Presentation Outline
2
• Introduction
• Present Condition of Bangladesh
• Rooppur Nuclear Power Plant
• RNPP at a Glance
• Safety Standards for RNPP
• A video clip on RNPP
• Conclusion
11/26/2016
Introduction
3
Main Plant Construction of Rooppur Nuclear Power Plant, Bangladesh going to
Start
11/26/2016
4
Introduction
11/26/2016
Present Condition of Bangladesh
5
Source- official website of Bangladesh Power Development Board
link - http://www.bpdb.gov.bd/
11/26/2016
Present Condition of Bangladesh
611/26/2016
Present Condition of Bangladesh
Source- Workshop on Energy Assessment and Pre-feasibility/feasibility
Studies for Nuclear Power Program
link - http://www.iaea.org/NuclearPower/Downloadable/Meetings/2014/2014-03-17-03-21-
WSINIG/DAY1/COUNTRY/Bangladesh_Presentation_at_Korea_17-21_March_2014.pdf11/26/2016 7
So, what do we do?
8
Nuclear can be a solution.
11/26/2016
Ruppur Nuclear Power Plant
 In 1961, first proposed to build a
nuclear power plant.
 Accordingly that year Govt.
acquired 253.90 acre of land in
Ruppur in Pabna district.
In 1963, the plant was approved.
911/26/2016
Rooppur Nuclear Power Plant
 After the independence in
1974 Bangladesh Govt.
started discussion with
Russia, which was not
successful.
 Finally, in February 2011,
Bangladesh got an
agreement with Russia to
build RNPP.
1011/26/2016
Ruppur Nuclear Power Plant
 The inter-govt agreement (IGA)
was officially signed on 2
November 2011.
 Prime Minister of Bangladesh (
Sheikh Hasina ) laying the
foundation stone of Bangladesh’s
first nuclear power plant on 2
October 2013.
1111/26/2016
RNPP at a Glance
 Capacity : 2400MW with two units
of 1200 MW each.
 Technology: VVER-1200 ( Water-
Water Energetic Reactor), Russian.
 Generation of Reactor: GEN-III+
 Fuel: 235 Uranium Dioxide.
1211/26/2016
RNPP at a Glance
 Construction by: State Atomic
Energy Corporation, Rosatom, Russia.
 Cost of the Project: $12.65 billion
Russia: $11.385 (90%)
BD : $1.265 (10%)
 Opening: Targeted Launch of 1st unit
in year 2022 and 2nd in year 2023.
 Longevity: 60 years and extend to
another 20 years.
1311/26/2016
Safety Standards for RNPP
Third-generation technology .
Protected by Five layers of security.
“Post-Fukushima” safety features(
can work for 72 hrs in any critical or
emergency Sit).
Russia will take back the nuclear
waste generated by the plant.
1411/26/2016
Rooppur Nuclear Power Plant Video Clips
Video Clips
1511/26/2016
Conclution
16
Feasible if fulfilled all standards. Safety has to be
the main concern than economic facts. Countries
long term benefit has to be ensured in all
contracts from all sides. A Bangladeshi nuclear
specialist team has to be raised.
11/26/2016
Any Question?
1711/26/2016

More Related Content

What's hot

Power generation and demand in bangladesh
Power generation and demand in bangladeshPower generation and demand in bangladesh
Power generation and demand in bangladesh
Galib Ghani
 
Roopur power plant and iran nuclear conflict
Roopur power plant and iran nuclear conflictRoopur power plant and iran nuclear conflict
Roopur power plant and iran nuclear conflict
Imran Sajol
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
ADITYA ARYAN
 
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Sarmad Adnan
 
Hydro Power Plant (P)
Hydro Power Plant (P)Hydro Power Plant (P)
Hydro Power Plant (P)
Gaurav Maniar
 

What's hot (20)

Power generation and demand in bangladesh
Power generation and demand in bangladeshPower generation and demand in bangladesh
Power generation and demand in bangladesh
 
Nuclear power plant in bangladesh
Nuclear power plant in bangladeshNuclear power plant in bangladesh
Nuclear power plant in bangladesh
 
Ruppur nuclear power plant
Ruppur nuclear power plantRuppur nuclear power plant
Ruppur nuclear power plant
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Nuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladeshNuclear power-plant-in-bangladesh
Nuclear power-plant-in-bangladesh
 
SNL Small Modular Reactor Program
SNL Small Modular Reactor ProgramSNL Small Modular Reactor Program
SNL Small Modular Reactor Program
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
Roopur power plant and iran nuclear conflict
Roopur power plant and iran nuclear conflictRoopur power plant and iran nuclear conflict
Roopur power plant and iran nuclear conflict
 
Energy in pakistan
Energy in pakistanEnergy in pakistan
Energy in pakistan
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptx
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptxWind Energy in Bangladesh Present Scenario and Future Prospect.pptx
Wind Energy in Bangladesh Present Scenario and Future Prospect.pptx
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
 
Nuclear power
Nuclear                                                         powerNuclear                                                         power
Nuclear power
 
Nuclear power plants in india
Nuclear power plants in indiaNuclear power plants in india
Nuclear power plants in india
 
Hydro Power Plant (P)
Hydro Power Plant (P)Hydro Power Plant (P)
Hydro Power Plant (P)
 
Wapda internship report
Wapda internship reportWapda internship report
Wapda internship report
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 

Viewers also liked

Science fair
Science fairScience fair
Science fair
sora1004
 
How does a projector works
How does a projector worksHow does a projector works
How does a projector works
Kumar Pradeep
 
Gas turbine technology
Gas turbine technologyGas turbine technology
Gas turbine technology
Ashish kumar
 
History of the Calculator
History of the CalculatorHistory of the Calculator
History of the Calculator
P1666
 

Viewers also liked (20)

Future of solar power
Future of solar powerFuture of solar power
Future of solar power
 
Product Market Analysis - Motorcycle
Product Market Analysis - MotorcycleProduct Market Analysis - Motorcycle
Product Market Analysis - Motorcycle
 
Science fair
Science fairScience fair
Science fair
 
Rural electrification using PV: Success Story of Bangladesh
Rural electrification using PV: Success Story of BangladeshRural electrification using PV: Success Story of Bangladesh
Rural electrification using PV: Success Story of Bangladesh
 
History of Calculator
History of CalculatorHistory of Calculator
History of Calculator
 
Study on solar irrigation system in bangladesh
Study on solar irrigation system in bangladeshStudy on solar irrigation system in bangladesh
Study on solar irrigation system in bangladesh
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
How does a projector works
How does a projector worksHow does a projector works
How does a projector works
 
Industrial high temperature hot glue gun
Industrial high temperature hot glue gunIndustrial high temperature hot glue gun
Industrial high temperature hot glue gun
 
Renewable Energy & Overview in Bangladesh
Renewable Energy & Overview in BangladeshRenewable Energy & Overview in Bangladesh
Renewable Energy & Overview in Bangladesh
 
Solar energy by hadi @bau
Solar energy by hadi @bauSolar energy by hadi @bau
Solar energy by hadi @bau
 
Solar cell
Solar cell Solar cell
Solar cell
 
Are you likely to be hit by a drone? (by Anders La Cour-Harbo)
Are you likely to be hit by a drone? (by Anders La Cour-Harbo)Are you likely to be hit by a drone? (by Anders La Cour-Harbo)
Are you likely to be hit by a drone? (by Anders La Cour-Harbo)
 
Gas turbine technology
Gas turbine technologyGas turbine technology
Gas turbine technology
 
Numerical analysis of Vertical Axis Wind Turbine
Numerical analysis of Vertical Axis Wind TurbineNumerical analysis of Vertical Axis Wind Turbine
Numerical analysis of Vertical Axis Wind Turbine
 
The calculator
The calculatorThe calculator
The calculator
 
Rampal Power Station
Rampal Power StationRampal Power Station
Rampal Power Station
 
History of the Calculator
History of the CalculatorHistory of the Calculator
History of the Calculator
 
Anti Matter
Anti MatterAnti Matter
Anti Matter
 
Gas turbines working ppt
Gas turbines working pptGas turbines working ppt
Gas turbines working ppt
 

Similar to Rnpp najmul

Grid solar demo_performance
Grid solar demo_performanceGrid solar demo_performance
Grid solar demo_performance
Sanman Rajput
 
Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...
ProSIM R & D Pvt. Ltd.
 

Similar to Rnpp najmul (20)

Nuclear power in pakistan
Nuclear power in pakistanNuclear power in pakistan
Nuclear power in pakistan
 
Comparison of Nuclear Energy of Bangladesh with India & Pakistan
Comparison of Nuclear Energy of Bangladesh with India & PakistanComparison of Nuclear Energy of Bangladesh with India & Pakistan
Comparison of Nuclear Energy of Bangladesh with India & Pakistan
 
Breakout_Infrastructure of nuclear power plant
Breakout_Infrastructure of nuclear power plantBreakout_Infrastructure of nuclear power plant
Breakout_Infrastructure of nuclear power plant
 
Bangladesh nuclear power facts
Bangladesh nuclear power factsBangladesh nuclear power facts
Bangladesh nuclear power facts
 
Nuclear energy in bangladesh
Nuclear energy in bangladeshNuclear energy in bangladesh
Nuclear energy in bangladesh
 
12 B .Storage CEA.pptx
12 B .Storage CEA.pptx12 B .Storage CEA.pptx
12 B .Storage CEA.pptx
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of India
 
Final report
Final reportFinal report
Final report
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
Grid solar demo_performance
Grid solar demo_performanceGrid solar demo_performance
Grid solar demo_performance
 
presentation vsv.ppt
presentation vsv.pptpresentation vsv.ppt
presentation vsv.ppt
 
China pakistan economic corridor Project
China pakistan economic corridor ProjectChina pakistan economic corridor Project
China pakistan economic corridor Project
 
Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...
 
NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015NPCIL-Summer Training Report-2015
NPCIL-Summer Training Report-2015
 
summer training report on nuclear power corporation of india
summer training  report on nuclear power corporation of indiasummer training  report on nuclear power corporation of india
summer training report on nuclear power corporation of india
 
Presentation to the speech President SE NNEGC “Energoatom” Yuriy Nedashkovsky...
Presentation to the speech President SE NNEGC “Energoatom” Yuriy Nedashkovsky...Presentation to the speech President SE NNEGC “Energoatom” Yuriy Nedashkovsky...
Presentation to the speech President SE NNEGC “Energoatom” Yuriy Nedashkovsky...
 
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
 
Lecture 15_PPE_Unit 5: Nuclear Power Plants
Lecture 15_PPE_Unit 5: Nuclear Power Plants Lecture 15_PPE_Unit 5: Nuclear Power Plants
Lecture 15_PPE_Unit 5: Nuclear Power Plants
 
bhadla solar park.pptx world's largest solar park
bhadla solar park.pptx  world's largest solar parkbhadla solar park.pptx  world's largest solar park
bhadla solar park.pptx world's largest solar park
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Rnpp najmul

  • 1. Rooppur Nuclear Power Plant 1 Submitted by Md. Najmul Hosain MSc in NSE Student ID: 1016280017 11/26/2016 Presentation on Military Institute of Science and Technology (MIST)
  • 2. Presentation Outline 2 • Introduction • Present Condition of Bangladesh • Rooppur Nuclear Power Plant • RNPP at a Glance • Safety Standards for RNPP • A video clip on RNPP • Conclusion 11/26/2016
  • 3. Introduction 3 Main Plant Construction of Rooppur Nuclear Power Plant, Bangladesh going to Start 11/26/2016
  • 5. Present Condition of Bangladesh 5 Source- official website of Bangladesh Power Development Board link - http://www.bpdb.gov.bd/ 11/26/2016
  • 6. Present Condition of Bangladesh 611/26/2016
  • 7. Present Condition of Bangladesh Source- Workshop on Energy Assessment and Pre-feasibility/feasibility Studies for Nuclear Power Program link - http://www.iaea.org/NuclearPower/Downloadable/Meetings/2014/2014-03-17-03-21- WSINIG/DAY1/COUNTRY/Bangladesh_Presentation_at_Korea_17-21_March_2014.pdf11/26/2016 7
  • 8. So, what do we do? 8 Nuclear can be a solution. 11/26/2016
  • 9. Ruppur Nuclear Power Plant  In 1961, first proposed to build a nuclear power plant.  Accordingly that year Govt. acquired 253.90 acre of land in Ruppur in Pabna district. In 1963, the plant was approved. 911/26/2016
  • 10. Rooppur Nuclear Power Plant  After the independence in 1974 Bangladesh Govt. started discussion with Russia, which was not successful.  Finally, in February 2011, Bangladesh got an agreement with Russia to build RNPP. 1011/26/2016
  • 11. Ruppur Nuclear Power Plant  The inter-govt agreement (IGA) was officially signed on 2 November 2011.  Prime Minister of Bangladesh ( Sheikh Hasina ) laying the foundation stone of Bangladesh’s first nuclear power plant on 2 October 2013. 1111/26/2016
  • 12. RNPP at a Glance  Capacity : 2400MW with two units of 1200 MW each.  Technology: VVER-1200 ( Water- Water Energetic Reactor), Russian.  Generation of Reactor: GEN-III+  Fuel: 235 Uranium Dioxide. 1211/26/2016
  • 13. RNPP at a Glance  Construction by: State Atomic Energy Corporation, Rosatom, Russia.  Cost of the Project: $12.65 billion Russia: $11.385 (90%) BD : $1.265 (10%)  Opening: Targeted Launch of 1st unit in year 2022 and 2nd in year 2023.  Longevity: 60 years and extend to another 20 years. 1311/26/2016
  • 14. Safety Standards for RNPP Third-generation technology . Protected by Five layers of security. “Post-Fukushima” safety features( can work for 72 hrs in any critical or emergency Sit). Russia will take back the nuclear waste generated by the plant. 1411/26/2016
  • 15. Rooppur Nuclear Power Plant Video Clips Video Clips 1511/26/2016
  • 16. Conclution 16 Feasible if fulfilled all standards. Safety has to be the main concern than economic facts. Countries long term benefit has to be ensured in all contracts from all sides. A Bangladeshi nuclear specialist team has to be raised. 11/26/2016

Editor's Notes

  1. You may not want to discuss every point on this slide. The left hand column focuses on issues that students in a marketing class may find interesting. The right hand column may be more appropriate for an operations management class. For additional information see: Linton, Jonathan D., Robert Klassen, and Vaidyanathan Jayaraman. 2007. Sustainable supply chains: An introduction. Journal of Operations Management 25 (6):1075-1082. A discussion of the waste generated by packaging will be a good lead in to the video on the following slide. Note that a small change in Puma’s packaging resulted in significant savings.
  2. The discussion of the triple bottom line on this slide and the following two slides was taken from Carter, Craig R., and Dale S. Rogers. 2008. A framework of sustainable supply chain management: moving toward new theory. International Journal of Physical Distribution & Logistics Management 38 (5):360-387. A review of the above article is strongly recommended. The triple bottom line recognizes there are activities in which organizations may engage that not only have a positive effect on society and the environment, but also create long-term economic benefits and a ‘sustainable’ competitive advantage. However, it must be recognized that long-term sustainability requires long-term investment and a shift in how companies do business. Companies must look for those opportunities which improve the bottom line by improving environmental and social issues.
  3. The discussion of the triple bottom line on this slide and the following two slides was taken from Carter, Craig R., and Dale S. Rogers. 2008. A framework of sustainable supply chain management: moving toward new theory. International Journal of Physical Distribution & Logistics Management 38 (5):360-387. A review of the above article is strongly recommended. The triple bottom line recognizes there are activities in which organizations may engage that not only have a positive effect on society and the environment, but also create long-term economic benefits and a ‘sustainable’ competitive advantage. However, it must be recognized that long-term sustainability requires long-term investment and a shift in how companies do business. Companies must look for those opportunities which improve the bottom line by improving environmental and social issues.
  4. The discussion of the triple bottom line on this slide and the following two slides was taken from Carter, Craig R., and Dale S. Rogers. 2008. A framework of sustainable supply chain management: moving toward new theory. International Journal of Physical Distribution & Logistics Management 38 (5):360-387. A review of the above article is strongly recommended. The triple bottom line recognizes there are activities in which organizations may engage that not only have a positive effect on society and the environment, but also create long-term economic benefits and a ‘sustainable’ competitive advantage. However, it must be recognized that long-term sustainability requires long-term investment and a shift in how companies do business. Companies must look for those opportunities which improve the bottom line by improving environmental and social issues.
  5. Transparency and Risk Management: Sustainability must consider “biodiversity loss, climate change, freshwater scarcity, food insecurity, and population growth." p. 366 Being aware of the risks associated with the supply chain may lower risk of new regulation or harm to reputation. It may also enhance an organization’s ability to take advantage of opportunities. In addition, management of risk through contingency planning may make the supply chain more resilient. Transparency throughout the supply chain in regard to sustainability issues is necessary to appropriately manage risk. Organizations must make information available to stakeholders and ensure that there is knowledge of supplier operations. Strategy: Sustainability may not be a separate program from an organization’s overall corporate strategy. Treating it as a separate strategy results in less ‘buy in’ from the organization as a whole. Organizational Culture: The culture of the organization must change so that sustainability issues are considered in every decision. For example, purchasing managers must be encouraged to consider supplier sustainability in addition to supplier cost and service levels.
  6. Operational: (See: Tibben-Lembke, R. S., & Rogers, D. S. 2002. Differences between forward and reverse logistics in a retail environment. Supply Chain Management: An International Journal, 7(5), pp.271 - 282) Information not consistent—retailers do not send enough/correct information back to suppliers; most companies that are successful in forward supply chain processes typically are not designed to handle reverse product flow (lack of training/education); different products require different repairs, and forward supply chains cannot handle all these variations Roles—roles of manufacturers, distributors and retailers, and customers are evolving Manufacturer—pressure to adhere to legal standards and customer demands Distributors/retailers—online sales, generous return policies, free shipping, lack of human interface cause greater amounts of returned items Customers—more demanding and conditioned to easy return policies. Ryder System, a logistics and transportation provider, found that 75% of electronic devices were returned with no fault found Product: Quantity, quality/value, shortened product life cycle Quantity—% of products returned has been escalating; last year in retail industry, about $185B products are returned; quality/value—varies from defects/dysfunctional, damaged, to excellent condition; but still expect same level of quality in both new products and reconditioned products. Value of product—costs increase due to evaluation of product being subjective Shortened life cycle—quick returns before product becomes obsolete and can hurt company’s strategic and financial performance Financial: Costs—can cost up to 4-5 times more than forward SC and on average, about 12 times as many steps to process returns; U.S. companies alone can spend up to $100B per year. See: Blanchard, D. 2009. Moving Ahead by Mastering the Reverse Supply Chain. IndustryWeek: May 27. Technological—difficult to develop and obtain competent and well-suited technological system to fully support reverse SC operations; most technologies for reverse SC cannot be used interchangeably with forward SC