(With co-participation of Vipul Singhal)
We need to implement; BUT HOW????,
That’s a Project !!!!!
What is a Project?
Projects is a temporary rather than permanent social systems or work
systems that are constituted by teams within or across organizations to
accomplish particular tasks under time constraints.
OR
A Project is a temporary endeavor undertaken to accomplish a unique product
or service
OR
In simple words it’s a collection of activities which needs to be performed in
certain defined constraints by a team to realize the need.
Attributes of a Project
 Unique purpose
 Temporary
 Requires resources
 Should have a primary sponsor and/or customer
 Involve uncertainty
Steps in a Project
 Step 1 : Realization of need
 Step 2 : Planning for its fulfillment
 Step 3 : Decision to produce or Procure
 Step 4 : Procurement
 Step 5 : Execution / Commissioning
 Step 6 : Verify fulfillment of parameters
 Step 7 : Handover for Operations
Who are the Stakeholders of Project?
Stakeholders are people or entities who have a say in implementation of the
project and they get affected w.r.t. Project’s success or failure.
They are :
 Employer - Those who are implementing
 Contractor - Those who are to supply, construct/ erect &
commission the project equipment or provide
respective services
 Consultant - or Engineers who specify, quantify, select and
supervise the supply, construction/erection,
commissioning & Handover of Project for Operations
 Financial Institute - Those who are lending money for project
What is Procurement ?
Procurement is the acquisition of goods, services or works from an outside
external source. It is favorable that the goods, services or works are
appropriate and that they are procured at the best possible cost to meet the
needs of the purchaser in terms of quality and quantity, time, and location.
What is the Requirement ?
 May be for Equipment / Machinery
 May be for Technology / Consultancy
 May be for Execution / Services / or for Safety / Quality
What are the Methods for Procurement ?
• Agreement
• Purchase order
• Rate contract
• Auction
• Tender
• Acquisition
What is a Tender ?
A written invitation sent to potential suppliers of a good or service to inform
them about the information required for the buyer to choose among them.
Its Objective
• To Ensure Best Fit Supplier is selected to Supply Goods/ Services to
customer which offers best value of money
• Selection process should be business ethics driven- Fair Practice
• More options
• Equal opportunity
Routes to be followed for Tendering
Depends primarily on the Statutory Norms or the Financial Institutes .
• ICB : International Competitive Bidding
• LICB : Limited International Competitive Bidding
• NCB : National Competitive Bidding
The Tendering Process
Step 1 : NIT – Notice Inviting Tender (Advertisement, Post , Email.. )
Step 2 : EOI- Expression of Interest by respective Bidders
Step 3 : Tender document Floating/ Selling
Step 4 : Pre Bid Meeting
Step 5 : Bid Submission- In Single Phase or Two Phases
Step 6 : Bid Opening – In Single Phase or Two Phases
Step 7 : Bid Evaluation
Step 8 : Post Bid Meeting
Step 9 : Report Formation
Step 10 : Award of Contract
Contents of NIT (Notice Inviting Tender)
• Brief Project Particulars
• Brief Requirement of Tender
• Eligibility Criteria – Technical & Financial
• Duration & Place of sale of tender document
• Price of tender document
• Contact Information
• Probable amount of Contract (Primarily in Govt. Tenders)
• Earnest Money amount
• Work completion period
• Bid submission period
Sample
NIT- Pvt.
NIT-Govt.
Advertising the NIT
Depending on the the need of the Route of tendering, the NIT needs
to be advertised or circulated through & to :
• All Embassies ( ICB/ LICB route to be followed)
• Major newspapers (ICB/ LICB/ NCB route to be followed)
• Web portals (ICB/ LICB/ NCB route to be followed)
The NIT may be brief from publishing point of view as an advertisement.
The detailed NIT in this case is given upon receiving EOI (Expression of
Interest) from the prospective Bidder
EOI - Expression of interest
Interested Bidders shall show their Interest in executing the
Tender/ submitting the Bid and ask for the Complete Tender
documents
Followed by purchase of the tender documents
Tendering type based on mode of submission
Manual tendering- Paper type submission
E Tendering- E-submission (E Bidding)
Contents of Tender Document
Section I : NIT/ IFB (Invitation For Bids)
Section II : ITB (Instruction To Bidders)
Section III : GCC (General Conditions of Contract)
Section IV : SCC (Special Conditions of Contract)
Section V : SOR (Schedule of Requirement)
Section VI : Technical Specification
Section VII : Various Bid Forms
Constituents of Bid Forms in Tender document
• Bid Security Form,
• Contract Form,
• Performance Security Form,
• Financial Capability Form,
• Technical Capability Form,
• Manufacturer Authorization Form,
• Advance bank Guarantee Form,
• Completion certificate Form,
• Deviation Statement Form,
• Places of Tests & Inspection Form….
The Pre Bid Meeting
Subsequent to the purchase of Tender Document, the prospective
Bidders, Employer and Consultants meet for discussions with following
objectives :
• Provide clarification to the Bidders- Technical or Commercial
• Communicate any additional information in Project
• Do necessary revision in the tender documents as per industry
feedback
• Ensure minimum deviations
• Critical points to explained and discussed
The Minutes of Pre Bid Meeting are recorded and it may be followed by an
Amendment or Addendum to the Tender documents
The Bid Submission/ Tender Submission
Subsequent to the Pre Bid Meeting, the Bids are prepared and submitted in
the prescribed time and form, duly sealed.
The Bid submission could be of following forms
Two Stage Bidding : First Techno commercial part & then Price part
Single stage Bidding : Comprehensive Bid is submitted
The Bid Submission/ Tender Submission
The Bid Opening / Tender Opening
Tender Board ( consisting of representative of Employer -Chairman/
Board Member/ CEO/ CE; Consultant, Financial Institute) meets on the
nominated day and time to open these Sealed bids ( Generally few
hours after last time of Bid submission date). Late Bids are not
supposed to be entertained. Usually Following steps are followed:
Step 1 : Introduction of the Participants and announcement of the
Bidders. Followed by Attendance marking.
Step 2 : Declaration of Sufficiency of the Bid Bond
Step 3 : Declaration of Guaranteed Technical Particulars
Step 4 : Declaration of the Bid Price if it’s a Single Stage Bid
The Bid Opening / Tender Opening
The Bid Evaluation
Generally the bid evaluation process involves a team of experts or panels
which is lead at the front by a single person who is responsible for
interdepartmental/interdisciplinary coordination as well as coordination with the
stake holders to and Bidders . He may be known as Project Coordinator or
Project Manager. His objectives are:
• The Bid is thoroughly evaluated by the respective Technical, Legal,
Commercial &Financial experts
• Proper flow of communication to & from bidders (queries & replies)
• All aspects of bids are evaluated
• Every Bidder gets a fair chance of winning the contract
The Bid Evaluation
The Evaluation of the bid has following parts:
• Technical Evaluation
• Commercial Evaluation
• Capacity Evaluation
The Bid Evaluation- Technical
• The equipment /system & manufacturer being offered by the bidder is to be
evaluated for its conformance with the tender technical specification
• The Guaranteed Technical particulars are to meet the minimum Tender
requirement.
• Any alternative technology or material grade offered by the bidder needs to
be verified.
• Any price implication on the project w.r.t. technical parameters to be verified
and respective loading on the price to be proposed.
• The feedback of working of the equipment supplied by the bidders in other
projects to be evaluated
• The factory load of the bidder or its major supplier should be evaluated
The Bid Evaluation- Technical (-Score method)
The Bid Evaluation- (-Weighted Score method)
The Bid Evaluation- Commercial
• The Bid Forms are duly filled and signed
• The declared Deviations on the Commercial part are to be evaluated
• All costs are properly covered in the offered prices
• Bid price is in specified currency or the listed conversion rate at the time of
price bid opening are to be considered.
• Any price variation/escalation formulae are correct and is justified
• Details of any extra costs ( such as Delivery cost , shipping cost, custom
charges, insurance, documentation , testing & inspection) are identified
• Cost of Spares if mentioned extra is identified
• Any other indirect commercial deviations are identified
The Bid Evaluation- Capacity
• The Bidder has sound financial condition
• The Bidder has sufficient funds to procure raw material and process so that
positive cash flow is maintained up to delivery of equipment
• The Bidder is not under litigation or any act resulting in bank corruptly
• The Bidder’s financial has sufficient immunity from market economy trend
• Will there be any cost resulting from loss of economy of scale
• If offer is for Services , then check should be done if resultant staff savings or
reduction in support services fully accounted for
• Has the cost of any long term agreement been included ?
• In case of Foreign Bidder, geo-Political scenario to be evaluated.
Post Bid Meeting
• During Bid Evaluation , Bid Evaluation committee witness that submitted Bid
has several variation with the Technical Specification of the Tender.
• It is therefore difficult for the Committee to Compare the Bids .
• A Post Bid Meeting is organized with separate Bidders individually to bring
them to a common Platform and negotiate on the Technical Specs wherever
appropriate
• Once the Technical part is freezed out , Bidders are asked to again submit
their Commercial Bid ( after taking into consideration the cost of technical
changes) .
Post Bid Meeting
Evaluation Report
• Before Release of Order/ award of contract , an evaluation report is being
generated for the purpose of Office records or for future reference.
• This report contains basic details such as
 Description of Contract
 Type of Tender
 Closing date of Tender
 Details of Tender Received
 Technical Compliance of tenders
 Analysis of Lowest 3 tenders
 Performance records of Lowest 3 tenders
 Recommendation of Assessment Panel
Sample
Evaluation Simple format
Evaluation- Technical
Evaluation Commercial
Award Process
• Based on Evaluation report & recommendation of Assessment Panel a “ Best Fit Bidder”
or successful is declared.
• A Letter of Award is Issued to the Successful Bidder.
• The Bidder is asked to submit a Contract Performance Guarantee which could be in
form of a Bank Guarantee, Demand Draft, Cash or a Fixed Deposit Receipt
• A contract between Bidder & Employer is drafted as per International Contract Laws.
• Contractual Obligations & Rights are being drafted / incorporated in the contract
• Technical Obligations are clearly stated
• Quality Obligations are clearly stated
• Completion Schedule is clearly stated
• Payment schedules are clearly stated
• The contract is signed and moved for implementation
Contract document’s Broad features
• Work of tender/contract is mentioned
• Date of signing is mentioned
• Parties are mentioned
• Scope of the contractor is mentioned
• Contract price is mentioned
• Documents of reference and their order of precedence is mentioned
• Time schedule is mentioned
• Payment terms is mentioned
• Other conditions of contract- technical & commercial are referred.
• Duly signed/stamped by the authorized representatives in presence of witness
Sample Contract 1 & 2
Thanks

More Related Content

What's hot

Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introductionDaniel Ross
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurementMalcolm Peart
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender ManagementAnand Subramaniam
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftMuneesh Methwani
 
The Basics of Tendering & Bidding
The Basics of Tendering & BiddingThe Basics of Tendering & Bidding
The Basics of Tendering & BiddingMoatasem Mabrouk
 
Contract management
Contract managementContract management
Contract managementNishant Rai
 
Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...axmedbaasaay
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tenderingvvsasane
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.Lilian Nwachukwu
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
Tender calling procedure
Tender calling procedureTender calling procedure
Tender calling procedureShourya Puri
 
Tendering and Procurement - Basic Principles
Tendering and Procurement   - Basic PrinciplesTendering and Procurement   - Basic Principles
Tendering and Procurement - Basic PrinciplesSHKLaw
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentationnipuna_bopage
 

What's hot (20)

Construction Bidding Step-by-Step
Construction Bidding Step-by-StepConstruction Bidding Step-by-Step
Construction Bidding Step-by-Step
 
EPC Contracts
EPC Contracts EPC Contracts
EPC Contracts
 
Tendering in construction introduction
Tendering in construction introductionTendering in construction introduction
Tendering in construction introduction
 
Project management procurement
Project management  procurementProject management  procurement
Project management procurement
 
Contract & Tender Management
Contract & Tender ManagementContract & Tender Management
Contract & Tender Management
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
 
The Basics of Tendering & Bidding
The Basics of Tendering & BiddingThe Basics of Tendering & Bidding
The Basics of Tendering & Bidding
 
Tendering presenation
Tendering presenationTendering presenation
Tendering presenation
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Contract management
Contract managementContract management
Contract management
 
Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...Lecture 1 Introduction to Procurement and contract Management Management - Co...
Lecture 1 Introduction to Procurement and contract Management Management - Co...
 
Tendering
TenderingTendering
Tendering
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Procurement Methods and their Application.
Procurement Methods and their Application.Procurement Methods and their Application.
Procurement Methods and their Application.
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Tender calling procedure
Tender calling procedureTender calling procedure
Tender calling procedure
 
Tendering and Procurement - Basic Principles
Tendering and Procurement   - Basic PrinciplesTendering and Procurement   - Basic Principles
Tendering and Procurement - Basic Principles
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Tenders
TendersTenders
Tenders
 

Viewers also liked

Tender processing
Tender processingTender processing
Tender processingdnyandev_d
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 

Viewers also liked (7)

Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Negotiation
NegotiationNegotiation
Negotiation
 
Tender
TenderTender
Tender
 
Tender processing
Tender processingTender processing
Tender processing
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Tender
TenderTender
Tender
 

Similar to Tendering process, Bid Evaluation & Award Process

Overview Presentation - Procurement Directive, December 2021.pptx
Overview Presentation - Procurement Directive, December 2021.pptxOverview Presentation - Procurement Directive, December 2021.pptx
Overview Presentation - Procurement Directive, December 2021.pptxabiytk
 
Contracts specialist
Contracts specialistContracts specialist
Contracts specialistYosry Farag
 
Procurement seminar
Procurement seminarProcurement seminar
Procurement seminarshabbirjaved
 
Chapter One Procrument An Overview.pdf
Chapter One Procrument An Overview.pdfChapter One Procrument An Overview.pdf
Chapter One Procrument An Overview.pdfmekuannintdemeke
 
Procurement ops450
Procurement ops450Procurement ops450
Procurement ops450kahogan62
 
Tender & its process.pptx
Tender & its process.pptxTender & its process.pptx
Tender & its process.pptx2ke21cv405
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSGanesh Bhorkade
 
2. Project Procurement Process.pptx
2. Project Procurement Process.pptx2. Project Procurement Process.pptx
2. Project Procurement Process.pptxDoctorOkelloBen
 
Understanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesUnderstanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesLloyd Sewell
 
Procurement of services ppt
Procurement of services pptProcurement of services ppt
Procurement of services pptparibeshtimsina1
 
Final presentation from shahida
Final presentation from shahidaFinal presentation from shahida
Final presentation from shahidashahida quraishi
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements Shereef Sabri
 

Similar to Tendering process, Bid Evaluation & Award Process (20)

PPRA.ppt
PPRA.pptPPRA.ppt
PPRA.ppt
 
Overview Presentation - Procurement Directive, December 2021.pptx
Overview Presentation - Procurement Directive, December 2021.pptxOverview Presentation - Procurement Directive, December 2021.pptx
Overview Presentation - Procurement Directive, December 2021.pptx
 
Procurement presentation Ace workshop - Cotonou
Procurement presentation Ace workshop - CotonouProcurement presentation Ace workshop - Cotonou
Procurement presentation Ace workshop - Cotonou
 
Contracts specialist
Contracts specialistContracts specialist
Contracts specialist
 
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
 
Procurement seminar
Procurement seminarProcurement seminar
Procurement seminar
 
Tender
TenderTender
Tender
 
Chapter One Procrument An Overview.pdf
Chapter One Procrument An Overview.pdfChapter One Procrument An Overview.pdf
Chapter One Procrument An Overview.pdf
 
Procurement ops450
Procurement ops450Procurement ops450
Procurement ops450
 
Tender & its process.pptx
Tender & its process.pptxTender & its process.pptx
Tender & its process.pptx
 
Chapter -Two (3).pdf
Chapter -Two (3).pdfChapter -Two (3).pdf
Chapter -Two (3).pdf
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
 
procurement overview
procurement overviewprocurement overview
procurement overview
 
2. Project Procurement Process.pptx
2. Project Procurement Process.pptx2. Project Procurement Process.pptx
2. Project Procurement Process.pptx
 
Understanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesUnderstanding Pre Qualification Questionnaires
Understanding Pre Qualification Questionnaires
 
Procurement of services ppt
Procurement of services pptProcurement of services ppt
Procurement of services ppt
 
Final presentation from shahida
Final presentation from shahidaFinal presentation from shahida
Final presentation from shahida
 
Tenders.pdf
Tenders.pdfTenders.pdf
Tenders.pdf
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements
 

Recently uploaded

The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Associazione Digital Days
 

Recently uploaded (20)

The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
 

Tendering process, Bid Evaluation & Award Process

  • 1. Tendering, Bid Evaluation & Award Process Knowledge sharing by : Prateek Kashyap (With co-participation of Vipul Singhal)
  • 2. We need to implement; BUT HOW????, That’s a Project !!!!!
  • 3. What is a Project? Projects is a temporary rather than permanent social systems or work systems that are constituted by teams within or across organizations to accomplish particular tasks under time constraints. OR A Project is a temporary endeavor undertaken to accomplish a unique product or service OR In simple words it’s a collection of activities which needs to be performed in certain defined constraints by a team to realize the need.
  • 4. Attributes of a Project  Unique purpose  Temporary  Requires resources  Should have a primary sponsor and/or customer  Involve uncertainty
  • 5. Steps in a Project  Step 1 : Realization of need  Step 2 : Planning for its fulfillment  Step 3 : Decision to produce or Procure  Step 4 : Procurement  Step 5 : Execution / Commissioning  Step 6 : Verify fulfillment of parameters  Step 7 : Handover for Operations
  • 6. Who are the Stakeholders of Project? Stakeholders are people or entities who have a say in implementation of the project and they get affected w.r.t. Project’s success or failure. They are :  Employer - Those who are implementing  Contractor - Those who are to supply, construct/ erect & commission the project equipment or provide respective services  Consultant - or Engineers who specify, quantify, select and supervise the supply, construction/erection, commissioning & Handover of Project for Operations  Financial Institute - Those who are lending money for project
  • 7. What is Procurement ? Procurement is the acquisition of goods, services or works from an outside external source. It is favorable that the goods, services or works are appropriate and that they are procured at the best possible cost to meet the needs of the purchaser in terms of quality and quantity, time, and location. What is the Requirement ?  May be for Equipment / Machinery  May be for Technology / Consultancy  May be for Execution / Services / or for Safety / Quality
  • 8. What are the Methods for Procurement ? • Agreement • Purchase order • Rate contract • Auction • Tender • Acquisition
  • 9. What is a Tender ? A written invitation sent to potential suppliers of a good or service to inform them about the information required for the buyer to choose among them. Its Objective • To Ensure Best Fit Supplier is selected to Supply Goods/ Services to customer which offers best value of money • Selection process should be business ethics driven- Fair Practice • More options • Equal opportunity
  • 10. Routes to be followed for Tendering Depends primarily on the Statutory Norms or the Financial Institutes . • ICB : International Competitive Bidding • LICB : Limited International Competitive Bidding • NCB : National Competitive Bidding
  • 11. The Tendering Process Step 1 : NIT – Notice Inviting Tender (Advertisement, Post , Email.. ) Step 2 : EOI- Expression of Interest by respective Bidders Step 3 : Tender document Floating/ Selling Step 4 : Pre Bid Meeting Step 5 : Bid Submission- In Single Phase or Two Phases Step 6 : Bid Opening – In Single Phase or Two Phases Step 7 : Bid Evaluation Step 8 : Post Bid Meeting Step 9 : Report Formation Step 10 : Award of Contract
  • 12. Contents of NIT (Notice Inviting Tender) • Brief Project Particulars • Brief Requirement of Tender • Eligibility Criteria – Technical & Financial • Duration & Place of sale of tender document • Price of tender document • Contact Information • Probable amount of Contract (Primarily in Govt. Tenders) • Earnest Money amount • Work completion period • Bid submission period Sample NIT- Pvt. NIT-Govt.
  • 13. Advertising the NIT Depending on the the need of the Route of tendering, the NIT needs to be advertised or circulated through & to : • All Embassies ( ICB/ LICB route to be followed) • Major newspapers (ICB/ LICB/ NCB route to be followed) • Web portals (ICB/ LICB/ NCB route to be followed) The NIT may be brief from publishing point of view as an advertisement. The detailed NIT in this case is given upon receiving EOI (Expression of Interest) from the prospective Bidder
  • 14. EOI - Expression of interest Interested Bidders shall show their Interest in executing the Tender/ submitting the Bid and ask for the Complete Tender documents Followed by purchase of the tender documents
  • 15. Tendering type based on mode of submission Manual tendering- Paper type submission E Tendering- E-submission (E Bidding)
  • 16. Contents of Tender Document Section I : NIT/ IFB (Invitation For Bids) Section II : ITB (Instruction To Bidders) Section III : GCC (General Conditions of Contract) Section IV : SCC (Special Conditions of Contract) Section V : SOR (Schedule of Requirement) Section VI : Technical Specification Section VII : Various Bid Forms
  • 17. Constituents of Bid Forms in Tender document • Bid Security Form, • Contract Form, • Performance Security Form, • Financial Capability Form, • Technical Capability Form, • Manufacturer Authorization Form, • Advance bank Guarantee Form, • Completion certificate Form, • Deviation Statement Form, • Places of Tests & Inspection Form….
  • 18. The Pre Bid Meeting Subsequent to the purchase of Tender Document, the prospective Bidders, Employer and Consultants meet for discussions with following objectives : • Provide clarification to the Bidders- Technical or Commercial • Communicate any additional information in Project • Do necessary revision in the tender documents as per industry feedback • Ensure minimum deviations • Critical points to explained and discussed The Minutes of Pre Bid Meeting are recorded and it may be followed by an Amendment or Addendum to the Tender documents
  • 19. The Bid Submission/ Tender Submission Subsequent to the Pre Bid Meeting, the Bids are prepared and submitted in the prescribed time and form, duly sealed. The Bid submission could be of following forms Two Stage Bidding : First Techno commercial part & then Price part Single stage Bidding : Comprehensive Bid is submitted
  • 20. The Bid Submission/ Tender Submission
  • 21. The Bid Opening / Tender Opening Tender Board ( consisting of representative of Employer -Chairman/ Board Member/ CEO/ CE; Consultant, Financial Institute) meets on the nominated day and time to open these Sealed bids ( Generally few hours after last time of Bid submission date). Late Bids are not supposed to be entertained. Usually Following steps are followed: Step 1 : Introduction of the Participants and announcement of the Bidders. Followed by Attendance marking. Step 2 : Declaration of Sufficiency of the Bid Bond Step 3 : Declaration of Guaranteed Technical Particulars Step 4 : Declaration of the Bid Price if it’s a Single Stage Bid
  • 22. The Bid Opening / Tender Opening
  • 23. The Bid Evaluation Generally the bid evaluation process involves a team of experts or panels which is lead at the front by a single person who is responsible for interdepartmental/interdisciplinary coordination as well as coordination with the stake holders to and Bidders . He may be known as Project Coordinator or Project Manager. His objectives are: • The Bid is thoroughly evaluated by the respective Technical, Legal, Commercial &Financial experts • Proper flow of communication to & from bidders (queries & replies) • All aspects of bids are evaluated • Every Bidder gets a fair chance of winning the contract
  • 24. The Bid Evaluation The Evaluation of the bid has following parts: • Technical Evaluation • Commercial Evaluation • Capacity Evaluation
  • 25. The Bid Evaluation- Technical • The equipment /system & manufacturer being offered by the bidder is to be evaluated for its conformance with the tender technical specification • The Guaranteed Technical particulars are to meet the minimum Tender requirement. • Any alternative technology or material grade offered by the bidder needs to be verified. • Any price implication on the project w.r.t. technical parameters to be verified and respective loading on the price to be proposed. • The feedback of working of the equipment supplied by the bidders in other projects to be evaluated • The factory load of the bidder or its major supplier should be evaluated
  • 26. The Bid Evaluation- Technical (-Score method)
  • 27. The Bid Evaluation- (-Weighted Score method)
  • 28. The Bid Evaluation- Commercial • The Bid Forms are duly filled and signed • The declared Deviations on the Commercial part are to be evaluated • All costs are properly covered in the offered prices • Bid price is in specified currency or the listed conversion rate at the time of price bid opening are to be considered. • Any price variation/escalation formulae are correct and is justified • Details of any extra costs ( such as Delivery cost , shipping cost, custom charges, insurance, documentation , testing & inspection) are identified • Cost of Spares if mentioned extra is identified • Any other indirect commercial deviations are identified
  • 29. The Bid Evaluation- Capacity • The Bidder has sound financial condition • The Bidder has sufficient funds to procure raw material and process so that positive cash flow is maintained up to delivery of equipment • The Bidder is not under litigation or any act resulting in bank corruptly • The Bidder’s financial has sufficient immunity from market economy trend • Will there be any cost resulting from loss of economy of scale • If offer is for Services , then check should be done if resultant staff savings or reduction in support services fully accounted for • Has the cost of any long term agreement been included ? • In case of Foreign Bidder, geo-Political scenario to be evaluated.
  • 30. Post Bid Meeting • During Bid Evaluation , Bid Evaluation committee witness that submitted Bid has several variation with the Technical Specification of the Tender. • It is therefore difficult for the Committee to Compare the Bids . • A Post Bid Meeting is organized with separate Bidders individually to bring them to a common Platform and negotiate on the Technical Specs wherever appropriate • Once the Technical part is freezed out , Bidders are asked to again submit their Commercial Bid ( after taking into consideration the cost of technical changes) .
  • 32. Evaluation Report • Before Release of Order/ award of contract , an evaluation report is being generated for the purpose of Office records or for future reference. • This report contains basic details such as  Description of Contract  Type of Tender  Closing date of Tender  Details of Tender Received  Technical Compliance of tenders  Analysis of Lowest 3 tenders  Performance records of Lowest 3 tenders  Recommendation of Assessment Panel Sample Evaluation Simple format Evaluation- Technical Evaluation Commercial
  • 33. Award Process • Based on Evaluation report & recommendation of Assessment Panel a “ Best Fit Bidder” or successful is declared. • A Letter of Award is Issued to the Successful Bidder. • The Bidder is asked to submit a Contract Performance Guarantee which could be in form of a Bank Guarantee, Demand Draft, Cash or a Fixed Deposit Receipt • A contract between Bidder & Employer is drafted as per International Contract Laws. • Contractual Obligations & Rights are being drafted / incorporated in the contract • Technical Obligations are clearly stated • Quality Obligations are clearly stated • Completion Schedule is clearly stated • Payment schedules are clearly stated • The contract is signed and moved for implementation
  • 34. Contract document’s Broad features • Work of tender/contract is mentioned • Date of signing is mentioned • Parties are mentioned • Scope of the contractor is mentioned • Contract price is mentioned • Documents of reference and their order of precedence is mentioned • Time schedule is mentioned • Payment terms is mentioned • Other conditions of contract- technical & commercial are referred. • Duly signed/stamped by the authorized representatives in presence of witness Sample Contract 1 & 2