parking     2 Parking
                    Stories       Stories


                    Lobby
Length = 121‟-4”

Width = 120‟-2”



4 Shear Walls
40 Columns
DUAL SYSTEM without Beams




Drop Panel
BUILDING FRAME SYSTEM with Beams




        Beam
Typical Beam Size                   Shear Wall Thickness

                                    18” (Story 1 to 8)
                 24”                15” (Story 9 to 14)
                                    12” (Story 15 to Roof)
        10”
                       Concrete Compressive Strength (f„c )
     Story
                       Beam/Slab        Column/Shear Wall
 Story 1 to 6             5 ksi                 7 ksi
 Story 7 to 11            4.5 ksi               6 ksi
 Story 12 to 16           4 ksi                 5 ksi
 Story 17 to Roof         3 ksi                 4 ksi
RAFT FOUNDATION (f’c = 5 ksi)


   Dual System              Building Frame
  without Beams           System with Beams



Thickness   Area offset   Thickness   Area offset

  72”          18”          72”          24”
 INTRODUCTION
 EARTHQUAKE REVIEW
 BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
ETABS modelling of
   Dual System without Beams

1st Model
Shear Walls and Columns take lateral loads
                          USED TO DESIGN SHEAR WALL


2nd Model
Shear Walls are replaced by Columns
& 25% Earthquake Load is induced
            COLUMNS ARE DESIGNED USING BOTH MODELS
ETABS modelling of
 Building Frame System with Beams


1st Model
We use compatibility combos
                        USED TO DESIGN COLUMNS


2nd Model
Frames are assigned moment of inertia = 0.01
Shear walls resist all the lateral load
                      USED TO DESIGN SHEAR WALLS
LIVE LOADS (UBC 97)
 Retail         50psf
 Parking        50psf
 Lobby          40psf
 Indoor Games   40psf
 Residential    40psf
 Roof           20psf
Seismic Factors (from UBC 97)
Ct   (Concrete Structure)                           0.03

Overstrength Factor “R” (Dual system)               6.5

Overstrength Factor “R” (Building Frame system)     5.5
Soil Profile Type (Very Dense Soil and Soft Rock)   Sc

Seismic Zone Factor “Z”     (2B)                    0.20

Importance Factor “I”                               1

Omega Factor (System Overstrength Factor) “ΩO”      2.8

Seismic Coefficient “Ca”                            0.24

Seismic Coefficient “Cv”                            0.32

Dead load Multiplier (0.5   x Ca x I)               0.12
 INTRODUCTION
 EARTHQUAKE REVIEW
 BUILDING DESCRIPTION
 DESIGN APPROACH AND INPUTS
 CONCLUSION
Cost Percentage of Dual System without Beams
            Shear wall
             14.1%


   Column
   15.6%
                                    Slabs
                                   55.4%

   Foundation
    10.5%
              Beams
               4.4%
Cost Percentage of Building Frame System with Beams
                                  Slabs
      Shear wall                  12.7%
       25.9%



                                          Beams
                                          24.5%
     Column
    11.8%
                     Foundation
                      25.1%
Cost Comparison of Different Elements


                            70

                            60
Cost (Rupees in millions)




                            50

                            40

                            30

                            20

                            10

                             0
                                 Slabs & Beams   Foundation      Columns      Shear walls
                             Dual System without beams   Building Frame System with beams
Cost Comparison of Systems

                            120


                            100
Cost (Rupees in millions)




                             80


                             60
                                               109

                             40                                           80


                             20


                              0
                                  Dual System without Beams   Building Frame System with Beams
Cost Comparison of all six Systems
                            140


                            120
                                                             Moment Resisting System
                                                             with Beams
Cost (Rupees in millions)




                            100                              Building Frame System
                                                             with Beams
                             80                              Dual System with Beams

                                                             Moment Resisting System
                             60                              without Beams
                                                             Dual System without
                             40                              Beams
                                                             Building Frame System
                                                             without Beams
                             20


                              0
Comparison in Ratio of all six Systems


                                           1.79
                                    1.69
                                                  Moment Resisting System
                                                  with Beams
                             1.37                 Building Frame System
                      1.32
               1.24                               with Beams
                                                  Dual System with Beams
         1
Ratios




                                                  Moment Resisting System
                                                  without Beams
                                                  Dual System without
                                                  Beams
                                                  Building Frame System
                                                  without Beams
Final Year Project Presentation

More Related Content

What's hot

Mini projects for_civil_engineering_(3)_(1) (1) (1)
Mini projects for_civil_engineering_(3)_(1) (1) (1)Mini projects for_civil_engineering_(3)_(1) (1) (1)
Mini projects for_civil_engineering_(3)_(1) (1) (1)arun naga sai
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship reportMd Mohsin Mohsin
 
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABSANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABSila vamsi krishna
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineeringalok0025
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingTarun kumar
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Gargharshit315
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONVed Jangid
 
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...Mahammad2251
 
Design Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designDesign Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designImran Nawaz
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONGLA University
 
Planning analysis design the overhead circular water tank in seerapalayam pan...
Planning analysis design the overhead circular water tank in seerapalayam pan...Planning analysis design the overhead circular water tank in seerapalayam pan...
Planning analysis design the overhead circular water tank in seerapalayam pan...Subash thangaraj
 
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)Ratnesh Kushwaha
 
residential buliding by stadd pro
residential buliding by stadd proresidential buliding by stadd pro
residential buliding by stadd proila vamsi krishna
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete pptGoogle
 
Analysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSAnalysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSIRJET Journal
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Study of design of the flexible pavements
Study of design of the flexible pavementsStudy of design of the flexible pavements
Study of design of the flexible pavementsShaik Asif Ahmed
 

What's hot (20)

Mini projects for_civil_engineering_(3)_(1) (1) (1)
Mini projects for_civil_engineering_(3)_(1) (1) (1)Mini projects for_civil_engineering_(3)_(1) (1) (1)
Mini projects for_civil_engineering_(3)_(1) (1) (1)
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABSANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
ANALYSIS AND DESIGN OF HIGH RISE BUILDING BY USING ETABS
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
Analysis of g+3 rcc storied building
Analysis of g+3 rcc storied buildingAnalysis of g+3 rcc storied building
Analysis of g+3 rcc storied building
 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
DESIGN AND ANALYSIS OF G+3 RESIDENTIAL BUILDING BY S.MAHAMMAD FROM RAJIV GAND...
 
Design Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designDesign Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement design
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
Planning analysis design the overhead circular water tank in seerapalayam pan...
Planning analysis design the overhead circular water tank in seerapalayam pan...Planning analysis design the overhead circular water tank in seerapalayam pan...
Planning analysis design the overhead circular water tank in seerapalayam pan...
 
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
 
residential buliding by stadd pro
residential buliding by stadd proresidential buliding by stadd pro
residential buliding by stadd pro
 
Water resource engineering project list
Water resource engineering project listWater resource engineering project list
Water resource engineering project list
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete ppt
 
Analysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSAnalysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABS
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Study of design of the flexible pavements
Study of design of the flexible pavementsStudy of design of the flexible pavements
Study of design of the flexible pavements
 

Viewers also liked

Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project PresentationLauraConroy
 
Final ppt of project
Final ppt of projectFinal ppt of project
Final ppt of projectRuchi Gulati
 
Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project PresentationSyed Absar
 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project reportramesh_x
 
Board reporting template
Board reporting templateBoard reporting template
Board reporting templateInspiring Women
 
How to Run a Board Meeting: Sample Slide Deck
How to Run a Board Meeting: Sample Slide DeckHow to Run a Board Meeting: Sample Slide Deck
How to Run a Board Meeting: Sample Slide DeckJesus Rodriguez
 
2010 sample board presentation
2010 sample board presentation2010 sample board presentation
2010 sample board presentationkipmcc
 
Automatic Toll Collection
Automatic Toll Collection Automatic Toll Collection
Automatic Toll Collection Ritesh Kumawat
 
Project ppt presentation (1)
Project ppt presentation (1)Project ppt presentation (1)
Project ppt presentation (1)Palash Awasthi
 
Project of Solar ppt
Project of Solar pptProject of Solar ppt
Project of Solar pptSOUMYA DATTA
 
Final year project proposal
Final year project proposalFinal year project proposal
Final year project proposalDawood Jan
 
Board of Directors Presentation
Board of Directors PresentationBoard of Directors Presentation
Board of Directors PresentationDwight Darby
 
Introduction To Software Engineering
Introduction To Software EngineeringIntroduction To Software Engineering
Introduction To Software EngineeringLeyla Bonilla
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management pptAndreea Usatenco
 
Software engineering presentation
Software engineering presentationSoftware engineering presentation
Software engineering presentationMJ Ferdous
 
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013Cain Ransbottyn
 

Viewers also liked (20)

Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project Presentation
 
Final ppt of project
Final ppt of projectFinal ppt of project
Final ppt of project
 
Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project Presentation
 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project report
 
Final Year Project
Final Year ProjectFinal Year Project
Final Year Project
 
Board reporting template
Board reporting templateBoard reporting template
Board reporting template
 
How to Run a Board Meeting: Sample Slide Deck
How to Run a Board Meeting: Sample Slide DeckHow to Run a Board Meeting: Sample Slide Deck
How to Run a Board Meeting: Sample Slide Deck
 
2010 sample board presentation
2010 sample board presentation2010 sample board presentation
2010 sample board presentation
 
Encryption
EncryptionEncryption
Encryption
 
Automatic Toll Collection
Automatic Toll Collection Automatic Toll Collection
Automatic Toll Collection
 
Project ppt presentation (1)
Project ppt presentation (1)Project ppt presentation (1)
Project ppt presentation (1)
 
Fyp
FypFyp
Fyp
 
Project of Solar ppt
Project of Solar pptProject of Solar ppt
Project of Solar ppt
 
Final Year Project Presentation
Final Year Project Presentation Final Year Project Presentation
Final Year Project Presentation
 
Final year project proposal
Final year project proposalFinal year project proposal
Final year project proposal
 
Board of Directors Presentation
Board of Directors PresentationBoard of Directors Presentation
Board of Directors Presentation
 
Introduction To Software Engineering
Introduction To Software EngineeringIntroduction To Software Engineering
Introduction To Software Engineering
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management ppt
 
Software engineering presentation
Software engineering presentationSoftware engineering presentation
Software engineering presentation
 
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013
Privacy is an Illusion and you’re all losers! - Cryptocow - Infosecurity 2013
 

Similar to Final Year Project Presentation

Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed AnwarCost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed AnwarAIT Solutions
 
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...Tirthak Shah
 
Động lực học công trình
Động lực học công trìnhĐộng lực học công trình
Động lực học công trìnhTung Nguyen Xuan
 
Changes in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdfChanges in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdfMaharshiSalvi1
 
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...IRJET Journal
 
Direct displacement design_methodology_for_woodframe_buildings_
Direct displacement design_methodology_for_woodframe_buildings_Direct displacement design_methodology_for_woodframe_buildings_
Direct displacement design_methodology_for_woodframe_buildings_Uriel Vélez Orejuela
 
Introduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsIntroduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsLatif Hyder Wadho
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).khaledalshami93
 
Progressive collapse
Progressive collapseProgressive collapse
Progressive collapseMd Polash
 
Seismic Performance of Flat Slab Structures Under Static and Dynamic Loads
Seismic Performance of Flat Slab Structures Under Static and Dynamic LoadsSeismic Performance of Flat Slab Structures Under Static and Dynamic Loads
Seismic Performance of Flat Slab Structures Under Static and Dynamic LoadsIRJET Journal
 
Structural design including disaster (wind & cyclone land slide_eq_ resistan...
Structural design including disaster (wind & cyclone  land slide_eq_ resistan...Structural design including disaster (wind & cyclone  land slide_eq_ resistan...
Structural design including disaster (wind & cyclone land slide_eq_ resistan...RAJESH JAIN
 
Geotechnical risk on large scale infrastructure projects
Geotechnical risk on large scale infrastructure projectsGeotechnical risk on large scale infrastructure projects
Geotechnical risk on large scale infrastructure projectsChris Bridges
 
3D printing technology in building construction
3D printing technology in building construction3D printing technology in building construction
3D printing technology in building constructionVodepalliManaswini
 
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...Roshni Ramakrishnan
 
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...IRJET Journal
 

Similar to Final Year Project Presentation (20)

Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed AnwarCost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
 
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...
Finite Element Analysis of Precast, Prestressed Hollow core slab to evaluate ...
 
Động lực học công trình
Động lực học công trìnhĐộng lực học công trình
Động lực học công trình
 
Changes in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdfChanges in IS 1893 and IS 13920.pdf
Changes in IS 1893 and IS 13920.pdf
 
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...
COMPARITIVE ANALYSIS OF RCC STRUCTURE ON SLOPING GROUND AGAINST SEISMIC LOADI...
 
Direct displacement design_methodology_for_woodframe_buildings_
Direct displacement design_methodology_for_woodframe_buildings_Direct displacement design_methodology_for_woodframe_buildings_
Direct displacement design_methodology_for_woodframe_buildings_
 
Structural Robustness against Accidents
Structural Robustness against AccidentsStructural Robustness against Accidents
Structural Robustness against Accidents
 
Reliability Analysis of Reinforced Concrete Shallow Footings Designed Using B...
Reliability Analysis of Reinforced Concrete Shallow Footings Designed Using B...Reliability Analysis of Reinforced Concrete Shallow Footings Designed Using B...
Reliability Analysis of Reinforced Concrete Shallow Footings Designed Using B...
 
Introduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsIntroduction to Pavement Design Concepts
Introduction to Pavement Design Concepts
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
 
Progressive collapse
Progressive collapseProgressive collapse
Progressive collapse
 
Seismic Performance of Flat Slab Structures Under Static and Dynamic Loads
Seismic Performance of Flat Slab Structures Under Static and Dynamic LoadsSeismic Performance of Flat Slab Structures Under Static and Dynamic Loads
Seismic Performance of Flat Slab Structures Under Static and Dynamic Loads
 
Structural design including disaster (wind & cyclone land slide_eq_ resistan...
Structural design including disaster (wind & cyclone  land slide_eq_ resistan...Structural design including disaster (wind & cyclone  land slide_eq_ resistan...
Structural design including disaster (wind & cyclone land slide_eq_ resistan...
 
Geotechnical risk on large scale infrastructure projects
Geotechnical risk on large scale infrastructure projectsGeotechnical risk on large scale infrastructure projects
Geotechnical risk on large scale infrastructure projects
 
Sr. Larbi Sennour
Sr. Larbi SennourSr. Larbi Sennour
Sr. Larbi Sennour
 
Ap24275280
Ap24275280Ap24275280
Ap24275280
 
3D printing technology in building construction
3D printing technology in building construction3D printing technology in building construction
3D printing technology in building construction
 
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
Comparison of Multi-Risers using Stiffness matrix method and Gazetas Semi-Ana...
 
W04408116121
W04408116121W04408116121
W04408116121
 
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
 

Recently uploaded

Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 

Recently uploaded (20)

Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

Final Year Project Presentation

  • 1. Design Cost Comparison 2B without beams & with beams. Group members: GHULAM MUSTAFA VIRA - 136 MUHAMMAD ISMAIL YAR - 154 FARHAN JAMEEL - 101 JAMHOOR ALAM - 158 NAJEEBULLAH - 194 TARIQ AMIN - 173 Civil Engineering Dept. 2009 BATCH
  • 2.
  • 3.  INTRODUCTION  EARTHQUAKE REVIEW BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 4. Concrete STRUCTURES are CHEAPER AND HEAVIER than others but SELECTING AN ECONOMICAL Lateral-Force-Resisting System is difficult!
  • 5. & not with STRUCTURAL SYSTEMS GOOD ENGINEERING = SAFE/SOUND + Design
  • 6. To develop Models Of an Advantages:  Reduces Design Time & Iterations  Direct Cost Savings
  • 7. Importance Factors (P ORTLAND CEMENT ASSOCIATION) Importance Cost Effectiveness 4.53 Construction Time 4.13 Material Availability 3.95 Design Flexibility 3.89 Material Delivery Time 3.83 Fire Resistance 3.78 Seismic Loads 3.66 Wind Loads 3.65 Contractor Availability 3.46 Design Tie 3.36 Appearance 3.31 Ease of Design 3.17 Return on Design Fees 2.87 Available Design Software 2.53 Publications 2.48 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 Mean Rating (1 = not important at all, 5 = very important)
  • 8.  INTRODUCTION  EARTHQUAKE REVIEW BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 11. HAZARD MAP OF PAKISTAN GSHAP Hazard map (1999) Revised Hazard map (2006) KARACHI IS ASSIGNED ZONE 2B
  • 12. LOAD PATH Horizontal Diaphragm (Floor and Roof slabs ) Elements Vertical Shear Walls / Frames Elements Foundation Soil
  • 13. LATERAL-FORCE-RESISTING SYSTEMS Moment Resisting Frames Frame System Resistance to Building Frame Shear Wall Lateral Loads System Frames (25% Lateral Load) Dual System Shear Wall
  • 14.  INTRODUCTION  EARTHQUAKE REVIEW  BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 15. 20 Stories 11 Residential 6 Podium 3 Basements Stories Stories Indoor Retail Games 4 Parking 2 Parking Stories Stories Lobby
  • 16. Length = 121‟-4” Width = 120‟-2” 4 Shear Walls 40 Columns
  • 17. DUAL SYSTEM without Beams Drop Panel
  • 18. BUILDING FRAME SYSTEM with Beams Beam
  • 19. Typical Beam Size Shear Wall Thickness 18” (Story 1 to 8) 24” 15” (Story 9 to 14) 12” (Story 15 to Roof) 10” Concrete Compressive Strength (f„c ) Story Beam/Slab Column/Shear Wall Story 1 to 6 5 ksi 7 ksi Story 7 to 11 4.5 ksi 6 ksi Story 12 to 16 4 ksi 5 ksi Story 17 to Roof 3 ksi 4 ksi
  • 20. RAFT FOUNDATION (f’c = 5 ksi) Dual System Building Frame without Beams System with Beams Thickness Area offset Thickness Area offset 72” 18” 72” 24”
  • 21.  INTRODUCTION  EARTHQUAKE REVIEW  BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 22. ETABS modelling of Dual System without Beams 1st Model Shear Walls and Columns take lateral loads USED TO DESIGN SHEAR WALL 2nd Model Shear Walls are replaced by Columns & 25% Earthquake Load is induced COLUMNS ARE DESIGNED USING BOTH MODELS
  • 23. ETABS modelling of Building Frame System with Beams 1st Model We use compatibility combos USED TO DESIGN COLUMNS 2nd Model Frames are assigned moment of inertia = 0.01 Shear walls resist all the lateral load USED TO DESIGN SHEAR WALLS
  • 24. LIVE LOADS (UBC 97) Retail 50psf Parking 50psf Lobby 40psf Indoor Games 40psf Residential 40psf Roof 20psf
  • 25. Seismic Factors (from UBC 97) Ct (Concrete Structure) 0.03 Overstrength Factor “R” (Dual system) 6.5 Overstrength Factor “R” (Building Frame system) 5.5 Soil Profile Type (Very Dense Soil and Soft Rock) Sc Seismic Zone Factor “Z” (2B) 0.20 Importance Factor “I” 1 Omega Factor (System Overstrength Factor) “ΩO” 2.8 Seismic Coefficient “Ca” 0.24 Seismic Coefficient “Cv” 0.32 Dead load Multiplier (0.5 x Ca x I) 0.12
  • 26.  INTRODUCTION  EARTHQUAKE REVIEW  BUILDING DESCRIPTION  DESIGN APPROACH AND INPUTS  CONCLUSION
  • 27. Cost Percentage of Dual System without Beams Shear wall 14.1% Column 15.6% Slabs 55.4% Foundation 10.5% Beams 4.4%
  • 28. Cost Percentage of Building Frame System with Beams Slabs Shear wall 12.7% 25.9% Beams 24.5% Column 11.8% Foundation 25.1%
  • 29. Cost Comparison of Different Elements 70 60 Cost (Rupees in millions) 50 40 30 20 10 0 Slabs & Beams Foundation Columns Shear walls Dual System without beams Building Frame System with beams
  • 30. Cost Comparison of Systems 120 100 Cost (Rupees in millions) 80 60 109 40 80 20 0 Dual System without Beams Building Frame System with Beams
  • 31.
  • 32. Cost Comparison of all six Systems 140 120 Moment Resisting System with Beams Cost (Rupees in millions) 100 Building Frame System with Beams 80 Dual System with Beams Moment Resisting System 60 without Beams Dual System without 40 Beams Building Frame System without Beams 20 0
  • 33. Comparison in Ratio of all six Systems 1.79 1.69 Moment Resisting System with Beams 1.37 Building Frame System 1.32 1.24 with Beams Dual System with Beams 1 Ratios Moment Resisting System without Beams Dual System without Beams Building Frame System without Beams