How it began
 India's 1st and Asia's 5th metro rail was introduced in
Kolkata.
 Over a length of 16.45 km and the work on this project
was sanctioned on 1.6.1972
 The construction work started in 1973-74.After crossing
so many hurdles Calcutta Metro started its journey on
October 24, 1984
Why is it needed ?
 Unprecedented growth of personal vehicles.
 Growing traffic congestion.
 Air pollution and traffic accidents has become a major
concern.
 To avoid congestion at peak hours.
 Time saving. Reduced fuel consumption.
INDIAN METRO
RAILWAY
EXISTING METRO RAILWAY
 Kolkata Metro Rail.
 Delhi Metro Rail.
FUTURE & PROPOSED METRO RAILWAY
 Mumbai Metro Rail
 Bangalore Metro Rail.
 Hyderabad Metro Rail.
 Chennai Metro Rail.
 Kochi Metro Rail
CITY METRO RAIL
 lack of adequate connectivity are becoming increasingly
eminent.
 Delhi has taken the exemplary lead of developing the
Metro rail.
 India is well on its way to create a world-class MRT
system as an integral part of community infrastructure
development in the country.
 shift from private modes of conveyance to public
transport.
India is looking to create a world
class MRT system:
 Growing cities, growing population and growing traffic
has invariably called for a shift from private modes of
conveyance to public transport.
 MRTS in the world’s developing nations exist
successfully
 India has lagged behing in this field but the reason
could be as follows:
 lack of funds planning as is known that such projects
require huge capital investments
 a long gestation period
 complex technology
 The lack of integration between various systems of
mass transportation
 the absence of comprehensive traffic and
transportation planning.
 Besides the existing and the upcoming
 proposals for MRTS for
Pune, Chandigarh, Ahmedabad, Kanpur, Ludhiana, Bh
opal, Indore and Faridabad are being chalked out.
Key Considerations for
MRTS
 A metro model for a county would have to depend on its
logistics, financial resources
 Planning, construction, designing and management
of metros require :-extensive data, detailed
surveys, study of economic structure, profile of settlement
topography, travel preference, major traffic corridors.
 System needs to be made self-reliant and self-contained to
minimize O&M (operations & maintenance) cost.
 Technology with low initial cost but with high O & M cost
should be avoided.
Cost Factors
 Metro projects are meant to cater to cities with more than
four million population
 Larger the underground and elevated proposal, larger shall
be the cost involved.
 Funding process is done through the PPP model (Public-
Private Partnership) as in Hyderabad and Mumbai or by
DMRC model by the state or the central government as in
Bengaluru, Chennai and Kolkata.
 Correct process is the PPP model.
 LPG (Liberalization, Privatization and Globalization) to
encourage private investors
BENEFITs OF METRO RAIL
 Requires 1/5th energy per passenger km compared to
road-based transport system.
 Causes less noise, no air pollution and eco friendly
transport system.
 Occupies no road space if underground and only about
2.60 meters width of the road if elevated.
 Reduces journey time.
 Cost effective mass transport system.
 Reducing traffic transport problems.
Disadvantages
Advantages
 A cheap mode of transport, the MRTS helps in low
energy consumption
 It is eco-friendly (runs on electricity, thus
minimizing air and sound pollution)
 Averts the number of accidents
 Is efficient in terms of space occupancy and provides
comfort with ultra-modern coaches and modern
systems like automatic ticketing, advanced signaling
systems, automatic train protection system and
integrated security systems.
Advantages contd…
 Services like ATMs, food outlets, cafés and
convenience stores at these stations make the
journey more fruitful.
 Also such stations lead to nearby economic
development.
 The international standard for MRTS with a
maximum speed of 80kmph and average speed of
around 34kmph helps in saving of time.
 With proper designing, the peak hour capacity
could be rated at 3-4 lakhs passengers per hour."
Disadvantages:
 The only disadvantage of metros is the slight
congestion on roads at the time of construction
which has to be taken care of.
 The cost factor is another disadvantage, the
solution for which is to integrate metros with
others systems considering the volume,
structure, availability of space and resources for
traffic and transportation.
Kolkata Metro
 The only metro service in the country functioning directly under the Indian Railways, the
foundation for this was laid as early as 1972.
 Delays due to non-availability of sufficient funds, shifting of underground utilities, court
injunctions and irregular supply of vital materials led to the commencement of services
being pushed to 1984, after which progressive construction followed leading to the
completion of the services of the entire stretch in 2005.
 Kolkata faced a transport problem with only 8% of the land being available for road
transport( 25-35% available in other cities)
 The metro has been quite a hit with the residents in Kolkata considering the number of
passengers which has expansively increased in the past years.
 Large scale expansion projects (covering 87 kms) have now been planned and in its
modernization program.
Modernization of the kolkata
metro includes:
 State-of-the-Art Automatic Fare Collection
 Passenger Control system with Radio Frequency
Identification based Flap Gates
 Integrated Security System
 new air-conditioned rakes
 Automatic Signaling system.
Delhi Metro
 The Delhi Metro Rail Corporation (DMRC) was
established to build a metro in two phases serving
Delhi, Gurgaon, Noida and Ghaziabad.
 While the first phase covering 65.11km was opened in
2002 the second phase of 125km was recently
completed.
 The first railway project in the world to be registered for
carbon credits by the United Nations, the Delhi Metro
achieved this by saving power by using regenerative
brakes in the trains, and reduced carbon emissions.
 DMRC has also partnered with Google India (through
Google Transit) to provide train schedule and route
information to mobile devices with Google Maps.
Delhi metro airport express:
 The popular Delhi Airport Metro Express rail from the Indira
Gandhi International Airport to the city centre takes less than 20
minutes as opposed to one hour by road.
 Its LCD screens equipped coaches imported from Spain are
entirely different from the trains on this line and have in-built
noise reduction features, padded fabric seats and provide flight
information for convenience of air travellers.
 The trains are fitted with an event recorder which can withstand
high levels of temperature and impact.
 The metro has been promoted as an integral part of community
infrastructure, and community artwork depicting the local way of
life at the stations in the form of decorative murals, panels and a
gallery showcasing artwork and handicrafts from across India.
 The Delhi Metro though plagued by controversies in the
form of technical snags, overcrowding and accidents at
the construction sites has proved as a model for the
other metros in the country to follow.
 Phases 3 and 4 will expand the total journey to 413.8km
and are scheduled to open in 2016 and 2020
respectively. With such a great pace of work, the Delhi
metro will soon become one of the fastest expanding
metro networks in the world.
Mumbai Metro
 Mumbai's existing Suburban Railway and BEST bus system
have not been able to compete with the rapid population
growth.
 The Mumbai MRTS saw the completion of the first phase, a
partnership between Mumbai Metropolitan Region
Development Authority (MMRDA) and Reliance
Infrastructure and Veolia Transport (France) in 2012 and
this entails a 12 km elevated metro with 12 stations enroute.
 While the Suburban Railways provide a NS connect, this
corridor will provide the relief in the East West (EW)
connectivity, covering the journey in 21 minutes.
 Phase 2 and Phase 3 would be totaling to a length of
146 km. Plans are on for a nine-line network by 2021 in
its three phases of development costing Rs.36,000
crore.
 Skywalks have also been provided to connect the metro
and suburban railways stations.
 Right from the construction stage, initiatives have been
on to make the Mumbai Metro Asia's first green metro.
Bengaluru Metro
 Though a MRTS has been in consideration for long in the
Garden City, the foundation stone was finally laid in 2006.
 Being operated by the Bangalore Metro Rail Corporation
Limited (BMRCL), a detailed project report of two double line
corridors with a total length of 33 km (elevated and
underground) with 32 stations has been prepared.
 The general consultants for the project:
o EW and NS corridors as part of Phase I of the project which is
estimated to complete by this year.
o The travel time from end to end on the EW corridor will be 33
minutes, and on the NS corridor will be 28 minutes.
o The second phase comprising 51km would involve the
extension of both the first two lines and the construction of an
additional line.
Cont…
 While the stations are contemporary keeping in mind
Bengaluru's erstwhile architecture and materials, there
have been competitions floated for developing
communication concepts for the interior space of some
stations too.
 Though at present 43 stations are being constructed
which would get completed by 2015 the DBR (Design
Basis report) issued by BMRCL shows an approval for
162 stations which means that in future, there would be
tributaries on the NS and EW corridors.
 The only complaint that could possibly be related to this
metro is the lack of transparency and the shirking of
public involvement in the project.
Hyderabad Metro
 Spanning over 71km, the phase 1 would include three traffic
corridors covering a total of 72 km and 66 stations.
 A completely elevated system, prepared by DMRC. Designed
to cater to 50,000 people in one hour
 Hyderabad Metro Rail Ltd (HMR) is the SPV set to look after
the project which has been allotted to L&T in PPP mode.
 Hyderabad MRTS which is the country's first two-track
elevated city transit system, has been much delayed since
2008
 The HMR is confident that by 2015 the entire project would
finish.
Cont..
 The travel time for the metro rail is 45 minutes for
Corridor I, 22 minutes for Corridor II and 39 minutes
for Corridor III.
 The metro stations are being designed keeping the local
architecture in mind. The Metro that will rest on
massive concrete pillars along the central median of the
roads will prove a boon for the city.
The Future
 MRTS is the best way to decongest traffic. However, a number
of considerations should be kept in mind in order to run a
successful MRTS.
 "Viability of metro projects depend upon correct
defining of traffic corridors, technology adapted,
availability of land, volume of traffic carried, capacity
utilization and acceptance of the mode by the
commuters,"
 Conclusively, transport needs to be made an integral part of
urban design/master plan of the city as it cannot be delineated
to a separate entity. A multi-modal transportation system would
ensure the use of MRTS to its best potential.
Cont..
 The uncertainty about MRTS, which has plagued the
importance of such systems in India seems to be
resolving.
 Though the Kolkata metro was designed without a rule
book and the Delhi Metro was designed on international
norms
Training:
 The National Mass Transit and Training Research
Institute (NMTTRI) in Mumbai (established by
MMRDA), is one of its kinds in Asia imparting training
and research on mass transit systems.
 The annual training courses cater to key issues like
Public Transport Security, Safety and
Emergency/Disaster Management, Noise Pollution &
Abatement Measures for Urban Transportation,
Integrated Ticketing, and seamless Travel across Modes
and Intelligent Transportation System.
CONCLUSION
 Even though the Metro systems are more reliable,
comfortable and safer than road-based systems & it
reduces congestion on the roads, the systems planned
in India show cost overrunning and under utilization of
capacity.
 High capacity system does not necessarily generate
high demand.
 Immense thought & planing is needed for such
expensive and expansive projects.
THANK
YOU!

More Related Content

What's hot

Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)Sourabh Jain
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesNayana 54321
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPTVikas Sukhwal
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Akhilesh Shukla
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway addavidson
 
Presentation on Railway STATION LAYOUT
Presentation on  Railway STATION LAYOUTPresentation on  Railway STATION LAYOUT
Presentation on Railway STATION LAYOUTRONAK SUTARIYA
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in IndiaRAMPRASAD KUMAWAT
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptxBalpreetSingh47890
 
Metro Construction
Metro ConstructionMetro Construction
Metro ConstructionMayur Soni
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
Importance and Classification of Road
Importance and Classification of RoadImportance and Classification of Road
Importance and Classification of RoadShrikant Ingale
 
Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in RailwaysAnupama Jha
 
Mass transit system
Mass transit systemMass transit system
Mass transit systemSagar Kaptan
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination surveyAkash Pandey
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackMani Vel
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 

What's hot (20)

Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notes
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...Construction sequence for metro Project (Elevated and Underground) and Time c...
Construction sequence for metro Project (Elevated and Underground) and Time c...
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway
 
Presentation on Railway STATION LAYOUT
Presentation on  Railway STATION LAYOUTPresentation on  Railway STATION LAYOUT
Presentation on Railway STATION LAYOUT
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in India
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Importance and Classification of Road
Importance and Classification of RoadImportance and Classification of Road
Importance and Classification of Road
 
Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in Railways
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination survey
 
Metro project
Metro project Metro project
Metro project
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 

Viewers also liked

Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation projectVimal Maurya
 
Metro cash & carry management Project
Metro cash & carry management Project Metro cash & carry management Project
Metro cash & carry management Project GhulamGhous7632000
 
Metro group
Metro groupMetro group
Metro groupTamanna
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Apparao Gandi
 
Mass transit system
Mass transit systemMass transit system
Mass transit systemAsjad Khuram
 
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...WRI Ross Center for Sustainable Cities
 

Viewers also liked (11)

Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
Metro cash & carry management Project
Metro cash & carry management Project Metro cash & carry management Project
Metro cash & carry management Project
 
Metro group
Metro groupMetro group
Metro group
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
 
Metro Retailing
Metro RetailingMetro Retailing
Metro Retailing
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Metro cash and carry
Metro cash and carryMetro cash and carry
Metro cash and carry
 
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
Implementing Transit Oriented Development in Indian Cities - Learnings and Ch...
 

Similar to Metro Rail in India ppt

36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01Akshay Gaikwad
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchSunil Dayma
 
Nagpur Metro Indicator
Nagpur Metro IndicatorNagpur Metro Indicator
Nagpur Metro Indicatorijtsrd
 
Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sAbi Abagun
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 
Marketing plan of DMRC
Marketing plan of DMRCMarketing plan of DMRC
Marketing plan of DMRCArun Singh
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaBhavya Jaiswal
 
Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtseSAT Journals
 
mrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfmrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfchhananpooja8827
 
× Le transport rapide personnalisé et systèmes de transport automatisés en Inde
×	Le transport rapide personnalisé et systèmes de transport automatisés en Inde×	Le transport rapide personnalisé et systèmes de transport automatisés en Inde
× Le transport rapide personnalisé et systèmes de transport automatisés en IndeVéronique SEEL (Michaut)
 
Metro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsMetro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsIRJET Journal
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor Joseph Jincy
 

Similar to Metro Rail in India ppt (20)

Metro
MetroMetro
Metro
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
12
1212
12
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary research
 
Nagpur Metro Indicator
Nagpur Metro IndicatorNagpur Metro Indicator
Nagpur Metro Indicator
 
Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-s
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Marketing plan of DMRC
Marketing plan of DMRCMarketing plan of DMRC
Marketing plan of DMRC
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
 
mrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdfmrtscp2018-190316162158 mass rapid transit system.pdf
mrtscp2018-190316162158 mass rapid transit system.pdf
 
aadesh3.pdf
aadesh3.pdfaadesh3.pdf
aadesh3.pdf
 
× Le transport rapide personnalisé et systèmes de transport automatisés en Inde
×	Le transport rapide personnalisé et systèmes de transport automatisés en Inde×	Le transport rapide personnalisé et systèmes de transport automatisés en Inde
× Le transport rapide personnalisé et systèmes de transport automatisés en Inde
 
Metro Development and Pedestrian Concerns
Metro Development and Pedestrian ConcernsMetro Development and Pedestrian Concerns
Metro Development and Pedestrian Concerns
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 

Recently uploaded

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 

Recently uploaded (20)

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 

Metro Rail in India ppt

  • 2. introduction of Indian Metro Railway. How it began  India's 1st and Asia's 5th metro rail was introduced in Kolkata.  Over a length of 16.45 km and the work on this project was sanctioned on 1.6.1972  The construction work started in 1973-74.After crossing so many hurdles Calcutta Metro started its journey on October 24, 1984
  • 3. Why is it needed ?  Unprecedented growth of personal vehicles.  Growing traffic congestion.  Air pollution and traffic accidents has become a major concern.  To avoid congestion at peak hours.  Time saving. Reduced fuel consumption.
  • 4. INDIAN METRO RAILWAY EXISTING METRO RAILWAY  Kolkata Metro Rail.  Delhi Metro Rail. FUTURE & PROPOSED METRO RAILWAY  Mumbai Metro Rail  Bangalore Metro Rail.  Hyderabad Metro Rail.  Chennai Metro Rail.  Kochi Metro Rail
  • 5. CITY METRO RAIL  lack of adequate connectivity are becoming increasingly eminent.  Delhi has taken the exemplary lead of developing the Metro rail.  India is well on its way to create a world-class MRT system as an integral part of community infrastructure development in the country.  shift from private modes of conveyance to public transport.
  • 6. India is looking to create a world class MRT system:  Growing cities, growing population and growing traffic has invariably called for a shift from private modes of conveyance to public transport.  MRTS in the world’s developing nations exist successfully  India has lagged behing in this field but the reason could be as follows:
  • 7.  lack of funds planning as is known that such projects require huge capital investments  a long gestation period  complex technology  The lack of integration between various systems of mass transportation  the absence of comprehensive traffic and transportation planning.
  • 8.  Besides the existing and the upcoming  proposals for MRTS for Pune, Chandigarh, Ahmedabad, Kanpur, Ludhiana, Bh opal, Indore and Faridabad are being chalked out.
  • 9. Key Considerations for MRTS  A metro model for a county would have to depend on its logistics, financial resources  Planning, construction, designing and management of metros require :-extensive data, detailed surveys, study of economic structure, profile of settlement topography, travel preference, major traffic corridors.  System needs to be made self-reliant and self-contained to minimize O&M (operations & maintenance) cost.  Technology with low initial cost but with high O & M cost should be avoided.
  • 10. Cost Factors  Metro projects are meant to cater to cities with more than four million population  Larger the underground and elevated proposal, larger shall be the cost involved.  Funding process is done through the PPP model (Public- Private Partnership) as in Hyderabad and Mumbai or by DMRC model by the state or the central government as in Bengaluru, Chennai and Kolkata.  Correct process is the PPP model.  LPG (Liberalization, Privatization and Globalization) to encourage private investors
  • 11. BENEFITs OF METRO RAIL  Requires 1/5th energy per passenger km compared to road-based transport system.  Causes less noise, no air pollution and eco friendly transport system.  Occupies no road space if underground and only about 2.60 meters width of the road if elevated.  Reduces journey time.  Cost effective mass transport system.  Reducing traffic transport problems.
  • 12. Disadvantages Advantages  A cheap mode of transport, the MRTS helps in low energy consumption  It is eco-friendly (runs on electricity, thus minimizing air and sound pollution)  Averts the number of accidents  Is efficient in terms of space occupancy and provides comfort with ultra-modern coaches and modern systems like automatic ticketing, advanced signaling systems, automatic train protection system and integrated security systems.
  • 13. Advantages contd…  Services like ATMs, food outlets, cafés and convenience stores at these stations make the journey more fruitful.  Also such stations lead to nearby economic development.  The international standard for MRTS with a maximum speed of 80kmph and average speed of around 34kmph helps in saving of time.  With proper designing, the peak hour capacity could be rated at 3-4 lakhs passengers per hour."
  • 14. Disadvantages:  The only disadvantage of metros is the slight congestion on roads at the time of construction which has to be taken care of.  The cost factor is another disadvantage, the solution for which is to integrate metros with others systems considering the volume, structure, availability of space and resources for traffic and transportation.
  • 15. Kolkata Metro  The only metro service in the country functioning directly under the Indian Railways, the foundation for this was laid as early as 1972.  Delays due to non-availability of sufficient funds, shifting of underground utilities, court injunctions and irregular supply of vital materials led to the commencement of services being pushed to 1984, after which progressive construction followed leading to the completion of the services of the entire stretch in 2005.  Kolkata faced a transport problem with only 8% of the land being available for road transport( 25-35% available in other cities)  The metro has been quite a hit with the residents in Kolkata considering the number of passengers which has expansively increased in the past years.  Large scale expansion projects (covering 87 kms) have now been planned and in its modernization program.
  • 16. Modernization of the kolkata metro includes:  State-of-the-Art Automatic Fare Collection  Passenger Control system with Radio Frequency Identification based Flap Gates  Integrated Security System  new air-conditioned rakes  Automatic Signaling system.
  • 17. Delhi Metro  The Delhi Metro Rail Corporation (DMRC) was established to build a metro in two phases serving Delhi, Gurgaon, Noida and Ghaziabad.  While the first phase covering 65.11km was opened in 2002 the second phase of 125km was recently completed.  The first railway project in the world to be registered for carbon credits by the United Nations, the Delhi Metro achieved this by saving power by using regenerative brakes in the trains, and reduced carbon emissions.  DMRC has also partnered with Google India (through Google Transit) to provide train schedule and route information to mobile devices with Google Maps.
  • 18. Delhi metro airport express:  The popular Delhi Airport Metro Express rail from the Indira Gandhi International Airport to the city centre takes less than 20 minutes as opposed to one hour by road.  Its LCD screens equipped coaches imported from Spain are entirely different from the trains on this line and have in-built noise reduction features, padded fabric seats and provide flight information for convenience of air travellers.  The trains are fitted with an event recorder which can withstand high levels of temperature and impact.  The metro has been promoted as an integral part of community infrastructure, and community artwork depicting the local way of life at the stations in the form of decorative murals, panels and a gallery showcasing artwork and handicrafts from across India.
  • 19.  The Delhi Metro though plagued by controversies in the form of technical snags, overcrowding and accidents at the construction sites has proved as a model for the other metros in the country to follow.  Phases 3 and 4 will expand the total journey to 413.8km and are scheduled to open in 2016 and 2020 respectively. With such a great pace of work, the Delhi metro will soon become one of the fastest expanding metro networks in the world.
  • 20. Mumbai Metro  Mumbai's existing Suburban Railway and BEST bus system have not been able to compete with the rapid population growth.  The Mumbai MRTS saw the completion of the first phase, a partnership between Mumbai Metropolitan Region Development Authority (MMRDA) and Reliance Infrastructure and Veolia Transport (France) in 2012 and this entails a 12 km elevated metro with 12 stations enroute.  While the Suburban Railways provide a NS connect, this corridor will provide the relief in the East West (EW) connectivity, covering the journey in 21 minutes.
  • 21.  Phase 2 and Phase 3 would be totaling to a length of 146 km. Plans are on for a nine-line network by 2021 in its three phases of development costing Rs.36,000 crore.  Skywalks have also been provided to connect the metro and suburban railways stations.  Right from the construction stage, initiatives have been on to make the Mumbai Metro Asia's first green metro.
  • 22. Bengaluru Metro  Though a MRTS has been in consideration for long in the Garden City, the foundation stone was finally laid in 2006.  Being operated by the Bangalore Metro Rail Corporation Limited (BMRCL), a detailed project report of two double line corridors with a total length of 33 km (elevated and underground) with 32 stations has been prepared.  The general consultants for the project: o EW and NS corridors as part of Phase I of the project which is estimated to complete by this year. o The travel time from end to end on the EW corridor will be 33 minutes, and on the NS corridor will be 28 minutes. o The second phase comprising 51km would involve the extension of both the first two lines and the construction of an additional line.
  • 23. Cont…  While the stations are contemporary keeping in mind Bengaluru's erstwhile architecture and materials, there have been competitions floated for developing communication concepts for the interior space of some stations too.  Though at present 43 stations are being constructed which would get completed by 2015 the DBR (Design Basis report) issued by BMRCL shows an approval for 162 stations which means that in future, there would be tributaries on the NS and EW corridors.  The only complaint that could possibly be related to this metro is the lack of transparency and the shirking of public involvement in the project.
  • 24. Hyderabad Metro  Spanning over 71km, the phase 1 would include three traffic corridors covering a total of 72 km and 66 stations.  A completely elevated system, prepared by DMRC. Designed to cater to 50,000 people in one hour  Hyderabad Metro Rail Ltd (HMR) is the SPV set to look after the project which has been allotted to L&T in PPP mode.  Hyderabad MRTS which is the country's first two-track elevated city transit system, has been much delayed since 2008  The HMR is confident that by 2015 the entire project would finish.
  • 25. Cont..  The travel time for the metro rail is 45 minutes for Corridor I, 22 minutes for Corridor II and 39 minutes for Corridor III.  The metro stations are being designed keeping the local architecture in mind. The Metro that will rest on massive concrete pillars along the central median of the roads will prove a boon for the city.
  • 26. The Future  MRTS is the best way to decongest traffic. However, a number of considerations should be kept in mind in order to run a successful MRTS.  "Viability of metro projects depend upon correct defining of traffic corridors, technology adapted, availability of land, volume of traffic carried, capacity utilization and acceptance of the mode by the commuters,"  Conclusively, transport needs to be made an integral part of urban design/master plan of the city as it cannot be delineated to a separate entity. A multi-modal transportation system would ensure the use of MRTS to its best potential.
  • 27. Cont..  The uncertainty about MRTS, which has plagued the importance of such systems in India seems to be resolving.  Though the Kolkata metro was designed without a rule book and the Delhi Metro was designed on international norms
  • 28. Training:  The National Mass Transit and Training Research Institute (NMTTRI) in Mumbai (established by MMRDA), is one of its kinds in Asia imparting training and research on mass transit systems.  The annual training courses cater to key issues like Public Transport Security, Safety and Emergency/Disaster Management, Noise Pollution & Abatement Measures for Urban Transportation, Integrated Ticketing, and seamless Travel across Modes and Intelligent Transportation System.
  • 29. CONCLUSION  Even though the Metro systems are more reliable, comfortable and safer than road-based systems & it reduces congestion on the roads, the systems planned in India show cost overrunning and under utilization of capacity.  High capacity system does not necessarily generate high demand.  Immense thought & planing is needed for such expensive and expansive projects.