CONTENTS 
 WHAT IS RESERVOIR SIMULATION? 
 SIMULATOR AND ITS TYPES 
 HISTORY MATCHING AND PREDICTION 
 CASE STUDY 
 MBE 
 MBE FOR GAS RESERVOIR 
 EXAMPLE NUMERICAL ON GAS MBE 
2
WHAT IS RESERVIR SIMULATION: 
 A digital description of reservoir together combined 
with physical and mathematical equations along 
with good reservoir engineering which is used to 
predict the future performance of the reservoir and 
hence managing the asset is called reservoir 
simulation 
 Reservoir simulation deals with solving set of 
equations, a representative of reservoir, using 
computer programming called simulator. 
3
SIMULATOR AND ITS TYPES 
Simulator is nothing but mathematical equations 
solving by the execution of set of computer programs. 
 Black-oil model (IMEX) 
 Compositional model (GEM) 
 Thermal model (STARS) 
 Chemical 
 Miscible 
 Dual Porosity 
 Dual permeability 
4
HISTORY MATCHING AND PREDICTION 
 History matching is the process of building one or 
more sets of numerical models (representing a 
reservoir) which account for observed, measured 
data. 
 It is a part of Uncertainty quantification. 
 It matches the developed model with geospatial, 
geological and production data to create a perfect 
reservoir model. 
 The matched model is used for future performance 
of the reservoir. 
5
Figure 1. 
6
CASE STUDY 
Organization: TNO - 1996 
 As the History matching is a process of selection of 
appropriate model for the future prediction, it should 
be more accurate. 
 Proper parameterization of the stochastic process 
involved. 
 The model parameter is assigned as show in the 
figure 1 which is an iterative process. 
 The data consistent with many models. 
 Subjective decision was made by the reservoir 
engineer. 7
 The uncertainty in any prediction cannot be 
assessed from just one model. 
 One point selection / base case. 
 The study demonstrates how limited and biased 
that practice is. Yet, most long-term forecasts are 
still based on a single history-matched. 
 Sometimes the best matched results may be 
improper due to the reason that the statistical 
nature of history matching and the inherent bias in 
the history-matching workflow are ignored. 
8
TNO’S NEW METHOD: AN AUTOMATIC 
PROBABILISTIC HISTORY-MATCH PROCEDURE: 
 An automatic probabilistic history-match and 
prediction procedure has been implemented by 
TNO. 
 This procedure automatically generates many 
realisations of the reservoir reproducing the history 
data with satisfactory accuracy. 
 Using these realisations, predictions are derived 
and processed into an expectation curve. 
 Most of the theory behind this methodology has 
been developed and demonstrated on synthetic 
cases within the Production forecasting with 
Uncertainty Quantification project (PUNQ) 9
10
Traditional history 
matching, keeps 
geological model 
along with the 
geological data out of 
the loop. 
Modern history 
matching, keeps 
geological model 
along with the 
geological data in 
the loop. 
11
RESULTS OF TNO’S WORKS: 
 The geo- spatial data is correlated with the fluid 
flow model with least uncertainty by using PUNQ. 
 25 values are optimized by using PUNQ for just one 
parameter – Water production. 
 This produces accurate model for the future 
prediction of the reservoir. 
 Thus a successful history matching is achieved. 
12
MBE: 
o Law of conservation of mass forms the basis for 
the MBE calculations for a reservoir estimation. 
o Predict future reservoir performance under 
various drive mechanism. 
ADVANTAGES OF MBE: 
The material balance equation and its many 
different forms have many uses including: 
 Confirming the producing mechanism 
 Estimating the OOIP and OGIP 
 Estimating gas cap sizes 
 Estimating water influx volumes 
 Identifying water influx model parameters 
 Estimating producing indices. 
13
MBE FOR GAS RESERVOIR 
([Solution gas present in 
the 
reservoir initially(st. vol.) 
] + 
[Free gas present in the 
reservoir initially (st. 
vol.)] - [Gas produced 
(st. vol.) ] + 
[Gas injected (st. vol.)] ) 
([Solution gas 
present in the 
reservoir finally (st. 
vol.)] + 
[Free gas present in 
the reservoir finally 
(st. vol.)] ) 
= 
14
CONCEPT 
 COMPRESSIBILITY OF GAS IS VERY 
SIGNIFICANT DRIVE MECHNISM IN GAS 
RESERVOIRS AS COMAPRED TO RESERVOIR 
PORE VOLUME. 
 IF THERE IS NO WATER DRIVE IN THE 
RESVOIR, THE CHANGE IN PORE VOLUME 
WITH PRESSURE IS NEGLIGIBLE 
 EQUATION FOR THE VOLUME OF THE GAS IN 
RESERVOIR IS A FUNCTION OF PRTESSURE. 
15
EQUATION FOR GAS MBE 
In gas reservoir oil volume is zero, thus the following is derived from 
Generalized MBE : 
Water and Formation compressibility is negligible when compared to 
gas compressibility 
For volumetric reservoir, We and Wp will become zero. 
16
REFERENCES: 
 “Principles of Applied Reservoir Simulation”, 
Second edition; Fanchi, R. John; Gulf Professional 
publishing, Elsevier, USA; 2001. 
 http://www.streamsim.com/technlogy/history-matching/ 
 http://www.streamsim.com/technology/sentivity-analysis- 
and-screening/ 
 “Production forecasting with uncertainty 
quantification” – TNO. – 
http://www.tno.nl/downloads%5C309beno.pdf 
17
18

More Related Content

What's hot

Introduction to Reservoir Engineering
Introduction to Reservoir EngineeringIntroduction to Reservoir Engineering
Introduction to Reservoir EngineeringMikeEllingham
 
Pressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfPressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfSeyedAbolfazlHossein4
 
Well Teste Interpretation
Well Teste InterpretationWell Teste Interpretation
Well Teste InterpretationMeg Medeiros
 
Q913 re1 w5 lec 17
Q913 re1 w5 lec 17Q913 re1 w5 lec 17
Q913 re1 w5 lec 17AFATous
 
Skin Factor and Formation Damage
Skin Factor and Formation DamageSkin Factor and Formation Damage
Skin Factor and Formation DamageNouh Almandhari
 
Reservoir Geomechanics
Reservoir GeomechanicsReservoir Geomechanics
Reservoir GeomechanicsAssem Elbakly
 
Estmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleEstmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleNarendra Kumar Dewangan
 
Reservoir simulation (april 2017)
Reservoir simulation (april 2017)Reservoir simulation (april 2017)
Reservoir simulation (april 2017)MichaelDang47
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineeringbehnamproeng
 
Q913 re1 w4 lec 13
Q913 re1 w4 lec 13Q913 re1 w4 lec 13
Q913 re1 w4 lec 13AFATous
 
Well Test Design and Analysis
Well Test Design and Analysis Well Test Design and Analysis
Well Test Design and Analysis petroEDGE
 
History matching with EnKF
History matching with EnKFHistory matching with EnKF
History matching with EnKFzyedb
 
Fundamental Reservoir Fluid Behaviour
Fundamental Reservoir Fluid BehaviourFundamental Reservoir Fluid Behaviour
Fundamental Reservoir Fluid BehaviourM.T.H Group
 
Introduction to Reservoir Rock & Fluid Properties
Introduction to Reservoir Rock & Fluid PropertiesIntroduction to Reservoir Rock & Fluid Properties
Introduction to Reservoir Rock & Fluid PropertiesM.T.H Group
 

What's hot (20)

Introduction to Reservoir Engineering
Introduction to Reservoir EngineeringIntroduction to Reservoir Engineering
Introduction to Reservoir Engineering
 
Pressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfPressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdf
 
Well Teste Interpretation
Well Teste InterpretationWell Teste Interpretation
Well Teste Interpretation
 
Well test analysis
Well test analysisWell test analysis
Well test analysis
 
Reservoir rock & fluid
Reservoir rock & fluidReservoir rock & fluid
Reservoir rock & fluid
 
Q913 re1 w5 lec 17
Q913 re1 w5 lec 17Q913 re1 w5 lec 17
Q913 re1 w5 lec 17
 
Oil and Gas Reservoir Engineering
Oil and Gas Reservoir EngineeringOil and Gas Reservoir Engineering
Oil and Gas Reservoir Engineering
 
Skin Factor and Formation Damage
Skin Factor and Formation DamageSkin Factor and Formation Damage
Skin Factor and Formation Damage
 
Reservoir Geomechanics
Reservoir GeomechanicsReservoir Geomechanics
Reservoir Geomechanics
 
Estmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleEstmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiible
 
Reservoir simulation (april 2017)
Reservoir simulation (april 2017)Reservoir simulation (april 2017)
Reservoir simulation (april 2017)
 
Reservoir rock & fluid
Reservoir rock & fluidReservoir rock & fluid
Reservoir rock & fluid
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineering
 
Q913 re1 w4 lec 13
Q913 re1 w4 lec 13Q913 re1 w4 lec 13
Q913 re1 w4 lec 13
 
Well Test Design and Analysis
Well Test Design and Analysis Well Test Design and Analysis
Well Test Design and Analysis
 
History matching with EnKF
History matching with EnKFHistory matching with EnKF
History matching with EnKF
 
Artificial Lift Methods
Artificial Lift MethodsArtificial Lift Methods
Artificial Lift Methods
 
Fundamental Reservoir Fluid Behaviour
Fundamental Reservoir Fluid BehaviourFundamental Reservoir Fluid Behaviour
Fundamental Reservoir Fluid Behaviour
 
Reservoir modeling and characterization
Reservoir modeling and characterizationReservoir modeling and characterization
Reservoir modeling and characterization
 
Introduction to Reservoir Rock & Fluid Properties
Introduction to Reservoir Rock & Fluid PropertiesIntroduction to Reservoir Rock & Fluid Properties
Introduction to Reservoir Rock & Fluid Properties
 

Viewers also liked

Reservoir Modeling with Petrel
Reservoir Modeling with PetrelReservoir Modeling with Petrel
Reservoir Modeling with Petreladeeba setu
 
Eclipse 100 - Petroleum reservoir simulation course
Eclipse 100 - Petroleum reservoir simulation courseEclipse 100 - Petroleum reservoir simulation course
Eclipse 100 - Petroleum reservoir simulation courseMohammad Massah
 
Petrel course Module_1: Import data and management, make simple surfaces
Petrel course Module_1: Import data and management, make simple surfacesPetrel course Module_1: Import data and management, make simple surfaces
Petrel course Module_1: Import data and management, make simple surfacesMarc Diviu Franco
 
Petrel introduction course guide
Petrel introduction course guidePetrel introduction course guide
Petrel introduction course guideMarc Diviu Franco
 

Viewers also liked (6)

Reservoir Modeling with Petrel
Reservoir Modeling with PetrelReservoir Modeling with Petrel
Reservoir Modeling with Petrel
 
E100 manual
E100 manualE100 manual
E100 manual
 
Eclipse 100 - Petroleum reservoir simulation course
Eclipse 100 - Petroleum reservoir simulation courseEclipse 100 - Petroleum reservoir simulation course
Eclipse 100 - Petroleum reservoir simulation course
 
Petrel course Module_1: Import data and management, make simple surfaces
Petrel course Module_1: Import data and management, make simple surfacesPetrel course Module_1: Import data and management, make simple surfaces
Petrel course Module_1: Import data and management, make simple surfaces
 
Petrel introduction course guide
Petrel introduction course guidePetrel introduction course guide
Petrel introduction course guide
 
Petrel course
Petrel coursePetrel course
Petrel course
 

Similar to Reservoir simulation

Unconventional Data-Driven Methodologies Forecast Performance
Unconventional Data-Driven Methodologies Forecast PerformanceUnconventional Data-Driven Methodologies Forecast Performance
Unconventional Data-Driven Methodologies Forecast PerformanceKaanthan Shanmugam
 
Eclipse reservoir simulation project presentation slides team ucsi
Eclipse reservoir simulation project presentation slides   team ucsiEclipse reservoir simulation project presentation slides   team ucsi
Eclipse reservoir simulation project presentation slides team ucsiBilly Lim Zhen Hao
 
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentation
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentationScript for Comparison vertical flow models BHR Cannes June 14 2013 presentation
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentationPablo Adames
 
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...TUM
 
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...Faisal Al-Jenaibi
 
A Study Of Production Optimization Of An Oil Copy
A Study Of Production Optimization Of An Oil   CopyA Study Of Production Optimization Of An Oil   Copy
A Study Of Production Optimization Of An Oil Copyaadrish
 
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...Society of Petroleum Engineers
 
Poseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinPoseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinLaurent Alessio
 
Paper-Journal of Petroleum Science and Engineering
Paper-Journal of Petroleum Science and EngineeringPaper-Journal of Petroleum Science and Engineering
Paper-Journal of Petroleum Science and EngineeringMohamed Elias
 
Performance comparison of SVM and ANN for aerobic granular sludge
Performance comparison of SVM and ANN for aerobic granular sludgePerformance comparison of SVM and ANN for aerobic granular sludge
Performance comparison of SVM and ANN for aerobic granular sludgejournalBEEI
 
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.41110216_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102Efrain Rodriguez Sanchez
 
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...eWater
 

Similar to Reservoir simulation (20)

Unconventional Data-Driven Methodologies Forecast Performance
Unconventional Data-Driven Methodologies Forecast PerformanceUnconventional Data-Driven Methodologies Forecast Performance
Unconventional Data-Driven Methodologies Forecast Performance
 
Eclipse reservoir simulation project presentation slides team ucsi
Eclipse reservoir simulation project presentation slides   team ucsiEclipse reservoir simulation project presentation slides   team ucsi
Eclipse reservoir simulation project presentation slides team ucsi
 
APCBEE
APCBEEAPCBEE
APCBEE
 
A Comparision Study of Five-Spot and Nine-Spot Water Injector Patterns to Enh...
A Comparision Study of Five-Spot and Nine-Spot Water Injector Patterns to Enh...A Comparision Study of Five-Spot and Nine-Spot Water Injector Patterns to Enh...
A Comparision Study of Five-Spot and Nine-Spot Water Injector Patterns to Enh...
 
Abstract-9-13
Abstract-9-13Abstract-9-13
Abstract-9-13
 
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentation
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentationScript for Comparison vertical flow models BHR Cannes June 14 2013 presentation
Script for Comparison vertical flow models BHR Cannes June 14 2013 presentation
 
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
Cfd study of a Pelton turbine runner by M.Minozzo R.Bergamin M.Merelli M.Galb...
 
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
New Approach to Design Capillary Pressure Curves, which Would Improve Simulat...
 
A Study Of Production Optimization Of An Oil Copy
A Study Of Production Optimization Of An Oil   CopyA Study Of Production Optimization Of An Oil   Copy
A Study Of Production Optimization Of An Oil Copy
 
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
Incorporating Numerical Simulation Into Your Reserves Estimation Process: A P...
 
Poseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedinPoseidon business case v16-g_linkedin
Poseidon business case v16-g_linkedin
 
dastgerdi2020 (2).pdf
dastgerdi2020 (2).pdfdastgerdi2020 (2).pdf
dastgerdi2020 (2).pdf
 
PFE PP modified
PFE PP modifiedPFE PP modified
PFE PP modified
 
Ijciet 10 01_169
Ijciet 10 01_169Ijciet 10 01_169
Ijciet 10 01_169
 
H05913540
H05913540H05913540
H05913540
 
Unu gtp-sc-04-13
Unu gtp-sc-04-13Unu gtp-sc-04-13
Unu gtp-sc-04-13
 
Paper-Journal of Petroleum Science and Engineering
Paper-Journal of Petroleum Science and EngineeringPaper-Journal of Petroleum Science and Engineering
Paper-Journal of Petroleum Science and Engineering
 
Performance comparison of SVM and ANN for aerobic granular sludge
Performance comparison of SVM and ANN for aerobic granular sludgePerformance comparison of SVM and ANN for aerobic granular sludge
Performance comparison of SVM and ANN for aerobic granular sludge
 
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.41110216_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
16_ENG_Concept Selection_Nov2012_DOI 10.4236eng.2012.411102
 
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
Hydrological Calibration in the Mount Lofty Ranges using Source Paramenter Es...
 

Recently uploaded

priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 

Recently uploaded (20)

priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 

Reservoir simulation

  • 1. RESERVOIR SIMULATION Assignment on 1. History matching and prediction 2. MBE with emphasis on Gas reservoir BY PARVEZ NOPHEL B.TECH APE UP (2011 - 15) R870211019 500017479 1
  • 2. CONTENTS  WHAT IS RESERVOIR SIMULATION?  SIMULATOR AND ITS TYPES  HISTORY MATCHING AND PREDICTION  CASE STUDY  MBE  MBE FOR GAS RESERVOIR  EXAMPLE NUMERICAL ON GAS MBE 2
  • 3. WHAT IS RESERVIR SIMULATION:  A digital description of reservoir together combined with physical and mathematical equations along with good reservoir engineering which is used to predict the future performance of the reservoir and hence managing the asset is called reservoir simulation  Reservoir simulation deals with solving set of equations, a representative of reservoir, using computer programming called simulator. 3
  • 4. SIMULATOR AND ITS TYPES Simulator is nothing but mathematical equations solving by the execution of set of computer programs.  Black-oil model (IMEX)  Compositional model (GEM)  Thermal model (STARS)  Chemical  Miscible  Dual Porosity  Dual permeability 4
  • 5. HISTORY MATCHING AND PREDICTION  History matching is the process of building one or more sets of numerical models (representing a reservoir) which account for observed, measured data.  It is a part of Uncertainty quantification.  It matches the developed model with geospatial, geological and production data to create a perfect reservoir model.  The matched model is used for future performance of the reservoir. 5
  • 7. CASE STUDY Organization: TNO - 1996  As the History matching is a process of selection of appropriate model for the future prediction, it should be more accurate.  Proper parameterization of the stochastic process involved.  The model parameter is assigned as show in the figure 1 which is an iterative process.  The data consistent with many models.  Subjective decision was made by the reservoir engineer. 7
  • 8.  The uncertainty in any prediction cannot be assessed from just one model.  One point selection / base case.  The study demonstrates how limited and biased that practice is. Yet, most long-term forecasts are still based on a single history-matched.  Sometimes the best matched results may be improper due to the reason that the statistical nature of history matching and the inherent bias in the history-matching workflow are ignored. 8
  • 9. TNO’S NEW METHOD: AN AUTOMATIC PROBABILISTIC HISTORY-MATCH PROCEDURE:  An automatic probabilistic history-match and prediction procedure has been implemented by TNO.  This procedure automatically generates many realisations of the reservoir reproducing the history data with satisfactory accuracy.  Using these realisations, predictions are derived and processed into an expectation curve.  Most of the theory behind this methodology has been developed and demonstrated on synthetic cases within the Production forecasting with Uncertainty Quantification project (PUNQ) 9
  • 10. 10
  • 11. Traditional history matching, keeps geological model along with the geological data out of the loop. Modern history matching, keeps geological model along with the geological data in the loop. 11
  • 12. RESULTS OF TNO’S WORKS:  The geo- spatial data is correlated with the fluid flow model with least uncertainty by using PUNQ.  25 values are optimized by using PUNQ for just one parameter – Water production.  This produces accurate model for the future prediction of the reservoir.  Thus a successful history matching is achieved. 12
  • 13. MBE: o Law of conservation of mass forms the basis for the MBE calculations for a reservoir estimation. o Predict future reservoir performance under various drive mechanism. ADVANTAGES OF MBE: The material balance equation and its many different forms have many uses including:  Confirming the producing mechanism  Estimating the OOIP and OGIP  Estimating gas cap sizes  Estimating water influx volumes  Identifying water influx model parameters  Estimating producing indices. 13
  • 14. MBE FOR GAS RESERVOIR ([Solution gas present in the reservoir initially(st. vol.) ] + [Free gas present in the reservoir initially (st. vol.)] - [Gas produced (st. vol.) ] + [Gas injected (st. vol.)] ) ([Solution gas present in the reservoir finally (st. vol.)] + [Free gas present in the reservoir finally (st. vol.)] ) = 14
  • 15. CONCEPT  COMPRESSIBILITY OF GAS IS VERY SIGNIFICANT DRIVE MECHNISM IN GAS RESERVOIRS AS COMAPRED TO RESERVOIR PORE VOLUME.  IF THERE IS NO WATER DRIVE IN THE RESVOIR, THE CHANGE IN PORE VOLUME WITH PRESSURE IS NEGLIGIBLE  EQUATION FOR THE VOLUME OF THE GAS IN RESERVOIR IS A FUNCTION OF PRTESSURE. 15
  • 16. EQUATION FOR GAS MBE In gas reservoir oil volume is zero, thus the following is derived from Generalized MBE : Water and Formation compressibility is negligible when compared to gas compressibility For volumetric reservoir, We and Wp will become zero. 16
  • 17. REFERENCES:  “Principles of Applied Reservoir Simulation”, Second edition; Fanchi, R. John; Gulf Professional publishing, Elsevier, USA; 2001.  http://www.streamsim.com/technlogy/history-matching/  http://www.streamsim.com/technology/sentivity-analysis- and-screening/  “Production forecasting with uncertainty quantification” – TNO. – http://www.tno.nl/downloads%5C309beno.pdf 17
  • 18. 18

Editor's Notes

  1. One point selection – when model is being run, the reservoir engineer is able to obtain any point as a base case for the future prediction since only one model was used in traditional history matching. This is disadvantageous.