SlideShare a Scribd company logo
1 of 6
A
PROJECT SYNOPSIS
ON
GRID SYNCHRONIZATION FAIL DETECTION WITH
UNDER VOLTAGE AND OVER VOLTAGE
SUBMITTED IN PARTIAL FULFILLMENT
FOR THE AWARD OF THE
DEGREE OF
BACHELOR OF TECHNOLOGY
IN
ELECTRICAL ENGINEERING
Submitted by
Karishma 1812018
Princy 1812020
Diksha 1812031
Under the guidance of
(2012 – 2016)
Haryana Engineering College
Jagadhri
(Kurukshetra University, Kurukshetra
INTRODUCTION
There is an Under/over voltage or under/over frequency, then the comparator will detect the
difference the actual power and reactive. If there is no failure of power grid synchronization then
the detectors will give the zero values. Based on the Under/over voltage and under/over
frequency values the power suppliers will be disconnected if any out of limitation values are
observed.
Synchronization means the minimization of difference in voltage, frequency and phase angle
between the corresponding phases of the generator output and grid supply. An alternating current
generator must be synchronized with the grid prior to connection. It can’t deliver the power
unless it is running at same frequency as the network. Synchronization must occur before
connecting the generator to a grid. Synchronization can be achieved manually or automatically.
The purpose of synchronization is to monitor, access, enable, and automatically take the control
action to prevent the abnormalities of voltage and frequency.
Rules must be followed for Synchronization:
Voltage Fluctuation:
When a generator is synchronized with a power grid, normally there is a voltage fluctuation on
the distribution line. During synchronization the voltage fluctuation should not exceed 3% at the
at the point of common coupling.
Synchronization Limits:
The limits allowing for synchronization are
1. Phase angle- +/-20 degrees
2. Maximum voltage difference – 7%
3. Maximum slip frequency – 0.44%
Relays:
For checking the synchronization “synch check relay” must be used. The usage of relays can’t
apply for induction generators. The use of synch check relay is to accept as a backup during
synchronization and to ensure a generator will not connect to a dead distribution line.
Synchronization of Induction Generators:
For the synchronization of induction generators it just needs to be run up to synchronization
speed and connected. For this purpose standard motor controllers will be used. To mechanically
drive the generators up to synchronization speed turbine shaft power will be used. The speed of
the motors depends on supplied frequency and number of poles on the generators.
Synchronization of Synchronous Machines:
For synchronous generators output waveform should be in phase with the grid voltage waveform
or with in specified limits. The rate of change of phase angle between the grid and the machine
(generator) must be with in the specified limits.
Some other rules are variable speed drive arrangement to maintain a constant output frequency,
inter connection protection between the generator and distribution system.
Failure of Synchronization:
Synchronization circuit may fail for responding to a received input pulse when the received input
pulse is shorted than the sampling period of the synchronizer. Then no synchronized
representation will take place. When the pulse rate of the input signal is higher than the
synchronization rate of the synchronizer then also it may fail to respond. Some times the
synchronizer it self may fail by ignoring input events. These all are the circumstances which
could create problems if not detected. There are various reasons for failure of power grid
synchronization.
Synchronization Failures and their Detections:
There are some situations where the generators and some local loads have become disconnected
from main distribution lines. Due to this reduction in quality of supply, and it may prevent
automatic reconnection of devices. This is called as islanding. For this reason islanding must be
detected immediately and producing power must be stopped immediately.
Due to Islanding following hazards may take place
1. Generally distributed lines are earthed only at the sub station. When the distributing lines and
generators are disconnected the line is not earthed. Due to this reason line voltages may
excessive.
2. The fault level contribution from the grid to sub-station may be lost. This will effect the
operation of protection on distributed lines. Due to this sufficient current may not be generated.
3. Due to Islanding synchronization can’t be maintained. When the grip attempts to reconnect with
distribution line it may be out of synchronization at the reconnection point. Due to this, suddenly
large power may flows which cause damage for generators, distribution units and consumer
products.
Some other disadvantages due to islanding are the voltage levels may go outside of normal
operating limits, and the quality of supply may be reduced.
Detection methods of Islanding:
Detection of islanding can be done through active and passive methods. Passive methods look
for transient events on the grid and active methods will probe the grid by sending signals from
the distribution point of grid. Loss of Mains Protection (LoM) will be designed to sense the
disconnection of generators and loads when an island has been created. The most utilized LoM
detection methods may fail to detect islanding when the production matches closely with the
consumption in the island zone. This blind area is called Non Detection Zone (NDZ). The size of
NDZ can be reduced by tightening the LoM setting relays.
Active Methods:
Impedance measurement, Detection of impedance at specific frequency, slip mode frequency
shift, Frequency bias, and frequency jump detection methods are some passive methods for
islanding detection. The advantage of impedance measurement method is an extremely small
NDZ for a single inverter. Slip mode frequency shift method is relatively easy to implement. It is
highly effective in islanding prevention when compared to other detection methods.
Passive Methods:
All grid-connected PV inverters are required to have Over/Under frequency protections methods
and Under/Over voltage protection methods that cause the inverter to stop supplying power to
the utility grid if the frequency or voltage of grid at the point of coupling.
Block Diagram
These protection methods protect consumer’s equipment and also servicing as anti-islanding
methods. Voltage Phase Jump detection, and Detection of voltage harmonics are some more
passive methods for detection islanding. The Under/Over voltage protection methods and the
Under/over frequency methods are required other than preventing islanding. Several islanding
prevention methods produce abnormal voltage, and frequency. Under/Over voltage protection
methods and Under/Over frequency protection methods are low cost methods for the detection
islanding.
Applications of Power grid failure Detection:
Lighting is one of the main causes for power system faults. The entire power system is consisting
electrically of power plants, sub-stations and transmission lines, distribution feeders and power
consumers. Detecting the synchronization failure between generators and power grid is the major
advantage such as saving the energy. Then we can avoid the loss of power consumption by
disconnecting from the power consumption devices.
When there is an Under/over voltage or under/over frequency, then the comparator will detect
the difference the actual power and reactive. If there is no failure of power grid synchronization
then the detectors will give the zero values. Based on the Under/over voltage and under/over
frequency values the power suppliers will be disconnected if any out of limitation values are
observed.

More Related Content

What's hot

Three Phase Fault Analysis With Auto Reset On Temporary Fault And Permanent Trip
Three Phase Fault Analysis With Auto Reset On Temporary Fault And Permanent TripThree Phase Fault Analysis With Auto Reset On Temporary Fault And Permanent Trip
Three Phase Fault Analysis With Auto Reset On Temporary Fault And Permanent TripEdgefxkits & Solutions
 
Fault analysis on three phase system by auto reclosing mechanism
Fault analysis on three phase system by auto reclosing mechanismFault analysis on three phase system by auto reclosing mechanism
Fault analysis on three phase system by auto reclosing mechanismeSAT Journals
 
three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...Vikram Rawani
 
AUTOMATIC ACTIVE PHASE SELECTOR FOR SINGLE ...
AUTOMATIC ACTIVE PHASE SELECTOR FOR SINGLE                                   ...AUTOMATIC ACTIVE PHASE SELECTOR FOR SINGLE                                   ...
AUTOMATIC ACTIVE PHASE SELECTOR FOR SINGLE ...MAHESH294
 
overview of grid structure and synchronization for distributed power generati...
overview of grid structure and synchronization for distributed power generati...overview of grid structure and synchronization for distributed power generati...
overview of grid structure and synchronization for distributed power generati...Shivani Kumari
 
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSUJAY RAVI KALE
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...Vikram Rawani
 
Auto selection of any aviliable phase
Auto selection of any aviliable phaseAuto selection of any aviliable phase
Auto selection of any aviliable phasenajeebs10
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2R.K. Mathuria
 
Automatic Phase Changer
Automatic Phase ChangerAutomatic Phase Changer
Automatic Phase ChangerBhanu Bhawesh
 
SELF SWITCHING POWER SUPLLY
SELF SWITCHING POWER SUPLLYSELF SWITCHING POWER SUPLLY
SELF SWITCHING POWER SUPLLYshiv kapil
 
Digital phase selector
Digital phase selectorDigital phase selector
Digital phase selectorSashank G
 
Design and Construction of Automatic Three Phase Power System Selector
Design and Construction of Automatic Three Phase Power System SelectorDesign and Construction of Automatic Three Phase Power System Selector
Design and Construction of Automatic Three Phase Power System Selectoriosrjce
 
7SR12 Directional Over Current Relay
7SR12 Directional Over Current Relay7SR12 Directional Over Current Relay
7SR12 Directional Over Current Relayashwini reliserv
 
Digital phase changer ppt
Digital phase changer pptDigital phase changer ppt
Digital phase changer pptAshish Verma
 
distribution system fault mangement
distribution system fault mangementdistribution system fault mangement
distribution system fault mangementManjunath Ds
 
Automated load shedding using microcontroller
Automated load shedding using microcontrollerAutomated load shedding using microcontroller
Automated load shedding using microcontrollerRajVerma175
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid designsusanta das
 
Basic short circuit calculation procedure
Basic short circuit calculation procedureBasic short circuit calculation procedure
Basic short circuit calculation procedureMustafa Ismail
 

What's hot (20)

Three Phase Fault Analysis With Auto Reset On Temporary Fault And Permanent Trip
Three Phase Fault Analysis With Auto Reset On Temporary Fault And Permanent TripThree Phase Fault Analysis With Auto Reset On Temporary Fault And Permanent Trip
Three Phase Fault Analysis With Auto Reset On Temporary Fault And Permanent Trip
 
Fault analysis on three phase system by auto reclosing mechanism
Fault analysis on three phase system by auto reclosing mechanismFault analysis on three phase system by auto reclosing mechanism
Fault analysis on three phase system by auto reclosing mechanism
 
three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...
 
AUTOMATIC ACTIVE PHASE SELECTOR FOR SINGLE ...
AUTOMATIC ACTIVE PHASE SELECTOR FOR SINGLE                                   ...AUTOMATIC ACTIVE PHASE SELECTOR FOR SINGLE                                   ...
AUTOMATIC ACTIVE PHASE SELECTOR FOR SINGLE ...
 
overview of grid structure and synchronization for distributed power generati...
overview of grid structure and synchronization for distributed power generati...overview of grid structure and synchronization for distributed power generati...
overview of grid structure and synchronization for distributed power generati...
 
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
 
Auto selection of any aviliable phase
Auto selection of any aviliable phaseAuto selection of any aviliable phase
Auto selection of any aviliable phase
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2
 
Automatic Phase Changer
Automatic Phase ChangerAutomatic Phase Changer
Automatic Phase Changer
 
SELF SWITCHING POWER SUPLLY
SELF SWITCHING POWER SUPLLYSELF SWITCHING POWER SUPLLY
SELF SWITCHING POWER SUPLLY
 
Digital phase selector
Digital phase selectorDigital phase selector
Digital phase selector
 
Design and Construction of Automatic Three Phase Power System Selector
Design and Construction of Automatic Three Phase Power System SelectorDesign and Construction of Automatic Three Phase Power System Selector
Design and Construction of Automatic Three Phase Power System Selector
 
7SR12 Directional Over Current Relay
7SR12 Directional Over Current Relay7SR12 Directional Over Current Relay
7SR12 Directional Over Current Relay
 
Digital phase changer ppt
Digital phase changer pptDigital phase changer ppt
Digital phase changer ppt
 
distribution system fault mangement
distribution system fault mangementdistribution system fault mangement
distribution system fault mangement
 
Relay & Protection
Relay  & ProtectionRelay  & Protection
Relay & Protection
 
Automated load shedding using microcontroller
Automated load shedding using microcontrollerAutomated load shedding using microcontroller
Automated load shedding using microcontroller
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
Basic short circuit calculation procedure
Basic short circuit calculation procedureBasic short circuit calculation procedure
Basic short circuit calculation procedure
 

Viewers also liked

Synopsis for Public Garden automation with solar tracker by Punith urs
Synopsis for Public Garden automation with solar tracker by Punith ursSynopsis for Public Garden automation with solar tracker by Punith urs
Synopsis for Public Garden automation with solar tracker by Punith ursPunith Urs
 
Project Synopsis sample
Project Synopsis sampleProject Synopsis sample
Project Synopsis sampleRahul Pola
 
J. A. P. Lopes, "The MERGE control concept - Microgrids and EVs - Development...
J. A. P. Lopes, "The MERGE control concept - Microgrids and EVs - Development...J. A. P. Lopes, "The MERGE control concept - Microgrids and EVs - Development...
J. A. P. Lopes, "The MERGE control concept - Microgrids and EVs - Development...Eamon Keane
 
Modelling the system dynamics of islanding asynchronous generators / Telemark...
Modelling the system dynamics of islanding asynchronous generators / Telemark...Modelling the system dynamics of islanding asynchronous generators / Telemark...
Modelling the system dynamics of islanding asynchronous generators / Telemark...Modelon
 
Storage Area Networks Unit 3 Notes
Storage Area Networks Unit 3 NotesStorage Area Networks Unit 3 Notes
Storage Area Networks Unit 3 NotesSudarshan Dhondaley
 
47879104 automatic-stand-release
47879104 automatic-stand-release47879104 automatic-stand-release
47879104 automatic-stand-releaseParveen Jaat
 
PPT_Final_Presentation
PPT_Final_PresentationPPT_Final_Presentation
PPT_Final_PresentationSleeba Paul
 
PROJECT Room envirment monitoring system synopsis
PROJECT  Room envirment monitoring system synopsisPROJECT  Room envirment monitoring system synopsis
PROJECT Room envirment monitoring system synopsisprashant shukla
 
Anish Kumar (EEE)
Anish Kumar (EEE)Anish Kumar (EEE)
Anish Kumar (EEE)Anish Kumar
 
Chap2coulomb law
Chap2coulomb lawChap2coulomb law
Chap2coulomb lawgtamayov
 
Van de graaff generator pp
Van de graaff generator ppVan de graaff generator pp
Van de graaff generator ppPaul Schumann
 
Automatic side stand remover
Automatic side stand removerAutomatic side stand remover
Automatic side stand removerSaurav Sd
 
Sprocket -Side Stand Retrieve System
Sprocket -Side Stand Retrieve SystemSprocket -Side Stand Retrieve System
Sprocket -Side Stand Retrieve SystemSuchit Moon
 
Audio steganography project presentation
Audio steganography project presentationAudio steganography project presentation
Audio steganography project presentationkartikeya upadhyay
 
Synopsis or minor project ppt's (2)
Synopsis or minor project ppt's (2)Synopsis or minor project ppt's (2)
Synopsis or minor project ppt's (2)sunil paswan
 
Canteen automation system (updated) revised
Canteen automation system (updated) revisedCanteen automation system (updated) revised
Canteen automation system (updated) revisedrinshi jain
 
B. Tech. Minor Project Synopsis
B. Tech. Minor Project Synopsis B. Tech. Minor Project Synopsis
B. Tech. Minor Project Synopsis Shashank Narayan
 

Viewers also liked (20)

DLD_SYNOPSIS
DLD_SYNOPSISDLD_SYNOPSIS
DLD_SYNOPSIS
 
Synopsis for Public Garden automation with solar tracker by Punith urs
Synopsis for Public Garden automation with solar tracker by Punith ursSynopsis for Public Garden automation with solar tracker by Punith urs
Synopsis for Public Garden automation with solar tracker by Punith urs
 
Project Synopsis sample
Project Synopsis sampleProject Synopsis sample
Project Synopsis sample
 
J. A. P. Lopes, "The MERGE control concept - Microgrids and EVs - Development...
J. A. P. Lopes, "The MERGE control concept - Microgrids and EVs - Development...J. A. P. Lopes, "The MERGE control concept - Microgrids and EVs - Development...
J. A. P. Lopes, "The MERGE control concept - Microgrids and EVs - Development...
 
18 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_16051018 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_160510
 
Modelling the system dynamics of islanding asynchronous generators / Telemark...
Modelling the system dynamics of islanding asynchronous generators / Telemark...Modelling the system dynamics of islanding asynchronous generators / Telemark...
Modelling the system dynamics of islanding asynchronous generators / Telemark...
 
Storage Area Networks Unit 3 Notes
Storage Area Networks Unit 3 NotesStorage Area Networks Unit 3 Notes
Storage Area Networks Unit 3 Notes
 
47879104 automatic-stand-release
47879104 automatic-stand-release47879104 automatic-stand-release
47879104 automatic-stand-release
 
PPT_Final_Presentation
PPT_Final_PresentationPPT_Final_Presentation
PPT_Final_Presentation
 
PROJECT Room envirment monitoring system synopsis
PROJECT  Room envirment monitoring system synopsisPROJECT  Room envirment monitoring system synopsis
PROJECT Room envirment monitoring system synopsis
 
Anish Kumar (EEE)
Anish Kumar (EEE)Anish Kumar (EEE)
Anish Kumar (EEE)
 
Chap2coulomb law
Chap2coulomb lawChap2coulomb law
Chap2coulomb law
 
Van de graaff generator pp
Van de graaff generator ppVan de graaff generator pp
Van de graaff generator pp
 
Automatic side stand remover
Automatic side stand removerAutomatic side stand remover
Automatic side stand remover
 
Sprocket -Side Stand Retrieve System
Sprocket -Side Stand Retrieve SystemSprocket -Side Stand Retrieve System
Sprocket -Side Stand Retrieve System
 
Ven de graaff generator 745
Ven de graaff generator 745Ven de graaff generator 745
Ven de graaff generator 745
 
Audio steganography project presentation
Audio steganography project presentationAudio steganography project presentation
Audio steganography project presentation
 
Synopsis or minor project ppt's (2)
Synopsis or minor project ppt's (2)Synopsis or minor project ppt's (2)
Synopsis or minor project ppt's (2)
 
Canteen automation system (updated) revised
Canteen automation system (updated) revisedCanteen automation system (updated) revised
Canteen automation system (updated) revised
 
B. Tech. Minor Project Synopsis
B. Tech. Minor Project Synopsis B. Tech. Minor Project Synopsis
B. Tech. Minor Project Synopsis
 

Similar to Detect Grid Synchronization Failures with Under/Over Voltage Monitoring

Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...IRJET Journal
 
Power quality & demand side management
Power quality & demand side managementPower quality & demand side management
Power quality & demand side managementMark Anthony Enoy
 
Power Swing Phenomena and Comparative Study of Its Detection on Transmission ...
Power Swing Phenomena and Comparative Study of Its Detection on Transmission ...Power Swing Phenomena and Comparative Study of Its Detection on Transmission ...
Power Swing Phenomena and Comparative Study of Its Detection on Transmission ...ijsrd.com
 
Relay operation principles
Relay operation principlesRelay operation principles
Relay operation principlesAmmar Al Hakeim
 
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...smartXBrains
 
Short circuit current calculations
Short circuit current calculationsShort circuit current calculations
Short circuit current calculationsRonald Santos
 
A High-Performance SPWM Controller for Three-Phase UPS Systems Operating Unde...
A High-Performance SPWM Controller for Three-Phase UPS Systems Operating Unde...A High-Performance SPWM Controller for Three-Phase UPS Systems Operating Unde...
A High-Performance SPWM Controller for Three-Phase UPS Systems Operating Unde...ijiert bestjournal
 
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...IRJET Journal
 
New Microsoft Word Document
New Microsoft Word DocumentNew Microsoft Word Document
New Microsoft Word DocumentBarunava Sikdar
 
Auto Reset on Temporary Fault Otherwise Permanent Trip in Three Phase Transmi...
Auto Reset on Temporary Fault Otherwise Permanent Trip in Three Phase Transmi...Auto Reset on Temporary Fault Otherwise Permanent Trip in Three Phase Transmi...
Auto Reset on Temporary Fault Otherwise Permanent Trip in Three Phase Transmi...IRJET Journal
 
Tata steel UISL Power Quality final.pptx
Tata steel UISL Power Quality final.pptxTata steel UISL Power Quality final.pptx
Tata steel UISL Power Quality final.pptxAbhishekkumar791894
 
A practical primer for paralleling electric systems
A practical primer for paralleling electric systemsA practical primer for paralleling electric systems
A practical primer for paralleling electric systemsJavier Maldonado Adco
 
IRJET- Wireless Power Theft Monitoring System using Zigbee
IRJET- Wireless Power Theft Monitoring System using ZigbeeIRJET- Wireless Power Theft Monitoring System using Zigbee
IRJET- Wireless Power Theft Monitoring System using ZigbeeIRJET Journal
 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor ImprovementIRJET Journal
 
How to conduct the test on the linearity of impulse voltage divider? (www.him...
How to conduct the test on the linearity of impulse voltage divider? (www.him...How to conduct the test on the linearity of impulse voltage divider? (www.him...
How to conduct the test on the linearity of impulse voltage divider? (www.him...Fang Sam
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power systemArvind Nathan
 
Switch gear and protection
Switch gear and protectionSwitch gear and protection
Switch gear and protectionDinesh Sharma
 
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET Journal
 

Similar to Detect Grid Synchronization Failures with Under/Over Voltage Monitoring (20)

Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
Detection of Power Grid Synchronization Failure by Sensing Bad Voltage and Fr...
 
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEMISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
 
Power quality & demand side management
Power quality & demand side managementPower quality & demand side management
Power quality & demand side management
 
Power Swing Phenomena and Comparative Study of Its Detection on Transmission ...
Power Swing Phenomena and Comparative Study of Its Detection on Transmission ...Power Swing Phenomena and Comparative Study of Its Detection on Transmission ...
Power Swing Phenomena and Comparative Study of Its Detection on Transmission ...
 
Relay operation principles
Relay operation principlesRelay operation principles
Relay operation principles
 
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
Detectingpowergridsynchronisationfailureonsensingfrequencyorvoltagebeyondacce...
 
Short circuit current calculations
Short circuit current calculationsShort circuit current calculations
Short circuit current calculations
 
A High-Performance SPWM Controller for Three-Phase UPS Systems Operating Unde...
A High-Performance SPWM Controller for Three-Phase UPS Systems Operating Unde...A High-Performance SPWM Controller for Three-Phase UPS Systems Operating Unde...
A High-Performance SPWM Controller for Three-Phase UPS Systems Operating Unde...
 
s.pdf
s.pdfs.pdf
s.pdf
 
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
Detection of Power Grid Synchronization Failure on Sensing Frequency and Volt...
 
New Microsoft Word Document
New Microsoft Word DocumentNew Microsoft Word Document
New Microsoft Word Document
 
Auto Reset on Temporary Fault Otherwise Permanent Trip in Three Phase Transmi...
Auto Reset on Temporary Fault Otherwise Permanent Trip in Three Phase Transmi...Auto Reset on Temporary Fault Otherwise Permanent Trip in Three Phase Transmi...
Auto Reset on Temporary Fault Otherwise Permanent Trip in Three Phase Transmi...
 
Tata steel UISL Power Quality final.pptx
Tata steel UISL Power Quality final.pptxTata steel UISL Power Quality final.pptx
Tata steel UISL Power Quality final.pptx
 
A practical primer for paralleling electric systems
A practical primer for paralleling electric systemsA practical primer for paralleling electric systems
A practical primer for paralleling electric systems
 
IRJET- Wireless Power Theft Monitoring System using Zigbee
IRJET- Wireless Power Theft Monitoring System using ZigbeeIRJET- Wireless Power Theft Monitoring System using Zigbee
IRJET- Wireless Power Theft Monitoring System using Zigbee
 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor Improvement
 
How to conduct the test on the linearity of impulse voltage divider? (www.him...
How to conduct the test on the linearity of impulse voltage divider? (www.him...How to conduct the test on the linearity of impulse voltage divider? (www.him...
How to conduct the test on the linearity of impulse voltage divider? (www.him...
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power system
 
Switch gear and protection
Switch gear and protectionSwitch gear and protection
Switch gear and protection
 
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
 

Recently uploaded

Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

Detect Grid Synchronization Failures with Under/Over Voltage Monitoring

  • 1. A PROJECT SYNOPSIS ON GRID SYNCHRONIZATION FAIL DETECTION WITH UNDER VOLTAGE AND OVER VOLTAGE SUBMITTED IN PARTIAL FULFILLMENT FOR THE AWARD OF THE DEGREE OF BACHELOR OF TECHNOLOGY IN ELECTRICAL ENGINEERING Submitted by Karishma 1812018 Princy 1812020 Diksha 1812031 Under the guidance of (2012 – 2016) Haryana Engineering College Jagadhri (Kurukshetra University, Kurukshetra
  • 2. INTRODUCTION There is an Under/over voltage or under/over frequency, then the comparator will detect the difference the actual power and reactive. If there is no failure of power grid synchronization then the detectors will give the zero values. Based on the Under/over voltage and under/over frequency values the power suppliers will be disconnected if any out of limitation values are observed. Synchronization means the minimization of difference in voltage, frequency and phase angle between the corresponding phases of the generator output and grid supply. An alternating current generator must be synchronized with the grid prior to connection. It can’t deliver the power unless it is running at same frequency as the network. Synchronization must occur before connecting the generator to a grid. Synchronization can be achieved manually or automatically. The purpose of synchronization is to monitor, access, enable, and automatically take the control action to prevent the abnormalities of voltage and frequency. Rules must be followed for Synchronization: Voltage Fluctuation: When a generator is synchronized with a power grid, normally there is a voltage fluctuation on the distribution line. During synchronization the voltage fluctuation should not exceed 3% at the at the point of common coupling. Synchronization Limits: The limits allowing for synchronization are 1. Phase angle- +/-20 degrees 2. Maximum voltage difference – 7% 3. Maximum slip frequency – 0.44%
  • 3. Relays: For checking the synchronization “synch check relay” must be used. The usage of relays can’t apply for induction generators. The use of synch check relay is to accept as a backup during synchronization and to ensure a generator will not connect to a dead distribution line. Synchronization of Induction Generators: For the synchronization of induction generators it just needs to be run up to synchronization speed and connected. For this purpose standard motor controllers will be used. To mechanically drive the generators up to synchronization speed turbine shaft power will be used. The speed of the motors depends on supplied frequency and number of poles on the generators. Synchronization of Synchronous Machines: For synchronous generators output waveform should be in phase with the grid voltage waveform or with in specified limits. The rate of change of phase angle between the grid and the machine (generator) must be with in the specified limits. Some other rules are variable speed drive arrangement to maintain a constant output frequency, inter connection protection between the generator and distribution system. Failure of Synchronization: Synchronization circuit may fail for responding to a received input pulse when the received input pulse is shorted than the sampling period of the synchronizer. Then no synchronized representation will take place. When the pulse rate of the input signal is higher than the synchronization rate of the synchronizer then also it may fail to respond. Some times the synchronizer it self may fail by ignoring input events. These all are the circumstances which could create problems if not detected. There are various reasons for failure of power grid synchronization.
  • 4. Synchronization Failures and their Detections: There are some situations where the generators and some local loads have become disconnected from main distribution lines. Due to this reduction in quality of supply, and it may prevent automatic reconnection of devices. This is called as islanding. For this reason islanding must be detected immediately and producing power must be stopped immediately. Due to Islanding following hazards may take place 1. Generally distributed lines are earthed only at the sub station. When the distributing lines and generators are disconnected the line is not earthed. Due to this reason line voltages may excessive. 2. The fault level contribution from the grid to sub-station may be lost. This will effect the operation of protection on distributed lines. Due to this sufficient current may not be generated. 3. Due to Islanding synchronization can’t be maintained. When the grip attempts to reconnect with distribution line it may be out of synchronization at the reconnection point. Due to this, suddenly large power may flows which cause damage for generators, distribution units and consumer products. Some other disadvantages due to islanding are the voltage levels may go outside of normal operating limits, and the quality of supply may be reduced. Detection methods of Islanding: Detection of islanding can be done through active and passive methods. Passive methods look for transient events on the grid and active methods will probe the grid by sending signals from the distribution point of grid. Loss of Mains Protection (LoM) will be designed to sense the disconnection of generators and loads when an island has been created. The most utilized LoM detection methods may fail to detect islanding when the production matches closely with the consumption in the island zone. This blind area is called Non Detection Zone (NDZ). The size of NDZ can be reduced by tightening the LoM setting relays.
  • 5. Active Methods: Impedance measurement, Detection of impedance at specific frequency, slip mode frequency shift, Frequency bias, and frequency jump detection methods are some passive methods for islanding detection. The advantage of impedance measurement method is an extremely small NDZ for a single inverter. Slip mode frequency shift method is relatively easy to implement. It is highly effective in islanding prevention when compared to other detection methods. Passive Methods: All grid-connected PV inverters are required to have Over/Under frequency protections methods and Under/Over voltage protection methods that cause the inverter to stop supplying power to the utility grid if the frequency or voltage of grid at the point of coupling. Block Diagram These protection methods protect consumer’s equipment and also servicing as anti-islanding methods. Voltage Phase Jump detection, and Detection of voltage harmonics are some more passive methods for detection islanding. The Under/Over voltage protection methods and the Under/over frequency methods are required other than preventing islanding. Several islanding
  • 6. prevention methods produce abnormal voltage, and frequency. Under/Over voltage protection methods and Under/Over frequency protection methods are low cost methods for the detection islanding. Applications of Power grid failure Detection: Lighting is one of the main causes for power system faults. The entire power system is consisting electrically of power plants, sub-stations and transmission lines, distribution feeders and power consumers. Detecting the synchronization failure between generators and power grid is the major advantage such as saving the energy. Then we can avoid the loss of power consumption by disconnecting from the power consumption devices. When there is an Under/over voltage or under/over frequency, then the comparator will detect the difference the actual power and reactive. If there is no failure of power grid synchronization then the detectors will give the zero values. Based on the Under/over voltage and under/over frequency values the power suppliers will be disconnected if any out of limitation values are observed.