Model:

Biomass CHP Volter 30

Biomass Fuel:
Fuel moisture:
Particle size:
Plant structure:
Color:
Fuel supply:
Generator:
Output:
Plant usage (e):
Fuel consumption:
Automation:
Connections:
Installation:
Ash removal:
Max. o.t./a:
Maint. interval:
Other:

Wood chips (birch, spruce, pine, aspen)
12 – 15%, max. 18%
8mm ≤ biomass ≤ 50mm, fine particles (<3,15mm) <1%, all <63mm
Steel frame, Insulated with paroc (or similar) panels
As per agreement
Spring agitator, auger, rotating feeder
Agco Sisu Power 4,9L, 4-cyl.
Generator output 28 kW, thermal 80kW
ca. 1,5-2kW
ca. 3,5 m3 of chips/24h at 100% power level
Schneider electric PLC, GSM –alarms, remote internet control
Electricity cable, Heat channel, water line, broadband, GSM-connection
Asphalt or concrete base
Automatic ash removal
7500h
once a week
SynGas from gasification reactor is tar free. Gas cleaning is only for solid particles.
Model:

Biomass CHP Volter 40

Biomass Fuel:
Fuel moisture:
Particle size:
Plant structure:
Color:
Fuel supply:
Generator:
Output:
Plant usage (e):
Fuel consumption:
Automation:
Connections:
Installation:
Ash removal:
Max. o.t./a:
Maint. interval:
Other:

Wood chips (birch, spruce, pine, aspen)
12 – 15%, max. 18%
8mm ≤ biomass ≤ 50mm, fine particles (<3,15mm) <1%, all <63mm
Steel frame, Insulated with paroc (or similar) panels
As per agreement
Spring agitator, auger, rotating feeder
Agco Sisu Power 8,4L, 6-cyl.
Generator output 40kW, thermal 100kW
ca. 1,5-2kW
ca. 4,5 m3 of chips/24h at 100% power level
Schneider electric PLC, GSM –alarms, remote internet control
Electricity cable, Heat channel, water line, broadband, GSM-connection
Asphalt or concrete base
Automatic ash removal
7500h
once a week
SynGas from gasification reactor is tar free. Gas cleaning is only for solid particles.
Volter biomass CHP frame before instalation
Volter biomass CHP frame before instalation
Volter biomass CHP “Agco Sisu Power” unit
Motor with electric generator
Fuel feding and gasification

•

Fuel is fed from the silo
or larger biomass
storage by screw and
chain conveyors

•

Rotating feeder prevents
from free air flow to the
reactor. It also protects
from back fire

•

Fuel is fed from the silo
by screw and chain
conveyors
Gas cooling and filtering

1. Cooling before the filtering phase (heat recovering)
2. Dry filtering system (
3. Washing the gas (for dust particles)
4. Cooling to the final product gas temperature (heat recovering)
5. Cooled and filtered gas to the motor
Heat and electricity from SynGas
Heat and electricity from SynGas
Remote monitoring
“I have done gasification research and development at VTT since 1981, Volter´s gasifier is the first
ideal working downdraft gasifier that I have come across. Congratulations!
Esa Kurkela, Development manager at VTT
Gasification and Gas Cleaning Technologies
Reference 1: Ecovillage

Off grid –residential area -> proof of concept
Electricity and heat from wood chips (wood gas)
Completed in 2009
RIL: Building enterprise #1 in Finland 2010
1. energy independent residential area in Finland
Green energy for 10 families
High valued area, satisfied residents
Reference 1: Ecovillage

30kWe + 80kWth
Heat grid temperature +65 oC
Hot water reservoirs 10m3 + 10x 0,75m3
Battery package 320kWh, for 24h need
Low energy houses, led -lightning
No electric heating, no elecric stowes
Reference 2: Volter 30 + fuel terminal

Volter 30
Green energy for machine shop
and a large house
Biomass dryer and storage
Grid connection
Reference 3: Majbacka

Volter 30
Green energy for a large house
and garages
High design requirements
Smart elecric grid
On/Off Grid system
Reference 4: Nurmes

Volter 40
Large farm
Reference 4: Nurmes

Volter 40
Fuel dryer
Reference 5: R&D Partners: Oulu University of
Applied Sciences

Oulu University of Applied Sciences
Gas engine R&D unit
Reference 6: R&D Partners - University of
Eastern Finland

Volter 30
Built inside an existing building
Reference 7-8: Quarry Farm, outside of Stamford,
Great Britain
1 x Volter 30 kWe
1x Volter 40 kWe (will be installed in February 2014)
Reference 7-8: Quarry Farm, outside of Stamford,
Great Britain
The project at Quarry Farm is situated just outside of Stamford. The main concept of this project was to
create a wood supply chain for the local area that is in the right specification for gasification. We are going
about this by installing a 30 KWe unit (as seen in picture) and also a second 40 kWe unit will be installed
in February. Both of these units combined will generate 165Kwth which will be dispersed into a drying floor
to dry the woodchip to the required moisture content. As the unit is a combined heat and power generator,
as the power is produced we will either be using the it onsite or selling it back through the grid. One of the
major benefits for this technology is the revenue stream that it unlocks through government incentives
these come through RHI (Renewable Heat Incentive) and ROCS (Renewable Obligation Certificate).
Fuel handling
More information www.volter.si , rado.irgl@artim.si , info@artim.si
Thank you!

More Related Content

Similar to Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth

Heating and Drying Equipment Booklet 2016 LR
Heating and Drying Equipment Booklet 2016 LRHeating and Drying Equipment Booklet 2016 LR
Heating and Drying Equipment Booklet 2016 LR
Alison Smith
 
Brochure_Range_Of_Products_And_Services
Brochure_Range_Of_Products_And_ServicesBrochure_Range_Of_Products_And_Services
Brochure_Range_Of_Products_And_Services
Anton Besaris
 
The Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsThe Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - Baltics
Fortum Heat Lietuva
 
GI Energy - Rehau PowerPoint June 2015
GI Energy - Rehau PowerPoint June 2015GI Energy - Rehau PowerPoint June 2015
GI Energy - Rehau PowerPoint June 2015
GI Energy
 
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
Suresh Jambunathan
 
Renewables lecture garth
Renewables lecture   garthRenewables lecture   garth
Renewables lecture garth
raja jbeli
 

Similar to Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth (20)

Small Biomass CHP - compact unit 40 kW electricity / 100 kW thermal power
Small Biomass CHP  - compact unit 40 kW electricity  / 100 kW thermal powerSmall Biomass CHP  - compact unit 40 kW electricity  / 100 kW thermal power
Small Biomass CHP - compact unit 40 kW electricity / 100 kW thermal power
 
Cultiveco_Greenhouse
Cultiveco_GreenhouseCultiveco_Greenhouse
Cultiveco_Greenhouse
 
Heating and Drying Equipment Booklet 2016 LR
Heating and Drying Equipment Booklet 2016 LRHeating and Drying Equipment Booklet 2016 LR
Heating and Drying Equipment Booklet 2016 LR
 
Brochure_Range_Of_Products_And_Services
Brochure_Range_Of_Products_And_ServicesBrochure_Range_Of_Products_And_Services
Brochure_Range_Of_Products_And_Services
 
The Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsThe Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - Baltics
 
Solarus Powercollectors Technical Brochure
Solarus Powercollectors Technical BrochureSolarus Powercollectors Technical Brochure
Solarus Powercollectors Technical Brochure
 
Gi energy renewable energy opportunities with infrastructure projects june ...
Gi energy   renewable energy opportunities with infrastructure projects june ...Gi energy   renewable energy opportunities with infrastructure projects june ...
Gi energy renewable energy opportunities with infrastructure projects june ...
 
Marcel Borkent, Triogen
Marcel Borkent, TriogenMarcel Borkent, Triogen
Marcel Borkent, Triogen
 
Energy efficiency
Energy efficiencyEnergy efficiency
Energy efficiency
 
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
Gi Energy Renewable Energy Opportunities with Infrastructure Projects June 2015
 
GI Energy - Rehau PowerPoint June 2015
GI Energy - Rehau PowerPoint June 2015GI Energy - Rehau PowerPoint June 2015
GI Energy - Rehau PowerPoint June 2015
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
6 MW DG Power Plant
6 MW DG Power Plant6 MW DG Power Plant
6 MW DG Power Plant
 
Renewable Energy - An Introduction to Everything you Need to Know
Renewable Energy - An Introduction to Everything you Need to KnowRenewable Energy - An Introduction to Everything you Need to Know
Renewable Energy - An Introduction to Everything you Need to Know
 
Efficient Power Usage
Efficient Power UsageEfficient Power Usage
Efficient Power Usage
 
Oswestry Energy Fair - Talbott
Oswestry Energy Fair - TalbottOswestry Energy Fair - Talbott
Oswestry Energy Fair - Talbott
 
Heat exchangers
Heat exchangersHeat exchangers
Heat exchangers
 
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL16th Elec Pwr Conf. 4-3-2014 SJ FINAL
16th Elec Pwr Conf. 4-3-2014 SJ FINAL
 
Renewables lecture garth
Renewables lecture   garthRenewables lecture   garth
Renewables lecture garth
 
kstps training report
kstps training reportkstps training report
kstps training report
 

More from Rado Irgl

Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Rado Irgl
 

More from Rado Irgl (7)

Biomass heat and power eco village-en
Biomass heat and power eco village-enBiomass heat and power eco village-en
Biomass heat and power eco village-en
 
Soproizvodnja toplote in elektrike na lesno biomaso, SPTE, Volter Ptuj
Soproizvodnja toplote in elektrike na lesno biomaso, SPTE,  Volter PtujSoproizvodnja toplote in elektrike na lesno biomaso, SPTE,  Volter Ptuj
Soproizvodnja toplote in elektrike na lesno biomaso, SPTE, Volter Ptuj
 
Strom und wärmegewinnung aus biomasse - Volter
Strom und wärmegewinnung aus biomasse - Volter Strom und wärmegewinnung aus biomasse - Volter
Strom und wärmegewinnung aus biomasse - Volter
 
Biomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifierBiomass heat and power - gasification CHP with universal biomass gasifier
Biomass heat and power - gasification CHP with universal biomass gasifier
 
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...
Kogeneracija na biomasu - univerzalni gasifikator i soproizvodnja topline i e...
 
ORC ElectraTherm Green Machine - waste heat to power, Power generation
ORC ElectraTherm Green Machine - waste heat to power, Power generationORC ElectraTherm Green Machine - waste heat to power, Power generation
ORC ElectraTherm Green Machine - waste heat to power, Power generation
 
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
Mikro soproizvodnja toplote in elektrike na lesno biomaso, Volter 40 kWe + 10...
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 

Biomass heat and power , Volter CHP, Cogeneration 40 kWe + 100 kWth

  • 1. Biomass based Combined Heat and Power generation
  • 2. This is how it works • High level of automation enables unattended operation and remote control
  • 3. Success stories for our customers Your story...
  • 4. Together with the best partners, we are able to fulfill specific needs of our customers
  • 5. Model: Biomass CHP Volter 30 Biomass Fuel: Fuel moisture: Particle size: Plant structure: Color: Fuel supply: Generator: Output: Plant usage (e): Fuel consumption: Automation: Connections: Installation: Ash removal: Max. o.t./a: Maint. interval: Other: Wood chips (birch, spruce, pine, aspen) 12 – 15%, max. 18% 8mm ≤ biomass ≤ 50mm, fine particles (<3,15mm) <1%, all <63mm Steel frame, Insulated with paroc (or similar) panels As per agreement Spring agitator, auger, rotating feeder Agco Sisu Power 4,9L, 4-cyl. Generator output 28 kW, thermal 80kW ca. 1,5-2kW ca. 3,5 m3 of chips/24h at 100% power level Schneider electric PLC, GSM –alarms, remote internet control Electricity cable, Heat channel, water line, broadband, GSM-connection Asphalt or concrete base Automatic ash removal 7500h once a week SynGas from gasification reactor is tar free. Gas cleaning is only for solid particles.
  • 6. Model: Biomass CHP Volter 40 Biomass Fuel: Fuel moisture: Particle size: Plant structure: Color: Fuel supply: Generator: Output: Plant usage (e): Fuel consumption: Automation: Connections: Installation: Ash removal: Max. o.t./a: Maint. interval: Other: Wood chips (birch, spruce, pine, aspen) 12 – 15%, max. 18% 8mm ≤ biomass ≤ 50mm, fine particles (<3,15mm) <1%, all <63mm Steel frame, Insulated with paroc (or similar) panels As per agreement Spring agitator, auger, rotating feeder Agco Sisu Power 8,4L, 6-cyl. Generator output 40kW, thermal 100kW ca. 1,5-2kW ca. 4,5 m3 of chips/24h at 100% power level Schneider electric PLC, GSM –alarms, remote internet control Electricity cable, Heat channel, water line, broadband, GSM-connection Asphalt or concrete base Automatic ash removal 7500h once a week SynGas from gasification reactor is tar free. Gas cleaning is only for solid particles.
  • 7. Volter biomass CHP frame before instalation
  • 8. Volter biomass CHP frame before instalation
  • 9. Volter biomass CHP “Agco Sisu Power” unit Motor with electric generator
  • 10. Fuel feding and gasification • Fuel is fed from the silo or larger biomass storage by screw and chain conveyors • Rotating feeder prevents from free air flow to the reactor. It also protects from back fire • Fuel is fed from the silo by screw and chain conveyors
  • 11. Gas cooling and filtering 1. Cooling before the filtering phase (heat recovering) 2. Dry filtering system ( 3. Washing the gas (for dust particles) 4. Cooling to the final product gas temperature (heat recovering) 5. Cooled and filtered gas to the motor
  • 12. Heat and electricity from SynGas
  • 13. Heat and electricity from SynGas
  • 15. “I have done gasification research and development at VTT since 1981, Volter´s gasifier is the first ideal working downdraft gasifier that I have come across. Congratulations! Esa Kurkela, Development manager at VTT Gasification and Gas Cleaning Technologies
  • 16. Reference 1: Ecovillage Off grid –residential area -> proof of concept Electricity and heat from wood chips (wood gas) Completed in 2009 RIL: Building enterprise #1 in Finland 2010 1. energy independent residential area in Finland Green energy for 10 families High valued area, satisfied residents
  • 17. Reference 1: Ecovillage 30kWe + 80kWth Heat grid temperature +65 oC Hot water reservoirs 10m3 + 10x 0,75m3 Battery package 320kWh, for 24h need Low energy houses, led -lightning No electric heating, no elecric stowes
  • 18. Reference 2: Volter 30 + fuel terminal Volter 30 Green energy for machine shop and a large house Biomass dryer and storage Grid connection
  • 19. Reference 3: Majbacka Volter 30 Green energy for a large house and garages High design requirements Smart elecric grid On/Off Grid system
  • 20. Reference 4: Nurmes Volter 40 Large farm
  • 21. Reference 4: Nurmes Volter 40 Fuel dryer
  • 22. Reference 5: R&D Partners: Oulu University of Applied Sciences Oulu University of Applied Sciences Gas engine R&D unit
  • 23. Reference 6: R&D Partners - University of Eastern Finland Volter 30 Built inside an existing building
  • 24. Reference 7-8: Quarry Farm, outside of Stamford, Great Britain 1 x Volter 30 kWe 1x Volter 40 kWe (will be installed in February 2014)
  • 25. Reference 7-8: Quarry Farm, outside of Stamford, Great Britain The project at Quarry Farm is situated just outside of Stamford. The main concept of this project was to create a wood supply chain for the local area that is in the right specification for gasification. We are going about this by installing a 30 KWe unit (as seen in picture) and also a second 40 kWe unit will be installed in February. Both of these units combined will generate 165Kwth which will be dispersed into a drying floor to dry the woodchip to the required moisture content. As the unit is a combined heat and power generator, as the power is produced we will either be using the it onsite or selling it back through the grid. One of the major benefits for this technology is the revenue stream that it unlocks through government incentives these come through RHI (Renewable Heat Incentive) and ROCS (Renewable Obligation Certificate).
  • 27. More information www.volter.si , rado.irgl@artim.si , info@artim.si Thank you!