SlideShare a Scribd company logo
1 of 14
Download to read offline
NDBโ€™s Operational Experience
Mobilizing and effectively using
finance for water-related SDG
24 November 2020
Outline
New Development Bank
Overview
E&S Framework &
Our Approach
Case Studies โ€“ Water
Sector
New Development Bank
NDB is a multilateral development bank established in 2015 by Brazil, Russia, India,
China and South Africa (BRICS), with a mandate to:
โ€œmobilize resources for infrastructure and sustainable development projects in BRICS
and other emerging market economies and developing countries (EMDCs)
complementing the existing efforts of multilateral and regional financial institutions for
global growth and developmentโ€
๏ฑHeadquartered in Shanghai (China)
๏ฑRegional offices:
๏ƒ˜South Africa โ€“ Johannesburg
๏ƒ˜Brazil โ€“ Brasilia and Sรฃo Paulo
๏ƒ˜Russia โ€“ Moscow
๏ƒ˜India โ€“ soon to be established
๏ฑ Development of sustainable infrastructure, being one of the key priorities for emerging
economies in the coming decades, is the core focus of NDBโ€™s operations
๏ฑ NDB Board of Directors has approved 65 projects in all member countries for a total amount of
US$ 20.6 billion*
Support for Infrastructure and Sustainable Development
1.5
1.9
4.7
7.2
5.5
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
2016 2017 2018 2019 2020
(up to end-Q3)
Actual project approvals
Yearly project approvals
USD billion
*Source: NDB data (up to end-Q3, 2020)
Clean Energy
18%
Transport
Infrastructure
23%
Irrigation,
Water
Resource
Management
and Sanitation
10%
Urban
Development
18%
Environmental
Efficiency
6%
Social
Infrastructure
24%
Multi-area
1%
By key area of operation
As at end-Q3 2020
Using the NDB funds in a
cost-effective way for
sustainable development:
the role of the NDB
Environment and Social
Framework (ESF)
NDBโ€™s Environment and Social FrameworkObjectives
Manage E&S risks and impacts
Manage operational and reputational risks on NDB and its stakeholders
Mainstream E&S considerations into decision-making processes of all parties
Encourage international good E&S practices in operations and strengthen country systems
Environment and
Social Framework
Part 1:
Environmental and Social
Policy
Part 2:
Environmental and Social
Standards
ESS
ESS 1. E&S
Impact
Assessment
ESS 2.
Involuntary
Resettlement
ESS 3.
Indigenous
People
NDBโ€™s Environment and Social Policy
Key principles:
โ€ข Applies to all NDB supported projects
โ€ข Requires project to meet ESF/ESS
โ€ข Promotes to use of country systems
โ€ข Sets roles and responsibilities
โ€ข Defines โ€œExclusion Listโ€
Key requirements:
โ€ข Screening and categorization
โ€ข E&S assessment and management plans
โ€ข Public consultations
โ€ข Information disclosure
โ€ข Monitoring and reporting
โ€ข Grievance redressal mechanism
The correct implementation of the ESF leads to:
๏ฑ The materialization of project benefits
๏ฑ Effective mitigation of risks and impacts of projects
๏ฑ The application of sustainable practices through provisions
in the Environmental and Social Impact Management Plan (ESIMP)
Example:
ESF as a tool to Enhance SGDโ€™s Reach
SDGโ€™s
1 and 16
E&S Impact
Mitigation
Project Impact
Involuntary
resettlement
The involuntary resettlement safeguards covers physical
and economic displacement, involuntary acquisition of
land, and involuntary restrictions on land use.
Free, prior & informed consent. Effective environmental & social impact
assessment (ESIA) process covering consultation, resettlement, and
compensation aspects.
1. No Poverty
1.3. Implement nationally appropriate social protection systems {โ€ฆ}
1.4. Ensure that all, in particular the poor and the vulnerable, have equal rights to economic
resources, basic services, ownership and control over land and other forms of property, {โ€ฆ}
16. Peace Justice and Strong Institutions
16.7. Ensure responsive, inclusive, participatory and representative decision-making at all levels
SDG17. Strengthen the means of implementation
and revitalize the Global Partnership for
Sustainable Development
- Promote the development, transfer, dissemination
and diffusion of environmentally sound technologies
to developing countries on favorable terms
- Enhance international support for implementing
effective and targeted capacity-building in developing
countries to support national plans to implement all
the Sustainable Development Goals
ESF: From Mitigation of Impacts to Contribution to SDGs
Case Study:
Water Supply and Sanitation
Systems in India, China and
Russia
๏ฑ Project:
๏ฑ Construction and upgrade of drinking water supply
system covering almost entire Manipur State
๏ฑ E&S Impacts:
๏ฑ clearance of existing land, vegetation or building;
generation of wastes and scraps during construction
and demolition works; community safety risks due to
accidents, where structural elements or components of
the Project are accessible to the community.
๏ฑ E&S benefits and development objectives:
๏ฑ provide household level water supply to urban and
rural population in the state
๏ฑ enhance level of water supply as recommended by
national guidelines
๏ฑ improve quality of water supplied through water
treatment
๏ฑ improve operation and maintenance (O&M) of the
water supply infrastructure
๏ฑ enhance the institutional capacity of PHED
Water Supply System Project in India
Clean Water and
Sanitation
SDG Alignment Based on Project Results
๏ฑ Project:
๏ฑ enhancement of hydraulic circulation, including
rehabilitation of irrigation canals and river courses,
construction of diversion water pipelines, dredging in lakes
and wetlands, construction of sewage treatment stations
and associated interception pipelines, construction of water
pumping stations, and installation of ecological flood
retention embankments along lake shores and riverside;
๏ฑ creation of vegetated buffer zones along riparian area.
๏ฑ Key potential negative E&S impacts and risks:
๏ฑ erosion, change of habitats, land acquisition, occupational
health and safety
๏ฑ E&S benefits and development objectives:
๏ฑ improved surface water supply in water-scarced Chongzuo
new downtown area
๏ฑ improved water quality and connectivity
๏ฑ increased wetland ecological function areas
๏ฑ enhanced urban flood protection capacities
๏ฑ improved public health
Chongzuo Water Rehabilitation Project
SDG Alignment Based on Project Results
Sustainable cities
and communities
Clean Water and
Sanitation
Climate Action
๏ฑ Project: upgrade of two sewage treatment facilities including
expansion of a wastewater sludge incineration plant
๏ฑ Key potential negative E&S impacts and risks:
๏ฑ Air emissions and noise from sludge incineration facilities due to
proximity to residential areas
๏ฑ Increased pressure on receiving water bodiesโ€™ ecosystems due to
increased volume of wastewater discharge
๏ฑ Hazardous chemicals used for wastewater and sludge treatment
๏ฑ Mitigation measures:
๏ฑ BAT-compliant flue-gas treatment systems. Emissions modelling
demonstrated compliance with air quality standards
๏ฑ Treated wastewater quality will meet national and international
standards
๏ฑ E&OHS management systems certified to ISO 14001, 45001
๏ฑ E&S & SDG benefits:
๏ฑ Reduction of untreated wastewater discharge to the environment
and the associated environmental pollution
๏ฑ Reduction of the wastewater sludge disposal at landfills
St. Petersburg Wastewater Treatment Upgrade Project, Russia
Ensure availability and
sustainable management of
water and sanitation for all
SDG Alignment Based on Project Results
Thank you!
Contact us
esg@ndb.int

More Related Content

What's hot

Cook County Solid Waste Management Plan, 2011 Update (Click on the fullscreen...
Cook County Solid Waste Management Plan, 2011 Update (Click on the fullscreen...Cook County Solid Waste Management Plan, 2011 Update (Click on the fullscreen...
Cook County Solid Waste Management Plan, 2011 Update (Click on the fullscreen...Sebastian James
ย 
Integrated water resources management in Action
Integrated water resources management in ActionIntegrated water resources management in Action
Integrated water resources management in ActionChristina Parmionova
ย 
India's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIndia's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIWRS Society
ย 
Abdulrazzak - Coordinating Action at the Regional Level
Abdulrazzak - Coordinating Action at the Regional LevelAbdulrazzak - Coordinating Action at the Regional Level
Abdulrazzak - Coordinating Action at the Regional LevelLaura Haddad
ย 
National water policy__2012_
National water policy__2012_National water policy__2012_
National water policy__2012_Siddharth Laxman
ย 
National Water Policy of Ghana
National Water Policy of GhanaNational Water Policy of Ghana
National Water Policy of GhanaEnoch Ofosu
ย 
Hydropower Development and Management Thinking Ahead - 22-March 2017
Hydropower Development and Management Thinking Ahead - 22-March 2017Hydropower Development and Management Thinking Ahead - 22-March 2017
Hydropower Development and Management Thinking Ahead - 22-March 2017IWRS Society
ย 
Talk on national water policy 2012 tata steel csr nrd 2015
Talk on national water policy 2012 tata steel csr nrd 2015Talk on national water policy 2012 tata steel csr nrd 2015
Talk on national water policy 2012 tata steel csr nrd 2015Kallol Saha
ย 
2012 status report on the application of integrated approaches to water resou...
2012 status report on the application of integrated approaches to water resou...2012 status report on the application of integrated approaches to water resou...
2012 status report on the application of integrated approaches to water resou...Christina Parmionova
ย 
River basin management plans and results of publicย consultation in Lithuania
River basin management plans and results of publicย consultation in LithuaniaRiver basin management plans and results of publicย consultation in Lithuania
River basin management plans and results of publicย consultation in LithuaniaPomcert
ย 
Orange County Water Authority - Watershed Design Guide
Orange County Water Authority - Watershed Design GuideOrange County Water Authority - Watershed Design Guide
Orange County Water Authority - Watershed Design GuideHudsonRiverEstuaryResiliency
ย 
Introduction: The Green Agenda for Jackson Heights
Introduction: The Green Agenda for Jackson HeightsIntroduction: The Green Agenda for Jackson Heights
Introduction: The Green Agenda for Jackson Heightsjhbg
ย 
Planning for Flood Resilience: What Can Your Community Do?
Planning for Flood Resilience: What Can Your Community Do?Planning for Flood Resilience: What Can Your Community Do?
Planning for Flood Resilience: What Can Your Community Do?HudsonRiverEstuaryResiliency
ย 
The People Behind the Projects - Interview with Steve Warren - Water quality ...
The People Behind the Projects - Interview with Steve Warren - Water quality ...The People Behind the Projects - Interview with Steve Warren - Water quality ...
The People Behind the Projects - Interview with Steve Warren - Water quality ...ENPI Info Centre
ย 
Integrated water resources management
Integrated water resources managementIntegrated water resources management
Integrated water resources managementBikralla Acharya
ย 
Water & Wastewater Funding Opportunities
Water & Wastewater Funding OpportunitiesWater & Wastewater Funding Opportunities
Water & Wastewater Funding OpportunitiesTata & Howard, Inc.
ย 
Reason to rescind OMB decision
Reason to rescind OMB decisionReason to rescind OMB decision
Reason to rescind OMB decisionlouisette lanteigne
ย 

What's hot (20)

Cook County Solid Waste Management Plan, 2011 Update (Click on the fullscreen...
Cook County Solid Waste Management Plan, 2011 Update (Click on the fullscreen...Cook County Solid Waste Management Plan, 2011 Update (Click on the fullscreen...
Cook County Solid Waste Management Plan, 2011 Update (Click on the fullscreen...
ย 
Integrated water resources management in Action
Integrated water resources management in ActionIntegrated water resources management in Action
Integrated water resources management in Action
ย 
India's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIndia's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for Implementation
ย 
Abdulrazzak - Coordinating Action at the Regional Level
Abdulrazzak - Coordinating Action at the Regional LevelAbdulrazzak - Coordinating Action at the Regional Level
Abdulrazzak - Coordinating Action at the Regional Level
ย 
National water policy__2012_
National water policy__2012_National water policy__2012_
National water policy__2012_
ย 
National Water Policy of Ghana
National Water Policy of GhanaNational Water Policy of Ghana
National Water Policy of Ghana
ย 
Hydropower Development and Management Thinking Ahead - 22-March 2017
Hydropower Development and Management Thinking Ahead - 22-March 2017Hydropower Development and Management Thinking Ahead - 22-March 2017
Hydropower Development and Management Thinking Ahead - 22-March 2017
ย 
Talk on national water policy 2012 tata steel csr nrd 2015
Talk on national water policy 2012 tata steel csr nrd 2015Talk on national water policy 2012 tata steel csr nrd 2015
Talk on national water policy 2012 tata steel csr nrd 2015
ย 
2012 status report on the application of integrated approaches to water resou...
2012 status report on the application of integrated approaches to water resou...2012 status report on the application of integrated approaches to water resou...
2012 status report on the application of integrated approaches to water resou...
ย 
River basin management plans and results of publicย consultation in Lithuania
River basin management plans and results of publicย consultation in LithuaniaRiver basin management plans and results of publicย consultation in Lithuania
River basin management plans and results of publicย consultation in Lithuania
ย 
Orange County Water Authority - Watershed Design Guide
Orange County Water Authority - Watershed Design GuideOrange County Water Authority - Watershed Design Guide
Orange County Water Authority - Watershed Design Guide
ย 
Introduction: The Green Agenda for Jackson Heights
Introduction: The Green Agenda for Jackson HeightsIntroduction: The Green Agenda for Jackson Heights
Introduction: The Green Agenda for Jackson Heights
ย 
Planning for Flood Resilience: What Can Your Community Do?
Planning for Flood Resilience: What Can Your Community Do?Planning for Flood Resilience: What Can Your Community Do?
Planning for Flood Resilience: What Can Your Community Do?
ย 
The People Behind the Projects - Interview with Steve Warren - Water quality ...
The People Behind the Projects - Interview with Steve Warren - Water quality ...The People Behind the Projects - Interview with Steve Warren - Water quality ...
The People Behind the Projects - Interview with Steve Warren - Water quality ...
ย 
Integrated water resources management
Integrated water resources managementIntegrated water resources management
Integrated water resources management
ย 
Hunts Point
Hunts PointHunts Point
Hunts Point
ย 
Staten Island
Staten IslandStaten Island
Staten Island
ย 
Water & Wastewater Funding Opportunities
Water & Wastewater Funding OpportunitiesWater & Wastewater Funding Opportunities
Water & Wastewater Funding Opportunities
ย 
Long Island
Long IslandLong Island
Long Island
ย 
Reason to rescind OMB decision
Reason to rescind OMB decisionReason to rescind OMB decision
Reason to rescind OMB decision
ย 

Similar to Item 5.2 NDB finance for sdgs

Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...Government of Ekiti State, Nigeria
ย 
BWP-LG-Webinar
BWP-LG-WebinarBWP-LG-Webinar
BWP-LG-WebinarJoshua Grant
ย 
Project Cycle and the World Bank Environmental and Social Framework (ESF)
Project Cycle and the World Bank Environmental and Social Framework (ESF)Project Cycle and the World Bank Environmental and Social Framework (ESF)
Project Cycle and the World Bank Environmental and Social Framework (ESF)MamoudBelloAbubakar
ย 
sdgs_and_seea_unsd.pptx
sdgs_and_seea_unsd.pptxsdgs_and_seea_unsd.pptx
sdgs_and_seea_unsd.pptxPriyankaVikas2
ย 
Integrating River Basin Management Plans with the planning system
Integrating River Basin Management Plans with the planning systemIntegrating River Basin Management Plans with the planning system
Integrating River Basin Management Plans with the planning systemEnvironmental Protection Agency, Ireland
ย 
Citizen act ang_equator_principles
Citizen act ang_equator_principlesCitizen act ang_equator_principles
Citizen act ang_equator_principlesCITIZEN ACT
ย 
RK DEV 604 Final Lecture.pptx
RK DEV 604 Final Lecture.pptxRK DEV 604 Final Lecture.pptx
RK DEV 604 Final Lecture.pptxNAZMUSSAKIB917684
ย 
Session 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfSession 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfOECD Environment
ย 
Session 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfSession 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfOECD Environment
ย 
Introduction to EIA in India and Its Evolution
Introduction to EIA in India and Its EvolutionIntroduction to EIA in India and Its Evolution
Introduction to EIA in India and Its Evolutionpareshchavda
ย 
Greening water resource use: A perspective from the Vietnam National Green Gr...
Greening water resource use: A perspective from the Vietnam National Green Gr...Greening water resource use: A perspective from the Vietnam National Green Gr...
Greening water resource use: A perspective from the Vietnam National Green Gr...Hanna Stahlberg
ย 
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-ZuccalaPresentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-ZuccalaOECD Environment
ย 
Climate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan ImplementationClimate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan ImplementationIRC
ย 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David TylerBecarAsset
ย 
Ecocentra Brochure_2015
Ecocentra Brochure_2015Ecocentra Brochure_2015
Ecocentra Brochure_2015Lama Bashour
ย 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Harish Sharma
ย 
Pollution controlboard
Pollution controlboardPollution controlboard
Pollution controlboardOnkar Chauhan
ย 
Environmental Impact Report 101 Workshop (2/5/13)
Environmental Impact Report 101 Workshop (2/5/13)Environmental Impact Report 101 Workshop (2/5/13)
Environmental Impact Report 101 Workshop (2/5/13)gbeltalliance
ย 
Item 6.1 NDB sdgs mapping method and results
Item 6.1 NDB sdgs mapping method and results Item 6.1 NDB sdgs mapping method and results
Item 6.1 NDB sdgs mapping method and results OECD Environment
ย 

Similar to Item 5.2 NDB finance for sdgs (20)

Hydro Program
Hydro ProgramHydro Program
Hydro Program
ย 
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
Environmental Safeguard Specialist And Head Of Department - Staff Terms Of Re...
ย 
BWP-LG-Webinar
BWP-LG-WebinarBWP-LG-Webinar
BWP-LG-Webinar
ย 
Project Cycle and the World Bank Environmental and Social Framework (ESF)
Project Cycle and the World Bank Environmental and Social Framework (ESF)Project Cycle and the World Bank Environmental and Social Framework (ESF)
Project Cycle and the World Bank Environmental and Social Framework (ESF)
ย 
sdgs_and_seea_unsd.pptx
sdgs_and_seea_unsd.pptxsdgs_and_seea_unsd.pptx
sdgs_and_seea_unsd.pptx
ย 
Integrating River Basin Management Plans with the planning system
Integrating River Basin Management Plans with the planning systemIntegrating River Basin Management Plans with the planning system
Integrating River Basin Management Plans with the planning system
ย 
Citizen act ang_equator_principles
Citizen act ang_equator_principlesCitizen act ang_equator_principles
Citizen act ang_equator_principles
ย 
RK DEV 604 Final Lecture.pptx
RK DEV 604 Final Lecture.pptxRK DEV 604 Final Lecture.pptx
RK DEV 604 Final Lecture.pptx
ย 
Session 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfSession 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdf
ย 
Session 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfSession 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdf
ย 
Introduction to EIA in India and Its Evolution
Introduction to EIA in India and Its EvolutionIntroduction to EIA in India and Its Evolution
Introduction to EIA in India and Its Evolution
ย 
Greening water resource use: A perspective from the Vietnam National Green Gr...
Greening water resource use: A perspective from the Vietnam National Green Gr...Greening water resource use: A perspective from the Vietnam National Green Gr...
Greening water resource use: A perspective from the Vietnam National Green Gr...
ย 
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-ZuccalaPresentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
Presentation- Fourth Roundtable on Financing Water- Wiebke Bartz-Zuccala
ย 
Climate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan ImplementationClimate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan Implementation
ย 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David Tyler
ย 
Ecocentra Brochure_2015
Ecocentra Brochure_2015Ecocentra Brochure_2015
Ecocentra Brochure_2015
ย 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS)
ย 
Pollution controlboard
Pollution controlboardPollution controlboard
Pollution controlboard
ย 
Environmental Impact Report 101 Workshop (2/5/13)
Environmental Impact Report 101 Workshop (2/5/13)Environmental Impact Report 101 Workshop (2/5/13)
Environmental Impact Report 101 Workshop (2/5/13)
ย 
Item 6.1 NDB sdgs mapping method and results
Item 6.1 NDB sdgs mapping method and results Item 6.1 NDB sdgs mapping method and results
Item 6.1 NDB sdgs mapping method and results
ย 

More from OECD Environment

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
ย 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
ย 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
ย 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
ย 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
ย 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
ย 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
ย 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
ย 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
ย 
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...
Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...OECD Environment
ย 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
ย 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
ย 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
ย 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
ย 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
ย 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
ย 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
ย 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
ย 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
ย 
CCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl JachnikCCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl JachnikOECD Environment
ย 

More from OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
ย 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
ย 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
ย 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
ย 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
ย 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
ย 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
ย 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
ย 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
ย 
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...
Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...
ย 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
ย 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
ย 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
ย 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
ย 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
ย 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
ย 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
ย 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
ย 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
ย 
CCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl JachnikCCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl Jachnik
ย 

Recently uploaded

VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Anamikakaur10
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxhossanmdjobayer103
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7Call Girls in Nagpur High Profile Call Girls
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas๐Ÿ’ฅVictoria K. Colangelo
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
ย 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
ย 

Recently uploaded (20)

VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
ย 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
ย 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 

Item 5.2 NDB finance for sdgs

  • 1. NDBโ€™s Operational Experience Mobilizing and effectively using finance for water-related SDG 24 November 2020
  • 2. Outline New Development Bank Overview E&S Framework & Our Approach Case Studies โ€“ Water Sector
  • 3. New Development Bank NDB is a multilateral development bank established in 2015 by Brazil, Russia, India, China and South Africa (BRICS), with a mandate to: โ€œmobilize resources for infrastructure and sustainable development projects in BRICS and other emerging market economies and developing countries (EMDCs) complementing the existing efforts of multilateral and regional financial institutions for global growth and developmentโ€ ๏ฑHeadquartered in Shanghai (China) ๏ฑRegional offices: ๏ƒ˜South Africa โ€“ Johannesburg ๏ƒ˜Brazil โ€“ Brasilia and Sรฃo Paulo ๏ƒ˜Russia โ€“ Moscow ๏ƒ˜India โ€“ soon to be established
  • 4. ๏ฑ Development of sustainable infrastructure, being one of the key priorities for emerging economies in the coming decades, is the core focus of NDBโ€™s operations ๏ฑ NDB Board of Directors has approved 65 projects in all member countries for a total amount of US$ 20.6 billion* Support for Infrastructure and Sustainable Development 1.5 1.9 4.7 7.2 5.5 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 2016 2017 2018 2019 2020 (up to end-Q3) Actual project approvals Yearly project approvals USD billion *Source: NDB data (up to end-Q3, 2020) Clean Energy 18% Transport Infrastructure 23% Irrigation, Water Resource Management and Sanitation 10% Urban Development 18% Environmental Efficiency 6% Social Infrastructure 24% Multi-area 1% By key area of operation As at end-Q3 2020
  • 5. Using the NDB funds in a cost-effective way for sustainable development: the role of the NDB Environment and Social Framework (ESF)
  • 6. NDBโ€™s Environment and Social FrameworkObjectives Manage E&S risks and impacts Manage operational and reputational risks on NDB and its stakeholders Mainstream E&S considerations into decision-making processes of all parties Encourage international good E&S practices in operations and strengthen country systems Environment and Social Framework Part 1: Environmental and Social Policy Part 2: Environmental and Social Standards ESS ESS 1. E&S Impact Assessment ESS 2. Involuntary Resettlement ESS 3. Indigenous People
  • 7. NDBโ€™s Environment and Social Policy Key principles: โ€ข Applies to all NDB supported projects โ€ข Requires project to meet ESF/ESS โ€ข Promotes to use of country systems โ€ข Sets roles and responsibilities โ€ข Defines โ€œExclusion Listโ€ Key requirements: โ€ข Screening and categorization โ€ข E&S assessment and management plans โ€ข Public consultations โ€ข Information disclosure โ€ข Monitoring and reporting โ€ข Grievance redressal mechanism
  • 8. The correct implementation of the ESF leads to: ๏ฑ The materialization of project benefits ๏ฑ Effective mitigation of risks and impacts of projects ๏ฑ The application of sustainable practices through provisions in the Environmental and Social Impact Management Plan (ESIMP) Example: ESF as a tool to Enhance SGDโ€™s Reach SDGโ€™s 1 and 16 E&S Impact Mitigation Project Impact Involuntary resettlement The involuntary resettlement safeguards covers physical and economic displacement, involuntary acquisition of land, and involuntary restrictions on land use. Free, prior & informed consent. Effective environmental & social impact assessment (ESIA) process covering consultation, resettlement, and compensation aspects. 1. No Poverty 1.3. Implement nationally appropriate social protection systems {โ€ฆ} 1.4. Ensure that all, in particular the poor and the vulnerable, have equal rights to economic resources, basic services, ownership and control over land and other forms of property, {โ€ฆ} 16. Peace Justice and Strong Institutions 16.7. Ensure responsive, inclusive, participatory and representative decision-making at all levels
  • 9. SDG17. Strengthen the means of implementation and revitalize the Global Partnership for Sustainable Development - Promote the development, transfer, dissemination and diffusion of environmentally sound technologies to developing countries on favorable terms - Enhance international support for implementing effective and targeted capacity-building in developing countries to support national plans to implement all the Sustainable Development Goals ESF: From Mitigation of Impacts to Contribution to SDGs
  • 10. Case Study: Water Supply and Sanitation Systems in India, China and Russia
  • 11. ๏ฑ Project: ๏ฑ Construction and upgrade of drinking water supply system covering almost entire Manipur State ๏ฑ E&S Impacts: ๏ฑ clearance of existing land, vegetation or building; generation of wastes and scraps during construction and demolition works; community safety risks due to accidents, where structural elements or components of the Project are accessible to the community. ๏ฑ E&S benefits and development objectives: ๏ฑ provide household level water supply to urban and rural population in the state ๏ฑ enhance level of water supply as recommended by national guidelines ๏ฑ improve quality of water supplied through water treatment ๏ฑ improve operation and maintenance (O&M) of the water supply infrastructure ๏ฑ enhance the institutional capacity of PHED Water Supply System Project in India Clean Water and Sanitation SDG Alignment Based on Project Results
  • 12. ๏ฑ Project: ๏ฑ enhancement of hydraulic circulation, including rehabilitation of irrigation canals and river courses, construction of diversion water pipelines, dredging in lakes and wetlands, construction of sewage treatment stations and associated interception pipelines, construction of water pumping stations, and installation of ecological flood retention embankments along lake shores and riverside; ๏ฑ creation of vegetated buffer zones along riparian area. ๏ฑ Key potential negative E&S impacts and risks: ๏ฑ erosion, change of habitats, land acquisition, occupational health and safety ๏ฑ E&S benefits and development objectives: ๏ฑ improved surface water supply in water-scarced Chongzuo new downtown area ๏ฑ improved water quality and connectivity ๏ฑ increased wetland ecological function areas ๏ฑ enhanced urban flood protection capacities ๏ฑ improved public health Chongzuo Water Rehabilitation Project SDG Alignment Based on Project Results Sustainable cities and communities Clean Water and Sanitation Climate Action
  • 13. ๏ฑ Project: upgrade of two sewage treatment facilities including expansion of a wastewater sludge incineration plant ๏ฑ Key potential negative E&S impacts and risks: ๏ฑ Air emissions and noise from sludge incineration facilities due to proximity to residential areas ๏ฑ Increased pressure on receiving water bodiesโ€™ ecosystems due to increased volume of wastewater discharge ๏ฑ Hazardous chemicals used for wastewater and sludge treatment ๏ฑ Mitigation measures: ๏ฑ BAT-compliant flue-gas treatment systems. Emissions modelling demonstrated compliance with air quality standards ๏ฑ Treated wastewater quality will meet national and international standards ๏ฑ E&OHS management systems certified to ISO 14001, 45001 ๏ฑ E&S & SDG benefits: ๏ฑ Reduction of untreated wastewater discharge to the environment and the associated environmental pollution ๏ฑ Reduction of the wastewater sludge disposal at landfills St. Petersburg Wastewater Treatment Upgrade Project, Russia Ensure availability and sustainable management of water and sanitation for all SDG Alignment Based on Project Results