SlideShare a Scribd company logo
1 of 37
Download to read offline
SU TU NAU FIELD DEVELOPMENT – SU TU NAU PROJECT
KICK OFF MEETING
FOR
VIETSOVPETRO
Vietsovpetro, 20 May 2014
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
AGENDA
A. SAFETY INSTRUCTION
B. ATTENDANCE INTRODUCTION
C. PROJECT OVERVIEW
D. PROJECT PROGRESS
E. PROJECT EXECUTION PLAN
F. AOB
A. SAFETY INSTRUCTION
VSP/OCD & PSD Building
EMERGENCY EVACUATION PLAN
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
A. SAFETY INSTRUCTION
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
SƠ ĐỒ THOÁT HIỂM TẦNG TRỆT – TÒA NHÀ XNXL-XNDV
EMERGENCY ESCAPE PLAN GROUND FLOOR OF OCD-PSD BUILDING.
MUSTER STATION
*WHEN YOU ESCAPED FROM THE BUILDING
*Go and report to your designated Muster Station Location.
B. ATTENDANCE INTRODUCTION
 CUU LONG JOC (Client)
 PTSC MC (EPCI Contractor)
 VIETSOVPETRO (T&I Contractor)
 MWS
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
• 1. GENERAL
• 2. SCOPE OF WORK
PROJECT
OVERVIEW
C. PROJECT OVERVIEW
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
C. PROJECT OVERVIEW >>
The Su Tu Nau field is located
at the northern part of Block
15-1, Offshore Vietnam and
located approximately 200 km
Southeast of Ho Chi Minh City.
The Su Tu Nau Field consist of two
platforms, one located in the south
area of the field (STN-S) and one in
the northern area of the field (STN-N).
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
C. PROJECT OVERVIEW >>
PICTURE OF STN – N JACKET AT FIELD
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
C. PROJECT OVERVIEW >>
No. Description Detail
1 Platform STN-N
2 Water depth 39.89m
3 Platform Type 4 legged wellhead
4 Conductor slots 6
5 Pre-installed Conductors (By other contractor) 2 (slot 1 & 3)
6 Conductor to be installed by VSP 4 (slot 2,4,5 & 6)
7 Conductor Diameter / Wall Thickness 914mm (36’’) /25mm (1’’)
8 Target Penetration 90.0m
9 Spider Deck Elevation (+) 6.339m
10 Drill Deck Elevation (+) 18.828m
11 Final Conductor Cut-off Elevation (+) 20.328m
12 Top of Wellhead (+) 22.613m
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
C. PROJECT OVERVIEW >>
Segment QTY
Diameter
(m)
Wall
Thickness
(mm)
Length
(m)
Weight
(T)
Cut-off
Allowance
(m)
C1 04 914 25 56 30.68 0
C2 04 914 25 49.524 27.13 1.524
C3 04 914 25 34.524 18.91 1.524
C4 04 914 25 21.768 12.65 9.889
CONDUCTORs SEGMENT
Conductor will be divided into 04 segments in accordance with conductor pipes
installation by using Truong Sa Crane Vessel as below:
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
C. PROJECT OVERVIEW >>
Supplying Material and Fabricating the temporary frame for
installation 04 Conductors.
Pre-installation survey and Post – survey by ROV
Transportation and offshore Installation of 04 conductors
(slot 2,4,5 & 6).
 Detail Scope of works, refer to the Split Scope for Conductor Installation
as per link attached file.
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
D. PROJECT PROGRESS
• 1. ORGANIZATION CHART
• 2. PROJECT SCHEDULE
PROJECT
PROGRESS
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
D. PROJECT PROGRESS >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
D. PROJECT PROGRESS >>
PROJECT KEY MILESTONE
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
D. PROJECT PROGRESS >>
 WINDOW FOR OFFSHORE INSTALLATION CAMPAIGN OF TRUONG SA 2014
 From 15/07 – 30/07: Thien Ưng SS Template Installation
 From 05/08 – 15/08: STN-N Jacket 04 Conductor pipe driving
(Window for offshore installation campaign from 05/08 to 26/08)
From 27/08 – 11/09: NCS2 11.85KM from BK4A to KP.212
 PLANNING AND SECURE FOR OFFSHORE CONSTRUCTION OF TRUONG
SA DERRICK BARGE & IHC S280/750 HAMMER 2014
Refer to link Attached file
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
E. PROJECT EXECUTION PLAN
• 1. Engineering Plan
• 2. Procurement Plan of VSP
• 3. Marine spread
• 4. Equipment List
• 5. Onshore fabrication & preparation
• 6. Load-out & Transportation
• 7. Offshore Installation
PROJECTEXECUTION
PLAN
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
VSP will utilize in-house and out-source for engineering scope. The main offshore
installation analysis shall be:
No. ITEMs In-house Out-source
1 Engineering and procedures for offshore installation x
2 Transportation and sea-fastening design x
3 Installation Engineering support to offshore Installation x
4 Answer technical site queries x
5 Drivability / Stick-up analysis of conductors x
6 Load-out Procedure and Analysis documentation. x
7 Barge Strength Check for Load-out x
8 Sea-fastening & Grillage design x
9 Liaison and coordination with MWS x
E. PROJECT EXECUTION PLAN >>
Refer to the STN North T&I Master Document Register
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
Refer to the STN North T&I Procedure list
E. PROJECT EXECUTION PLAN >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
E. PROJECT EXECUTION PLAN >>
ID No. NAME OF VESSEL SCOPE
1. Derrick Barge spreads
Truong Sa - install/ remove temporary frame
- STN-N Conductor pipe installation
3. Anchor Handling Tugs
Vung Tau 02 - Anchor Handling
- Assist Transportation Barge
- Approach to Truong Sa
4. Transportation Barge
Class 250 Transportation Barge
c/w towing tug (4000–4500 BHP)
- Transportation for Conductor pipes
and Temporary frame.
5. ROV
Ky Van 01 (Inc. ROV) - Pre and Post installation survey
- Assist during Conductor Pipe
Driving
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
E. PROJECT EXECUTION PLAN >>
No. DISCRIPTION Q’TY
(pcs)
SCOPE
I Hydraulic Hammer
1.1 S750 1 Conductor Driving
1.2 S280 1 Conductor Driving
II Equipment Other
2.1 Centralizer Equipment 02 The Keep Conductor to Fit-up
and Weld
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
TEMPORARY FRAME ONSHORE FABRICATION
E. PROJECT PROGRESS >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
E. PROJECT PROGRESS >>
STN-N JACKET CONDUCTOR PIPE DRIVING STN PROJECT
KICK OFF MEETING
E. PROJECT PROGRESS >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
 Temporary Frame will be load-out by Truong Sa crane
vessel at VSP’s port.
 Conductors pipe will be load-out by Crawler Crane at
PTSC’s port.
LOADOUT METHODOLOGY
LAYOUT TEMPORARY FRAME ON TRUONG SA VESSEL
E. PROJECT PROGRESS >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
LAYOUT CONDUCTORs PIPE ON BARGE
E. PROJECT PROGRESS >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
TRUONG SA ANCHOR PATTERN FOR PIPE DRIVING
E. PROJECT PROGRESS >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
CONDUCTOR PIPE DRIVING SEQUENCE
E. PROJECT PROGRESS >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
E. PROJECT PROGRESS >>
CONDUCTOR PIPE DRIVING SEQUENCE
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
CONDUCTOR PIPE DRIVING SEQUENCE
E. PROJECT PROGRESS >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
E. PROJECT PROGRESS >>
CONDUCTOR PIPE DRIVING SEQUENCE
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
F. AOB >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
F. AOB >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
MARINE WARRANTY SURVEYOR PRESENTATIVE
TBA
F. AOB >>
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
F. AOB
Weekly Meeting
Weekly report, Monthly report cut off date.
Engineering Documents check, review and approval
flow chart
Weather forecast provides
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING
Thank you for your attention!
T&I SERVICES FOR STN-N CONDUCTORS
KICK OFF MEETING

More Related Content

Similar to KOM Presentation STN-N Conductor_rev 2

QP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalQP_Safety_executive_procedure_final
QP_Safety_executive_procedure_final
Ian Kelly
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013
Hans Holkenborg
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
Momen Mohamed
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
Richard Turnbull
 
Hai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insHai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_ins
Vuong Huy Hai
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
Adeoye Okunoye
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
Adeoye Okunoye
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
daniel cobar
 

Similar to KOM Presentation STN-N Conductor_rev 2 (20)

PTSC M&C Brochure (Apr 2018)
PTSC M&C Brochure (Apr 2018)PTSC M&C Brochure (Apr 2018)
PTSC M&C Brochure (Apr 2018)
 
QP_Safety_executive_procedure_final
QP_Safety_executive_procedure_finalQP_Safety_executive_procedure_final
QP_Safety_executive_procedure_final
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
jahangir
jahangirjahangir
jahangir
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
C.V Momen.last update
C.V Momen.last updateC.V Momen.last update
C.V Momen.last update
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Hai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insHai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_ins
 
KOM 15082014 HUC
KOM 15082014 HUCKOM 15082014 HUC
KOM 15082014 HUC
 
CV
CVCV
CV
 
CV
CVCV
CV
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
ReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturingReFreeDrive 03 - Webinar induction motor advanced manufacturing
ReFreeDrive 03 - Webinar induction motor advanced manufacturing
 
Project Management Report for Tank Farm
Project Management Report for Tank FarmProject Management Report for Tank Farm
Project Management Report for Tank Farm
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 

KOM Presentation STN-N Conductor_rev 2

  • 1. SU TU NAU FIELD DEVELOPMENT – SU TU NAU PROJECT KICK OFF MEETING FOR VIETSOVPETRO Vietsovpetro, 20 May 2014
  • 2. T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING AGENDA A. SAFETY INSTRUCTION B. ATTENDANCE INTRODUCTION C. PROJECT OVERVIEW D. PROJECT PROGRESS E. PROJECT EXECUTION PLAN F. AOB
  • 3. A. SAFETY INSTRUCTION VSP/OCD & PSD Building EMERGENCY EVACUATION PLAN T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 4. A. SAFETY INSTRUCTION T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 5. SƠ ĐỒ THOÁT HIỂM TẦNG TRỆT – TÒA NHÀ XNXL-XNDV EMERGENCY ESCAPE PLAN GROUND FLOOR OF OCD-PSD BUILDING. MUSTER STATION
  • 6. *WHEN YOU ESCAPED FROM THE BUILDING *Go and report to your designated Muster Station Location.
  • 7. B. ATTENDANCE INTRODUCTION  CUU LONG JOC (Client)  PTSC MC (EPCI Contractor)  VIETSOVPETRO (T&I Contractor)  MWS T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 8. • 1. GENERAL • 2. SCOPE OF WORK PROJECT OVERVIEW C. PROJECT OVERVIEW T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 9. C. PROJECT OVERVIEW >> The Su Tu Nau field is located at the northern part of Block 15-1, Offshore Vietnam and located approximately 200 km Southeast of Ho Chi Minh City. The Su Tu Nau Field consist of two platforms, one located in the south area of the field (STN-S) and one in the northern area of the field (STN-N). T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 10. C. PROJECT OVERVIEW >> PICTURE OF STN – N JACKET AT FIELD T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 11. C. PROJECT OVERVIEW >> No. Description Detail 1 Platform STN-N 2 Water depth 39.89m 3 Platform Type 4 legged wellhead 4 Conductor slots 6 5 Pre-installed Conductors (By other contractor) 2 (slot 1 & 3) 6 Conductor to be installed by VSP 4 (slot 2,4,5 & 6) 7 Conductor Diameter / Wall Thickness 914mm (36’’) /25mm (1’’) 8 Target Penetration 90.0m 9 Spider Deck Elevation (+) 6.339m 10 Drill Deck Elevation (+) 18.828m 11 Final Conductor Cut-off Elevation (+) 20.328m 12 Top of Wellhead (+) 22.613m T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 12. C. PROJECT OVERVIEW >> Segment QTY Diameter (m) Wall Thickness (mm) Length (m) Weight (T) Cut-off Allowance (m) C1 04 914 25 56 30.68 0 C2 04 914 25 49.524 27.13 1.524 C3 04 914 25 34.524 18.91 1.524 C4 04 914 25 21.768 12.65 9.889 CONDUCTORs SEGMENT Conductor will be divided into 04 segments in accordance with conductor pipes installation by using Truong Sa Crane Vessel as below: T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 13. C. PROJECT OVERVIEW >> Supplying Material and Fabricating the temporary frame for installation 04 Conductors. Pre-installation survey and Post – survey by ROV Transportation and offshore Installation of 04 conductors (slot 2,4,5 & 6).  Detail Scope of works, refer to the Split Scope for Conductor Installation as per link attached file. T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 14. D. PROJECT PROGRESS • 1. ORGANIZATION CHART • 2. PROJECT SCHEDULE PROJECT PROGRESS T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 15. D. PROJECT PROGRESS >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 16. D. PROJECT PROGRESS >> PROJECT KEY MILESTONE T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 17. D. PROJECT PROGRESS >>  WINDOW FOR OFFSHORE INSTALLATION CAMPAIGN OF TRUONG SA 2014  From 15/07 – 30/07: Thien Ưng SS Template Installation  From 05/08 – 15/08: STN-N Jacket 04 Conductor pipe driving (Window for offshore installation campaign from 05/08 to 26/08) From 27/08 – 11/09: NCS2 11.85KM from BK4A to KP.212  PLANNING AND SECURE FOR OFFSHORE CONSTRUCTION OF TRUONG SA DERRICK BARGE & IHC S280/750 HAMMER 2014 Refer to link Attached file T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 18. E. PROJECT EXECUTION PLAN • 1. Engineering Plan • 2. Procurement Plan of VSP • 3. Marine spread • 4. Equipment List • 5. Onshore fabrication & preparation • 6. Load-out & Transportation • 7. Offshore Installation PROJECTEXECUTION PLAN T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 19. VSP will utilize in-house and out-source for engineering scope. The main offshore installation analysis shall be: No. ITEMs In-house Out-source 1 Engineering and procedures for offshore installation x 2 Transportation and sea-fastening design x 3 Installation Engineering support to offshore Installation x 4 Answer technical site queries x 5 Drivability / Stick-up analysis of conductors x 6 Load-out Procedure and Analysis documentation. x 7 Barge Strength Check for Load-out x 8 Sea-fastening & Grillage design x 9 Liaison and coordination with MWS x E. PROJECT EXECUTION PLAN >> Refer to the STN North T&I Master Document Register T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING Refer to the STN North T&I Procedure list
  • 20. E. PROJECT EXECUTION PLAN >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 21. E. PROJECT EXECUTION PLAN >> ID No. NAME OF VESSEL SCOPE 1. Derrick Barge spreads Truong Sa - install/ remove temporary frame - STN-N Conductor pipe installation 3. Anchor Handling Tugs Vung Tau 02 - Anchor Handling - Assist Transportation Barge - Approach to Truong Sa 4. Transportation Barge Class 250 Transportation Barge c/w towing tug (4000–4500 BHP) - Transportation for Conductor pipes and Temporary frame. 5. ROV Ky Van 01 (Inc. ROV) - Pre and Post installation survey - Assist during Conductor Pipe Driving T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 22. E. PROJECT EXECUTION PLAN >> No. DISCRIPTION Q’TY (pcs) SCOPE I Hydraulic Hammer 1.1 S750 1 Conductor Driving 1.2 S280 1 Conductor Driving II Equipment Other 2.1 Centralizer Equipment 02 The Keep Conductor to Fit-up and Weld T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 23. TEMPORARY FRAME ONSHORE FABRICATION E. PROJECT PROGRESS >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 24. E. PROJECT PROGRESS >> STN-N JACKET CONDUCTOR PIPE DRIVING STN PROJECT KICK OFF MEETING
  • 25. E. PROJECT PROGRESS >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING  Temporary Frame will be load-out by Truong Sa crane vessel at VSP’s port.  Conductors pipe will be load-out by Crawler Crane at PTSC’s port. LOADOUT METHODOLOGY
  • 26. LAYOUT TEMPORARY FRAME ON TRUONG SA VESSEL E. PROJECT PROGRESS >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 27. LAYOUT CONDUCTORs PIPE ON BARGE E. PROJECT PROGRESS >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 28. TRUONG SA ANCHOR PATTERN FOR PIPE DRIVING E. PROJECT PROGRESS >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 29. CONDUCTOR PIPE DRIVING SEQUENCE E. PROJECT PROGRESS >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 30. E. PROJECT PROGRESS >> CONDUCTOR PIPE DRIVING SEQUENCE T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 31. CONDUCTOR PIPE DRIVING SEQUENCE E. PROJECT PROGRESS >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 32. E. PROJECT PROGRESS >> CONDUCTOR PIPE DRIVING SEQUENCE T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 33. F. AOB >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 34. F. AOB >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING MARINE WARRANTY SURVEYOR PRESENTATIVE TBA
  • 35. F. AOB >> T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 36. F. AOB Weekly Meeting Weekly report, Monthly report cut off date. Engineering Documents check, review and approval flow chart Weather forecast provides T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING
  • 37. Thank you for your attention! T&I SERVICES FOR STN-N CONDUCTORS KICK OFF MEETING