Aldar
Headquarters:
The First Spherical
Building In The Middle
East
Architect
Marwan Zgheib
Location
Abu Dhabi - United Arab in Al Raha Beach
Facade Design and Construction
Josef Gartner
Total built-up Area (including basement(
123,000sqm
Cost
AED 1,000,000,000
Owner & Developer
Al Dar Properties
Project Year 2005-2010
Height: Architectural110.1 m Floors Above Ground25
Floors Below Ground3# of Elevators14Top Elevator Speed6 m/s
height 121m
IntroductionIntroduction
The AlDar Headquarters has a distinctive and innovative design Zgheib
first had to select from natural forms he was inspired by the clam
shell which has deep meaning for Abu Dhabi with its seafaring
heritage. Asemispherical building comprising two circular convex
shaped facades linked by a narrow band of indented glazing. This
iconic fully glazed structure is completely circular in elevation and
curved in all other directions.
For the architect Marwan Zgheib, the power of the monument is in its
simplicity. His enthusiasm for the project led to a clear goal: to
create a simple object
The conceptThe concept
:
The Circle symbolizes unity, stability, rationality. It is also the symbol of infinity,
without beginning or end, perfection, the ultimate geometric symbol. It
represents a completeness which encompasses all space and Time.
It is also the symbol of infinity, without beginning or end, the perfection, the
ultimate geometric symbol
The circular shape inThe circular shape in
architecturearchitecture
To bring the massive circular concept to life, the issues of visual stability,
harmony and dynamism proved to be crucial. The real challenge of the
façade was to find the two points where the building should pose on the
ground – and for that, the development of the volume began by using one of
the oldest rules in architecture: the rule of proportion based on the Golden
Section.
The golden section is not merely an aesthetic proportion important to artists, but an
omnipresent cosmic principle that induces structural differentiation.
123.000m2 construction including foundation, dedicated 61.900m2 offices,
spread over 23 floors that can accommodate 120,000 people. Plants vary
between 1.700 and 2.700m2, with large column-free spaces and three
underground floors with capacity for 1184 vehicles.
The Harmonic proportionsThe Harmonic proportions
•A
SiteSite
PlanPlan
Piles
Construction
method
Basic design
function
End bearing
piles
Friction or
Floating piles
Replacement
piles
Displacement
piles
Methods of protecting the head of the pile from shattering must be decided before
commencing the
driving process. This can be determined from the end bearing requirements and driving
conditions.
Fig.: Simple Pile Driving Rig
Driven precast concrete pilesDriven precast concrete piles
Protecting pile head damage during driving
Disadvantage of Driven Precast Concrete Piles Method:
•Damage may occur in the pile at a position not visible from the surface during
driving process.
•Pile may get laterally displaced if it encounters any obstructions like rocks in the
ground.
•The length of pile is estimated before driving commences, but the accuracy of
this assumption is only known on site, where short piles can be difficult to extend
and long piles may prove to be expensive and wasteful.
With a rapid implementation program, 30 months to cover the inauguration of
the Formula One Grand Prix of Abu Dhabi, architects, engineers and many
experts on board worked with a collaborative effort, helping to direct
intelligently intricate overlapping design and construction with its new
challenges and complexities.
Foundation work began a month after the design was sketched and with
planes not yet completed by the engineers. The concrete cores were made
in the period of one year. At 14 months into the project, steel structure
erected to the fourth floor. Concrete elements, such as stairs, columns and
even the bathrooms were
prefabricated.
ConstructionConstruction
Structurally in plants Airodek system was used, consisting of lightweight
aluminum panels,. Each plant was divided into four 600m2 spill where
pouring concrete, which once set allowed the easy release of the support by
the loosening of the pins, being moved to the next section. This system
allowed covering 100m2 per day.
company collective contract was key to the successful design and construction of
the building proyecto.Durante Aldar HQ was adopted an innovative method of
Analysis and Writing. Engineering data and modeling were used in the early
stages of the project to maximize advance contracting and optimize the use of
materials
Structural Efficiency
&Increasing Popularity
– “Diagrid (a portmanteau of
diagonal grid) is a design
for constructing large
buildings with steel that
creates triangular structures
with diagonal support
beams”
–Is a system of triangulated
beams, straight or curved,
and horizontal rings that
together make up a
structural system for a
skyscraper
–Similar in idea and
execution to a typical
moment frame - just more
evolved
DiagridDiagrid
•Diagrids are redundant and load
path
following
•The Diagrid combines the benefits of
a
hollow tube with those of a truss and
its
chords
-The angled setting of the columnar
elements allows for a natural flow of
forces through the structure
-In this manner, both gravity loads
and
lateral loads are transferred through
the
diagrid to the the ground below
-loads are able to follow the diagonals
through the structure as it naturally
resists vectors of forces through its
triangulation
Diagrids employ configurations of
members such as to take full
advantage of said members’
inherent
ability to resist compression and
tension. Due to this reason, most
diagrids employed today are
constructed of steel, as is the
Swiss Re, or Gherkin. The
exploitation of steel’s compressive
and
tensile abilities creates a need for
less steel in a building using the
diagrid system (for instance, in
the Hearst Tower in NYC, it has
been estimated that the diagrid
employed there required 20% less
steel than would have been
needed if the building were a
typical moment frame).
The striking shape of this building is achieved through the use of an external
structural triangular diagrid – a diagonal grid of steel. The first of its kind in
the UAE, it allowed the creation of structural efficiency and stability
appropriate to the circular building with greater flexibility than a conventional
rectangular form. The system not only helped minimize the impact of the
steel frame on the façade but also served as an architectural element that
blurred all sense of scale and inflated the structure, moving away from the
typical horizontal stratification of the facades that influenced most high rises
in the area
The Facade curvatureThe Facade curvature
:
Unlike the conventional four sided buildings, the circular building challenges the
approach to construction by questioning the typical roof structure. This three
faceted building relies on its zipper-like element, a continuous glass and
structural band that stitches the two main facets together, creating a slim
continuous surface that is both vertical and horizontal, side and face,
window and roof.
Fusion of the façadeFusion of the façade
•The curved glass skin became one of its most complex components to be
executed. In order to solve the challenge of the façade curvature, triangular
pieces of flat glass combined into diamond like shapes, came together like a
puzzle working with the diagrid and the highly complex geometry of the
skin..
To the outside of the building structure, which has a cantilevered design of 25
m in each longitudinal direction, the concrete could not be considered as a
construction material. A concrete structure would have required internal
supports both unwanted and costly long led construction work. Therefore,
the team developed a complex external structure of diamond-shaped steel,
called "diagrid", which achieves the striking shape of the building, the first of
its kind in the UAE. This structure allowed efficient creation and structural
stability appropriate to the circular building.
Glass skinGlass skin
The system not only helped minimize the impact of the steel structure in the
facade, but also served as an architectural element that blurred any sense
of the scale and structure robustecía away from the typical horizontal
layering of the facades. The diagrid system eliminates the need for internal
columns to support the construction that would jeopardize the aesthetic
appeal and the view from within, improving building efficiency and providing
design flexibility for tenants.
Unlike existing four facades conventional buildings, the project challenges the
construction approach by questioning the typical structure of the roof. This
building based on three sides "zipper element" as a third hand, a continuous
structural glass band connecting the two main fronts creating a thin,
continuous surface that is both horizontal and vertical front and side
windows and roof. This lateral element, the "backbone" project structure
creates a brilliant fusion between façade and roof, allowing monolithic
object.
Truss system
The space between two main elevationThe space between two main elevation
ROOF SYSTEM
ENTRANCE
Guangzhou CircleGuangzhou Circle
:
The project was developed in line with the US Green Building Council LEED
rating system. It is one of the first eco-friendly official buildings in Abu Dhabi,
which is made up of recyclable kind of materials like steel, concrete and
glass, and includes a district cooling plant, as well as efficient lighting and
water systems. The building maximizes natural light, with meeting areas and
offices spread around the perimeter of each floor. A subterranean
automated vacuum waste collection system is also incorporated to reuse all
the waste products of the building. The first of its kind in Abu Dhabi, the
system sucks rubbish directly to a local waste transfer station for recycling
and compacting.
The building Aldar Headquater received several awards and recognitions,
including the "Best Futuristic Design" award by The Building Exchange
(BEX), and Silver LEED as green building Green Building Council (USA)
The buildings sustainableThe buildings sustainable
strategiesstrategies
Aldar Headqaurter

More Related Content

What's hot

High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic BuildingsDania Abdel-aziz
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Towermisschand
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures rohan joshi
 
Diagrid structure system - شبكات العقد الاطارية
Diagrid structure system -    شبكات العقد الاطاريةDiagrid structure system -    شبكات العقد الاطارية
Diagrid structure system - شبكات العقد الاطاريةDr.Youssef Hammida
 
Palace of assembly
Palace of assemblyPalace of assembly
Palace of assemblyDisha Pandya
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems TypesMazin Elbashkatib
 
Chicago School of Architecture
Chicago School of ArchitectureChicago School of Architecture
Chicago School of ArchitectureAndhra University
 
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURESTEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTUREMohd Azmatullah
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)Prince Pathania
 
barcelona pavilion
barcelona pavilionbarcelona pavilion
barcelona pavilionZubda Sajda
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise BuildingsPrasad Thanthratey
 
Post modern architecture
Post modern architecturePost modern architecture
Post modern architectureLipikaPandey
 
High rise structure
High rise structureHigh rise structure
High rise structureAnuj Singhal
 
Cable systems - form active structure system
Cable systems - form active structure systemCable systems - form active structure system
Cable systems - form active structure systemArchistudent Portal
 

What's hot (20)

High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic Buildings
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures
 
Mies van der rohe
Mies van der roheMies van der rohe
Mies van der rohe
 
Zaha hadid
Zaha hadidZaha hadid
Zaha hadid
 
Diagrid structure system - شبكات العقد الاطارية
Diagrid structure system -    شبكات العقد الاطاريةDiagrid structure system -    شبكات العقد الاطارية
Diagrid structure system - شبكات العقد الاطارية
 
Palace of assembly
Palace of assemblyPalace of assembly
Palace of assembly
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems Types
 
The Gherkin.
The Gherkin.The Gherkin.
The Gherkin.
 
The tents structure system
The tents structure systemThe tents structure system
The tents structure system
 
Chicago School of Architecture
Chicago School of ArchitectureChicago School of Architecture
Chicago School of Architecture
 
Tensile structures
Tensile structuresTensile structures
Tensile structures
 
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURESTEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
STEEL IN ARCHITECTURE-CONTEMPORARY ARCHITECTURE
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)
 
barcelona pavilion
barcelona pavilionbarcelona pavilion
barcelona pavilion
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
Post modern architecture
Post modern architecturePost modern architecture
Post modern architecture
 
norman foster
norman fosternorman foster
norman foster
 
High rise structure
High rise structureHigh rise structure
High rise structure
 
Cable systems - form active structure system
Cable systems - form active structure systemCable systems - form active structure system
Cable systems - form active structure system
 

Similar to Aldar Headqaurter

architectural concept
architectural conceptarchitectural concept
architectural conceptHezhaHaydar
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Yee Len Wan
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsSasanSafar
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down methodDarshan Parakhiya
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyChyi Ong
 
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...Darwin Jayson Mariano
 
Lincoln arc welding article183
Lincoln arc welding article183Lincoln arc welding article183
Lincoln arc welding article183Miklos Peller, Sr.
 
Case study on steel structure Shrikant
Case study on steel structure  ShrikantCase study on steel structure  Shrikant
Case study on steel structure ShrikantShriKant49
 
Bcon final.compressed
Bcon final.compressedBcon final.compressed
Bcon final.compressedAlexis Wei
 
Diagrid structural system
Diagrid structural systemDiagrid structural system
Diagrid structural systemvivek bhathee
 
earthquake resistant design
earthquake resistant designearthquake resistant design
earthquake resistant designAditya Sanyal
 

Similar to Aldar Headqaurter (20)

Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
architectural concept
architectural conceptarchitectural concept
architectural concept
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
Presentation1
Presentation1Presentation1
Presentation1
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materials
 
kkr 2
kkr 2kkr 2
kkr 2
 
115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)115659118 pre-engineered-buildings (1)
115659118 pre-engineered-buildings (1)
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down method
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copy
 
Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
 
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
 
Lincoln arc welding article183
Lincoln arc welding article183Lincoln arc welding article183
Lincoln arc welding article183
 
Al dar hq
Al dar hqAl dar hq
Al dar hq
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Case study on steel structure Shrikant
Case study on steel structure  ShrikantCase study on steel structure  Shrikant
Case study on steel structure Shrikant
 
Btech
BtechBtech
Btech
 
Bcon final.compressed
Bcon final.compressedBcon final.compressed
Bcon final.compressed
 
Diagrid structural system
Diagrid structural systemDiagrid structural system
Diagrid structural system
 
earthquake resistant design
earthquake resistant designearthquake resistant design
earthquake resistant design
 

Recently uploaded

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 

Aldar Headqaurter

  • 2. Architect Marwan Zgheib Location Abu Dhabi - United Arab in Al Raha Beach Facade Design and Construction Josef Gartner Total built-up Area (including basement( 123,000sqm Cost AED 1,000,000,000 Owner & Developer Al Dar Properties Project Year 2005-2010 Height: Architectural110.1 m Floors Above Ground25 Floors Below Ground3# of Elevators14Top Elevator Speed6 m/s height 121m IntroductionIntroduction
  • 3.
  • 4. The AlDar Headquarters has a distinctive and innovative design Zgheib first had to select from natural forms he was inspired by the clam shell which has deep meaning for Abu Dhabi with its seafaring heritage. Asemispherical building comprising two circular convex shaped facades linked by a narrow band of indented glazing. This iconic fully glazed structure is completely circular in elevation and curved in all other directions. For the architect Marwan Zgheib, the power of the monument is in its simplicity. His enthusiasm for the project led to a clear goal: to create a simple object The conceptThe concept
  • 5.
  • 6.
  • 7. : The Circle symbolizes unity, stability, rationality. It is also the symbol of infinity, without beginning or end, perfection, the ultimate geometric symbol. It represents a completeness which encompasses all space and Time. It is also the symbol of infinity, without beginning or end, the perfection, the ultimate geometric symbol The circular shape inThe circular shape in architecturearchitecture
  • 8.
  • 9. To bring the massive circular concept to life, the issues of visual stability, harmony and dynamism proved to be crucial. The real challenge of the façade was to find the two points where the building should pose on the ground – and for that, the development of the volume began by using one of the oldest rules in architecture: the rule of proportion based on the Golden Section. The golden section is not merely an aesthetic proportion important to artists, but an omnipresent cosmic principle that induces structural differentiation. 123.000m2 construction including foundation, dedicated 61.900m2 offices, spread over 23 floors that can accommodate 120,000 people. Plants vary between 1.700 and 2.700m2, with large column-free spaces and three underground floors with capacity for 1184 vehicles. The Harmonic proportionsThe Harmonic proportions
  • 10.
  • 13.
  • 14. Piles Construction method Basic design function End bearing piles Friction or Floating piles Replacement piles Displacement piles
  • 15.
  • 16.
  • 17.
  • 18. Methods of protecting the head of the pile from shattering must be decided before commencing the driving process. This can be determined from the end bearing requirements and driving conditions. Fig.: Simple Pile Driving Rig Driven precast concrete pilesDriven precast concrete piles
  • 19. Protecting pile head damage during driving Disadvantage of Driven Precast Concrete Piles Method: •Damage may occur in the pile at a position not visible from the surface during driving process. •Pile may get laterally displaced if it encounters any obstructions like rocks in the ground. •The length of pile is estimated before driving commences, but the accuracy of this assumption is only known on site, where short piles can be difficult to extend and long piles may prove to be expensive and wasteful.
  • 20. With a rapid implementation program, 30 months to cover the inauguration of the Formula One Grand Prix of Abu Dhabi, architects, engineers and many experts on board worked with a collaborative effort, helping to direct intelligently intricate overlapping design and construction with its new challenges and complexities. Foundation work began a month after the design was sketched and with planes not yet completed by the engineers. The concrete cores were made in the period of one year. At 14 months into the project, steel structure erected to the fourth floor. Concrete elements, such as stairs, columns and even the bathrooms were prefabricated. ConstructionConstruction
  • 21. Structurally in plants Airodek system was used, consisting of lightweight aluminum panels,. Each plant was divided into four 600m2 spill where pouring concrete, which once set allowed the easy release of the support by the loosening of the pins, being moved to the next section. This system allowed covering 100m2 per day. company collective contract was key to the successful design and construction of the building proyecto.Durante Aldar HQ was adopted an innovative method of Analysis and Writing. Engineering data and modeling were used in the early stages of the project to maximize advance contracting and optimize the use of materials
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. Structural Efficiency &Increasing Popularity – “Diagrid (a portmanteau of diagonal grid) is a design for constructing large buildings with steel that creates triangular structures with diagonal support beams” –Is a system of triangulated beams, straight or curved, and horizontal rings that together make up a structural system for a skyscraper –Similar in idea and execution to a typical moment frame - just more evolved DiagridDiagrid
  • 28. •Diagrids are redundant and load path following •The Diagrid combines the benefits of a hollow tube with those of a truss and its chords -The angled setting of the columnar elements allows for a natural flow of forces through the structure -In this manner, both gravity loads and lateral loads are transferred through the diagrid to the the ground below -loads are able to follow the diagonals through the structure as it naturally resists vectors of forces through its triangulation
  • 29.
  • 30. Diagrids employ configurations of members such as to take full advantage of said members’ inherent ability to resist compression and tension. Due to this reason, most diagrids employed today are constructed of steel, as is the Swiss Re, or Gherkin. The exploitation of steel’s compressive and tensile abilities creates a need for less steel in a building using the diagrid system (for instance, in the Hearst Tower in NYC, it has been estimated that the diagrid employed there required 20% less steel than would have been needed if the building were a typical moment frame).
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36. The striking shape of this building is achieved through the use of an external structural triangular diagrid – a diagonal grid of steel. The first of its kind in the UAE, it allowed the creation of structural efficiency and stability appropriate to the circular building with greater flexibility than a conventional rectangular form. The system not only helped minimize the impact of the steel frame on the façade but also served as an architectural element that blurred all sense of scale and inflated the structure, moving away from the typical horizontal stratification of the facades that influenced most high rises in the area The Facade curvatureThe Facade curvature
  • 37. : Unlike the conventional four sided buildings, the circular building challenges the approach to construction by questioning the typical roof structure. This three faceted building relies on its zipper-like element, a continuous glass and structural band that stitches the two main facets together, creating a slim continuous surface that is both vertical and horizontal, side and face, window and roof. Fusion of the façadeFusion of the façade
  • 38.
  • 39.
  • 40. •The curved glass skin became one of its most complex components to be executed. In order to solve the challenge of the façade curvature, triangular pieces of flat glass combined into diamond like shapes, came together like a puzzle working with the diagrid and the highly complex geometry of the skin.. To the outside of the building structure, which has a cantilevered design of 25 m in each longitudinal direction, the concrete could not be considered as a construction material. A concrete structure would have required internal supports both unwanted and costly long led construction work. Therefore, the team developed a complex external structure of diamond-shaped steel, called "diagrid", which achieves the striking shape of the building, the first of its kind in the UAE. This structure allowed efficient creation and structural stability appropriate to the circular building. Glass skinGlass skin
  • 41. The system not only helped minimize the impact of the steel structure in the facade, but also served as an architectural element that blurred any sense of the scale and structure robustecía away from the typical horizontal layering of the facades. The diagrid system eliminates the need for internal columns to support the construction that would jeopardize the aesthetic appeal and the view from within, improving building efficiency and providing design flexibility for tenants.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47. Unlike existing four facades conventional buildings, the project challenges the construction approach by questioning the typical structure of the roof. This building based on three sides "zipper element" as a third hand, a continuous structural glass band connecting the two main fronts creating a thin, continuous surface that is both horizontal and vertical front and side windows and roof. This lateral element, the "backbone" project structure creates a brilliant fusion between façade and roof, allowing monolithic object. Truss system The space between two main elevationThe space between two main elevation
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 58.
  • 59. : The project was developed in line with the US Green Building Council LEED rating system. It is one of the first eco-friendly official buildings in Abu Dhabi, which is made up of recyclable kind of materials like steel, concrete and glass, and includes a district cooling plant, as well as efficient lighting and water systems. The building maximizes natural light, with meeting areas and offices spread around the perimeter of each floor. A subterranean automated vacuum waste collection system is also incorporated to reuse all the waste products of the building. The first of its kind in Abu Dhabi, the system sucks rubbish directly to a local waste transfer station for recycling and compacting. The building Aldar Headquater received several awards and recognitions, including the "Best Futuristic Design" award by The Building Exchange (BEX), and Silver LEED as green building Green Building Council (USA) The buildings sustainableThe buildings sustainable strategiesstrategies