 Established in 2002
 An ISO 9001: 2008 certified company
 Executed 200+ projects
 A team strength of 250 Engineers
 Offices in California, USA, Bangalore & Mysore, India with 350 work stations
 Projects executed for Fabricators, Engineering Companies, General Contractors
and EPC Contractors
 Project size up to 40,000 tons, simple to complicated structures executed to the
satisfaction of our customers
 Experience in Power, Petroleum, Chemical, Airport, Manufacturing, Commercial &
Architectural structures
 Experience in designing and detailing projects in seismic zones
 Have not lost a single customer in last 10 years
 Consistently 70%+ revenue through repeat business from existing customers
 Projects executed in US, Mexico, Middle East, Hong Kong & India
About US
 250 Engineers
 30 Connection Design Engineers
 120 BIM/3D modelling Engineers
 100 Engineers in checking and Quality Control teams of which 30 Engineers
with experience in Fabrication and Erection
 Support Functions
 In-house software development team
 Support and admin staff
 Sales and pre-sales team
 Partners
 Professional Engineers
 MEP firms
Our Team
 Software expertese
Trimble/Tekla Structures – 62 licenses
 DESCON
 STAAD
AutoCAD Rivet
3D Max
 In house developed Tools
 iConnect – Connection design suite ASC, LRFD – 9,13 & 14 th Editions
 iSoft – In house developed automation tools running on Tekla Structures
 iManage – Project Management & workflow automaton tools
Software & Automation Tools
 ISO 9001 2008 certified company
 Matured Process – in use for over 9 years and continuously improved to handle
changing environments
 Process Tracks
 Critical aspects of project
 Traceability – Revisions, RFIs
 Process Helps in
 Allocating right people for the projects based on employees’ skill certification
and experience
 Identifying training needs
 Improving efficiency
 Improving Quality
 Ensures checks and controls at every stage
 Timely delivery of Projects
Process
Services offered to Fabricators
 Connection Design services and stamping of Connection Designs services
 BIM Development and Maintenance
 3-D Modelling of both Structural and Miscellaneous Steel
 Detailed Shop Drawings and CNC files for Fabrication
 Coordination with joists, decking, grating & facades service providers
 Review and stamping of shop drawings
 Project Estimation and take off services to assist Fabricators in bidding
 A single source for connection design and detailing services
 A great partner for Design Build / Design Assist projects and Material take off
 On-demand, scalable resource mobilization leading to quicker delivery cycles with
no long term commitment from the customer
 Access to 3D Modeling software, custom applications and tools (over $2 million in
investments) and trained professionals
 On Schedule, Error free drawings delivered at a very Competitive Price through
a combination of on-site and offshore resource utilization
 On demand customer support during Fabrication and Erection stage
Benefits to Fabricators
Projects & Case Studies
Project Name Owner Location
Engineering
Consultant
Tonnage
Plant Scherer
Southern Company
Juliette, GA,
USA
Worley Parsons 40,000
(Units 1 to 4)
Kemper County IGCC Project Southern Company
Kemper County,
MS, USA
Southern
Company
24,500
Dow Poly 5 Dow Chemical Company
Freeport, TX,
USA
Dow Chemicals 20,000
IOC Paradip
Indian Oil Corporation
Limited
Pardip Valdel 20,000
Dow LHC9 Stick Builds
The Dow Chemical
Company
Houston, TX,
USA
FLUOR 5,000
Plant Bowen (Unit 3&4) Southern Company
Cartersville, GA,
USA
Southern
Company
4,500
Oak Grove Power Station Texas Utilities
Robertson
County, TX,
USA
Neil & Gunter 4,900
La Cygne Generating Stations (Unit 1&2) Kansas City Power & Light
La Cygne, KS,
USA
Sargent &
Lundy
9,000
Plant Daniel Southern Company
Jackson County,
MS, USA
Southern
Company
3,300
Projects & Case Studies
Project Name Owner Location Engineering Consultant Tonnage
Dow LHC9 Pipe Rack
The Dow Chemical
Company
Houston, TX, USA FLUOR 2200
Williams Generating Stations
South Carolina Electric
& Gas
Berkeley, SC, USA Stantec 1300
Plant Scherer Baghouse Structure Georgia Power Co., Juliette, GA, USA Worley Parsons 1500
Wateree Generation Stations
South Carolina Electric
& Gas
Richland County,
SC, USA
Stantec 1900
Plant Miller Alabama Power
West Jefferson, AL,
USA
Advatech 2900
USGC Petrochemical - ISBL
Chevron Phillips
Chemical Company
Baytown, TX, USA JGC-FLUOR 2000
Brandon Shores Generating Station
Constellation Power
Source Generation
Baltimore, MD, USA Wheelabrator 1600
Altamira Line 2 - C6774 Dupont
Wilmington, DE,
USA
Dupont 1600
Shawnee Fossil Fuel Plant
Tennessee Valley
Authority
West Paducah,
Kentucky
Stantec 1400
Projects & Case Studies
Project Name Owner Location
Engineering
Consultant
Tonnage
Chana 2 & Thailand
Power
Thailand Siemens 1,600
Wangnoi 4
Mount Storm Power
Station
Dominion West Virginia Mill Creek 450
Clifty Creek
Indiana
Kentucky
Electric
Corporation
Madison,
Indiana
6,000
Bangalore
International Airport
BIAL Bangalore STUP 6,000
Baggage Handling
System
BIAL Bangalore Vanderlande 800
UT, Dallas, Brain
Performance
Institute
UT Dallas Dallas
Datum
Engineers
800
Fabricator Engineering Company
About the Project
The Shawnee Fossil Plant is a coal-fired power plant owned and operated
by the Tennessee Valley Authority located near Paducah, Kentucky. Our
scope included SCR support structure
Tonnage 1400 Tons
Scope
Design of connections as per Seismic Zone D,
Review and Stamping of Connections
3 D Modelling & Detailed Shop Drawings
Case Study - Shawnee – Fossil Fuel Plant
Shawnee 1/3
Our services
1. Connection design as per AISC 341 -02
Basic seismic resisting system is OCBF (ordinary
concentrically base frames)
Complex Vertical Braces and Trusses as the brace
loads posted were amplified loads
Total connection types included 60 truss connections,
60 Brace connections and 130 special connections
2. Preparation of 3 D models in Tekla
3. Providing detailed shop drawings & CNC outputs
Benefits
1. Turnaround time – designed, reviewed, stamped, modelled and
released shop drawings for approval in 8 weeks.
2. One stop shop – Fabricator did not have to invest time in co-
ordinating between the designer and detailing company
3. Faster completion of the project due to reduced coordination
time and RFIs
Shawnee – Fossil Fuel Plant
Shawnee 2/3
Huge transfer force from beam to HB
Shawnee – Fossil Fuel Plant
Shawnee 3/3
Fabricator Schuff Steel Company Engineering Company FLOUR
About the Project
Dow is currently expanding its production facilities on the Gulf Coast in
Freeport, Texas and Plaquemine, Louisiana with its Gulfstream Program.
Tonnage 20,000 Tons
Scope
Design of connections
Review and Stamping of Connections
3 D Modelling & Detailed Shop Drawings using Model based inputs
Case Study - Dow Chemicals
Dow 1/6
Our services
Connection Design
3 D Modelling – over 100 sequences
Completely Model based detailing – Inputs from Dow as an STP model,
Revisions through STP, BFA comments through XSR files. No paper drawings were
received in this project.
Benefits
 Design and detailing done at one location
 Multiple sequences and coordination among various sequences
 Impact analysis was carried out in less than 24 hours
 Effficiently managed multiple revisions based on site requirements up to 9
revisions (in few sequences) which impacted sequences already detailed/
fabricated/erected. Suggested Field modifications wherever required and
coordinated with earlier sequences to address the impacts
Dow Chemicals
Dow 2/6
Model based Detailing Process
 RFI’s were reviewed by the client using model viewer.
 UDA report in .xsr format were given by the client along with loads wherever
connections need to be designed by iCAD.
 All the connections applied in model were tracked using connection codes.
 After completing the modeling activities and updating all the RFI responses in
model, the assembly drawings and E-plans were generated, edited and checked
as per customer standards.
 Models along with the assembly drawings, E-plans and Fabtrol reports were
submitted for approval (OFA).
Dow Chemicals
Dow 3/6
 RFI’s were tracked using member UDA in the model.
Dow Chemicals
Dow 4/6
BFA (Back From Approval) Drawings
 Approver comments were received through .xsr file and the same was imported in to
Tekla model using GUID number for future reference.
Dow Chemicals
Dow 5/6
Dow Chemicals
Dow 6/6
Dow Poly B
Fabricator Engineering Company
About the Project
Retrofitting two WFGDs complete with Absorber Island, limestone
preparation, and gypsum dewatering systems, with complete flue duct and
structural steel components to integrate the WFGD system into the existing
power plants.
Tonnage 3300 Tons
Scope
Design of connections as per Seismic Zone D,
Review and Stamping of Connections
3 D Modelling & Detailed Shop Drawings
Case Study - Wateree & Williams Generating
Station
Wateree 1/4
Our Services
1. Designing Connections as per AISC 341 -02
Basic seismic resisting system is SCBF (Specially
concentrically base frames)
Designed and 3 D modelled connections for retrofitting
WFGD (wet flue gas desulphurization) to the existing structure.
2. Preparation of 3 D model in Tekla
3. Preparation of Detailed shop drawings & CNC outputs
Benefits
1. Quicker Turnaround time – designed, reviewed, stamped, modelled and
shop drawings under one roof
2. Fabricator did not have to invest time in co-ordinating between the
designer and detailing company
3. Faster completion as both Design and Detailing carried out parallelly
Wateree & Williams Generating Station
Wateree 2/4
Wateree & Williams Generating Station
Wateree
Wateree 3/4
Wateree & Williams Generating Station
Williams
Williams Wateree 4/4
General Contractor Larsen & Toubro Engineering Company STUP
About the Project
The Bangalore airport expansion involved four new link bridges, walkways,
support structure for escalators and Travelator
Scope
Structural design of Fixed Link Bridge, Connection Designs and developing
Detailed Fabrication Drawings
Our Services
1. Developed a STAAD model USING the given preliminary load model
2. Designed specific connections to suit tubular structural steel and architecturally
exposed (aesthetic) steel
3. Got the designs reviewed by another external consultant in addition to Airport
Design team due to Airport regulation requirements
Case Study - Bangalore International Airport
BIA 1/2
4. Visited the project site periodically to understand the site conditions and modified the design
based on the studies carried out.
5. Was responsible for interacting with other agencies, resolving RFIs and approval of designs
6. Developed custom work sheets for validating the STAAD outputs.
Benefits
1. Acted as single firm responsible for design, validation, site co-ordination and approvals
2. Co-ordinated amongst other trades to ensure there is no clash/fowling in the site
3. Ensured timely completion of project through deployment of resources as needed
4. Faster turn around of shop drawings & RFIs as design and detailing was carried out under
one roof
5. Customer did not have to deploy any of their key resources in this project
Bangalore International Airport
BIA 2/2
EPC Contractor Vanderlande, Netherlands
About the Project
Design of Baggage handling support structures at Bangalore International
Airport. This is a suspended structure based on site needs and required
a very high precision.
Scope
1. Member Design, Connection Design, 3D Modelling and shop drawings
2. Coordination with Airport Authority for review and approval of designs
Our services
1. Site visits to understand the site conditions
2. Incorporated site conditions in the design as the structure was fitting to an
existing concrete structure
3. Designed Connections
4. Developed 3 D Models in Tekla Structures and prepared Shop Drawings
5. Got the design reviewed and approved by the Airport Authority of India
Case Study - Baggage Handling System
BHS 1/2
Tools used
STAAD, In-house designed connection design worksheets and Tekla
Structures
Benefits
1. Entire Structural Design, Connection Design and Detailing works were
carried under one roof
2. Customer did not assign any of their design resources.
3. Coordinated with Fabrication and Erection companies
4. Coordinated all the approvals from Governmental Agencies
5. Assisted customer in executing the project with very few resources
Baggage Handling System
BHS 2/2
EPC : Siemens
Scope
Design of all connections in the two power plants
Develop 3 D model to validate clash with pipelines in PDMS
About The Project
These two Power plants were designed by SIEMNS for Electricity Authority
of Thailand. The steel sections involved Japanese and Thailand sections
Tonnage 1600 Tons
Scope
1. Connections were designed as per ASIC standards. Standard
connection design software could not be used because of the load combinations for
the given sections was very high as Siemens looked at optimising the steel
Case Study - Chana 2 & Wangnoi 4 Power Plant, Thailand
Chana 1/2
2. Connection concepts were developed by us and approved by Siemens
3. Designed the connection work sheets for the approved concept
4. Designed 1000 plus connections
5. Provided detailed Calculations for all the connections
6. Resolved Detailer and Fabricators RFIs
Tools Used
STAAD, In-house developed connection suite & Tekla Structures
Benefits
1. As modelling was done and validated with PDMS, there were no design revisions
during fabrication and erection.
2. We were able to ramp up resources as required thereby ensuring timely
completion of project
3. In many cases steel connections were modified to accommodate pipelines at
design stage
4. With very few resources Siemens was able to complete the job
5. Our core strength of AISC knowledge was very help full to Siemens Asia
Chana 2 & Wangnoi 4 Power Plant, Thailand
Chana 2/2
UDH 1/3
Fabricator Indiana Bridge Inc.
About the Project
This is a complex building with hip and Valley roofs & Curved roofs.
Because of the complexity, it involved coordination with lot of other
vendors to ensure there are no issues at the site.
Scope
Developing 3 D Model & Detailed Shop Drawings
Coordination with HVAC, Joist, Deck & Skylight vendors
Benefits
Lot of interferences with other desciplines were brought to the notice of
the Architect which led to revisions in the roof slopes at an early stage to
avoid costly field fixes.
In spite of being complex architectural building, the fabrication and
erection went of smoothly as we were able to identify the problems
early and suggest possible solutions.
This project was awarded the best BIM Model award by an independent jury
in Tekla BIM competition 2015
Case Study - Hoover Dining Hall
UDH 2/3
Hoover Dining Hall
UDH 3/3
Hoover Dining Hall
Fabricator Schuff Steel Company
About the Project
The Brian Performance Institute - a new 62,000-square-foot facility will
bring together the latest research and training techniques designed to
improve cognitive skills and health. Brain training rooms, event spaces and
other clinical offerings will be in an elliptical, three-story glass structure
connected to a rectangular building filled with administrative offices.
Tonnage 800 Tons
Scope
Providing Connection Designs
Detailed shop Drawings for Structural and Miscellaneous Steel structures
Case Study - UT Dallas, Brain Performance Institute
UTDBPI 1/3
Work Carried Out:
1. Design of specific connections as per AISC 13th Edition, ASD method.
2. Created 3D model of elliptical structure using Tekla structure software - version
20.1 by interpreting design drawings supplied by customer, produced 2D shop
and erection drawings for fabrication and erection
3. Provided weekly BIM model to General Contractor to co-ordinate with MEP, Civil,
Joist, Fire safety, Deck suppliers
4. Identifying Architecturally exposed structural steel and design & detail steel as
per AESS requirements.
5. Model Coordination with Joist, Steel deck, architectural stair, monumental stair
and Mechanical equipment's.
UT Dallas, Brain Performance Institute
UTDBPI 2/3
UT Dallas, Brain Performance Institute
UTDBPI 3/3
Fabricator NAFCO Steel
About the Project
Mount Storm Power station is a coal fired power station owned by
Dominion located in West Virginia. Mount storm power station has
three different building units namely Head house-A, Head house –B and
Storage transfer tower.
Tonnage 450 Tons
Scope
Structural Steel Connection Design
Develop 3D Model and Detailed Shop Drawings
Case Study - Mount Storm Power Station
MSPS 1/3
Our Services
Designed the connection using LRFD 14th edition
150 varieties of connections designed along with connection calculations
3D Modeling and Shop Drawings
Benefits
Timely delivery of drawings was very critical to this project
Customer realized the need for Connection Design services after 3 weeks
in to the project but could not extend the schedule due to Liquidated
Damages clause. We took the responsibility of Designing the Connections
without affecting the final Drawing delivery schedule
Reduction in RFIs as Design and detailing were under one roof and faster
turn around
Mount Storm Power Station
MSPS 2/3
Mount Storm Power Station
MSPS 3/3
Our Automation Tools
APPLICATION NAME DESCRIPTION BENIFITS
MEMBER CHECKS -
132M17
Checks the Assembly Name, Assembly Prefix,
Part Prefix, Material Grade and generates a
report for the wrong ones.
Used in QC. Helps the user to check part prefix,
assembly prefix, material grades before
generating the drawings to improve quality.
GUSSET ON CENTER -
2A02
Verifies that Gussets are exactly placed to the
center of BEAM/COLUMN/BRACES
Used in QC to ensure gussets are to the center of
the Main Member.
ASSEMBLY NOT LINKED -
3A03 and PARTS NOT
LINKED - 22P03
Checks to ensure assemblies are linked to the
respective multi drawings and parts are linked
to respective G-Sheets. Generates reports of
Assembly/Parts that are not linked.
Assemblies and parts will not be missed out in
the MULTI DRAWING and PART DRAWING.
K-ENCROACHMENT
VERIFICATION - 32C03
Checks the material encroachment in to K-
Value/K1 Value and generates a report when
there is encroachment.
Used in QC which helps to ensure there are no
material encroachment into the k/K1 value.
HANDRAIL
VERIFICATION - 47HR02
Checks the parameters of Handrails Like Height,
P-end Distance, Max Post to Post Spacing, Max
length, Profile etc.
Used in QC which helps to verify the handrail
parameters are correct and reduces checking
time.
SIMILAR BOLT QTY. ON
BOTH ENDS - 41B04
Checks if the GAGE and No of Bolts are same on
both the ends of the Braces
Used in QC. Helps to check the connection design
requirement through automation.
WASHER
ENCROACHMENT -
59W03
Checks the Washer encroachment into K-
Value/K1 Value and generates a report when
there is encroachment.
Used in QC to ensure there is no washer
encroachment in the model.
Our Automation Tools
APPLICATION NAME DESCRIPTION BENIFITS
COORDINATION
CHECKING OF BOLTS
Checks if the location of bolts are correct
between two or more coordinating tekla
models.
Used in QC to check if the location of bolts at the
coordinating locations are correct.
BENT PLATE
VERIFICATION - 74P10
Checks Bent Plate Radius, washer
encroachment into the bent plate radius.
Used in QC. Helps to verify if the bent plate radius is
correct and there are no washer encroachment into
the bent plate radius.
WORK POINT CHECKING
- 130P17
Checks the work points intersection between
BEAM To BEAM, BEAM To COLUMN, BRACE To
BEAM and COLUMN
Used in QC to check if work points are proper.
VERIFYING SHEAR
PLATE IS ONE SIDE OF
BEAM - 116C13
Verifies whether shear plate is on the same
side of beam.
Used in QC to check if shear plates are one side of the
beam.
SET BACK
VERIFICATION - 60C07
Verifies the set back value for the members
like Beams, gussets, Haunch plate etc.
Used in QC to check if set back value is proper at all
the locations.
BOLT CHECKS - 241B12
Checks the bolt errors which may occur in the
TEKLA STRUCTURES
like 1) Bolt parts are not proper
2) GAP between bolt parts
3) Multiple bolts at same location, etc
Used in QC to ensure that bolt errors do not exist in
the model.
GAGE VERIFICATION -
8C01
Validates the bolt GAGE for W, Wt, Channel
and L section profiles.
Helps in ensuring the bolt gages are proper.
EDGE DISTANCE - 7B03
Checks the EDGE DISTANCE of the bolt with
respect to bolt Dia.
Ensures that the required edge distance exists for all
the bolts.
CONNECTION DESIGN
CHECKING - 125C15
Checks the connection design parameters Like
profile, No of bolts, weld Length, Hole To Hole
Spacing etc for Beam To Beam connections,
Beam to Column connections, Vertical Brace
connections, Horizontal Brace Connections.
Quality and efficiency based application to ensure
quality.
Our Automation Tools
APPLICATION NAME DESCRIPTION BENIFITS
BATTEN PLATES - 73C10
Automatically insert the batten Plates(Spacer
plates) for the 2L braces in the model.
Efficiency based application helps in reducing the
time of placing the batten plate in the model .
DELIVERABLES -
110D08
This generates customer related deliverables
from Tekla, Like
1) bolt report, 2) .nc1, 3) .dxf, 4) .kISS, etc
Also generates customer specified outputs as
per the requirement like 1) DXF Splitter: Dxf
separately for different Plate Thickness
2) NC File Splitter - To create NC files for
Different hole Dia
3) .KISS File With Out Bolt and .KISS with Cost
code information.
Generates customized outputs as per the customer
requirement. Since the generation is automatic, helps
in efficiency and quality
DRAWING CHECKS -
158DWG12
This application is used to check the
1) RD start point are correctly called out in the
drawing.
2) Used to check the Precision and dimension
format check.
Quality based application, which helps to ensure RD
start points are correct for the members (Especially
for skewed and sloped member) and also the
precision and dimension format used for the entire
drawings are right.
AUTO DIMENSIONING -
98DWG06
Providing the Dimensions automatically for the
VERTICAL BRACES, HORIZONTAL BRACES,
BEAMS
Helps in eliminating the editing errors.
COPE AND BLOCK OUT
REPORT - 61C09
Extracts CopeX and CopeY (Left Top, Left
Bottom, Right Top, Right Bottom) and Flange
Cuts (X and Y) for the W-Section Members.
Quality related application which helps to verify that
copes and cuts are with in the limit of design. The
application is also useful to checker to ensure that
flange cut details are called out in the detail drawings
BO - APPLICATION -
16B09
Generates hole report for each member from
the model.
The holes will be cross verified with the drawing
output, to ensure that holes are correctly called
out in the drawings.
Quality related application, which helps the checkers
while checking the drawings and also useful in
identifying the wrong hole Sizes used in the model
E-PLAN VS ASSEMBLY
LIST - 189EPLAN01
Checks and generates a report for the
assemblies which are not called out in the E-
PLAN.
Ensures all the assemblies are called out in the E-
Plan.
Automation Tools - iManager
Automation Tools - iManager
Automation Tools - iManager
CONTACT
SANRIA LIMITED
WWW.SANRIAENGINEERING.COM
3080 ALCOTT STREET
SANTA CLARA CA 95054 USA
6, SECOND MAIN ROAD 338 KIADB
BG ROAD HEBBAL INDUSTRIAL AREA
BANGALORE 560076 MYSORE 570016
INDIA INDIA
SALES MANAGEMENT
Pravin Patel Mahesh Nagarajaiah
Senior Sales Manager President & CEO
pravin@sanriaengineering.com mahesh@sanriaengineering.com
P: +1 408 620 5878 x1017 P: +1 408 620 5878 x1015
C: +1 832 455 6071 C: +1 510 996 2022

More Related Content

What's hot

Accounting manager recommendation letter
Accounting manager recommendation letterAccounting manager recommendation letter
Accounting manager recommendation letter
mrbo6070
 
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
Raghavendra Rachamadugu
 
Architectural aluminium extrutions hindalco
Architectural aluminium extrutions hindalcoArchitectural aluminium extrutions hindalco
Architectural aluminium extrutions hindalco
rajeshraj214
 
NISHAD RESUME (B.tech. Mechanical + MBA)
NISHAD RESUME (B.tech. Mechanical + MBA)NISHAD RESUME (B.tech. Mechanical + MBA)
NISHAD RESUME (B.tech. Mechanical + MBA)
NISHAD PARMAR
 

What's hot (20)

SUSPENSION BRIDGE
SUSPENSION BRIDGESUSPENSION BRIDGE
SUSPENSION BRIDGE
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
 
Accounting manager recommendation letter
Accounting manager recommendation letterAccounting manager recommendation letter
Accounting manager recommendation letter
 
Construction errors and their case studies
Construction errors and their case studiesConstruction errors and their case studies
Construction errors and their case studies
 
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
 
Francis Padayatty - CV
Francis Padayatty - CVFrancis Padayatty - CV
Francis Padayatty - CV
 
Steel
Steel Steel
Steel
 
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...
INTERNSHIP REPORT FOR CONCSTRUCTION MANAGEMENT AND ORGANISING WORKS OF A BUIL...
 
Architectural aluminium extrutions hindalco
Architectural aluminium extrutions hindalcoArchitectural aluminium extrutions hindalco
Architectural aluminium extrutions hindalco
 
Timber frame construction
Timber frame constructionTimber frame construction
Timber frame construction
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
 
Design And Construction Of Cantilevered Retaining Walls
Design And Construction Of Cantilevered Retaining WallsDesign And Construction Of Cantilevered Retaining Walls
Design And Construction Of Cantilevered Retaining Walls
 
REQUIREMENT OF BIM MODELER
REQUIREMENT OF BIM MODELERREQUIREMENT OF BIM MODELER
REQUIREMENT OF BIM MODELER
 
importance of formwork and types of formwork
importance of formwork and types of formworkimportance of formwork and types of formwork
importance of formwork and types of formwork
 
NISHAD RESUME (B.tech. Mechanical + MBA)
NISHAD RESUME (B.tech. Mechanical + MBA)NISHAD RESUME (B.tech. Mechanical + MBA)
NISHAD RESUME (B.tech. Mechanical + MBA)
 
Structural Steel Work
 Structural Steel  Work Structural Steel  Work
Structural Steel Work
 
RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING RESIDENTIAL CONSTRUCTION BUILDING
RESIDENTIAL CONSTRUCTION BUILDING
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
Mechanical Design Engineer
Mechanical Design EngineerMechanical Design Engineer
Mechanical Design Engineer
 
Beam
BeamBeam
Beam
 

Viewers also liked

SUN STEEL ENGINEERING SERVICES Presentation
SUN STEEL ENGINEERING SERVICES PresentationSUN STEEL ENGINEERING SERVICES Presentation
SUN STEEL ENGINEERING SERVICES Presentation
sandeep sutar
 
E n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsE n e r g o Cement Plant - Projects
E n e r g o Cement Plant - Projects
Daniel DRAGOSIN
 
Vibrating machinery steel skid on piles
Vibrating machinery steel skid on pilesVibrating machinery steel skid on piles
Vibrating machinery steel skid on piles
r2d22
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Sin Byrne
 
Sap tutorial for dynamics
Sap tutorial for dynamicsSap tutorial for dynamics
Sap tutorial for dynamics
colosimoricardo
 
Silo at narrow space
Silo at narrow spaceSilo at narrow space
Silo at narrow space
chandra manik
 
Construction Methodology Scheduling1
Construction Methodology Scheduling1Construction Methodology Scheduling1
Construction Methodology Scheduling1
Allan Leyte
 
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Ursachi Răzvan
 
A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information Modelling
Siddhartha Kamat
 

Viewers also liked (20)

SUN STEEL ENGINEERING SERVICES Presentation
SUN STEEL ENGINEERING SERVICES PresentationSUN STEEL ENGINEERING SERVICES Presentation
SUN STEEL ENGINEERING SERVICES Presentation
 
Maquette numérique BIM pour la collaboration en conception/construction. Prat...
Maquette numérique BIM pour la collaboration en conception/construction. Prat...Maquette numérique BIM pour la collaboration en conception/construction. Prat...
Maquette numérique BIM pour la collaboration en conception/construction. Prat...
 
Harshal
HarshalHarshal
Harshal
 
E n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsE n e r g o Cement Plant - Projects
E n e r g o Cement Plant - Projects
 
Comparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel siloComparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel silo
 
Vibrating machinery steel skid on piles
Vibrating machinery steel skid on pilesVibrating machinery steel skid on piles
Vibrating machinery steel skid on piles
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
The Ins & Outs of Concrete Silo Inspection
The Ins & Outs of Concrete Silo InspectionThe Ins & Outs of Concrete Silo Inspection
The Ins & Outs of Concrete Silo Inspection
 
Seismic response of reinforced concrete silos
Seismic response of reinforced concrete silosSeismic response of reinforced concrete silos
Seismic response of reinforced concrete silos
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study
 
Sap tutorial for dynamics
Sap tutorial for dynamicsSap tutorial for dynamics
Sap tutorial for dynamics
 
Post Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdPost Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt Ltd
 
Silo at narrow space
Silo at narrow spaceSilo at narrow space
Silo at narrow space
 
Design steps of foot bridge , stringer and cross girder
Design steps of foot bridge , stringer and cross girderDesign steps of foot bridge , stringer and cross girder
Design steps of foot bridge , stringer and cross girder
 
Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro. Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro.
 
Construction Methodology Scheduling1
Construction Methodology Scheduling1Construction Methodology Scheduling1
Construction Methodology Scheduling1
 
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
 
A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information Modelling
 
Storage structre
Storage structreStorage structre
Storage structre
 
Structure Analysis-Deflection using SAP2000
Structure Analysis-Deflection using  SAP2000Structure Analysis-Deflection using  SAP2000
Structure Analysis-Deflection using SAP2000
 

Similar to Company presentation fabricator feb20_2016

Similar to Company presentation fabricator feb20_2016 (20)

Arb2011
Arb2011Arb2011
Arb2011
 
Resume - W. Travis Scott
Resume - W. Travis ScottResume - W. Travis Scott
Resume - W. Travis Scott
 
Mech Design Engineer
Mech Design EngineerMech Design Engineer
Mech Design Engineer
 
Resume_Rangarajan (1)
Resume_Rangarajan (1)Resume_Rangarajan (1)
Resume_Rangarajan (1)
 
Brevard, Chris Resume - General Purpose
Brevard, Chris Resume - General PurposeBrevard, Chris Resume - General Purpose
Brevard, Chris Resume - General Purpose
 
Brevard, Chris Resume - General Purpose
Brevard, Chris Resume - General PurposeBrevard, Chris Resume - General Purpose
Brevard, Chris Resume - General Purpose
 
Brevard, Chris Resume - General Purpose
Brevard, Chris Resume - General PurposeBrevard, Chris Resume - General Purpose
Brevard, Chris Resume - General Purpose
 
Brown Gregg 02-2016
Brown Gregg 02-2016Brown Gregg 02-2016
Brown Gregg 02-2016
 
AES_Capabilities_09012016
AES_Capabilities_09012016AES_Capabilities_09012016
AES_Capabilities_09012016
 
New format
New formatNew format
New format
 
New format
New formatNew format
New format
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
JAF_RESUME_2015a
JAF_RESUME_2015aJAF_RESUME_2015a
JAF_RESUME_2015a
 
Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin N Drude Resume 10-16
Justin N Drude Resume 10-16
 
Jean-2015-rmf
Jean-2015-rmfJean-2015-rmf
Jean-2015-rmf
 
Structural Designer-Vijayanand
Structural Designer-VijayanandStructural Designer-Vijayanand
Structural Designer-Vijayanand
 
Rick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 ARick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 A
 
Atta Demetre - General 16062015
Atta Demetre - General 16062015Atta Demetre - General 16062015
Atta Demetre - General 16062015
 
Gennaro Palmieri
Gennaro PalmieriGennaro Palmieri
Gennaro Palmieri
 
Bill Delano Resume
Bill Delano ResumeBill Delano Resume
Bill Delano Resume
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Company presentation fabricator feb20_2016

  • 1. 20 Feb 2016 CA, USA Presentation to Bechtel National Bank of Kuwait
  • 2.  Established in 2002  An ISO 9001: 2008 certified company  Executed 200+ projects  A team strength of 250 Engineers  Offices in California, USA, Bangalore & Mysore, India with 350 work stations  Projects executed for Fabricators, Engineering Companies, General Contractors and EPC Contractors  Project size up to 40,000 tons, simple to complicated structures executed to the satisfaction of our customers  Experience in Power, Petroleum, Chemical, Airport, Manufacturing, Commercial & Architectural structures  Experience in designing and detailing projects in seismic zones  Have not lost a single customer in last 10 years  Consistently 70%+ revenue through repeat business from existing customers  Projects executed in US, Mexico, Middle East, Hong Kong & India About US
  • 3.  250 Engineers  30 Connection Design Engineers  120 BIM/3D modelling Engineers  100 Engineers in checking and Quality Control teams of which 30 Engineers with experience in Fabrication and Erection  Support Functions  In-house software development team  Support and admin staff  Sales and pre-sales team  Partners  Professional Engineers  MEP firms Our Team
  • 4.  Software expertese Trimble/Tekla Structures – 62 licenses  DESCON  STAAD AutoCAD Rivet 3D Max  In house developed Tools  iConnect – Connection design suite ASC, LRFD – 9,13 & 14 th Editions  iSoft – In house developed automation tools running on Tekla Structures  iManage – Project Management & workflow automaton tools Software & Automation Tools
  • 5.  ISO 9001 2008 certified company  Matured Process – in use for over 9 years and continuously improved to handle changing environments  Process Tracks  Critical aspects of project  Traceability – Revisions, RFIs  Process Helps in  Allocating right people for the projects based on employees’ skill certification and experience  Identifying training needs  Improving efficiency  Improving Quality  Ensures checks and controls at every stage  Timely delivery of Projects Process
  • 6. Services offered to Fabricators  Connection Design services and stamping of Connection Designs services  BIM Development and Maintenance  3-D Modelling of both Structural and Miscellaneous Steel  Detailed Shop Drawings and CNC files for Fabrication  Coordination with joists, decking, grating & facades service providers  Review and stamping of shop drawings  Project Estimation and take off services to assist Fabricators in bidding
  • 7.  A single source for connection design and detailing services  A great partner for Design Build / Design Assist projects and Material take off  On-demand, scalable resource mobilization leading to quicker delivery cycles with no long term commitment from the customer  Access to 3D Modeling software, custom applications and tools (over $2 million in investments) and trained professionals  On Schedule, Error free drawings delivered at a very Competitive Price through a combination of on-site and offshore resource utilization  On demand customer support during Fabrication and Erection stage Benefits to Fabricators
  • 8. Projects & Case Studies Project Name Owner Location Engineering Consultant Tonnage Plant Scherer Southern Company Juliette, GA, USA Worley Parsons 40,000 (Units 1 to 4) Kemper County IGCC Project Southern Company Kemper County, MS, USA Southern Company 24,500 Dow Poly 5 Dow Chemical Company Freeport, TX, USA Dow Chemicals 20,000 IOC Paradip Indian Oil Corporation Limited Pardip Valdel 20,000 Dow LHC9 Stick Builds The Dow Chemical Company Houston, TX, USA FLUOR 5,000 Plant Bowen (Unit 3&4) Southern Company Cartersville, GA, USA Southern Company 4,500 Oak Grove Power Station Texas Utilities Robertson County, TX, USA Neil & Gunter 4,900 La Cygne Generating Stations (Unit 1&2) Kansas City Power & Light La Cygne, KS, USA Sargent & Lundy 9,000 Plant Daniel Southern Company Jackson County, MS, USA Southern Company 3,300
  • 9. Projects & Case Studies Project Name Owner Location Engineering Consultant Tonnage Dow LHC9 Pipe Rack The Dow Chemical Company Houston, TX, USA FLUOR 2200 Williams Generating Stations South Carolina Electric & Gas Berkeley, SC, USA Stantec 1300 Plant Scherer Baghouse Structure Georgia Power Co., Juliette, GA, USA Worley Parsons 1500 Wateree Generation Stations South Carolina Electric & Gas Richland County, SC, USA Stantec 1900 Plant Miller Alabama Power West Jefferson, AL, USA Advatech 2900 USGC Petrochemical - ISBL Chevron Phillips Chemical Company Baytown, TX, USA JGC-FLUOR 2000 Brandon Shores Generating Station Constellation Power Source Generation Baltimore, MD, USA Wheelabrator 1600 Altamira Line 2 - C6774 Dupont Wilmington, DE, USA Dupont 1600 Shawnee Fossil Fuel Plant Tennessee Valley Authority West Paducah, Kentucky Stantec 1400
  • 10. Projects & Case Studies Project Name Owner Location Engineering Consultant Tonnage Chana 2 & Thailand Power Thailand Siemens 1,600 Wangnoi 4 Mount Storm Power Station Dominion West Virginia Mill Creek 450 Clifty Creek Indiana Kentucky Electric Corporation Madison, Indiana 6,000 Bangalore International Airport BIAL Bangalore STUP 6,000 Baggage Handling System BIAL Bangalore Vanderlande 800 UT, Dallas, Brain Performance Institute UT Dallas Dallas Datum Engineers 800
  • 11. Fabricator Engineering Company About the Project The Shawnee Fossil Plant is a coal-fired power plant owned and operated by the Tennessee Valley Authority located near Paducah, Kentucky. Our scope included SCR support structure Tonnage 1400 Tons Scope Design of connections as per Seismic Zone D, Review and Stamping of Connections 3 D Modelling & Detailed Shop Drawings Case Study - Shawnee – Fossil Fuel Plant Shawnee 1/3
  • 12. Our services 1. Connection design as per AISC 341 -02 Basic seismic resisting system is OCBF (ordinary concentrically base frames) Complex Vertical Braces and Trusses as the brace loads posted were amplified loads Total connection types included 60 truss connections, 60 Brace connections and 130 special connections 2. Preparation of 3 D models in Tekla 3. Providing detailed shop drawings & CNC outputs Benefits 1. Turnaround time – designed, reviewed, stamped, modelled and released shop drawings for approval in 8 weeks. 2. One stop shop – Fabricator did not have to invest time in co- ordinating between the designer and detailing company 3. Faster completion of the project due to reduced coordination time and RFIs Shawnee – Fossil Fuel Plant Shawnee 2/3
  • 13. Huge transfer force from beam to HB Shawnee – Fossil Fuel Plant Shawnee 3/3
  • 14. Fabricator Schuff Steel Company Engineering Company FLOUR About the Project Dow is currently expanding its production facilities on the Gulf Coast in Freeport, Texas and Plaquemine, Louisiana with its Gulfstream Program. Tonnage 20,000 Tons Scope Design of connections Review and Stamping of Connections 3 D Modelling & Detailed Shop Drawings using Model based inputs Case Study - Dow Chemicals Dow 1/6
  • 15. Our services Connection Design 3 D Modelling – over 100 sequences Completely Model based detailing – Inputs from Dow as an STP model, Revisions through STP, BFA comments through XSR files. No paper drawings were received in this project. Benefits  Design and detailing done at one location  Multiple sequences and coordination among various sequences  Impact analysis was carried out in less than 24 hours  Effficiently managed multiple revisions based on site requirements up to 9 revisions (in few sequences) which impacted sequences already detailed/ fabricated/erected. Suggested Field modifications wherever required and coordinated with earlier sequences to address the impacts Dow Chemicals Dow 2/6
  • 16. Model based Detailing Process  RFI’s were reviewed by the client using model viewer.  UDA report in .xsr format were given by the client along with loads wherever connections need to be designed by iCAD.  All the connections applied in model were tracked using connection codes.  After completing the modeling activities and updating all the RFI responses in model, the assembly drawings and E-plans were generated, edited and checked as per customer standards.  Models along with the assembly drawings, E-plans and Fabtrol reports were submitted for approval (OFA). Dow Chemicals Dow 3/6
  • 17.  RFI’s were tracked using member UDA in the model. Dow Chemicals Dow 4/6
  • 18. BFA (Back From Approval) Drawings  Approver comments were received through .xsr file and the same was imported in to Tekla model using GUID number for future reference. Dow Chemicals Dow 5/6
  • 20. Fabricator Engineering Company About the Project Retrofitting two WFGDs complete with Absorber Island, limestone preparation, and gypsum dewatering systems, with complete flue duct and structural steel components to integrate the WFGD system into the existing power plants. Tonnage 3300 Tons Scope Design of connections as per Seismic Zone D, Review and Stamping of Connections 3 D Modelling & Detailed Shop Drawings Case Study - Wateree & Williams Generating Station Wateree 1/4
  • 21. Our Services 1. Designing Connections as per AISC 341 -02 Basic seismic resisting system is SCBF (Specially concentrically base frames) Designed and 3 D modelled connections for retrofitting WFGD (wet flue gas desulphurization) to the existing structure. 2. Preparation of 3 D model in Tekla 3. Preparation of Detailed shop drawings & CNC outputs Benefits 1. Quicker Turnaround time – designed, reviewed, stamped, modelled and shop drawings under one roof 2. Fabricator did not have to invest time in co-ordinating between the designer and detailing company 3. Faster completion as both Design and Detailing carried out parallelly Wateree & Williams Generating Station Wateree 2/4
  • 22. Wateree & Williams Generating Station Wateree Wateree 3/4
  • 23. Wateree & Williams Generating Station Williams Williams Wateree 4/4
  • 24. General Contractor Larsen & Toubro Engineering Company STUP About the Project The Bangalore airport expansion involved four new link bridges, walkways, support structure for escalators and Travelator Scope Structural design of Fixed Link Bridge, Connection Designs and developing Detailed Fabrication Drawings Our Services 1. Developed a STAAD model USING the given preliminary load model 2. Designed specific connections to suit tubular structural steel and architecturally exposed (aesthetic) steel 3. Got the designs reviewed by another external consultant in addition to Airport Design team due to Airport regulation requirements Case Study - Bangalore International Airport BIA 1/2
  • 25. 4. Visited the project site periodically to understand the site conditions and modified the design based on the studies carried out. 5. Was responsible for interacting with other agencies, resolving RFIs and approval of designs 6. Developed custom work sheets for validating the STAAD outputs. Benefits 1. Acted as single firm responsible for design, validation, site co-ordination and approvals 2. Co-ordinated amongst other trades to ensure there is no clash/fowling in the site 3. Ensured timely completion of project through deployment of resources as needed 4. Faster turn around of shop drawings & RFIs as design and detailing was carried out under one roof 5. Customer did not have to deploy any of their key resources in this project Bangalore International Airport BIA 2/2
  • 26. EPC Contractor Vanderlande, Netherlands About the Project Design of Baggage handling support structures at Bangalore International Airport. This is a suspended structure based on site needs and required a very high precision. Scope 1. Member Design, Connection Design, 3D Modelling and shop drawings 2. Coordination with Airport Authority for review and approval of designs Our services 1. Site visits to understand the site conditions 2. Incorporated site conditions in the design as the structure was fitting to an existing concrete structure 3. Designed Connections 4. Developed 3 D Models in Tekla Structures and prepared Shop Drawings 5. Got the design reviewed and approved by the Airport Authority of India Case Study - Baggage Handling System BHS 1/2
  • 27. Tools used STAAD, In-house designed connection design worksheets and Tekla Structures Benefits 1. Entire Structural Design, Connection Design and Detailing works were carried under one roof 2. Customer did not assign any of their design resources. 3. Coordinated with Fabrication and Erection companies 4. Coordinated all the approvals from Governmental Agencies 5. Assisted customer in executing the project with very few resources Baggage Handling System BHS 2/2
  • 28. EPC : Siemens Scope Design of all connections in the two power plants Develop 3 D model to validate clash with pipelines in PDMS About The Project These two Power plants were designed by SIEMNS for Electricity Authority of Thailand. The steel sections involved Japanese and Thailand sections Tonnage 1600 Tons Scope 1. Connections were designed as per ASIC standards. Standard connection design software could not be used because of the load combinations for the given sections was very high as Siemens looked at optimising the steel Case Study - Chana 2 & Wangnoi 4 Power Plant, Thailand Chana 1/2
  • 29. 2. Connection concepts were developed by us and approved by Siemens 3. Designed the connection work sheets for the approved concept 4. Designed 1000 plus connections 5. Provided detailed Calculations for all the connections 6. Resolved Detailer and Fabricators RFIs Tools Used STAAD, In-house developed connection suite & Tekla Structures Benefits 1. As modelling was done and validated with PDMS, there were no design revisions during fabrication and erection. 2. We were able to ramp up resources as required thereby ensuring timely completion of project 3. In many cases steel connections were modified to accommodate pipelines at design stage 4. With very few resources Siemens was able to complete the job 5. Our core strength of AISC knowledge was very help full to Siemens Asia Chana 2 & Wangnoi 4 Power Plant, Thailand Chana 2/2
  • 30. UDH 1/3 Fabricator Indiana Bridge Inc. About the Project This is a complex building with hip and Valley roofs & Curved roofs. Because of the complexity, it involved coordination with lot of other vendors to ensure there are no issues at the site. Scope Developing 3 D Model & Detailed Shop Drawings Coordination with HVAC, Joist, Deck & Skylight vendors Benefits Lot of interferences with other desciplines were brought to the notice of the Architect which led to revisions in the roof slopes at an early stage to avoid costly field fixes. In spite of being complex architectural building, the fabrication and erection went of smoothly as we were able to identify the problems early and suggest possible solutions. This project was awarded the best BIM Model award by an independent jury in Tekla BIM competition 2015 Case Study - Hoover Dining Hall
  • 33. Fabricator Schuff Steel Company About the Project The Brian Performance Institute - a new 62,000-square-foot facility will bring together the latest research and training techniques designed to improve cognitive skills and health. Brain training rooms, event spaces and other clinical offerings will be in an elliptical, three-story glass structure connected to a rectangular building filled with administrative offices. Tonnage 800 Tons Scope Providing Connection Designs Detailed shop Drawings for Structural and Miscellaneous Steel structures Case Study - UT Dallas, Brain Performance Institute UTDBPI 1/3
  • 34. Work Carried Out: 1. Design of specific connections as per AISC 13th Edition, ASD method. 2. Created 3D model of elliptical structure using Tekla structure software - version 20.1 by interpreting design drawings supplied by customer, produced 2D shop and erection drawings for fabrication and erection 3. Provided weekly BIM model to General Contractor to co-ordinate with MEP, Civil, Joist, Fire safety, Deck suppliers 4. Identifying Architecturally exposed structural steel and design & detail steel as per AESS requirements. 5. Model Coordination with Joist, Steel deck, architectural stair, monumental stair and Mechanical equipment's. UT Dallas, Brain Performance Institute UTDBPI 2/3
  • 35. UT Dallas, Brain Performance Institute UTDBPI 3/3
  • 36. Fabricator NAFCO Steel About the Project Mount Storm Power station is a coal fired power station owned by Dominion located in West Virginia. Mount storm power station has three different building units namely Head house-A, Head house –B and Storage transfer tower. Tonnage 450 Tons Scope Structural Steel Connection Design Develop 3D Model and Detailed Shop Drawings Case Study - Mount Storm Power Station MSPS 1/3
  • 37. Our Services Designed the connection using LRFD 14th edition 150 varieties of connections designed along with connection calculations 3D Modeling and Shop Drawings Benefits Timely delivery of drawings was very critical to this project Customer realized the need for Connection Design services after 3 weeks in to the project but could not extend the schedule due to Liquidated Damages clause. We took the responsibility of Designing the Connections without affecting the final Drawing delivery schedule Reduction in RFIs as Design and detailing were under one roof and faster turn around Mount Storm Power Station MSPS 2/3
  • 38. Mount Storm Power Station MSPS 3/3
  • 39. Our Automation Tools APPLICATION NAME DESCRIPTION BENIFITS MEMBER CHECKS - 132M17 Checks the Assembly Name, Assembly Prefix, Part Prefix, Material Grade and generates a report for the wrong ones. Used in QC. Helps the user to check part prefix, assembly prefix, material grades before generating the drawings to improve quality. GUSSET ON CENTER - 2A02 Verifies that Gussets are exactly placed to the center of BEAM/COLUMN/BRACES Used in QC to ensure gussets are to the center of the Main Member. ASSEMBLY NOT LINKED - 3A03 and PARTS NOT LINKED - 22P03 Checks to ensure assemblies are linked to the respective multi drawings and parts are linked to respective G-Sheets. Generates reports of Assembly/Parts that are not linked. Assemblies and parts will not be missed out in the MULTI DRAWING and PART DRAWING. K-ENCROACHMENT VERIFICATION - 32C03 Checks the material encroachment in to K- Value/K1 Value and generates a report when there is encroachment. Used in QC which helps to ensure there are no material encroachment into the k/K1 value. HANDRAIL VERIFICATION - 47HR02 Checks the parameters of Handrails Like Height, P-end Distance, Max Post to Post Spacing, Max length, Profile etc. Used in QC which helps to verify the handrail parameters are correct and reduces checking time. SIMILAR BOLT QTY. ON BOTH ENDS - 41B04 Checks if the GAGE and No of Bolts are same on both the ends of the Braces Used in QC. Helps to check the connection design requirement through automation. WASHER ENCROACHMENT - 59W03 Checks the Washer encroachment into K- Value/K1 Value and generates a report when there is encroachment. Used in QC to ensure there is no washer encroachment in the model.
  • 40. Our Automation Tools APPLICATION NAME DESCRIPTION BENIFITS COORDINATION CHECKING OF BOLTS Checks if the location of bolts are correct between two or more coordinating tekla models. Used in QC to check if the location of bolts at the coordinating locations are correct. BENT PLATE VERIFICATION - 74P10 Checks Bent Plate Radius, washer encroachment into the bent plate radius. Used in QC. Helps to verify if the bent plate radius is correct and there are no washer encroachment into the bent plate radius. WORK POINT CHECKING - 130P17 Checks the work points intersection between BEAM To BEAM, BEAM To COLUMN, BRACE To BEAM and COLUMN Used in QC to check if work points are proper. VERIFYING SHEAR PLATE IS ONE SIDE OF BEAM - 116C13 Verifies whether shear plate is on the same side of beam. Used in QC to check if shear plates are one side of the beam. SET BACK VERIFICATION - 60C07 Verifies the set back value for the members like Beams, gussets, Haunch plate etc. Used in QC to check if set back value is proper at all the locations. BOLT CHECKS - 241B12 Checks the bolt errors which may occur in the TEKLA STRUCTURES like 1) Bolt parts are not proper 2) GAP between bolt parts 3) Multiple bolts at same location, etc Used in QC to ensure that bolt errors do not exist in the model. GAGE VERIFICATION - 8C01 Validates the bolt GAGE for W, Wt, Channel and L section profiles. Helps in ensuring the bolt gages are proper. EDGE DISTANCE - 7B03 Checks the EDGE DISTANCE of the bolt with respect to bolt Dia. Ensures that the required edge distance exists for all the bolts. CONNECTION DESIGN CHECKING - 125C15 Checks the connection design parameters Like profile, No of bolts, weld Length, Hole To Hole Spacing etc for Beam To Beam connections, Beam to Column connections, Vertical Brace connections, Horizontal Brace Connections. Quality and efficiency based application to ensure quality.
  • 41. Our Automation Tools APPLICATION NAME DESCRIPTION BENIFITS BATTEN PLATES - 73C10 Automatically insert the batten Plates(Spacer plates) for the 2L braces in the model. Efficiency based application helps in reducing the time of placing the batten plate in the model . DELIVERABLES - 110D08 This generates customer related deliverables from Tekla, Like 1) bolt report, 2) .nc1, 3) .dxf, 4) .kISS, etc Also generates customer specified outputs as per the requirement like 1) DXF Splitter: Dxf separately for different Plate Thickness 2) NC File Splitter - To create NC files for Different hole Dia 3) .KISS File With Out Bolt and .KISS with Cost code information. Generates customized outputs as per the customer requirement. Since the generation is automatic, helps in efficiency and quality DRAWING CHECKS - 158DWG12 This application is used to check the 1) RD start point are correctly called out in the drawing. 2) Used to check the Precision and dimension format check. Quality based application, which helps to ensure RD start points are correct for the members (Especially for skewed and sloped member) and also the precision and dimension format used for the entire drawings are right. AUTO DIMENSIONING - 98DWG06 Providing the Dimensions automatically for the VERTICAL BRACES, HORIZONTAL BRACES, BEAMS Helps in eliminating the editing errors. COPE AND BLOCK OUT REPORT - 61C09 Extracts CopeX and CopeY (Left Top, Left Bottom, Right Top, Right Bottom) and Flange Cuts (X and Y) for the W-Section Members. Quality related application which helps to verify that copes and cuts are with in the limit of design. The application is also useful to checker to ensure that flange cut details are called out in the detail drawings BO - APPLICATION - 16B09 Generates hole report for each member from the model. The holes will be cross verified with the drawing output, to ensure that holes are correctly called out in the drawings. Quality related application, which helps the checkers while checking the drawings and also useful in identifying the wrong hole Sizes used in the model E-PLAN VS ASSEMBLY LIST - 189EPLAN01 Checks and generates a report for the assemblies which are not called out in the E- PLAN. Ensures all the assemblies are called out in the E- Plan.
  • 42. Automation Tools - iManager
  • 43. Automation Tools - iManager
  • 44. Automation Tools - iManager
  • 45. CONTACT SANRIA LIMITED WWW.SANRIAENGINEERING.COM 3080 ALCOTT STREET SANTA CLARA CA 95054 USA 6, SECOND MAIN ROAD 338 KIADB BG ROAD HEBBAL INDUSTRIAL AREA BANGALORE 560076 MYSORE 570016 INDIA INDIA SALES MANAGEMENT Pravin Patel Mahesh Nagarajaiah Senior Sales Manager President & CEO pravin@sanriaengineering.com mahesh@sanriaengineering.com P: +1 408 620 5878 x1017 P: +1 408 620 5878 x1015 C: +1 832 455 6071 C: +1 510 996 2022