Work
Measurement
and
Productivity


    Presented by:

        MD. NAZIR ANSARI

            ANSHUL GARG
Work Measurement
 Work Measurement: establish a
  measurable work standard upon which
  to evaluate, compare and improve labor
  productivity.
 Work (labor) Standard: Determine on
  average-how many labor-hour are
  required to produce one unit of desired
  output for a well-trained worker under
  normal operating conditions
Work Measurement Continue…
 Level of standard:
    * Operations/Department/Plant standards
    * Element/Operations/Product standards
 Use of work standard:
    * Work and personnel planning
    * Cost estimation for labor and machine
 Techniques to set work standard:
    * Time study
    * Work sampling
    * Elemental timing
    * Predetermined motion-time study
Three Levels of Standards
 Production and operations standards:
  individuals job standards
 Department standards: sum of
  performance of the individual and team
  in a department
 Plant standards: quantity and labor
  standards of the plant are the goals
  management strives to meet
Evaluation Performance
   Evaluating individual performance:
    subsequent compensation
   Evaluating department performance:
    subsequent supervisor compensation
   Evaluating process design, layout, and
    work methods
   Estimating expense and revenue streams
    in equipment evaluation as alternative are
    compared
   Formulating standards costs
Predicting, Planning, and
     Controlling Operations
 Aggregate planning of work force levels
  and production rates
 Capacity planning and utilization
 Scheduling operations: time sequencing
  jobs
 Cost estimating of products and
  production lots
 Planning types of labor skills necessary
  and budgeting labor expenses
Work Measurement- Average
             Worker
 Determined by observing several
  workers and estimating their average
  performance
 Sampling costs increase with number of
  workers sampled: accuracy of estimate
  increases as sample size increases
 Must tradeoff sampling cost and
  accuracy
How to Determine “Average Worker” Standard
                    ?
         Example from Distribution of 100 Workers Sample

   Number of          Performance in Units
   Workers Sampled
                      Per Hour        Mean

   5                  10-14           12         *5%       =0.6
   20                 15-19           17         *20%      =3.4
   45                 20-24           22         *45%      =9.9
   25                 25-29           27         *25%      =6.75
   5                  30-34           32         *5%       =1.6
   100                                           Total =   22.5
Work Measurement Time
             Study
                           Normal time
   Standards time=
                          (1-allowance)

   Normal time= (average cycle time)* (rating factor)
                       Time recorded to perform an element
   Average cycle time=
                           Number of cycles observed

   Allowance fraction= fraction of time for personal
    needs, unavoidable work delays, fatigue
Work Measurement- Work
Sampling
   Purpose:
      To estimate what proportion of a worker’s time
       is devoted to work activities
   Main Issues:
      What level of statistical confidence is desired
       in the results?
      How many observations are necessary

   Primary Applications:
      Time standards: to obtain the standards time
       for a task
Work Measurement- Work Sampling
              Formulas
                                  Proportion of
                                  Time Employee      Performance
               Total Study Time * Observed Working * Rating Factor
Normal Time=
                            Number of Units Produced




 Proportional of       Number of observations in which working occurred
 Time Employee    =
 Observed Working                  Number of Observations

                        x
        Or
                  P=
                        n
Work Measurement- Work
     Sampling Formulas
Example:    N= 100 (observations)
            X= 83 (sampled worker is working)
            P= 83/100 = 0.83

Given:           Total Study Time = 37.5
  (hours)
            Rating Factor = 1.05
            Number of Units Produced = 100

Normal Time:     = (37.5*0.83*1.05)/100
                 = 1/3 (hours)
                 = 20 (min)
Work Measurement- Elemental
       Standards- Time Data

 Elemental Standards- time data tables
  contain performance time for operations
  that are common to many applications
 Used where numerous configuration of
  product make detailed time study of each
  configuration impractical
Work Measurement- Predetermined
      Motion- Time Study
   Description: used in the planning process
    when the jobs are not currently being
    performed
   Can also be an alternative to observed
    time studies
   Basis in the historical information on basic
    human movement and motion such as
    reaching, gasping, lifting, etc.
   Elemental times have been developed for
    the basic human motion
   Commonly industry specific
Measurement Problems
   Quality may change while the quantity
    of inputs and outputs remains
    constant
   External elements may cause an
    increase or decrease in productivity
   Precise units of measure may be
    lacking
Productivity

                      Units produced
     Productivity =
                        Input used

   Measure of process improvement
   Represents output relative to input
   Only through productivity increases
    can our standard of living improve
Productivity Calculation

 Labour Productivity
                          Units produced
   Productivity =
                        Labour-hours used

                        1,000
                    =           = 4 units/labour-hour
                        250

One resource input  single-factor productivity
Example
Multi-Factor Productivity
                               Output
 Productivity =
                    Labor + Material + Energy +
                      Capital + Miscellaneous
      Also known as total factor productivity
      Output and inputs are often expressed in
       dollars

Multiple resource inputs  multi-factor productivity
Example
Productivity Variables
   Labor - contributes about 10% of the
    annual increase

   Capital - contributes about 38% of the
    annual increase

   Management - contributes about 52%
    of the annual increase
Key Variables for Improved
Labor Productivity
   Basic education appropriate for the labor
    force
   Diet of the labor force
   Social overhead that makes labor
    available
   Maintaining and enhancing skills in the
    midst of rapidly changing technology and
    knowledge
Service Productivity
   Typically labor intensive
   Frequently focused on unique individual
    attributes or desires
   Often an intellectual task performed by
    professionals
   Often difficult to mechanize
   Often difficult to evaluate for quality
Conclusion
Work measurement and productivity

More Related Content

What's hot

Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 

What's hot (20)

Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
Activity-Based Costing System
Activity-Based Costing SystemActivity-Based Costing System
Activity-Based Costing System
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Break even analysis
Break even analysisBreak even analysis
Break even analysis
 
Unit costing
Unit costing Unit costing
Unit costing
 
Productivity and operation management
Productivity and operation managementProductivity and operation management
Productivity and operation management
 
Method study
Method studyMethod study
Method study
 
Labour cost
Labour costLabour cost
Labour cost
 
Standard costing presentation
Standard costing presentationStandard costing presentation
Standard costing presentation
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Work study method-and_time_study-final
Work study method-and_time_study-finalWork study method-and_time_study-final
Work study method-and_time_study-final
 
Incentive plans
Incentive plansIncentive plans
Incentive plans
 
Batch costing
Batch costingBatch costing
Batch costing
 
Classification of cost
Classification of costClassification of cost
Classification of cost
 
Cost sheet
Cost sheetCost sheet
Cost sheet
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
 
Fringe benefits
Fringe benefitsFringe benefits
Fringe benefits
 
Work sample
Work sampleWork sample
Work sample
 
Methods and techniques of Costing
Methods and techniques of CostingMethods and techniques of Costing
Methods and techniques of Costing
 
Job and batch costing
Job and batch costingJob and batch costing
Job and batch costing
 

Viewers also liked

cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
Pratibha Khemchandani
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
Harinadh Karimikonda
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
grubinm
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
Akash Bakshi
 
Method Study
Method StudyMethod Study
Method Study
ajithsrc
 

Viewers also liked (20)

Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
Productivity
ProductivityProductivity
Productivity
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 
Basic of work study, work measurement & job design om
Basic of work study, work measurement & job design    om Basic of work study, work measurement & job design    om
Basic of work study, work measurement & job design om
 
Work Study
Work StudyWork Study
Work Study
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 
Work measurement ppt @ bec doms
Work measurement ppt @ bec domsWork measurement ppt @ bec doms
Work measurement ppt @ bec doms
 
Productivity, Productivity, Productivity
Productivity, Productivity, ProductivityProductivity, Productivity, Productivity
Productivity, Productivity, Productivity
 
1. productivity concept and calculation.
1. productivity concept and calculation.1. productivity concept and calculation.
1. productivity concept and calculation.
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Work study - production and operations management
Work study - production and operations managementWork study - production and operations management
Work study - production and operations management
 
Work measurement
Work measurementWork measurement
Work measurement
 
Method Study
Method StudyMethod Study
Method Study
 
Work study
Work studyWork study
Work study
 
Productivity
ProductivityProductivity
Productivity
 

Similar to Work measurement and productivity

Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copy
Hareesh M
 
Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
Rahul Jain
 

Similar to Work measurement and productivity (20)

Production & Operation Management
Production & Operation ManagementProduction & Operation Management
Production & Operation Management
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copy
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
 
module 3 OM.ppt
module 3 OM.pptmodule 3 OM.ppt
module 3 OM.ppt
 
Ch11
Ch11Ch11
Ch11
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
 
Good work measurement
Good work measurementGood work measurement
Good work measurement
 
What is Industial Engineering
What is Industial EngineeringWhat is Industial Engineering
What is Industial Engineering
 
Employee productivity and Role of HR
Employee productivity and Role of HREmployee productivity and Role of HR
Employee productivity and Role of HR
 
Employee productivity
Employee productivityEmployee productivity
Employee productivity
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work study and productivity index
Work study and productivity indexWork study and productivity index
Work study and productivity index
 
Efficiency
Efficiency Efficiency
Efficiency
 
P roduction ppt
P roduction pptP roduction ppt
P roduction ppt
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
 
Work Study
Work StudyWork Study
Work Study
 
Garments
Garments Garments
Garments
 
Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
 
Introduction to work study
Introduction to work study Introduction to work study
Introduction to work study
 

Recently uploaded

Top profile Call Girls In Shimla [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Shimla [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Shimla [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Shimla [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
gajnagarg
 
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
eqaqen
 
Top profile Call Girls In Rampur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rampur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Rampur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rampur [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
K VENKAT NAVEEN KUMAR
 
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
gajnagarg
 
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdfreStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
Ken Fuller
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
ZurliaSoop
 
Top profile Call Girls In Jabalpur [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Jabalpur [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Jabalpur [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Jabalpur [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 

Recently uploaded (20)

Miletti Gabriela_Vision Plan for artist Jahzel.pdf
Miletti Gabriela_Vision Plan for artist Jahzel.pdfMiletti Gabriela_Vision Plan for artist Jahzel.pdf
Miletti Gabriela_Vision Plan for artist Jahzel.pdf
 
Top profile Call Girls In Shimla [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Shimla [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Shimla [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Shimla [ 7014168258 ] Call Me For Genuine Models We...
 
Launch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideLaunch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's Guide
 
Guide to a Winning Interview May 2024 for MCWN
Guide to a Winning Interview May 2024 for MCWNGuide to a Winning Interview May 2024 for MCWN
Guide to a Winning Interview May 2024 for MCWN
 
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
 
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Etawah [ 7014168258 ] Call Me For Genuine Models We...
 
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
 
Top profile Call Girls In Rampur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rampur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Rampur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Rampur [ 7014168258 ] Call Me For Genuine Models We...
 
Sample IT RISK REGISTER for Education Purpose
Sample IT RISK REGISTER for Education PurposeSample IT RISK REGISTER for Education Purpose
Sample IT RISK REGISTER for Education Purpose
 
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Varanasi [ 7014168258 ] Call Me For Genuine Models ...
 
B.tech civil major project by Deepak Kumar
B.tech civil major project by Deepak KumarB.tech civil major project by Deepak Kumar
B.tech civil major project by Deepak Kumar
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
 
Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.Brand Analysis for reggaeton artist Jahzel.
Brand Analysis for reggaeton artist Jahzel.
 
DMER-AYUSH-MIMS-Staff-Nurse-_Selection-List-04-05-2024.pdf
DMER-AYUSH-MIMS-Staff-Nurse-_Selection-List-04-05-2024.pdfDMER-AYUSH-MIMS-Staff-Nurse-_Selection-List-04-05-2024.pdf
DMER-AYUSH-MIMS-Staff-Nurse-_Selection-List-04-05-2024.pdf
 
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
 
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
 
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdfreStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
reStartEvents 5:9 DC metro & Beyond V-Career Fair Employer Directory.pdf
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
 
Kannada Call Girls Mira Bhayandar WhatsApp +91-9930687706, Best Service
Kannada Call Girls Mira Bhayandar WhatsApp +91-9930687706, Best ServiceKannada Call Girls Mira Bhayandar WhatsApp +91-9930687706, Best Service
Kannada Call Girls Mira Bhayandar WhatsApp +91-9930687706, Best Service
 
Top profile Call Girls In Jabalpur [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Jabalpur [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Jabalpur [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Jabalpur [ 7014168258 ] Call Me For Genuine Models ...
 

Work measurement and productivity

  • 1. Work Measurement and Productivity Presented by: MD. NAZIR ANSARI ANSHUL GARG
  • 2. Work Measurement  Work Measurement: establish a measurable work standard upon which to evaluate, compare and improve labor productivity.  Work (labor) Standard: Determine on average-how many labor-hour are required to produce one unit of desired output for a well-trained worker under normal operating conditions
  • 3. Work Measurement Continue…  Level of standard: * Operations/Department/Plant standards * Element/Operations/Product standards  Use of work standard: * Work and personnel planning * Cost estimation for labor and machine  Techniques to set work standard: * Time study * Work sampling * Elemental timing * Predetermined motion-time study
  • 4. Three Levels of Standards  Production and operations standards: individuals job standards  Department standards: sum of performance of the individual and team in a department  Plant standards: quantity and labor standards of the plant are the goals management strives to meet
  • 5. Evaluation Performance  Evaluating individual performance: subsequent compensation  Evaluating department performance: subsequent supervisor compensation  Evaluating process design, layout, and work methods  Estimating expense and revenue streams in equipment evaluation as alternative are compared  Formulating standards costs
  • 6. Predicting, Planning, and Controlling Operations  Aggregate planning of work force levels and production rates  Capacity planning and utilization  Scheduling operations: time sequencing jobs  Cost estimating of products and production lots  Planning types of labor skills necessary and budgeting labor expenses
  • 7. Work Measurement- Average Worker  Determined by observing several workers and estimating their average performance  Sampling costs increase with number of workers sampled: accuracy of estimate increases as sample size increases  Must tradeoff sampling cost and accuracy
  • 8. How to Determine “Average Worker” Standard ? Example from Distribution of 100 Workers Sample Number of Performance in Units Workers Sampled Per Hour Mean 5 10-14 12 *5% =0.6 20 15-19 17 *20% =3.4 45 20-24 22 *45% =9.9 25 25-29 27 *25% =6.75 5 30-34 32 *5% =1.6 100 Total = 22.5
  • 9. Work Measurement Time Study Normal time  Standards time= (1-allowance)  Normal time= (average cycle time)* (rating factor) Time recorded to perform an element  Average cycle time= Number of cycles observed  Allowance fraction= fraction of time for personal needs, unavoidable work delays, fatigue
  • 10. Work Measurement- Work Sampling  Purpose:  To estimate what proportion of a worker’s time is devoted to work activities  Main Issues:  What level of statistical confidence is desired in the results?  How many observations are necessary  Primary Applications:  Time standards: to obtain the standards time for a task
  • 11. Work Measurement- Work Sampling Formulas Proportion of Time Employee Performance Total Study Time * Observed Working * Rating Factor Normal Time= Number of Units Produced Proportional of Number of observations in which working occurred Time Employee = Observed Working Number of Observations x Or P= n
  • 12. Work Measurement- Work Sampling Formulas Example: N= 100 (observations) X= 83 (sampled worker is working) P= 83/100 = 0.83 Given: Total Study Time = 37.5 (hours) Rating Factor = 1.05 Number of Units Produced = 100 Normal Time: = (37.5*0.83*1.05)/100 = 1/3 (hours) = 20 (min)
  • 13. Work Measurement- Elemental Standards- Time Data  Elemental Standards- time data tables contain performance time for operations that are common to many applications  Used where numerous configuration of product make detailed time study of each configuration impractical
  • 14. Work Measurement- Predetermined Motion- Time Study  Description: used in the planning process when the jobs are not currently being performed  Can also be an alternative to observed time studies  Basis in the historical information on basic human movement and motion such as reaching, gasping, lifting, etc.  Elemental times have been developed for the basic human motion  Commonly industry specific
  • 15. Measurement Problems  Quality may change while the quantity of inputs and outputs remains constant  External elements may cause an increase or decrease in productivity  Precise units of measure may be lacking
  • 16. Productivity Units produced Productivity = Input used  Measure of process improvement  Represents output relative to input  Only through productivity increases can our standard of living improve
  • 17. Productivity Calculation Labour Productivity Units produced Productivity = Labour-hours used 1,000 = = 4 units/labour-hour 250 One resource input  single-factor productivity
  • 19. Multi-Factor Productivity Output Productivity = Labor + Material + Energy + Capital + Miscellaneous  Also known as total factor productivity  Output and inputs are often expressed in dollars Multiple resource inputs  multi-factor productivity
  • 21. Productivity Variables  Labor - contributes about 10% of the annual increase  Capital - contributes about 38% of the annual increase  Management - contributes about 52% of the annual increase
  • 22. Key Variables for Improved Labor Productivity  Basic education appropriate for the labor force  Diet of the labor force  Social overhead that makes labor available  Maintaining and enhancing skills in the midst of rapidly changing technology and knowledge
  • 23. Service Productivity  Typically labor intensive  Frequently focused on unique individual attributes or desires  Often an intellectual task performed by professionals  Often difficult to mechanize  Often difficult to evaluate for quality