DEBRE TABOR UNIVERSITY
FACULTY OF TECHNOLOGY
CIVIL ENGINEERING DEPARTMENT
Project Title:Final Internship Report
Hosting Company:Seid Ahmed Nur Construction PLC
Internship Duration:March 11th
, to June 30th
, 2009 E.C.
Submitted by: Nahom Balcha
Regd. No.: ENG(R)/1499/06
Contact Address: E-mail: nahom3443@gmail.com
Phone: +251-921593345
Mentor: Mr. Getachew B.
Site Supervisor: Ms. Jemila Mohammed
Submission Date: Oct. 6th
, 2010.
Submitted to: Mr. Amare
Debre Tabor, Ethiopia.
Final Internship Report
DTU-CEng
Page ii
Pr. By: Nahom B.
0
1
0
STUDENTS’ DECLARATION
This is to clarify that I, Nahom Balcha Debre Tabor University 4th
year Civil Engineering
student Roll No. ENG(R)/1499/06 has undergone industrial training in Seid Ahmed Nur
Construction PLC in Adama as required of four months project semester.
This report has not been previously submitted to any other university, college or
organization for an academic, qualification, certificate, diploma or degree. I hereby
warrant that the work I have presented does not breach any existing copyright.
I also confirm that the report is only prepared for my academic requirement, but not for
any other purpose. It might not be used with the interest of opposite party of the
organization and/or the university.
Nahom Balcha
Sign: ……….
Approved by: Mentor: Mr. Getachew B.
Signature: ………….
Final Internship Report
DTU-CEng
Page iii
Pr. By: Nahom B.
0
1
0
ACKNOWLEDGEMENT
I take this opportunity to extend my gratitude to Seid Ahmed Nur Construction PLC for
having provided me with an unbelievable practical learning experience during training
time. It was indeed a pleasure to be a part of such organization.
First and above all, I praise God the almighty for providing this opportunity, and granting
the capability to proceed successfully. I would like to express my deepest appreciation to
all those who provided the possibilities to complete this report. A special gratitude to our
Technical Report Writing and Research Methodology Course Instructor, Mr. Zeleke W,
whose contribution in stimulating suggestions and encouragement, helped us to
coordinate our project especially in writing this report.
Secondly, I am no less grateful to the other employees for their kind co-operation and
spontaneous response.
Last but not least; I express my gratitude toward my family members, my teachers, and
friends for their encouragement which help me in completion of this training.
Thank you, all.
Nahom Balcha
4th
Year: 2nd
Semester
Civil Engineering Department
Final Internship Report
DTU-CEng
Page iv
Pr. By: Nahom B.
0
1
0
EXECUTIVE SUMMARY
This final industrial internship report in broad spectrum includes four chapters in which I
have tried to explain my four month industrial training experience in Seid Ahmed Nur
Construction PLC. The content of all chapters is deeply and broadly discussed. The
report is constructed and developed from the practical basis of the site work that have
been performed and ended from the early of March to the end of July 2009 E.C.
In the opening chapter, I have tried to give a brief history of the company which include
mission, vision and goal of the company, main products and end users of the company,
projects run through the company have been mentioned. In this chapter, I have put overall
organizational structure of the company, and work flow of the site.
Chapter two exclusively discusses the overall internship experience that I have gained
from the industrial training program. This Chapter of the report is basic and which I am
going to present mostly. It highlights the overall works I have been executing.
The third chapter has been dedicated for the overall internship benefits that I have
grasped from this program. Points that have been discussed throughout this chapter
include practical, leadership skill, entrepreneurship skill improvements.
The final and fourth chapter of this report has raised conclusion and recommendation.
This section elaborates the recommendation to the organization and the university, and
the conclusion of the entire internship report.
Final Internship Report
DTU-CEng
Page v
Pr. By: Nahom B.
0
1
0
INTRODUCTION
I have completed a four month period of training at Seid Ahmed Nur Construction PLC. I
have spent the major part of training at the site rather than office where the planned and
designed projects are executed in the ground. This is a report on the internship program
that lasted for four months from early March to the end of June.
More specifically, most of my training period has passed on observing, mitigating the
chance of similarity and difference between the work which is planned and designed, and
the work that is executed. However, I have submitted small tasks for helping in projects,
and self-learning sessions such as over viewing concrete filling, performing leveling
works on the section of the site, and etc.
Here in this session of five years training program in university I have developed
theoretical skills, practical skills, and socio-economical skills. I have developed a skill
how to communicate with different class of employees. I have also developed a skill on
work ethics like punctuality, working with others (teamwork).
I have buried in mind thatan engineer has to keep in mind the municipal conditions,
building bye laws, environment, financial capacity, water supply, sewage arrangement,
provision of future, aeration, ventilation etc. in suggestion a particular type of plan to any
client.
Final Internship Report
DTU-CEng
Page vi
Pr. By: Nahom B.
0
1
0
ACRONYMS/ ABBREVIATIONS
B+G+”X”= Basement plus Ground plus “X” building.
E.C. = Ethiopian Calendar.
ETB= Ethiopian Birr.
G+”X”= Ground plus “X” building.
PLC= Private Limited Company.
Final Internship Report
DTU-CEng
Page vii
Pr. By: Nahom B.
0
1
0
TABLE OF CONTENTS
Contents Pages
STUDENTS‟ DECLARATION .......................................................................................... i
ACKNOWLEDGEMENT.................................................................................................iii
EXECUTIVE SUMMARY ............................................................................................... iv
INTRODUCTION .............................................................................................................. v
ACRONYMS/ ABBREVIATIONS................................................................................... vi
TABLE OF CONTENTS..................................................................................................vii
Contents ........................................................................................................................ vii
LIST OF FIGURES ........................................................................................................ ix
LIST OF TABLES.............................................................................................................. x
CHAPTER ONE................................................................................................................. 1
1. COMPANY PROFILE ................................................................................................... 1
Introduction................................................................................................................. 1
Background of Seid Ahmed Nur Construction PLC................................................... 1
1.1 Brief history of the company .................................................................................... 1
1.2 Mission, vision, and goal of the company ................................................................ 2
1.2.1 Mission of the company..................................................................................... 2
1.2.2 Vision of the company....................................................................................... 3
1.2.3 Goal of the company.......................................................................................... 3
1.3 Main products of the company ................................................................................. 3
1.4 End users of the company‟s product......................................................................... 3
1.5 Overall organizational structure................................................................................ 4
1.6 Manpower and equipment description...................................................................... 5
1.6.1 Manpower Description....................................................................................... 5
1.6.2 Machineries and Equipment of the Company.................................................... 6
1.7 General workflow of the company ........................................................................... 7
CHAPTER TWO ................................................................................................................ 8
2. OVERALL INTERNSHIP EXPERIENCE .................................................................... 8
Introduction: Project Description........................................................................................ 8
2.1 Brief on how I get into the company ........................................................................ 9
2.2 Section of the company I have been working......................................................... 10
Final Internship Report
DTU-CEng
Page viii
Pr. By: Nahom B.
0
1
0
2.3 Workflow in the section.......................................................................................... 11
2.4 Work pieces that I have been executing ................................................................. 11
2.4.1 Concrete work.................................................................................................. 11
2.4.2 Substructure work ............................................................................................ 16
2.4.3 Superstructure work......................................................................................... 16
2.4.4 Aggregate Works ............................................................................................. 20
2.4.5 Temporary Structure Work.............................................................................. 21
2.4.6 Reinforcement works....................................................................................... 24
2.4.7 Surveying......................................................................................................... 24
2.5 Major challenges encountered ................................................................................ 25
2.6 Solutions for the challenges.................................................................................... 25
CHAPTER THREE .......................................................................................................... 26
3. OVERALL BENEFITS I GAINED FROM THE INTERNSHIP ................................ 26
Introduction............................................................................................................... 26
3.1 Benefits I gained in terms of improving my practical skills................................... 26
3.2 Benefits I gained in terms of upgrading my theoretical knowledge ....................... 26
3.3 Benefits I gained in terms of improving my interpersonal communication skills.. 27
3.4 Benefits I gained in terms of improving team work skill ....................................... 27
3.5 Benefits I gained in terms of improving my leadership skills ................................ 28
3.6 Benefits I gained in terms of understanding work ethics related issues ................. 28
3.7 Benefits I gained in terms of entrepreneurship skills.............................................. 29
CHAPTER FOUR............................................................................................................. 30
4. CONCLUSION AND RECOMMENDATION............................................................ 30
Introduction............................................................................................................... 30
4.1 Conclusion .............................................................................................................. 30
4.2 Recommendation .................................................................................................... 30
4.2.1 Recommendation to the company.................................................................... 30
4.2.2 Recommendation to the university .................................................................. 31
ENGINEERING SIGNIFICANCE OF INTERNSHIP .................................................... 33
REFERENCES ................................................................................................................. 34
APPENDIXES.................................................................................................................. 35
Final Internship Report
DTU-CEng
Page ix
Pr. By: Nahom B.
0
1
0
LIST OF FIGURES
Pages
Figure 1.1.Overall organizational structure. ....................................................................... 4
Figure 1.2.Flowchart........................................................................................................... 7
Figure 2.1.Site plan of the project....................................................................................... 8
Figure 2.2.Executive Hotel No-2 archicad. ........................................................................ 9
Figure 2.3.Entrance card to the site. ................................................................................. 10
Figure 2.4.Concrete mixing simulation. ........................................................................... 12
Figure 2.5. Ground bottom slab concrete leveling.. ...................................................... 13
Figure 2.6.Gauge box........................................................................................................ 16
Figure 2.7.Staircase........................................................................................................... 18
Figure 2.8.Columns to be casted....................................................................................... 19
Figure 2.9.False work. ...................................................................................................... 21
Final Internship Report
DTU-CEng
Page x
Pr. By: Nahom B.
0
1
0
LIST OF TABLES
Pages
Table 2.1 Workflow in the Section................................................................................... 11
Table 2.2 Mixing Ratio..................................................................................................... 16
Table 2.2 Time of Removing Formworks......................................................................... 23
Final Internship Report
DTU-CEng
Page 1
Pr. By: Nahom B.
0
1
0
CHAPTER ONE
1. COMPANY PROFILE
Introduction
Background of Seid Ahmed Nur Construction PLC
1.1 Brief history of the company
Seid Ahmed Nur Construction PLC was established in 1984 E.C to fulfill the
construction needs of the owner of the company. The company has got its title after the
name of the owner Seid Ahmed Nur. At that moment, the company could have built
different buildings that belong to the owner. Ato Seid Ahmed Nur, the owner of the
company, has started to construct buildings and civil works for himself with an Italian
engineer named Fikadu Bantuma. At the beginning, the company could have built Plaza
Hotel (named now Palace Hotel), in Adama city Kebele 09. The construction of this hotel
takes around two years and it costs about 800,000 birr. After then, the company
continued to build four projects with each 2 million birr like „„Nur Gebeya‟‟ (Kebele 19),
“Wulesh Giby” (Kebele 20) and others since 1986 E.C.
In 1988 E.C, the company reorganized itself and had got Class 6 License and built Nur
Paisa (Kebele 07, where the office of the company is found/) and Soap Factory (Kebele
13) for the owner. Each of these works cost around 6 million birr.
These all the above buildings and civil works belongs to the owner of the company, Ato
Seid Ahmed Nur. Thus, the company had stayed on constructing its own projects for
more than 9 years. During this time, the contractor had increased its capital in a great
rate.
After then, the company started to construct buildings, Olympic Hotel and Mereb
Buildings that are not belongs to the owner of the construction company in 1993 and
1994 E.C.
Starting from1994 E.C, for about seven years, the company had passed a remarkable time
to support governmental institution. During this time, the company provides police
stations, meeting halls, and other governmental buildings that are now giving services to
the people in almost more than five kebeles of Adama City. In the construction of these
Final Internship Report
DTU-CEng
Page 2
Pr. By: Nahom B.
0
1
0
governmental institution buildings, the company was not profitable; it did it for the
supporting of the government in fulfilling society‟s needs. And then, the construction
company could have been built trade centers, named in common Arada that contains five
trade centers like Cherka Trade Center(G+3), and other four similar with Cherka. Each
costs 2 million birr and a total of 10 million birr in 2002 E.C. These trade centers are now
giving services to the society. At the end of 2003 E.C, Nur City Center has been built
with a budget of ETB 21 million. Mereb Hotel (ETB 17 million project), and Olympic
Hotel (G+8) had been constructing since the end of 2004 E.C. At the mid of 2005 E.C,
the company has started to build MuluYerer Hotel (B+G+6). And also the company has
had projects in different places like a 3 million birr projects in Addis Ababa city. In 2006
E.C, the company had started to construct Pasta and Macaroni Factory in Addis Ababa,
trade center and ware house in Adama City located in Kebele 07 and 16, respectively.
The site in which I was practicing my internship program is a 2 basement and a 15 storied
hotel named, Executive Hotel Number 2, located in Kebele 09, Adama, Ethiopia. The
client of the project is Executive Hotel PLC. The consultant of this project is Hailegabreil
Architectures and Consultancy PLC.
Generally, the company has played a great role in providing different accesses in the
development of the country.
1.2 Mission, vision, and goal of the company
1.2.1 Mission of the company
 Solving the country‟s infrastructure problems like road, and housing.
 Play a significant role in the construction sector.
 Take an active part in the nation‟s real estate development; thus, ensuring
maximum customer satisfaction.
By making sure these objectives are met, the company‟s mission is “to make its presence
felt in the development of the Country‟s economy and the preservation of its social values
while remaining target full in the dynamism of the business world.
Final Internship Report
DTU-CEng
Page 3
Pr. By: Nahom B.
0
1
0
1.2.2 Vision of the company
 Observing a developed, beautiful and internationally competitive country.
 Being active and leading actor of the Ethiopian development.
 To be a very competent construction company on different civil works across the
country.
 To have a license of class one construction company.
 To work on Highway and Water work projects.
 Construct reliable, standardized and quality buildings.
1.2.3 Goal of the company
 Infrastructure developments like buildings, roads, etc.
 Industry development.
1.3 Main products of the company
On the end of the construction the company's main product will be Executive Hotel
Number 2.
1.4 End users of the company’s product
The company produces its products to the society like residential, recreational, industrial
and institutional structures which are single and multi-storied buildings to satisfy the
needs of society.
Generally the end users or costumers are the community or the society as a whole.
Final Internship Report
DTU-CEng
Page4
Pr. By: Nahom B.
0
1
0
1.5 Overall organizational structure
The number of permanent employees in the company both in office and at the project sites are
more than 250 and the number of daily labors vary according to the project site and the type of
work to be executed. For example, up to 50 temporary workers are engaged at Executive Hotel
Number 2 project site, and around 35 temporary workers are engaged at Adama Steel and Nail
Factory Group owned business centerproject site.
Figure 1.1.Overall organizational structure.
Company Address
The company currently maintains its head quarter in Adama, Ethiopia on Eagle Tower 4th
floor
office number 404 to 408.
Contact Address: TEL: +251930107826
+25122589564
E-mail: seidnur2008@gmail.com
General Manager
Audit
Legal Service
Engineering
Structural
Electrical
Mechanical
Contract Administration
and Supervision
Site Coordinating
Quantity Surveying
Site Supervision
Finance and Administration
Finance
Administration
Office Assistance
Final Internship Report
DTU-CEng
Page5
Pr. By: Nahom B.
0
1
0
1.6 Manpower and equipment description
1.6.1 Manpower Description
A. Project Manager
The project manager is the one who manages the whole project throughout the project sites of the
company. In new projects he studies the plans before moving to the site in order to make himself
familiar with the structures to be constructed. His duty on the project site is dividing the site into
manageable units or sections by assigning engineer or Forman depending on the type of work
and work volume, and then allocates the resources according to the needs. He gives special
attention to avoid wastage of materials while allocating resources.
Another duty of project manager is preparing meetings, with different section heads for
reviewing schedules; evaluate performances, better understanding of problems and solutions, and
recollection of resources, removal of doubts, acceleration of plans etc.
Closer monitoring of the site activity is another important task of the Project Manager to check
all progresses are according to the plan.
In general, the project manager acts as a leader, planner and decision-maker.
B. Site Engineer
Control all the construction activities on the site starting from the very beginning. In construction
sites, depending on the schedule given by the project manager, the site engineer;
 Set outs the site,
 Check the excavation and earthworks are according to specification and drawings,
 Check the construction of all structural and finishing works,
 Make all necessary reports to the Project Manager, including all activities on the site and
materials used on the construction site.
 Strictly follows the given time schedules in order to avoid any delaying on the project
completion time.
C. Office Engineer
Collect data by the supervisor or data collector, from the site, then compile and analyze these
data to prepare Payment certificate
 Monthly
 Weekly
Final Internship Report
DTU-CEng
Page6
Pr. By: Nahom B.
0
1
0
He also makes reports to the project manager and makes detail drawings to be easy for
construction and provide it to surveyor, Foreman or any concerned section.
D. Foreman
Acts as the agent‟s right hand man for the execution of the work at the field, his duty is to keep
the work moving ahead as the agent has planned it. He often has much authority on the site, and
is often astonishingly capable from their long experience of construction. On many civil
engineering works the Foreman is the key person in charging the construction.
E. Store Keeper
Control the amount and type of materials entering and leaving the store.
F. Data Collector
Collect data about the daily work activities including the type and amount of material used, the
type and number of workers participated on a given work.
To summarize the above work flow, all the work men and the machineries mentioned above are
organized under the project manager effective management, and will complete the
projectaccording to its schedule, within agreed time and within its budget, for its intended
purpose and services.
1.6.2 Machineries and Equipment of the Company
The company has fulfilled different machineries and equipment which are vital to the
construction industries as a class four contractor. These are:
 3 dump trucks
 1 crusher
 4 mixers
 1 loader
 3 pick ups
 More than 10 vibrator
Final Internship Report
DTU-CEng
Page7
Pr. By: Nahom B.
0
1
0
1.7 General workflow of the company
The general work-flow of Seid Ahmed Nur Construction PLC is shown in figure below. Exact
information about the number and job descriptions of each and every company employees cannot
be provided because of privacy policy of such a sensitive institution and because of the very
large number of employees.
Figure 1.2.Flowchart
Project manager
Site engineer Office engineerAdministration
Secretary
Data collector
Quantity surveyorStore keeper
Time keeper
General Forman
Sub-contractor Forman
Carpenters
Bar benders
Daily laborer
Electrical
Mons
Mechanical
Sanitary
Surveyor
Final Internship Report
DTU-CEng
Page8
Pr. By: Nahom B.
0
1
0
CHAPTER TWO
2. OVERALL INTERNSHIP EXPERIENCE
Introduction: Project Description
Internship Site: Executive Hotel No. 2; Ground+15-2Basement; Located in Kebele 09, Adama,
Ethiopia.
Client:Executive Hotel PLC
Consultant:Hailegabreil Consultancy PLC
Initial Cost: 60 Million ETB
Figure 2.1.Site plan of the project.
This site has consisted two blocks of the same structural integrity. Mat, combined, and isolated
types of foundations had been executed. Thus, they excavated the soil in both bulky, and pit
forms. Expansion joints have been used to differentiate the blocks.
Final Internship Report
DTU-CEng
Page9
Pr. By: Nahom B.
0
1
0
Figure 2.2.Executive Hotel No-2 archicad.
2.1 Brief on how I get into the company
I was given an application letter for proposing a company to heir me as an intern. This letter was
prepared and dispatched for internship candidate students from Debre Tabor University Industry
Linkage Office when 3rd
year academic schedule is about to end.
I, my friends, and my family members have submitted several copies of this letter for illegible
university industry linkage companies and as a chance many of the application was accepted.
Tulu Bolo Town Municipal Office, Sunshine Real State PLC, and Seid Ahmed Nur Construction
Final Internship Report
DTU-CEng
Page10
Pr. By: Nahom B.
0
1
0
PLC were best examples of industries that have shown willingness. My friend Tibebu Abera and
my brother Getachew Balcha were the controversial peoples in which they are the ones who
submitted the letters for Seid Ahmed Nur Construction PLC, and Sunshine Real State PLC,
respectively.
Although, the acceptance confirmation letter, from the companies I have granted, was given back
to me after I have started fourth year academic year through email. In this academic year of first
two months, we candidate interns have been asked to submit the confirmation letter. By the time
the confirmation letter I have in my hand and submitted to the DTUUIL‟s was Sunshine Real
State PLC‟s. Thanks to the DTUUIL office we are given a chance to reconsider and submit other
alternative companies. Timely my friend Tibebu had able me to have the acceptance
confirmation paper of Seid Ahmed Nur Construction PLC there I have submitted it. We were
given an entrance card to the project site.
Figure 2.3.Entrance card to the site.
2.2 Section of the company I have been working
When I arrive at the site I ask to the company supervisor and other workers of the company to
get my own specific task, but they were not voluntary. Instead of giving my own specific task
they told me to participate in every work task. Therefore, my decision was to participate at the
site work.
This site has consisted of two blocks of the same structural integrity. Mat, combined, and
isolated types of foundations had been executed. Thus, they excavated the soil in both bulky, and
pit forms. Expansion joints have been used to differentiate the blocks.
Final Internship Report
DTU-CEng
Page11
Pr. By: Nahom B.
0
1
0
2.3 Work-flow in the section
The work-flow of Seid Ahmed Nur Construction PLC at Executive Hotel Number 2 is presented
in the table below.
Table 2.1 Workflow in the Section
Item Number Job/ Career Total Amount
1 Project Manager 1
2 Site Engineer 3
3 Foreman 5
4 Office Engineer 3
5 Store Keeper 2
6 Guard 2
2.4 Work pieces that I have been executing
2.4.1 Concrete work
There are a variety of concrete services available for residential and commercial construction.
Concrete had been prepared using the batching plant which is fixed in the site. Most concrete
classes used are Reinforced concrete in C-30 (with a 28 day 150mm cube crushing strength of
30MPa), cast into form-works and vibrated around rod reinforcement bars. (Form-
work&reinforcement bars are measured separately.
Final Internship Report
DTU-CEng
Page12
Pr. By: Nahom B.
0
1
0
Figure 2.4.Concrete mixing simulation.
And for the concrete road a special concrete type which has its own mix ratio and for lean
concrete C-5 is used.
After the mixing process is completed in the batching plant the fresh concrete is transported by
Truck Mixers to the required place. In the concrete there are different types of admixture are
added to for different purpose. For instance „repair mortar‟ is added to concrete to made the
ground more level and avoid crack.
Final Internship Report
DTU-CEng
Page13
Pr. By: Nahom B.
0
1
0
Figure 2.5.Ground bottom slab concrete levelling.
Advantages of concrete work
a. Concrete has a high compressive strength compared to other building materials.
b. Fire and weather resistance of concrete is fair.
c. The concrete building system is more durable than any other building system.
Final Internship Report
DTU-CEng
Page14
Pr. By: Nahom B.
0
1
0
d. Concrete, as a fluid material, in the beginning, can be economically moulded into a
nearly limitless range of shapes.
e. The maintenance cost of concrete is very low.
Disadvantages of concrete work
I. Compared to other binding materials, the tensile strength of concrete is relatively low.
II. Concrete is less ductile.
III. .The weight of compared is high compared to its strength.
IV. Concrete may contains soluble salts. Soluble salts cause efflorescence.
Types of Concrete
Properties of Concrete
 Grades (C20, C25, and C30 etc.):-Concrete is known by its grade which is designated as
C15, C20 etc. in which letter M refers to concrete mix and number 15, 20 denotes the
specified compressive strength (fck) of 150mm cube at 28 days, expressed in N/mm2.
 Compressive strength: - the strength of the concrete is also a quality which varies
considerably for the same concrete mix. Therefore, a single representative value, known
as characteristic strength is used.
 Characteristic Strength:- It is defined as the value of the strength below which not more
than 5% of the test results are expected to fall (i.e. there is 95% probability of achieving
this value only 5% of not achieving the same).
 Tensile strength
 Durability
 Creep:- is defined as the plastic deformation under sustain load. Creep strain depends
primarily on the duration of sustained loading. According to the code, the value of the
ultimate creep coefficient is taken as 1.6 at 28 days of loading.
 Shrinkage:- is the property of diminishing in volume during the process of drying and
hardening is termed Shrinkage. It depends mainly on the duration of exposure. If this
strain is prevented, it produces tensile stress in the concrete and hence concrete develops
cracks.
 Defects in Concrete Work
Final Internship Report
DTU-CEng
Page15
Pr. By: Nahom B.
0
1
0
Chemical attack
Chemical attack can occur because concrete is alkaline and chemically reactive. It can be
attacked by acids; some alkalis; numerous salt solutions; and organics such as fermenting liquids,
sugars, and animal oils, especially if they contain free acids. Seawater will attack concrete.
Crazing
This is a network of very small surface cracks usually spreading out over large areas or the entire
surface. Crazing is caused by finishing the concrete with bleed water on top.
Efflorescence
Efflorescence is more likely to be found on concrete that has been in place for a while. Concrete
contains water-soluble salts. As water from the interior of the concrete migrates to the surface
and evaporates, salts are deposited on the surface, usually as a white stain.
 Concrete mix ingredient
There are three basic ingredients in the concrete mix:
A. Ordinary Portland Cement: - is the most common cement used in general concrete
construction when there is no exposure to sulphates in the soil or groundwater.
B. Water: - is being used potable tap water.
C. Aggregates (rock and sand)
 Site Quality Test of Concrete Ingredient
 Concrete Mix Design: - is the process of finding the proportions of concrete mix in terms
of ratios of cement, sand and coarse aggregates. For e.g., a concrete mix of proportions
1:2:4 means that cement, fine and coarse aggregate are in the ratio 1:2:4 or the mix
contains one part of cement, two parts of fine aggregate and four parts of coarse
aggregate. The concrete mix design proportions are either by volume or by mass. The
water-cement ratio is usually expressed in mass.
Batching by weight is being used to measure materials to attain the right proportion of mixing
concrete. Due to batching there are different kinds of concrete classes such as C-5, C-25, C-30,
and C-35 in the site we are practising.
Final Internship Report
DTU-CEng
Page16
Pr. By: Nahom B.
0
1
0
Table 2.2 Mixing Ratio
Concrete Class Ratio Box Dimension(cm3
) Uses
C-5 1:5:7 20*40*50 Lean Concrete
C-25 1:2:3 18*40*50 Footing Pad, Grade Beam
C-30 1:2:3 16*40*50 Footing Column, Slab
C-35 1:2:3 13*40*50 Elevation Column, Shear Wall
Figure 2.6.Gauge box.
Curing and casting of fresh concrete
Curing is the process of controlling the rate and extent of moisture loss from concrete during
cement hydration. Curing by continuously wetting the exposed surface; thereby, preventing the
loss of moisture from it.
2.4.2 Substructure work
Substructure Works had been executed when I arrive in the site.
2.4.3 Superstructure work
A superstructure is the portion of the structure that is above ground level that receives the live
load is referred to as Superstructure. The superstructure of a building is the part that is entirely
above its foundation or basement.
40cm
50cm
m
Final Internship Report
DTU-CEng
Page17
Pr. By: Nahom B.
0
1
0
2.4.3.1 Types of beam
Beams: - are generally horizontal structural members which transfer loads horizontally along
their length to the supports where the loads are usually resolved into vertical forces. Beams are
used for resisting vertical loads, shear forces and bending moments.
Different types of beams can be classified based on the type of support.
The four different types of beams are:
i. Simply Supported Beam
ii. Fixed Beam
iii. Cantilever Beam
iv. Continuously Supported Beam
i. Simply Supported Beam
If the ends of a beam are made to rest freely on supports beam, it is called a simple (freely)
supported beam.
ii. Fixed Beam
A beam fixed at both ends.
iii. Cantilever Beam
A beam that is fixed at one end and the other end is free.
iv. Continuously Supported Beam
Here more than two supports are provided to the beam.
All the above types of stair cases are being constructed in our site.
2.4.3.2 Types of stair
Stair: - A staircase or stairway is one or more flights of stairs leading from one floor to another,
and includes landings, newel posts, handrails, balustrades and additional parts.
Dogged-legged Stair
This stair consists of two straight flights of steps with direct turns between them. This stair is
very useful where the total width of the stair is just twice the width of the steps.
Final Internship Report
DTU-CEng
Page18
Pr. By: Nahom B.
0
1
0
Figure 2.7.Staircase.
2.4.3.3 Types of Column
Column: - is a structural element that transmits, through compression, the weight of the structure
above to other structural elements below. In other words, a column is a compression member.
Columns are frequently used to support beams or arches on which the upper parts of walls or
ceilings rest.
Landing
Flight
Final Internship Report
DTU-CEng
Page19
Pr. By: Nahom B.
0
1
0
Figure 2.8.Columns to be casted.
Types of columns can be listed based on material used, function, shape and structural
configuration.
Material: Stone, Timber, brick, concrete, steel.
Function: Building columns, platform supporting columns, portico/canopy supporting columns,
equipment supporting columns, free standing posts, or poles, pilot‟s, etc
Shape: Solid, hollow, laced, battened, rectangular, square, circular, octagonal, hexagonal,
hollow, fluted, ornamental columns like ionic, Doric, Corinthian single stepped, double stepped,
rolled shape, or built up with plates,
Structural configuration: braced, unbraced, fixed base columns, pinned base columns, short
columns, long columns (based on slenderness)
Plumb bob
“Catcher”
Form work
Bracings
Cravat
Final Internship Report
DTU-CEng
Page20
Pr. By: Nahom B.
0
1
0
2.4.3.4 Types of Slab
Slabs: -are constructed to provide flat surfaces, usually horizontal, in building floors, roofs,
bridges, and other types of structures. The slab has been supported by walls, by reinforced
concrete beams, and by columns. This project has used one way rigid slab.
Based on length and breadth of Conventional Slab is classified into two types:
1. One-Way Slab
2. Two-Way Slab
2.4.3.5 Types of Wall
Wall: -A wall is a structure that defines an area, carries a load, or provides shelter or security.
There are many kinds of walls.
Shear Wall: - is a structural system composed of braced panels to counter the effects of lateral
load acting on a structure. Wind and seismic loads are the most common loads that shear walls
are designed to carry.
2.4.4 Aggregate Works
Aggregate is a broad category of coarse to medium grained particulate material used in
construction, including sand, gravel, crushed stone, slag, recycled concrete and geosynthetic
aggregates. Aggregates are the most mined materials in the world. Aggregates are a component
of composite materials such as concrete and asphalt concrete; the aggregate serves as
reinforcement to add strength to the overall composite material. Aggregates are the most massed
ingredient in making of concrete (up to 70 percentages). It is being bought from suppliers.
Final Internship Report
DTU-CEng
Page21
Pr. By: Nahom B.
0
1
0
2.4.5 Temporary Structure Work
Temporary works are defined as parts of the works that allow or enable construction of, protect,
support or provide access to, the permanent works and which might or might not remain in place
at the completion of the works.
False work
 False work is a temporary works used to support a structure during construction including
any plant required and form-work and panels of concrete. It is also used to support the
slabs and beams.
Procedures
 Measure the height of the room to be constructed on the given floor.
 Drive a nail into the column and tie a string around all columns.
 Check that whether it is water level or not.
 Prepare the vertical supports i.e. props and “cristy”.
 Erect the vertical supports and tie them with the columns using wooden “purlin”.
 Lay the soffit and side form-works i.e. the suspended part of the beam
 Fasten a horizontal member called “modeno” with the top edge beam form-work
supported by a vertical member called “ponte”. Then, Check whether it is water level or
not and provide other horizontal member called “firgrig” between the previous horizontal
member.
Figure 2.9.False work.
“Cristy”
Final Internship Report
DTU-CEng
Page22
Pr. By: Nahom B.
0
1
0
Form work
Form work is a temporary construction material used for mould a structure with a required shape
and dimensions and support it until it harden sufficiently to become self supporting. After the
concrete has sufficiently set and harden the form-work is removed.
Form-work may steel or wooden material with desired shape. There are different types of form-
works used in the construction industry in the construction site.It can be;
 Plywood (timber):- Ply wood timber with its cross- grained structure provides strong and
reasonable economic.
 Hard board (Oil tempered):- Almost impermeable, this material will give the concrete a
uniform surface colour, but with inevitable blow holes.
 Steel or panel: - These are different dimensions and angles. Steel form-work has many
advantages. Such as;
 It can be put to high number of use crate surface.
 It possesses greater rigidity.
 I have got the opportunity to observe the construction of formworks for footing pads,
beams, columns, slabs, shear wall and stair in our project site. They use both steel and
timber form-works.
Procedures to set-up form-works
 Spacers of required dimension are tied along the longitudinal reinforcement bars of the
structure to be casted to give the required clear cover
 Panel of required dimension and angle are placed along the face of the spacers provided
earlier. These panels are provided s
 It provides ease of stripping (removing)
 It ensures an even and smooth con
 On both directions (back and front) in a good manner shaped.
 The duration of removal of this form-work depends on the type of structure to be casted
i.e. whether it is a vertical (column, retaining wall & shear wall) or horizontal (slab &
beam). Where, 24 hour period is enough for vertical structure while it is longer (14-28
days) for horizontal structures.
Final Internship Report
DTU-CEng
Page23
Pr. By: Nahom B.
0
1
0
 The time between the castings of the concrete to the dismantling of form-work depends
on the strength development of the concrete and on the function of the form-work.
 The time between casting and removals of the form-work depends on mainly on the
strength developments of the concrete and on the function of the form-work the following
minimum period of the recommended.
In our case we have been using the following period.
Table 2.2 Time of Removing Form-works
Form-work Curing Time
Vertical member (columns and shear wall)
Sides of beams
1 day (24 hr)
1 day (24 hr)
Soffit of beams
Soffit and/or props of slabs
21 day
21 day
A good form Work should satisfy the following requirements.
 The form work should be strong enough to carry safely the dead load of the wet concrete
placed on it, and the live load from the men and machines used in placing the concrete in
position.
 It should be practically water proof so that it does not absorb water form concrete.
 The joints between forms should be smooth, so that no unwanted surface irregularities are
apparent on the finished unit.
 A form work should be re-used as many tines as possible.
 A form work should be free from bent, cracking, and straight and strong.
 8. Bracing
 It is used to fix the panels in position. Without bracing s there is no way that the panels
will withstand the pressure that from the concrete.
Final Internship Report
DTU-CEng
Page24
Pr. By: Nahom B.
0
1
0
Scaffoldings
Scaffoldings are used as a temporary staircase, and for placing wooden formworks which are
used as a walkway for the workmen.
Scaffoldings are constructed from:
 Steel/prop
 Wood
 Eucalyptus trees
Spacer
Spacers are made up of concrete that secures the reinforcing steel or rebar in reinforced concrete
structures as the rebar is assembled in place prior to the final concrete pour. The spacers are left
in place for the pour to keep the reinforcing in place, and become a permanent part of the
structure.
2.4.6 Reinforcement works
In the site there is a bar shop in which bar bending, cutting and making of skeletons of structures
like colons, beams and slab meshes are prepared then the structures skeletons are transported to
the required place. The process of the work in the compound is that the engineer will print out
the required structure bar schedule and give to the bar Foreman then the Foreman will order to
prepare the bar. Here also the task given to me was checking the work performed with the
structural drawing. In this department the weakness I observed is that to be reluctant to be
economical.
2.4.7 Surveying
In the site surveying work is decisive work sector because for instance to place, grade and
compact select material to check the level of the colons, in the construction of the concrete road,
trench and pit excavation, levelling work, steel structure work, ditch lines, septic tanks, sanitary
lines are among works which highly require the aid of the surveying work(total station, and
levelling) on the other hand when participating in surveying work since it will touch different
work types help to collect additional skill on the other work fill.
Final Internship Report
DTU-CEng
Page25
Pr. By: Nahom B.
0
1
0
The challenge I have been encountered on this sector was lack of communication between I and
the assistances alongside me because in the compound they have their own communication
words, gestures, and sign languages.
But gradually with the aid of senior surveyors I learnt the local words and communicate simply.
Carpentry
The carpentry in the site includes form-works for; foundation pad and columns, grid beam,
elevation colons, for slab and staircase (“soffit”form-work), scaffolding work (crusty).The most
form-works are made of Swan “Zigiba” wood because of this they are “use and through” means
once they used it is not possible to re use the wood.
In this area the task which is given by my supervisor was to check whether the drawing and the
work practically performed match or not and to check the dimensions, straightness, attachment
and other quality of the work and if any mistake there I inform to the responsible party and take a
correction action.
2.5 Major challenges encountered
During my intern-ship period especially on the first two week the challenges I faced was;
1- Difficulty in understanding of the local working words like “Linga”, “Crusty”, “Fondo”,
“Sponda”, and “skuadra” etc..
2. Misunderstanding, and some workers were not happy to accept interns‟ suggestions.
3. The contractor has different projects at different sites, and this makes them not to able to finish
on scheduled time.
2.6 Solutions for the challenges
For the first challenge mentioned above the measure I had taken was to ask and study those
strange words from the worker. In this regard I succeeded within a short period of time and
communicate with the workers.
In fact, humans by nature are not happy when they are told their mistakes even if it depends on
how it is being told. Thus, I criticize them individually and my relation becomes smooth.
Final Internship Report
DTU-CEng
Page26
Pr. By: Nahom B.
0
1
0
CHAPTER THREE
3. OVERALL BENEFITS I GAINED FROM THE INTERNSHIP
Introduction
There were lots of benefits that I have gained from my internship program. Since it was my first
practical experience everything there was new and important to me. I mentioned the benefits in
terms of:
 Practical skills
 Theoretical knowledge
 Interpersonal communication skills
 Team playing skills
 Leadership skills
 Work ethics related issues
 Entrepreneurship skill
3.1 Benefits I gained in terms of improving my practical skills
This program gave me many opportunities to test and refine my skills. To make theoretical
knowledge applicable and to make it practical skill there should be a chance like this. This
program helps me to build and improve my confidence in construction tasks. Some of the things
that help me to improve my practical skills are:
 Different site works are performed continuously that I have learned in theoretical classes.
 The theoretical lessons that I take before the internship.
 My motivation and ambition to know for new things.
 The best relation I have had with the site crew.
3.2 Benefits I gained in terms of upgrading my theoretical
knowledge
This program helped me to strengthen my theoretical knowledge. All the courses I have had
taken except some of them, focused on theoretical part. Since the practice depends first on
theory, it is easy to work for the one having good theoretical base. In addition to that when I was
Final Internship Report
DTU-CEng
Page27
Pr. By: Nahom B.
0
1
0
practicing I relate the theory with the practical matter, so at this time it helps to me in upgrading
my theoretical knowledge. Generally speaking, my theoretical knowledge got strengthen more
by those practical techniques invested on site.
3.3 Benefits I gained in terms of improving my interpersonal
communication skills
Since construction work is a team work by its nature there are different individuals with different
professions and personalities come up together and communicate with each other to solve
different problems and run the whole work, so here good interpersonal communication skill will
bring success.
By the time I started the intern-ship program I was not able to know how to deal with people at
the work place that I did not know the way to communicate with different worker. It was difficult
to me to communicate with the workers. But afterwards I believe that good relation and
communication skill is the key for getting the experience and knowledge require for the intern-
ship program. Based on this I tried to change my approach to the people at the work place and
through time I was able to saw progress on myself. So as a conclusion I can say that I have got
good lesson regarding communication skill while my stay in the company for the intern-ship
program.
I used to have different discussions with my friends who are intern students and the workers at
the site. During discussions different ideas are raised. Through such team work, it was easier to
address problems emerging. Therefore it becomes easy for me to improve my interpersonal
communication skill.
3.4 Benefits I gained in terms of improving team work skill
Team work is the way of success and strength. I learnt that as part of a team, an engineer
should have to works with a positive attitude within a group for the success of a project. When
called upon to lead, an engineer must have good managerial and team playing skill. Therefore, I
try to improve my team playing skill in order to be successful engineer. Confident engineers are
able to succeed by gaining the trust of co-workings. Generally speaking I know that an engineer
with good team playing skill has the following qualities.
 Demonstrates reliability
Final Internship Report
DTU-CEng
Page28
Pr. By: Nahom B.
0
1
0
 Communicates constructively
 Listens actively
 Functions as an active participant
 Shares openly and willingly
 Cooperates and pitches in to help
 Exhibits flexibility
3.5 Benefits I gained in terms of improving my leadership skills
Leadership is a skill to guide, control and monitor peoples. The intern-ship helps me to improve
my leadership talents to future employers, my ability to work well with different types of people
and my skills in seeing projects through from start to finish. I have seen how each worker is
controlled and organized to perform its day to day activities. Among all other managements I
have seen that human resource management is the most important one.
I have actually observed the method of controlling the working time and amount of work done
by each worker so that the work proceeds according to the work plan. For the time being I didn‟t
practice leadership from the higher level. However I meet with an efficient project manager and I
grasp a lot of knowledge concerning different issues such as how to treat different persons and
how to control the overall activity on the site. Generally regarding leadership skill I have got a
good experience. Also to be an effective leadership I understood that personal values like:
 Confidence
 Effective communication
3.6 Benefits I gained in terms of understanding work ethics related
issues
Internship helps to me to know the values of the work ethics, so that I try to practice and
understand work ethics related issues during my intern-ship.
 Punctuality: - means keeping the companies work beginning and ending time and to
complete a given task within the given period.
 Office Disciplines: - on work place you don‟t have to disturb the working atmosphere.
For example abstain from opening loud voice, loud music, songs and things which
disturb others workers mood.
Final Internship Report
DTU-CEng
Page29
Pr. By: Nahom B.
0
1
0
 Reliability: - the worker should be qualified for the part he is supposed to be performing.
He/she must have appropriate skill and knowledge for the task assigned.
 Honesty:-Regarding this value each worker regardless of its status should abstain from
bad behaviors such as cheating, bias, corruption etc..
 Cooperation: - Each worker should interact and cooperate with each other while working.
That is because it is through such system problems could be easily solved.
3.7 Benefits I gained in terms of entrepreneurship skills
A construction project mainly requires large human, financial, physical i.e. material and
equipment resources. Entrepreneurship is defined as special human talent that helps manage
those factors of production such as labour, machinery and capital and takes risks of making
loses. An entrepreneur is required to establish meaningful relationship between activity and
authority which is intimately related to planning function.
Human resource management: - Having a quality worker is a must if one needs to be productive.
Therefore I have been able to understand that taking responsibility for the safety and well-being
of employees in job related activities by providing safety wares like safety shoes &helmet-sand
insurances one can attain high level of support from them.
Equipment utilization management: - Construction equipment management helps a person to
plan implement and monitor construction equipments to:
 Enhance optimum utilization.
 Increase efficiency or productivity of inputs to the products of the construction.
 Harmonize standards and enhance the quality of work.
 Financial management: - Wide financial flow is achieved through detailed market studies.
A company should also be able to put well qualified and efficient personnel for preparation of
contracts and payments. During my intern-ship experience I have been able to grasp ideas about
human resources management, equipment utilization and financial flow and also develop self-
confidence to play my strength in believing in myself and taking risks in my future career.
Final Internship Report
DTU-CEng
Page30
Pr. By: Nahom B.
0
1
0
CHAPTER FOUR
4. CONCLUSION AND RECOMMENDATION
Introduction
This section elaborates the recommendation to the organization and the university, and the
conclusion of the entire intern-ship report.
4.1 Conclusion
I have benefited a lot in the field attachment in a way that I managed to apply the theoretical
knowledge from the university into practice through many activities/tasks/assignments.
I have improved the skills like interpersonal, listening, presentation skills, acting freely around
people, typing skills, accounting, recording, presentation, typing, conflict resolution,
organizational skills to mention but a few.
I have learnt many lessons which included; how to create an accounting system, how the
working environment runs, etc.
I have got different ideas from different employees at the organization and also through
interacting with other interns from various universities and this contributed a lot on the
knowledge and experience.
Generally this intern-ship program has played a great role in providing an opportunity to an out-
of-classroom learning experience to relate the theoretical knowledge with the practical work.
Finally, internship was fun and therefore the students have to encourage Debre Tabor University
to continue giving students this opportunity to do their academic requirement of internship from
industrial organization.
4.2 Recommendation
4.2.1 Recommendation to the company
Facilitation:
The management of Seid Ahmed Nur Construction PLC should buy more facilities such as
computers, vehicles so as to enable smooth running of the company‟s activities and respond to
the dynamic competition environment and globalization. This technological advancement will
Final Internship Report
DTU-CEng
Page31
Pr. By: Nahom B.
0
1
0
enable the organization to change from manual to computerized methods of processing
documents and proper record keeping. And the vehicles play role on giving transportation
services for the workers of the company.
Reliability and giving more careers to interns:
I would suggest the Organization to continue giving intern-ship placements to as many students
as they can because some miss this experience which is also important requirement of the
university.
Allowances:
The organization should give allowances to interns most especially transport allowances. Most
students stay far from the intern-ship places; hence, being on the site and attending the intern-
ship program increases their expenses. Therefore, I recommends the organization to put that in to
action in order to motivate interns and boost their productivity levels in performing their tasks
during the field attachment.
Serious supervision to the workers:
The organization should increase and ensure more supervision over the employees in order to
work effectively and also eliminate workers who relax, work lazily and perform actively after
seeing their supervisors.
Job enlargement:
The management of should also carry out job enlargement and enrichment to newly graduating
students. This will ensure good industrial relations between the company and education ministry
subordinates.
4.2.2 Recommendation to the university
Constant supervision of students:
The intern recommends the university to carry out constant supervision and monitoring of
students during the internship training so as to encourage them to perform the duties fully and
also accurately. This will also put a close link between the academic supervisors and the field
supervisors so as to foster appropriate assessment of what the interns are doing in the field.
Secure internship placements for students:
Final Internship Report
DTU-CEng
Page32
Pr. By: Nahom B.
0
1
0
The university should help students to secure intern-ship positions according to their respective
programs undertaken at the university through giving students recommendations in order to ease
their training periods and also avoid the ache gotten by students in search of intern-ship
placements.
Should continue this program:
This is because it helps to prepare the students for their careers in future and also enable the
students to practice the theoretical knowledge obtained during class be exercised practically. It
also helps to develop students understanding of work ethics, employment demands,
responsibilities and opportunities.
Curriculum should be revised:
Courses that should be pre-given before the intern-ship program did not taught, and that made us
not to compete and be a student that a company relies on.
Final Internship Report
DTU-CEng
Page33
Pr. By: Nahom B.
0
1
0
ENGINEERING SIGNIFICANCE OF INTERNSHIP
The potential benefits we students of participating in the engineering internship program includes
the following:
 gain meaningful engineering experience to complement academic studies;
 develop a professional attitude that is reflected in the performance of responsibilities and
tasks, and learn about the importance of professionalism in the real world;
 assess a future employer;
 obtain more interesting and satisfying jobs because of the internship experience;
 stand out from other graduates in the eyes of employers;
 earn money while gaining valuable experience;
 Use the activities carried out during an internship term as the basis of a fourth-year thesis.
Final Internship Report
DTU-CEng
Page34
Pr. By: Nahom B.
0
1
0
REFERENCES
1. Zeleke W. et al. 2007 E.C. Technical Report Writing and Research Methodology Course
Module. Debre Tabor University. Debre Tabor, Ethiopia.
2. Yitayal T. 2008 E.C. Building Construction Course Module. Debre Tabor University.
Debre Tabor, Ethiopia.
3. Esmail Aragaw. 2005 E.C. Final Internship Report. Hawassa University. Hawassa,
Ethiopia..
Final Internship Report
DTU-CEng
Page35
Pr. By: Nahom B.
0
1
0
APPENDIXES
Appendix A
Duties and responsibilities of workers.
1) “Anatsi”= stands for carpenter, who executes wood works.
2) “Ginbegna”= stands for masons, who executes masonry works.
Appendix B
Name and use of materials on site.
1. “Armata”= Concrete composed of aggregate, cement, and water.
2. “Kiset”= Stanger used to keep the strength of the form-work to stable the level.
3. “Tumbi”= Plumb Bob used as levelling or uses to keep the vertical alignment of a
structure like column.

More Related Content

What's hot

SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONVed Jangid
 
CSE390 industrial attachment I report
CSE390 industrial attachment I reportCSE390 industrial attachment I report
CSE390 industrial attachment I reportAmos Kiplagat
 
Civil enginerring internship report
Civil enginerring internship reportCivil enginerring internship report
Civil enginerring internship reportZahid Khan
 
INTERNSHIP REPORT (Repaired).docx
INTERNSHIP REPORT (Repaired).docxINTERNSHIP REPORT (Repaired).docx
INTERNSHIP REPORT (Repaired).docxPaulosMekuria
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.JAPJEETSINGH13
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION L&W BUILDING SOLUTIONS PVT. LMT.
 
PRACTICUM REPORT ON Monitoring the Construction Process of Superstructure ...
 PRACTICUM REPORT ON   Monitoring the Construction Process of Superstructure ... PRACTICUM REPORT ON   Monitoring the Construction Process of Superstructure ...
PRACTICUM REPORT ON Monitoring the Construction Process of Superstructure ...Rubel Rana
 
Final Report for Summer internship at Software House
Final Report for Summer internship at Software HouseFinal Report for Summer internship at Software House
Final Report for Summer internship at Software HouseSaad Shahzad
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONRising Sher
 
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...SufiyanAhmedJeddy
 
Summer Internship Report
Summer Internship ReportSummer Internship Report
Summer Internship ReportHari Krishnan
 
Student Work Experience Programme (SWEP 1) Technical Report by Michael Agwulonu
Student Work Experience Programme (SWEP 1) Technical Report by Michael AgwulonuStudent Work Experience Programme (SWEP 1) Technical Report by Michael Agwulonu
Student Work Experience Programme (SWEP 1) Technical Report by Michael AgwulonuMichael Agwulonu
 
Internship Report
Internship Report Internship Report
Internship Report zahurul88
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction siteUmair Ali
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Alok Mishra
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report Poojan Patel
 
WSO2 Internship Report
WSO2 Internship ReportWSO2 Internship Report
WSO2 Internship ReportUjitha Iroshan
 

What's hot (20)

SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
 
CSE390 industrial attachment I report
CSE390 industrial attachment I reportCSE390 industrial attachment I report
CSE390 industrial attachment I report
 
Civil enginerring internship report
Civil enginerring internship reportCivil enginerring internship report
Civil enginerring internship report
 
Internship report 2015
Internship report 2015Internship report 2015
Internship report 2015
 
INTERNSHIP REPORT (Repaired).docx
INTERNSHIP REPORT (Repaired).docxINTERNSHIP REPORT (Repaired).docx
INTERNSHIP REPORT (Repaired).docx
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
 
PRACTICUM REPORT ON Monitoring the Construction Process of Superstructure ...
 PRACTICUM REPORT ON   Monitoring the Construction Process of Superstructure ... PRACTICUM REPORT ON   Monitoring the Construction Process of Superstructure ...
PRACTICUM REPORT ON Monitoring the Construction Process of Superstructure ...
 
Whole Report (2)
Whole Report (2)Whole Report (2)
Whole Report (2)
 
Final Report for Summer internship at Software House
Final Report for Summer internship at Software HouseFinal Report for Summer internship at Software House
Final Report for Summer internship at Software House
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...
 
SIWES TECHNICAL REPORT SAMPLE
SIWES TECHNICAL REPORT SAMPLESIWES TECHNICAL REPORT SAMPLE
SIWES TECHNICAL REPORT SAMPLE
 
Summer Internship Report
Summer Internship ReportSummer Internship Report
Summer Internship Report
 
Student Work Experience Programme (SWEP 1) Technical Report by Michael Agwulonu
Student Work Experience Programme (SWEP 1) Technical Report by Michael AgwulonuStudent Work Experience Programme (SWEP 1) Technical Report by Michael Agwulonu
Student Work Experience Programme (SWEP 1) Technical Report by Michael Agwulonu
 
Internship Report
Internship Report Internship Report
Internship Report
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
 
WSO2 Internship Report
WSO2 Internship ReportWSO2 Internship Report
WSO2 Internship Report
 

Similar to Nahom final internship report

This week work question and answers shiro meda tvet
This week work  question and answers shiro meda tvetThis week work  question and answers shiro meda tvet
This week work question and answers shiro meda tvetberhanu taye
 
BULE HORA UNIVERSITY.pptx
BULE HORA UNIVERSITY.pptxBULE HORA UNIVERSITY.pptx
BULE HORA UNIVERSITY.pptxAbrshWubishet
 
Monthly(3rd & 4th) internship report_ by_Nahom
Monthly(3rd & 4th)  internship report_ by_NahomMonthly(3rd & 4th)  internship report_ by_Nahom
Monthly(3rd & 4th) internship report_ by_NahomNahom Balcha
 
NEC Interview with Wai-Chi Sing of the HK Development Bureau
NEC Interview with Wai-Chi Sing of the HK Development BureauNEC Interview with Wai-Chi Sing of the HK Development Bureau
NEC Interview with Wai-Chi Sing of the HK Development BureauNEC Contracts
 
Design report
Design report Design report
Design report yash patel
 
pdfcoffee.com_civil-engineering-summer-training-report--pdf-free.pdf
pdfcoffee.com_civil-engineering-summer-training-report--pdf-free.pdfpdfcoffee.com_civil-engineering-summer-training-report--pdf-free.pdf
pdfcoffee.com_civil-engineering-summer-training-report--pdf-free.pdfzeeshansami3
 
An internship report on PRACTICAL APPROACH ON HYDRO MECHANICAL WORK THAT ARE ...
An internship report on PRACTICAL APPROACH ON HYDRO MECHANICAL WORK THAT ARE ...An internship report on PRACTICAL APPROACH ON HYDRO MECHANICAL WORK THAT ARE ...
An internship report on PRACTICAL APPROACH ON HYDRO MECHANICAL WORK THAT ARE ...glmbb4
 
Internship Report Semester 2 Civil Engineering.
Internship Report Semester 2 Civil Engineering.Internship Report Semester 2 Civil Engineering.
Internship Report Semester 2 Civil Engineering.Siana Ann Sebastian
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copyayman hussien
 
This week work question and answers shiro meda tvet
This week work  question and answers shiro meda tvetThis week work  question and answers shiro meda tvet
This week work question and answers shiro meda tvetberhanu taye
 
Chapter one new.pptx
Chapter one new.pptxChapter one new.pptx
Chapter one new.pptxHumnaTolina
 
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...Yamini Kahaliya
 
Factors affecting successful completion of ajk governmental construction proj...
Factors affecting successful completion of ajk governmental construction proj...Factors affecting successful completion of ajk governmental construction proj...
Factors affecting successful completion of ajk governmental construction proj...Engr. Mudassar Tahir Khan
 

Similar to Nahom final internship report (20)

Biniyam alaso
Biniyam alasoBiniyam alaso
Biniyam alaso
 
TOM'S report
TOM'S reportTOM'S report
TOM'S report
 
Internship Report
Internship ReportInternship Report
Internship Report
 
DECLARATION3.docx
DECLARATION3.docxDECLARATION3.docx
DECLARATION3.docx
 
This week work question and answers shiro meda tvet
This week work  question and answers shiro meda tvetThis week work  question and answers shiro meda tvet
This week work question and answers shiro meda tvet
 
BULE HORA UNIVERSITY.pptx
BULE HORA UNIVERSITY.pptxBULE HORA UNIVERSITY.pptx
BULE HORA UNIVERSITY.pptx
 
Monthly(3rd & 4th) internship report_ by_Nahom
Monthly(3rd & 4th)  internship report_ by_NahomMonthly(3rd & 4th)  internship report_ by_Nahom
Monthly(3rd & 4th) internship report_ by_Nahom
 
NEC Interview with Wai-Chi Sing of the HK Development Bureau
NEC Interview with Wai-Chi Sing of the HK Development BureauNEC Interview with Wai-Chi Sing of the HK Development Bureau
NEC Interview with Wai-Chi Sing of the HK Development Bureau
 
Final Project
Final ProjectFinal Project
Final Project
 
Intern report
Intern reportIntern report
Intern report
 
Design report
Design report Design report
Design report
 
induarial trainin report
induarial trainin reportinduarial trainin report
induarial trainin report
 
pdfcoffee.com_civil-engineering-summer-training-report--pdf-free.pdf
pdfcoffee.com_civil-engineering-summer-training-report--pdf-free.pdfpdfcoffee.com_civil-engineering-summer-training-report--pdf-free.pdf
pdfcoffee.com_civil-engineering-summer-training-report--pdf-free.pdf
 
An internship report on PRACTICAL APPROACH ON HYDRO MECHANICAL WORK THAT ARE ...
An internship report on PRACTICAL APPROACH ON HYDRO MECHANICAL WORK THAT ARE ...An internship report on PRACTICAL APPROACH ON HYDRO MECHANICAL WORK THAT ARE ...
An internship report on PRACTICAL APPROACH ON HYDRO MECHANICAL WORK THAT ARE ...
 
Internship Report Semester 2 Civil Engineering.
Internship Report Semester 2 Civil Engineering.Internship Report Semester 2 Civil Engineering.
Internship Report Semester 2 Civil Engineering.
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copy
 
This week work question and answers shiro meda tvet
This week work  question and answers shiro meda tvetThis week work  question and answers shiro meda tvet
This week work question and answers shiro meda tvet
 
Chapter one new.pptx
Chapter one new.pptxChapter one new.pptx
Chapter one new.pptx
 
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...
PROJECT MANAGEMENT - ASSIGNMENT ON BRIDGE CONSTRUCTION PLAYS A ROLE OF PROJEC...
 
Factors affecting successful completion of ajk governmental construction proj...
Factors affecting successful completion of ajk governmental construction proj...Factors affecting successful completion of ajk governmental construction proj...
Factors affecting successful completion of ajk governmental construction proj...
 

Recently uploaded

4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17Celine George
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 

Nahom final internship report

  • 1. DEBRE TABOR UNIVERSITY FACULTY OF TECHNOLOGY CIVIL ENGINEERING DEPARTMENT Project Title:Final Internship Report Hosting Company:Seid Ahmed Nur Construction PLC Internship Duration:March 11th , to June 30th , 2009 E.C. Submitted by: Nahom Balcha Regd. No.: ENG(R)/1499/06 Contact Address: E-mail: nahom3443@gmail.com Phone: +251-921593345 Mentor: Mr. Getachew B. Site Supervisor: Ms. Jemila Mohammed Submission Date: Oct. 6th , 2010. Submitted to: Mr. Amare Debre Tabor, Ethiopia.
  • 2. Final Internship Report DTU-CEng Page ii Pr. By: Nahom B. 0 1 0 STUDENTS’ DECLARATION This is to clarify that I, Nahom Balcha Debre Tabor University 4th year Civil Engineering student Roll No. ENG(R)/1499/06 has undergone industrial training in Seid Ahmed Nur Construction PLC in Adama as required of four months project semester. This report has not been previously submitted to any other university, college or organization for an academic, qualification, certificate, diploma or degree. I hereby warrant that the work I have presented does not breach any existing copyright. I also confirm that the report is only prepared for my academic requirement, but not for any other purpose. It might not be used with the interest of opposite party of the organization and/or the university. Nahom Balcha Sign: ………. Approved by: Mentor: Mr. Getachew B. Signature: ………….
  • 3. Final Internship Report DTU-CEng Page iii Pr. By: Nahom B. 0 1 0 ACKNOWLEDGEMENT I take this opportunity to extend my gratitude to Seid Ahmed Nur Construction PLC for having provided me with an unbelievable practical learning experience during training time. It was indeed a pleasure to be a part of such organization. First and above all, I praise God the almighty for providing this opportunity, and granting the capability to proceed successfully. I would like to express my deepest appreciation to all those who provided the possibilities to complete this report. A special gratitude to our Technical Report Writing and Research Methodology Course Instructor, Mr. Zeleke W, whose contribution in stimulating suggestions and encouragement, helped us to coordinate our project especially in writing this report. Secondly, I am no less grateful to the other employees for their kind co-operation and spontaneous response. Last but not least; I express my gratitude toward my family members, my teachers, and friends for their encouragement which help me in completion of this training. Thank you, all. Nahom Balcha 4th Year: 2nd Semester Civil Engineering Department
  • 4. Final Internship Report DTU-CEng Page iv Pr. By: Nahom B. 0 1 0 EXECUTIVE SUMMARY This final industrial internship report in broad spectrum includes four chapters in which I have tried to explain my four month industrial training experience in Seid Ahmed Nur Construction PLC. The content of all chapters is deeply and broadly discussed. The report is constructed and developed from the practical basis of the site work that have been performed and ended from the early of March to the end of July 2009 E.C. In the opening chapter, I have tried to give a brief history of the company which include mission, vision and goal of the company, main products and end users of the company, projects run through the company have been mentioned. In this chapter, I have put overall organizational structure of the company, and work flow of the site. Chapter two exclusively discusses the overall internship experience that I have gained from the industrial training program. This Chapter of the report is basic and which I am going to present mostly. It highlights the overall works I have been executing. The third chapter has been dedicated for the overall internship benefits that I have grasped from this program. Points that have been discussed throughout this chapter include practical, leadership skill, entrepreneurship skill improvements. The final and fourth chapter of this report has raised conclusion and recommendation. This section elaborates the recommendation to the organization and the university, and the conclusion of the entire internship report.
  • 5. Final Internship Report DTU-CEng Page v Pr. By: Nahom B. 0 1 0 INTRODUCTION I have completed a four month period of training at Seid Ahmed Nur Construction PLC. I have spent the major part of training at the site rather than office where the planned and designed projects are executed in the ground. This is a report on the internship program that lasted for four months from early March to the end of June. More specifically, most of my training period has passed on observing, mitigating the chance of similarity and difference between the work which is planned and designed, and the work that is executed. However, I have submitted small tasks for helping in projects, and self-learning sessions such as over viewing concrete filling, performing leveling works on the section of the site, and etc. Here in this session of five years training program in university I have developed theoretical skills, practical skills, and socio-economical skills. I have developed a skill how to communicate with different class of employees. I have also developed a skill on work ethics like punctuality, working with others (teamwork). I have buried in mind thatan engineer has to keep in mind the municipal conditions, building bye laws, environment, financial capacity, water supply, sewage arrangement, provision of future, aeration, ventilation etc. in suggestion a particular type of plan to any client.
  • 6. Final Internship Report DTU-CEng Page vi Pr. By: Nahom B. 0 1 0 ACRONYMS/ ABBREVIATIONS B+G+”X”= Basement plus Ground plus “X” building. E.C. = Ethiopian Calendar. ETB= Ethiopian Birr. G+”X”= Ground plus “X” building. PLC= Private Limited Company.
  • 7. Final Internship Report DTU-CEng Page vii Pr. By: Nahom B. 0 1 0 TABLE OF CONTENTS Contents Pages STUDENTS‟ DECLARATION .......................................................................................... i ACKNOWLEDGEMENT.................................................................................................iii EXECUTIVE SUMMARY ............................................................................................... iv INTRODUCTION .............................................................................................................. v ACRONYMS/ ABBREVIATIONS................................................................................... vi TABLE OF CONTENTS..................................................................................................vii Contents ........................................................................................................................ vii LIST OF FIGURES ........................................................................................................ ix LIST OF TABLES.............................................................................................................. x CHAPTER ONE................................................................................................................. 1 1. COMPANY PROFILE ................................................................................................... 1 Introduction................................................................................................................. 1 Background of Seid Ahmed Nur Construction PLC................................................... 1 1.1 Brief history of the company .................................................................................... 1 1.2 Mission, vision, and goal of the company ................................................................ 2 1.2.1 Mission of the company..................................................................................... 2 1.2.2 Vision of the company....................................................................................... 3 1.2.3 Goal of the company.......................................................................................... 3 1.3 Main products of the company ................................................................................. 3 1.4 End users of the company‟s product......................................................................... 3 1.5 Overall organizational structure................................................................................ 4 1.6 Manpower and equipment description...................................................................... 5 1.6.1 Manpower Description....................................................................................... 5 1.6.2 Machineries and Equipment of the Company.................................................... 6 1.7 General workflow of the company ........................................................................... 7 CHAPTER TWO ................................................................................................................ 8 2. OVERALL INTERNSHIP EXPERIENCE .................................................................... 8 Introduction: Project Description........................................................................................ 8 2.1 Brief on how I get into the company ........................................................................ 9 2.2 Section of the company I have been working......................................................... 10
  • 8. Final Internship Report DTU-CEng Page viii Pr. By: Nahom B. 0 1 0 2.3 Workflow in the section.......................................................................................... 11 2.4 Work pieces that I have been executing ................................................................. 11 2.4.1 Concrete work.................................................................................................. 11 2.4.2 Substructure work ............................................................................................ 16 2.4.3 Superstructure work......................................................................................... 16 2.4.4 Aggregate Works ............................................................................................. 20 2.4.5 Temporary Structure Work.............................................................................. 21 2.4.6 Reinforcement works....................................................................................... 24 2.4.7 Surveying......................................................................................................... 24 2.5 Major challenges encountered ................................................................................ 25 2.6 Solutions for the challenges.................................................................................... 25 CHAPTER THREE .......................................................................................................... 26 3. OVERALL BENEFITS I GAINED FROM THE INTERNSHIP ................................ 26 Introduction............................................................................................................... 26 3.1 Benefits I gained in terms of improving my practical skills................................... 26 3.2 Benefits I gained in terms of upgrading my theoretical knowledge ....................... 26 3.3 Benefits I gained in terms of improving my interpersonal communication skills.. 27 3.4 Benefits I gained in terms of improving team work skill ....................................... 27 3.5 Benefits I gained in terms of improving my leadership skills ................................ 28 3.6 Benefits I gained in terms of understanding work ethics related issues ................. 28 3.7 Benefits I gained in terms of entrepreneurship skills.............................................. 29 CHAPTER FOUR............................................................................................................. 30 4. CONCLUSION AND RECOMMENDATION............................................................ 30 Introduction............................................................................................................... 30 4.1 Conclusion .............................................................................................................. 30 4.2 Recommendation .................................................................................................... 30 4.2.1 Recommendation to the company.................................................................... 30 4.2.2 Recommendation to the university .................................................................. 31 ENGINEERING SIGNIFICANCE OF INTERNSHIP .................................................... 33 REFERENCES ................................................................................................................. 34 APPENDIXES.................................................................................................................. 35
  • 9. Final Internship Report DTU-CEng Page ix Pr. By: Nahom B. 0 1 0 LIST OF FIGURES Pages Figure 1.1.Overall organizational structure. ....................................................................... 4 Figure 1.2.Flowchart........................................................................................................... 7 Figure 2.1.Site plan of the project....................................................................................... 8 Figure 2.2.Executive Hotel No-2 archicad. ........................................................................ 9 Figure 2.3.Entrance card to the site. ................................................................................. 10 Figure 2.4.Concrete mixing simulation. ........................................................................... 12 Figure 2.5. Ground bottom slab concrete leveling.. ...................................................... 13 Figure 2.6.Gauge box........................................................................................................ 16 Figure 2.7.Staircase........................................................................................................... 18 Figure 2.8.Columns to be casted....................................................................................... 19 Figure 2.9.False work. ...................................................................................................... 21
  • 10. Final Internship Report DTU-CEng Page x Pr. By: Nahom B. 0 1 0 LIST OF TABLES Pages Table 2.1 Workflow in the Section................................................................................... 11 Table 2.2 Mixing Ratio..................................................................................................... 16 Table 2.2 Time of Removing Formworks......................................................................... 23
  • 11. Final Internship Report DTU-CEng Page 1 Pr. By: Nahom B. 0 1 0 CHAPTER ONE 1. COMPANY PROFILE Introduction Background of Seid Ahmed Nur Construction PLC 1.1 Brief history of the company Seid Ahmed Nur Construction PLC was established in 1984 E.C to fulfill the construction needs of the owner of the company. The company has got its title after the name of the owner Seid Ahmed Nur. At that moment, the company could have built different buildings that belong to the owner. Ato Seid Ahmed Nur, the owner of the company, has started to construct buildings and civil works for himself with an Italian engineer named Fikadu Bantuma. At the beginning, the company could have built Plaza Hotel (named now Palace Hotel), in Adama city Kebele 09. The construction of this hotel takes around two years and it costs about 800,000 birr. After then, the company continued to build four projects with each 2 million birr like „„Nur Gebeya‟‟ (Kebele 19), “Wulesh Giby” (Kebele 20) and others since 1986 E.C. In 1988 E.C, the company reorganized itself and had got Class 6 License and built Nur Paisa (Kebele 07, where the office of the company is found/) and Soap Factory (Kebele 13) for the owner. Each of these works cost around 6 million birr. These all the above buildings and civil works belongs to the owner of the company, Ato Seid Ahmed Nur. Thus, the company had stayed on constructing its own projects for more than 9 years. During this time, the contractor had increased its capital in a great rate. After then, the company started to construct buildings, Olympic Hotel and Mereb Buildings that are not belongs to the owner of the construction company in 1993 and 1994 E.C. Starting from1994 E.C, for about seven years, the company had passed a remarkable time to support governmental institution. During this time, the company provides police stations, meeting halls, and other governmental buildings that are now giving services to the people in almost more than five kebeles of Adama City. In the construction of these
  • 12. Final Internship Report DTU-CEng Page 2 Pr. By: Nahom B. 0 1 0 governmental institution buildings, the company was not profitable; it did it for the supporting of the government in fulfilling society‟s needs. And then, the construction company could have been built trade centers, named in common Arada that contains five trade centers like Cherka Trade Center(G+3), and other four similar with Cherka. Each costs 2 million birr and a total of 10 million birr in 2002 E.C. These trade centers are now giving services to the society. At the end of 2003 E.C, Nur City Center has been built with a budget of ETB 21 million. Mereb Hotel (ETB 17 million project), and Olympic Hotel (G+8) had been constructing since the end of 2004 E.C. At the mid of 2005 E.C, the company has started to build MuluYerer Hotel (B+G+6). And also the company has had projects in different places like a 3 million birr projects in Addis Ababa city. In 2006 E.C, the company had started to construct Pasta and Macaroni Factory in Addis Ababa, trade center and ware house in Adama City located in Kebele 07 and 16, respectively. The site in which I was practicing my internship program is a 2 basement and a 15 storied hotel named, Executive Hotel Number 2, located in Kebele 09, Adama, Ethiopia. The client of the project is Executive Hotel PLC. The consultant of this project is Hailegabreil Architectures and Consultancy PLC. Generally, the company has played a great role in providing different accesses in the development of the country. 1.2 Mission, vision, and goal of the company 1.2.1 Mission of the company  Solving the country‟s infrastructure problems like road, and housing.  Play a significant role in the construction sector.  Take an active part in the nation‟s real estate development; thus, ensuring maximum customer satisfaction. By making sure these objectives are met, the company‟s mission is “to make its presence felt in the development of the Country‟s economy and the preservation of its social values while remaining target full in the dynamism of the business world.
  • 13. Final Internship Report DTU-CEng Page 3 Pr. By: Nahom B. 0 1 0 1.2.2 Vision of the company  Observing a developed, beautiful and internationally competitive country.  Being active and leading actor of the Ethiopian development.  To be a very competent construction company on different civil works across the country.  To have a license of class one construction company.  To work on Highway and Water work projects.  Construct reliable, standardized and quality buildings. 1.2.3 Goal of the company  Infrastructure developments like buildings, roads, etc.  Industry development. 1.3 Main products of the company On the end of the construction the company's main product will be Executive Hotel Number 2. 1.4 End users of the company’s product The company produces its products to the society like residential, recreational, industrial and institutional structures which are single and multi-storied buildings to satisfy the needs of society. Generally the end users or costumers are the community or the society as a whole.
  • 14. Final Internship Report DTU-CEng Page4 Pr. By: Nahom B. 0 1 0 1.5 Overall organizational structure The number of permanent employees in the company both in office and at the project sites are more than 250 and the number of daily labors vary according to the project site and the type of work to be executed. For example, up to 50 temporary workers are engaged at Executive Hotel Number 2 project site, and around 35 temporary workers are engaged at Adama Steel and Nail Factory Group owned business centerproject site. Figure 1.1.Overall organizational structure. Company Address The company currently maintains its head quarter in Adama, Ethiopia on Eagle Tower 4th floor office number 404 to 408. Contact Address: TEL: +251930107826 +25122589564 E-mail: seidnur2008@gmail.com General Manager Audit Legal Service Engineering Structural Electrical Mechanical Contract Administration and Supervision Site Coordinating Quantity Surveying Site Supervision Finance and Administration Finance Administration Office Assistance
  • 15. Final Internship Report DTU-CEng Page5 Pr. By: Nahom B. 0 1 0 1.6 Manpower and equipment description 1.6.1 Manpower Description A. Project Manager The project manager is the one who manages the whole project throughout the project sites of the company. In new projects he studies the plans before moving to the site in order to make himself familiar with the structures to be constructed. His duty on the project site is dividing the site into manageable units or sections by assigning engineer or Forman depending on the type of work and work volume, and then allocates the resources according to the needs. He gives special attention to avoid wastage of materials while allocating resources. Another duty of project manager is preparing meetings, with different section heads for reviewing schedules; evaluate performances, better understanding of problems and solutions, and recollection of resources, removal of doubts, acceleration of plans etc. Closer monitoring of the site activity is another important task of the Project Manager to check all progresses are according to the plan. In general, the project manager acts as a leader, planner and decision-maker. B. Site Engineer Control all the construction activities on the site starting from the very beginning. In construction sites, depending on the schedule given by the project manager, the site engineer;  Set outs the site,  Check the excavation and earthworks are according to specification and drawings,  Check the construction of all structural and finishing works,  Make all necessary reports to the Project Manager, including all activities on the site and materials used on the construction site.  Strictly follows the given time schedules in order to avoid any delaying on the project completion time. C. Office Engineer Collect data by the supervisor or data collector, from the site, then compile and analyze these data to prepare Payment certificate  Monthly  Weekly
  • 16. Final Internship Report DTU-CEng Page6 Pr. By: Nahom B. 0 1 0 He also makes reports to the project manager and makes detail drawings to be easy for construction and provide it to surveyor, Foreman or any concerned section. D. Foreman Acts as the agent‟s right hand man for the execution of the work at the field, his duty is to keep the work moving ahead as the agent has planned it. He often has much authority on the site, and is often astonishingly capable from their long experience of construction. On many civil engineering works the Foreman is the key person in charging the construction. E. Store Keeper Control the amount and type of materials entering and leaving the store. F. Data Collector Collect data about the daily work activities including the type and amount of material used, the type and number of workers participated on a given work. To summarize the above work flow, all the work men and the machineries mentioned above are organized under the project manager effective management, and will complete the projectaccording to its schedule, within agreed time and within its budget, for its intended purpose and services. 1.6.2 Machineries and Equipment of the Company The company has fulfilled different machineries and equipment which are vital to the construction industries as a class four contractor. These are:  3 dump trucks  1 crusher  4 mixers  1 loader  3 pick ups  More than 10 vibrator
  • 17. Final Internship Report DTU-CEng Page7 Pr. By: Nahom B. 0 1 0 1.7 General workflow of the company The general work-flow of Seid Ahmed Nur Construction PLC is shown in figure below. Exact information about the number and job descriptions of each and every company employees cannot be provided because of privacy policy of such a sensitive institution and because of the very large number of employees. Figure 1.2.Flowchart Project manager Site engineer Office engineerAdministration Secretary Data collector Quantity surveyorStore keeper Time keeper General Forman Sub-contractor Forman Carpenters Bar benders Daily laborer Electrical Mons Mechanical Sanitary Surveyor
  • 18. Final Internship Report DTU-CEng Page8 Pr. By: Nahom B. 0 1 0 CHAPTER TWO 2. OVERALL INTERNSHIP EXPERIENCE Introduction: Project Description Internship Site: Executive Hotel No. 2; Ground+15-2Basement; Located in Kebele 09, Adama, Ethiopia. Client:Executive Hotel PLC Consultant:Hailegabreil Consultancy PLC Initial Cost: 60 Million ETB Figure 2.1.Site plan of the project. This site has consisted two blocks of the same structural integrity. Mat, combined, and isolated types of foundations had been executed. Thus, they excavated the soil in both bulky, and pit forms. Expansion joints have been used to differentiate the blocks.
  • 19. Final Internship Report DTU-CEng Page9 Pr. By: Nahom B. 0 1 0 Figure 2.2.Executive Hotel No-2 archicad. 2.1 Brief on how I get into the company I was given an application letter for proposing a company to heir me as an intern. This letter was prepared and dispatched for internship candidate students from Debre Tabor University Industry Linkage Office when 3rd year academic schedule is about to end. I, my friends, and my family members have submitted several copies of this letter for illegible university industry linkage companies and as a chance many of the application was accepted. Tulu Bolo Town Municipal Office, Sunshine Real State PLC, and Seid Ahmed Nur Construction
  • 20. Final Internship Report DTU-CEng Page10 Pr. By: Nahom B. 0 1 0 PLC were best examples of industries that have shown willingness. My friend Tibebu Abera and my brother Getachew Balcha were the controversial peoples in which they are the ones who submitted the letters for Seid Ahmed Nur Construction PLC, and Sunshine Real State PLC, respectively. Although, the acceptance confirmation letter, from the companies I have granted, was given back to me after I have started fourth year academic year through email. In this academic year of first two months, we candidate interns have been asked to submit the confirmation letter. By the time the confirmation letter I have in my hand and submitted to the DTUUIL‟s was Sunshine Real State PLC‟s. Thanks to the DTUUIL office we are given a chance to reconsider and submit other alternative companies. Timely my friend Tibebu had able me to have the acceptance confirmation paper of Seid Ahmed Nur Construction PLC there I have submitted it. We were given an entrance card to the project site. Figure 2.3.Entrance card to the site. 2.2 Section of the company I have been working When I arrive at the site I ask to the company supervisor and other workers of the company to get my own specific task, but they were not voluntary. Instead of giving my own specific task they told me to participate in every work task. Therefore, my decision was to participate at the site work. This site has consisted of two blocks of the same structural integrity. Mat, combined, and isolated types of foundations had been executed. Thus, they excavated the soil in both bulky, and pit forms. Expansion joints have been used to differentiate the blocks.
  • 21. Final Internship Report DTU-CEng Page11 Pr. By: Nahom B. 0 1 0 2.3 Work-flow in the section The work-flow of Seid Ahmed Nur Construction PLC at Executive Hotel Number 2 is presented in the table below. Table 2.1 Workflow in the Section Item Number Job/ Career Total Amount 1 Project Manager 1 2 Site Engineer 3 3 Foreman 5 4 Office Engineer 3 5 Store Keeper 2 6 Guard 2 2.4 Work pieces that I have been executing 2.4.1 Concrete work There are a variety of concrete services available for residential and commercial construction. Concrete had been prepared using the batching plant which is fixed in the site. Most concrete classes used are Reinforced concrete in C-30 (with a 28 day 150mm cube crushing strength of 30MPa), cast into form-works and vibrated around rod reinforcement bars. (Form- work&reinforcement bars are measured separately.
  • 22. Final Internship Report DTU-CEng Page12 Pr. By: Nahom B. 0 1 0 Figure 2.4.Concrete mixing simulation. And for the concrete road a special concrete type which has its own mix ratio and for lean concrete C-5 is used. After the mixing process is completed in the batching plant the fresh concrete is transported by Truck Mixers to the required place. In the concrete there are different types of admixture are added to for different purpose. For instance „repair mortar‟ is added to concrete to made the ground more level and avoid crack.
  • 23. Final Internship Report DTU-CEng Page13 Pr. By: Nahom B. 0 1 0 Figure 2.5.Ground bottom slab concrete levelling. Advantages of concrete work a. Concrete has a high compressive strength compared to other building materials. b. Fire and weather resistance of concrete is fair. c. The concrete building system is more durable than any other building system.
  • 24. Final Internship Report DTU-CEng Page14 Pr. By: Nahom B. 0 1 0 d. Concrete, as a fluid material, in the beginning, can be economically moulded into a nearly limitless range of shapes. e. The maintenance cost of concrete is very low. Disadvantages of concrete work I. Compared to other binding materials, the tensile strength of concrete is relatively low. II. Concrete is less ductile. III. .The weight of compared is high compared to its strength. IV. Concrete may contains soluble salts. Soluble salts cause efflorescence. Types of Concrete Properties of Concrete  Grades (C20, C25, and C30 etc.):-Concrete is known by its grade which is designated as C15, C20 etc. in which letter M refers to concrete mix and number 15, 20 denotes the specified compressive strength (fck) of 150mm cube at 28 days, expressed in N/mm2.  Compressive strength: - the strength of the concrete is also a quality which varies considerably for the same concrete mix. Therefore, a single representative value, known as characteristic strength is used.  Characteristic Strength:- It is defined as the value of the strength below which not more than 5% of the test results are expected to fall (i.e. there is 95% probability of achieving this value only 5% of not achieving the same).  Tensile strength  Durability  Creep:- is defined as the plastic deformation under sustain load. Creep strain depends primarily on the duration of sustained loading. According to the code, the value of the ultimate creep coefficient is taken as 1.6 at 28 days of loading.  Shrinkage:- is the property of diminishing in volume during the process of drying and hardening is termed Shrinkage. It depends mainly on the duration of exposure. If this strain is prevented, it produces tensile stress in the concrete and hence concrete develops cracks.  Defects in Concrete Work
  • 25. Final Internship Report DTU-CEng Page15 Pr. By: Nahom B. 0 1 0 Chemical attack Chemical attack can occur because concrete is alkaline and chemically reactive. It can be attacked by acids; some alkalis; numerous salt solutions; and organics such as fermenting liquids, sugars, and animal oils, especially if they contain free acids. Seawater will attack concrete. Crazing This is a network of very small surface cracks usually spreading out over large areas or the entire surface. Crazing is caused by finishing the concrete with bleed water on top. Efflorescence Efflorescence is more likely to be found on concrete that has been in place for a while. Concrete contains water-soluble salts. As water from the interior of the concrete migrates to the surface and evaporates, salts are deposited on the surface, usually as a white stain.  Concrete mix ingredient There are three basic ingredients in the concrete mix: A. Ordinary Portland Cement: - is the most common cement used in general concrete construction when there is no exposure to sulphates in the soil or groundwater. B. Water: - is being used potable tap water. C. Aggregates (rock and sand)  Site Quality Test of Concrete Ingredient  Concrete Mix Design: - is the process of finding the proportions of concrete mix in terms of ratios of cement, sand and coarse aggregates. For e.g., a concrete mix of proportions 1:2:4 means that cement, fine and coarse aggregate are in the ratio 1:2:4 or the mix contains one part of cement, two parts of fine aggregate and four parts of coarse aggregate. The concrete mix design proportions are either by volume or by mass. The water-cement ratio is usually expressed in mass. Batching by weight is being used to measure materials to attain the right proportion of mixing concrete. Due to batching there are different kinds of concrete classes such as C-5, C-25, C-30, and C-35 in the site we are practising.
  • 26. Final Internship Report DTU-CEng Page16 Pr. By: Nahom B. 0 1 0 Table 2.2 Mixing Ratio Concrete Class Ratio Box Dimension(cm3 ) Uses C-5 1:5:7 20*40*50 Lean Concrete C-25 1:2:3 18*40*50 Footing Pad, Grade Beam C-30 1:2:3 16*40*50 Footing Column, Slab C-35 1:2:3 13*40*50 Elevation Column, Shear Wall Figure 2.6.Gauge box. Curing and casting of fresh concrete Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration. Curing by continuously wetting the exposed surface; thereby, preventing the loss of moisture from it. 2.4.2 Substructure work Substructure Works had been executed when I arrive in the site. 2.4.3 Superstructure work A superstructure is the portion of the structure that is above ground level that receives the live load is referred to as Superstructure. The superstructure of a building is the part that is entirely above its foundation or basement. 40cm 50cm m
  • 27. Final Internship Report DTU-CEng Page17 Pr. By: Nahom B. 0 1 0 2.4.3.1 Types of beam Beams: - are generally horizontal structural members which transfer loads horizontally along their length to the supports where the loads are usually resolved into vertical forces. Beams are used for resisting vertical loads, shear forces and bending moments. Different types of beams can be classified based on the type of support. The four different types of beams are: i. Simply Supported Beam ii. Fixed Beam iii. Cantilever Beam iv. Continuously Supported Beam i. Simply Supported Beam If the ends of a beam are made to rest freely on supports beam, it is called a simple (freely) supported beam. ii. Fixed Beam A beam fixed at both ends. iii. Cantilever Beam A beam that is fixed at one end and the other end is free. iv. Continuously Supported Beam Here more than two supports are provided to the beam. All the above types of stair cases are being constructed in our site. 2.4.3.2 Types of stair Stair: - A staircase or stairway is one or more flights of stairs leading from one floor to another, and includes landings, newel posts, handrails, balustrades and additional parts. Dogged-legged Stair This stair consists of two straight flights of steps with direct turns between them. This stair is very useful where the total width of the stair is just twice the width of the steps.
  • 28. Final Internship Report DTU-CEng Page18 Pr. By: Nahom B. 0 1 0 Figure 2.7.Staircase. 2.4.3.3 Types of Column Column: - is a structural element that transmits, through compression, the weight of the structure above to other structural elements below. In other words, a column is a compression member. Columns are frequently used to support beams or arches on which the upper parts of walls or ceilings rest. Landing Flight
  • 29. Final Internship Report DTU-CEng Page19 Pr. By: Nahom B. 0 1 0 Figure 2.8.Columns to be casted. Types of columns can be listed based on material used, function, shape and structural configuration. Material: Stone, Timber, brick, concrete, steel. Function: Building columns, platform supporting columns, portico/canopy supporting columns, equipment supporting columns, free standing posts, or poles, pilot‟s, etc Shape: Solid, hollow, laced, battened, rectangular, square, circular, octagonal, hexagonal, hollow, fluted, ornamental columns like ionic, Doric, Corinthian single stepped, double stepped, rolled shape, or built up with plates, Structural configuration: braced, unbraced, fixed base columns, pinned base columns, short columns, long columns (based on slenderness) Plumb bob “Catcher” Form work Bracings Cravat
  • 30. Final Internship Report DTU-CEng Page20 Pr. By: Nahom B. 0 1 0 2.4.3.4 Types of Slab Slabs: -are constructed to provide flat surfaces, usually horizontal, in building floors, roofs, bridges, and other types of structures. The slab has been supported by walls, by reinforced concrete beams, and by columns. This project has used one way rigid slab. Based on length and breadth of Conventional Slab is classified into two types: 1. One-Way Slab 2. Two-Way Slab 2.4.3.5 Types of Wall Wall: -A wall is a structure that defines an area, carries a load, or provides shelter or security. There are many kinds of walls. Shear Wall: - is a structural system composed of braced panels to counter the effects of lateral load acting on a structure. Wind and seismic loads are the most common loads that shear walls are designed to carry. 2.4.4 Aggregate Works Aggregate is a broad category of coarse to medium grained particulate material used in construction, including sand, gravel, crushed stone, slag, recycled concrete and geosynthetic aggregates. Aggregates are the most mined materials in the world. Aggregates are a component of composite materials such as concrete and asphalt concrete; the aggregate serves as reinforcement to add strength to the overall composite material. Aggregates are the most massed ingredient in making of concrete (up to 70 percentages). It is being bought from suppliers.
  • 31. Final Internship Report DTU-CEng Page21 Pr. By: Nahom B. 0 1 0 2.4.5 Temporary Structure Work Temporary works are defined as parts of the works that allow or enable construction of, protect, support or provide access to, the permanent works and which might or might not remain in place at the completion of the works. False work  False work is a temporary works used to support a structure during construction including any plant required and form-work and panels of concrete. It is also used to support the slabs and beams. Procedures  Measure the height of the room to be constructed on the given floor.  Drive a nail into the column and tie a string around all columns.  Check that whether it is water level or not.  Prepare the vertical supports i.e. props and “cristy”.  Erect the vertical supports and tie them with the columns using wooden “purlin”.  Lay the soffit and side form-works i.e. the suspended part of the beam  Fasten a horizontal member called “modeno” with the top edge beam form-work supported by a vertical member called “ponte”. Then, Check whether it is water level or not and provide other horizontal member called “firgrig” between the previous horizontal member. Figure 2.9.False work. “Cristy”
  • 32. Final Internship Report DTU-CEng Page22 Pr. By: Nahom B. 0 1 0 Form work Form work is a temporary construction material used for mould a structure with a required shape and dimensions and support it until it harden sufficiently to become self supporting. After the concrete has sufficiently set and harden the form-work is removed. Form-work may steel or wooden material with desired shape. There are different types of form- works used in the construction industry in the construction site.It can be;  Plywood (timber):- Ply wood timber with its cross- grained structure provides strong and reasonable economic.  Hard board (Oil tempered):- Almost impermeable, this material will give the concrete a uniform surface colour, but with inevitable blow holes.  Steel or panel: - These are different dimensions and angles. Steel form-work has many advantages. Such as;  It can be put to high number of use crate surface.  It possesses greater rigidity.  I have got the opportunity to observe the construction of formworks for footing pads, beams, columns, slabs, shear wall and stair in our project site. They use both steel and timber form-works. Procedures to set-up form-works  Spacers of required dimension are tied along the longitudinal reinforcement bars of the structure to be casted to give the required clear cover  Panel of required dimension and angle are placed along the face of the spacers provided earlier. These panels are provided s  It provides ease of stripping (removing)  It ensures an even and smooth con  On both directions (back and front) in a good manner shaped.  The duration of removal of this form-work depends on the type of structure to be casted i.e. whether it is a vertical (column, retaining wall & shear wall) or horizontal (slab & beam). Where, 24 hour period is enough for vertical structure while it is longer (14-28 days) for horizontal structures.
  • 33. Final Internship Report DTU-CEng Page23 Pr. By: Nahom B. 0 1 0  The time between the castings of the concrete to the dismantling of form-work depends on the strength development of the concrete and on the function of the form-work.  The time between casting and removals of the form-work depends on mainly on the strength developments of the concrete and on the function of the form-work the following minimum period of the recommended. In our case we have been using the following period. Table 2.2 Time of Removing Form-works Form-work Curing Time Vertical member (columns and shear wall) Sides of beams 1 day (24 hr) 1 day (24 hr) Soffit of beams Soffit and/or props of slabs 21 day 21 day A good form Work should satisfy the following requirements.  The form work should be strong enough to carry safely the dead load of the wet concrete placed on it, and the live load from the men and machines used in placing the concrete in position.  It should be practically water proof so that it does not absorb water form concrete.  The joints between forms should be smooth, so that no unwanted surface irregularities are apparent on the finished unit.  A form work should be re-used as many tines as possible.  A form work should be free from bent, cracking, and straight and strong.  8. Bracing  It is used to fix the panels in position. Without bracing s there is no way that the panels will withstand the pressure that from the concrete.
  • 34. Final Internship Report DTU-CEng Page24 Pr. By: Nahom B. 0 1 0 Scaffoldings Scaffoldings are used as a temporary staircase, and for placing wooden formworks which are used as a walkway for the workmen. Scaffoldings are constructed from:  Steel/prop  Wood  Eucalyptus trees Spacer Spacers are made up of concrete that secures the reinforcing steel or rebar in reinforced concrete structures as the rebar is assembled in place prior to the final concrete pour. The spacers are left in place for the pour to keep the reinforcing in place, and become a permanent part of the structure. 2.4.6 Reinforcement works In the site there is a bar shop in which bar bending, cutting and making of skeletons of structures like colons, beams and slab meshes are prepared then the structures skeletons are transported to the required place. The process of the work in the compound is that the engineer will print out the required structure bar schedule and give to the bar Foreman then the Foreman will order to prepare the bar. Here also the task given to me was checking the work performed with the structural drawing. In this department the weakness I observed is that to be reluctant to be economical. 2.4.7 Surveying In the site surveying work is decisive work sector because for instance to place, grade and compact select material to check the level of the colons, in the construction of the concrete road, trench and pit excavation, levelling work, steel structure work, ditch lines, septic tanks, sanitary lines are among works which highly require the aid of the surveying work(total station, and levelling) on the other hand when participating in surveying work since it will touch different work types help to collect additional skill on the other work fill.
  • 35. Final Internship Report DTU-CEng Page25 Pr. By: Nahom B. 0 1 0 The challenge I have been encountered on this sector was lack of communication between I and the assistances alongside me because in the compound they have their own communication words, gestures, and sign languages. But gradually with the aid of senior surveyors I learnt the local words and communicate simply. Carpentry The carpentry in the site includes form-works for; foundation pad and columns, grid beam, elevation colons, for slab and staircase (“soffit”form-work), scaffolding work (crusty).The most form-works are made of Swan “Zigiba” wood because of this they are “use and through” means once they used it is not possible to re use the wood. In this area the task which is given by my supervisor was to check whether the drawing and the work practically performed match or not and to check the dimensions, straightness, attachment and other quality of the work and if any mistake there I inform to the responsible party and take a correction action. 2.5 Major challenges encountered During my intern-ship period especially on the first two week the challenges I faced was; 1- Difficulty in understanding of the local working words like “Linga”, “Crusty”, “Fondo”, “Sponda”, and “skuadra” etc.. 2. Misunderstanding, and some workers were not happy to accept interns‟ suggestions. 3. The contractor has different projects at different sites, and this makes them not to able to finish on scheduled time. 2.6 Solutions for the challenges For the first challenge mentioned above the measure I had taken was to ask and study those strange words from the worker. In this regard I succeeded within a short period of time and communicate with the workers. In fact, humans by nature are not happy when they are told their mistakes even if it depends on how it is being told. Thus, I criticize them individually and my relation becomes smooth.
  • 36. Final Internship Report DTU-CEng Page26 Pr. By: Nahom B. 0 1 0 CHAPTER THREE 3. OVERALL BENEFITS I GAINED FROM THE INTERNSHIP Introduction There were lots of benefits that I have gained from my internship program. Since it was my first practical experience everything there was new and important to me. I mentioned the benefits in terms of:  Practical skills  Theoretical knowledge  Interpersonal communication skills  Team playing skills  Leadership skills  Work ethics related issues  Entrepreneurship skill 3.1 Benefits I gained in terms of improving my practical skills This program gave me many opportunities to test and refine my skills. To make theoretical knowledge applicable and to make it practical skill there should be a chance like this. This program helps me to build and improve my confidence in construction tasks. Some of the things that help me to improve my practical skills are:  Different site works are performed continuously that I have learned in theoretical classes.  The theoretical lessons that I take before the internship.  My motivation and ambition to know for new things.  The best relation I have had with the site crew. 3.2 Benefits I gained in terms of upgrading my theoretical knowledge This program helped me to strengthen my theoretical knowledge. All the courses I have had taken except some of them, focused on theoretical part. Since the practice depends first on theory, it is easy to work for the one having good theoretical base. In addition to that when I was
  • 37. Final Internship Report DTU-CEng Page27 Pr. By: Nahom B. 0 1 0 practicing I relate the theory with the practical matter, so at this time it helps to me in upgrading my theoretical knowledge. Generally speaking, my theoretical knowledge got strengthen more by those practical techniques invested on site. 3.3 Benefits I gained in terms of improving my interpersonal communication skills Since construction work is a team work by its nature there are different individuals with different professions and personalities come up together and communicate with each other to solve different problems and run the whole work, so here good interpersonal communication skill will bring success. By the time I started the intern-ship program I was not able to know how to deal with people at the work place that I did not know the way to communicate with different worker. It was difficult to me to communicate with the workers. But afterwards I believe that good relation and communication skill is the key for getting the experience and knowledge require for the intern- ship program. Based on this I tried to change my approach to the people at the work place and through time I was able to saw progress on myself. So as a conclusion I can say that I have got good lesson regarding communication skill while my stay in the company for the intern-ship program. I used to have different discussions with my friends who are intern students and the workers at the site. During discussions different ideas are raised. Through such team work, it was easier to address problems emerging. Therefore it becomes easy for me to improve my interpersonal communication skill. 3.4 Benefits I gained in terms of improving team work skill Team work is the way of success and strength. I learnt that as part of a team, an engineer should have to works with a positive attitude within a group for the success of a project. When called upon to lead, an engineer must have good managerial and team playing skill. Therefore, I try to improve my team playing skill in order to be successful engineer. Confident engineers are able to succeed by gaining the trust of co-workings. Generally speaking I know that an engineer with good team playing skill has the following qualities.  Demonstrates reliability
  • 38. Final Internship Report DTU-CEng Page28 Pr. By: Nahom B. 0 1 0  Communicates constructively  Listens actively  Functions as an active participant  Shares openly and willingly  Cooperates and pitches in to help  Exhibits flexibility 3.5 Benefits I gained in terms of improving my leadership skills Leadership is a skill to guide, control and monitor peoples. The intern-ship helps me to improve my leadership talents to future employers, my ability to work well with different types of people and my skills in seeing projects through from start to finish. I have seen how each worker is controlled and organized to perform its day to day activities. Among all other managements I have seen that human resource management is the most important one. I have actually observed the method of controlling the working time and amount of work done by each worker so that the work proceeds according to the work plan. For the time being I didn‟t practice leadership from the higher level. However I meet with an efficient project manager and I grasp a lot of knowledge concerning different issues such as how to treat different persons and how to control the overall activity on the site. Generally regarding leadership skill I have got a good experience. Also to be an effective leadership I understood that personal values like:  Confidence  Effective communication 3.6 Benefits I gained in terms of understanding work ethics related issues Internship helps to me to know the values of the work ethics, so that I try to practice and understand work ethics related issues during my intern-ship.  Punctuality: - means keeping the companies work beginning and ending time and to complete a given task within the given period.  Office Disciplines: - on work place you don‟t have to disturb the working atmosphere. For example abstain from opening loud voice, loud music, songs and things which disturb others workers mood.
  • 39. Final Internship Report DTU-CEng Page29 Pr. By: Nahom B. 0 1 0  Reliability: - the worker should be qualified for the part he is supposed to be performing. He/she must have appropriate skill and knowledge for the task assigned.  Honesty:-Regarding this value each worker regardless of its status should abstain from bad behaviors such as cheating, bias, corruption etc..  Cooperation: - Each worker should interact and cooperate with each other while working. That is because it is through such system problems could be easily solved. 3.7 Benefits I gained in terms of entrepreneurship skills A construction project mainly requires large human, financial, physical i.e. material and equipment resources. Entrepreneurship is defined as special human talent that helps manage those factors of production such as labour, machinery and capital and takes risks of making loses. An entrepreneur is required to establish meaningful relationship between activity and authority which is intimately related to planning function. Human resource management: - Having a quality worker is a must if one needs to be productive. Therefore I have been able to understand that taking responsibility for the safety and well-being of employees in job related activities by providing safety wares like safety shoes &helmet-sand insurances one can attain high level of support from them. Equipment utilization management: - Construction equipment management helps a person to plan implement and monitor construction equipments to:  Enhance optimum utilization.  Increase efficiency or productivity of inputs to the products of the construction.  Harmonize standards and enhance the quality of work.  Financial management: - Wide financial flow is achieved through detailed market studies. A company should also be able to put well qualified and efficient personnel for preparation of contracts and payments. During my intern-ship experience I have been able to grasp ideas about human resources management, equipment utilization and financial flow and also develop self- confidence to play my strength in believing in myself and taking risks in my future career.
  • 40. Final Internship Report DTU-CEng Page30 Pr. By: Nahom B. 0 1 0 CHAPTER FOUR 4. CONCLUSION AND RECOMMENDATION Introduction This section elaborates the recommendation to the organization and the university, and the conclusion of the entire intern-ship report. 4.1 Conclusion I have benefited a lot in the field attachment in a way that I managed to apply the theoretical knowledge from the university into practice through many activities/tasks/assignments. I have improved the skills like interpersonal, listening, presentation skills, acting freely around people, typing skills, accounting, recording, presentation, typing, conflict resolution, organizational skills to mention but a few. I have learnt many lessons which included; how to create an accounting system, how the working environment runs, etc. I have got different ideas from different employees at the organization and also through interacting with other interns from various universities and this contributed a lot on the knowledge and experience. Generally this intern-ship program has played a great role in providing an opportunity to an out- of-classroom learning experience to relate the theoretical knowledge with the practical work. Finally, internship was fun and therefore the students have to encourage Debre Tabor University to continue giving students this opportunity to do their academic requirement of internship from industrial organization. 4.2 Recommendation 4.2.1 Recommendation to the company Facilitation: The management of Seid Ahmed Nur Construction PLC should buy more facilities such as computers, vehicles so as to enable smooth running of the company‟s activities and respond to the dynamic competition environment and globalization. This technological advancement will
  • 41. Final Internship Report DTU-CEng Page31 Pr. By: Nahom B. 0 1 0 enable the organization to change from manual to computerized methods of processing documents and proper record keeping. And the vehicles play role on giving transportation services for the workers of the company. Reliability and giving more careers to interns: I would suggest the Organization to continue giving intern-ship placements to as many students as they can because some miss this experience which is also important requirement of the university. Allowances: The organization should give allowances to interns most especially transport allowances. Most students stay far from the intern-ship places; hence, being on the site and attending the intern- ship program increases their expenses. Therefore, I recommends the organization to put that in to action in order to motivate interns and boost their productivity levels in performing their tasks during the field attachment. Serious supervision to the workers: The organization should increase and ensure more supervision over the employees in order to work effectively and also eliminate workers who relax, work lazily and perform actively after seeing their supervisors. Job enlargement: The management of should also carry out job enlargement and enrichment to newly graduating students. This will ensure good industrial relations between the company and education ministry subordinates. 4.2.2 Recommendation to the university Constant supervision of students: The intern recommends the university to carry out constant supervision and monitoring of students during the internship training so as to encourage them to perform the duties fully and also accurately. This will also put a close link between the academic supervisors and the field supervisors so as to foster appropriate assessment of what the interns are doing in the field. Secure internship placements for students:
  • 42. Final Internship Report DTU-CEng Page32 Pr. By: Nahom B. 0 1 0 The university should help students to secure intern-ship positions according to their respective programs undertaken at the university through giving students recommendations in order to ease their training periods and also avoid the ache gotten by students in search of intern-ship placements. Should continue this program: This is because it helps to prepare the students for their careers in future and also enable the students to practice the theoretical knowledge obtained during class be exercised practically. It also helps to develop students understanding of work ethics, employment demands, responsibilities and opportunities. Curriculum should be revised: Courses that should be pre-given before the intern-ship program did not taught, and that made us not to compete and be a student that a company relies on.
  • 43. Final Internship Report DTU-CEng Page33 Pr. By: Nahom B. 0 1 0 ENGINEERING SIGNIFICANCE OF INTERNSHIP The potential benefits we students of participating in the engineering internship program includes the following:  gain meaningful engineering experience to complement academic studies;  develop a professional attitude that is reflected in the performance of responsibilities and tasks, and learn about the importance of professionalism in the real world;  assess a future employer;  obtain more interesting and satisfying jobs because of the internship experience;  stand out from other graduates in the eyes of employers;  earn money while gaining valuable experience;  Use the activities carried out during an internship term as the basis of a fourth-year thesis.
  • 44. Final Internship Report DTU-CEng Page34 Pr. By: Nahom B. 0 1 0 REFERENCES 1. Zeleke W. et al. 2007 E.C. Technical Report Writing and Research Methodology Course Module. Debre Tabor University. Debre Tabor, Ethiopia. 2. Yitayal T. 2008 E.C. Building Construction Course Module. Debre Tabor University. Debre Tabor, Ethiopia. 3. Esmail Aragaw. 2005 E.C. Final Internship Report. Hawassa University. Hawassa, Ethiopia..
  • 45. Final Internship Report DTU-CEng Page35 Pr. By: Nahom B. 0 1 0 APPENDIXES Appendix A Duties and responsibilities of workers. 1) “Anatsi”= stands for carpenter, who executes wood works. 2) “Ginbegna”= stands for masons, who executes masonry works. Appendix B Name and use of materials on site. 1. “Armata”= Concrete composed of aggregate, cement, and water. 2. “Kiset”= Stanger used to keep the strength of the form-work to stable the level. 3. “Tumbi”= Plumb Bob used as levelling or uses to keep the vertical alignment of a structure like column.