COLUMN,BEAM,SLAB
Construction Process
Column
 RCC (Reinforced Cement Concrete) column is a
structural member of RCC frame structured
building. It's a vertical member which transfers
loads from slab and beam directly to subsequent
soil.
 Material used in columns
 Cement
 Coarse aggregate
 Fine aggregate
 Steel bar
 Water
 Shuttering
Column Construction process
 Constructing RCC (Reinforced Cement Concrete)
Column involves following four stages of works.
1. Column layout work.
2. Column reinforcement work.
3. Column formwork.
4. Pouring concrete into column.
1. Column layout work
In this stage of works the location of columns are
determined practically in field. It is done by laying
rope according to grids shown in the drawing and
then mark the location of columns related to rope.
2. Column reinforcement work.
After marking the column locations, we then
start to place reinforcement as instructed in the
structural drawing.
This is normally described in the drawing like -
(C1-12#16 mm⌀ and stirrup-10 mm⌀ @ 4" c/c)
3. Column formwork
Column formwork is a term used for structures that
are used to support forms or molds for poured
concrete columns. It can be as simple as a
reinforced cardboard tube for small cylindrical
columns or very complex forms constructed from
many pieces of wood and metal
4. Pouring concrete into column
For small quantity of concrete volume we normally
depend on machine-mix concrete and for large
concrete quantity we order ready-mix concrete.
Because, if you use moving pump with ready-mix
concrete and if you want not to exceed 5 feet height
range for dropping concrete that would be difficult
Curing
Concrete which is moist cured for 7 days is about
50% stronger than uncured concrete
Slab
 In building construction the roof or slab for roof
is very important constituents.
 Material used in slab.
 Cement.
 Coarse aggregate.
 Fine aggregate.
 Steel bar.
 Binding wire.
 Water .
 Shuttering materials (wooden Planks, and Iron
Plates).
Slab laying process
 According to work arrangement laying of RCC slab
can be done in 4 stages such as formwork or
centering and shuttering, bending and binding MS
steel bars and laying of concrete
1. Formwork
2. Bending And Binding Steel bars
3. Spacing of steel bars
4. Laying of Cement Concrete
1. Form work
 The formwork should be as per ( I S : 14687-1999).
To retain concrete, formwork or centering and
shuttering is required, which provides the support
to the wet concrete until it has gained sufficient
strength to be self supporting.
2. Bending And Binding Steel bars
 At the time of designing the slab, it is consider that
concrete is strong in compressive strength but weak
in tensile strength, so make the structure safe against
the tensile stress, steel bars are .provided.
3. Spacing of steel bars
 Steel bars diameter and its spacing in the RCC slab is
calculated by designing the slab according to load and span
of the slab. In general 12mm, 10mm and 8mm diameter
steel bars are used in RCC slab according to the length of
span of the slab and similarly spacing is from 4.5’’ to 6’’ in
the main bars and 6’’ to 8’’ in distribution bars.
4. Laying of Cement Concrete
 Make walking way on steel bars by placing wooden
plates to avoid disturbance in steel bars. Now start
to lay the cement concrete mix as per design but
not below the 1; 2; 4 ratio. The mix should be
mechanically mixed and vibrated after laying on
the slab.
Curing
 After laying the RCC slab it should be cure for 28
days for getting full strength.
Beam
 A beam is a structural element that is capable of
withstanding load primarily by resisting against
bending. The bending force induced into the
material of the beam as a result of the external
loads, own weight, span and external reactions to
these loads is called a bending moment.
Beam construction process
 According to work arrangement laying of RCC Beam
can be done in 4 stages
1. Formwork.
2. Bending And Binding Steel bars.
3. Laying of Cement Concrete.
4. Curing .
Form work
The formwork should be
To retain concrete, formwork or centering and
shuttering is required
Bending And Binding Steel bars.
 At the time of designing the slab, it is consider that
concrete is strong in compressive strength but weak
in tensile strength, so make the structure safe against
the tensile stress, steel bars are .provided.
Laying of Cement Concrete.
 For small quantity of concrete volume we normally
depend on machine-mix concrete and filling the
beam.

More Related Content

What's hot

What's hot (20)

PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Beam design
Beam designBeam design
Beam design
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Retaining walls
Retaining walls Retaining walls
Retaining walls
 
Formwork
FormworkFormwork
Formwork
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Slipform
SlipformSlipform
Slipform
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
 
grouting and guniting
grouting and gunitinggrouting and guniting
grouting and guniting
 
Different types of pile
Different types of pile Different types of pile
Different types of pile
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
7 losses in prestress
7 losses in prestress7 losses in prestress
7 losses in prestress
 
PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE
 

Viewers also liked

Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelinesMain Uddin
 
Lecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceLecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceDr. H.M.A. Mahzuz
 
Insert some activities into primavera p6
Insert some activities into primavera p6Insert some activities into primavera p6
Insert some activities into primavera p6firdaus Muhammad Adnan
 
Two way slab
Two way slabTwo way slab
Two way slabillpa
 
Columns lecture#1
Columns lecture#1Columns lecture#1
Columns lecture#1Irfan Malik
 

Viewers also liked (6)

Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelines
 
Lecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importanceLecture 1 what is rcc column and its importance
Lecture 1 what is rcc column and its importance
 
Insert some activities into primavera p6
Insert some activities into primavera p6Insert some activities into primavera p6
Insert some activities into primavera p6
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Columns lecture#1
Columns lecture#1Columns lecture#1
Columns lecture#1
 

Similar to RCC Column, Beam and Slab Construction Guide

REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEBrijesh Alig
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
RCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfRCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfUMESHVerma100
 
Reinforced Concrete
Reinforced ConcreteReinforced Concrete
Reinforced ConcreteCivil Manage
 
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURESCOMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURESMohammed Tajammul Ahmed
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Simran Aggarwal
 
04. superstructure
04. superstructure04. superstructure
04. superstructureThien Hee
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxanik7nziza
 
Steelplacementhandbook
SteelplacementhandbookSteelplacementhandbook
Steelplacementhandbookdefrimk
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Mechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-IMechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-IIrfan Malik
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs632k18BilalAhmad
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Buildingppt_master
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining WallAnanthakumar75
 
Lectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptxLectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptx2020CEB005POTNURUSAI
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdfPrakashM970621
 

Similar to RCC Column, Beam and Slab Construction Guide (20)

BEAM.pptx
BEAM.pptxBEAM.pptx
BEAM.pptx
 
REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETE
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
RCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdfRCSDD_PPT editing format.pdf
RCSDD_PPT editing format.pdf
 
Reinforced Concrete
Reinforced ConcreteReinforced Concrete
Reinforced Concrete
 
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURESCOMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
COMPARATIVE STUDY OF RCC AND COMPOSITE STRUCTURES
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
KUY Limeng,e20190482(I4GCI-B)_4.pdf
KUY Limeng,e20190482(I4GCI-B)_4.pdfKUY Limeng,e20190482(I4GCI-B)_4.pdf
KUY Limeng,e20190482(I4GCI-B)_4.pdf
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptx
 
Steelplacementhandbook
SteelplacementhandbookSteelplacementhandbook
Steelplacementhandbook
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Mechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-IMechanism of load transfored...PRC-I
Mechanism of load transfored...PRC-I
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
 
Jacketing (RR&S)
Jacketing (RR&S)Jacketing (RR&S)
Jacketing (RR&S)
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining Wall
 
Lectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptxLectures Note 1. Civil Construction.pptx
Lectures Note 1. Civil Construction.pptx
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdf
 

Recently uploaded

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 

RCC Column, Beam and Slab Construction Guide

  • 2. Column  RCC (Reinforced Cement Concrete) column is a structural member of RCC frame structured building. It's a vertical member which transfers loads from slab and beam directly to subsequent soil.  Material used in columns  Cement  Coarse aggregate  Fine aggregate  Steel bar  Water  Shuttering
  • 3. Column Construction process  Constructing RCC (Reinforced Cement Concrete) Column involves following four stages of works. 1. Column layout work. 2. Column reinforcement work. 3. Column formwork. 4. Pouring concrete into column.
  • 4. 1. Column layout work In this stage of works the location of columns are determined practically in field. It is done by laying rope according to grids shown in the drawing and then mark the location of columns related to rope.
  • 5. 2. Column reinforcement work. After marking the column locations, we then start to place reinforcement as instructed in the structural drawing. This is normally described in the drawing like - (C1-12#16 mm⌀ and stirrup-10 mm⌀ @ 4" c/c)
  • 6. 3. Column formwork Column formwork is a term used for structures that are used to support forms or molds for poured concrete columns. It can be as simple as a reinforced cardboard tube for small cylindrical columns or very complex forms constructed from many pieces of wood and metal
  • 7. 4. Pouring concrete into column For small quantity of concrete volume we normally depend on machine-mix concrete and for large concrete quantity we order ready-mix concrete. Because, if you use moving pump with ready-mix concrete and if you want not to exceed 5 feet height range for dropping concrete that would be difficult
  • 8. Curing Concrete which is moist cured for 7 days is about 50% stronger than uncured concrete
  • 9. Slab  In building construction the roof or slab for roof is very important constituents.  Material used in slab.  Cement.  Coarse aggregate.  Fine aggregate.  Steel bar.  Binding wire.  Water .  Shuttering materials (wooden Planks, and Iron Plates).
  • 10. Slab laying process  According to work arrangement laying of RCC slab can be done in 4 stages such as formwork or centering and shuttering, bending and binding MS steel bars and laying of concrete 1. Formwork 2. Bending And Binding Steel bars 3. Spacing of steel bars 4. Laying of Cement Concrete
  • 11. 1. Form work  The formwork should be as per ( I S : 14687-1999). To retain concrete, formwork or centering and shuttering is required, which provides the support to the wet concrete until it has gained sufficient strength to be self supporting.
  • 12. 2. Bending And Binding Steel bars  At the time of designing the slab, it is consider that concrete is strong in compressive strength but weak in tensile strength, so make the structure safe against the tensile stress, steel bars are .provided.
  • 13. 3. Spacing of steel bars  Steel bars diameter and its spacing in the RCC slab is calculated by designing the slab according to load and span of the slab. In general 12mm, 10mm and 8mm diameter steel bars are used in RCC slab according to the length of span of the slab and similarly spacing is from 4.5’’ to 6’’ in the main bars and 6’’ to 8’’ in distribution bars.
  • 14. 4. Laying of Cement Concrete  Make walking way on steel bars by placing wooden plates to avoid disturbance in steel bars. Now start to lay the cement concrete mix as per design but not below the 1; 2; 4 ratio. The mix should be mechanically mixed and vibrated after laying on the slab.
  • 15. Curing  After laying the RCC slab it should be cure for 28 days for getting full strength.
  • 16. Beam  A beam is a structural element that is capable of withstanding load primarily by resisting against bending. The bending force induced into the material of the beam as a result of the external loads, own weight, span and external reactions to these loads is called a bending moment.
  • 17. Beam construction process  According to work arrangement laying of RCC Beam can be done in 4 stages 1. Formwork. 2. Bending And Binding Steel bars. 3. Laying of Cement Concrete. 4. Curing .
  • 18. Form work The formwork should be To retain concrete, formwork or centering and shuttering is required
  • 19. Bending And Binding Steel bars.  At the time of designing the slab, it is consider that concrete is strong in compressive strength but weak in tensile strength, so make the structure safe against the tensile stress, steel bars are .provided.
  • 20. Laying of Cement Concrete.  For small quantity of concrete volume we normally depend on machine-mix concrete and filling the beam.