CONTRACT AND TYPES OF
CONTRACT
SUBJECT: ESTIMATION AND COSTING
HISTORY OF LAW
Indian Contract Act came into force on 1st Sept,
1872.
 The act is applicable to whole India except the
state of Jammu & Kashmir.
 It contains 266 sections.
WHAT IS CONTRACT?
• A contract is a legally binding or valid agreement between two
parties. The law will consider a contract to be valid if the
agreement contains all of the following elements:
• offer and acceptance;
• an intention between the parties to create binding relations;
• consideration to be paid for the promise made;
• legal capacity of the parties to act;
• genuine consent of the parties; and
• legality of the agreement.
• An agreement that lacks one or more of the elements listed
above is not a valid contract.
WHY DO WE USE CONTRACT IN
CONSTRUCTION?
• Describe scope of work
• Establish time frame
• Establish cost and payment provision
• Set fourth obligations and relationship
• Minimize disputes
• Improve economic return of investment
CONSTRUCTION CONTRACT
A construction contract is a mutual or legally
binding agreement between two parties based on policies and
conditions recorded in document form. The two parties
involved are one or more owners, and one or more contractors.
The owner has full authority to decide what type of contract
should be used for a specific development to be constructed
and to set forth the legally-binding terms and conditions in
a contractual agreement.
ACTIVITIES IN CONSTRUCTION PROJECT
Engineering
•Issues related to process
finalization, structural analysis
& design, technical issues
related to equipment design &
selection
1
Procurement
•Procurement of materials , also
includes identification of
suitable vendors
2
Construction
•This covers construction,
installation & test run of a
constructed facility before
handed to owner
3
MAJOR CONTRACT TYPES (TRADITIONAL)
CLASSIFICATION
• Separated contracts
• Management contracts
• Integrated contracts
• Discretionary contracts
SEPARATED
CONTRACTS
• Lump sum contract
• Measurement
contract
• Item rate
• Percentage rate
• Cost plus percentage
MANAGEMENT CONTRACT
• Management contract
• Construction management contract
• Design, management & construction contract.
• INTEGRATED CONTRACT
• Design build contract
• Turn key contract
• Build, operate & transfer contract.
DISCRETIONARY
CONTRACT
• Partnering contract
• Joint venture contract
SEPARATED
• Traditional system & sequential process
• Division b/w design & construction responsibility
• Design - project briefing, outlining proposal, detail design, etc.
• Delay - preparation & approval of drawings, mistakes in design
documentation
• Lengthy tendering period & suitable for small to medium sized
projects where time is not critical
MAJOR DRAWBACKS
• Time consuming aspects of development process
• Effect of cost uncertainty
• Effect of buildability
• Fragmentation of organizational interfaces
Lump sum and scheduled contract:
This is a lump sum contract that requires a cost breakdown.
Cost plus fixed fee contract:
In cost plus fixed fee, the owner pays the contractor an agreed amount over and above the
documented cost of work.
Cost plus percentage of cost contract:
In cost plus percentage, the owner pays greater than 100 percent of the documented cost, usually
requiring detailed expense accounting.
Special contracts:
Special contracts are further classified into five types:
•Turn key contract
•Negotiated contract
•Package contract
•Continuing contract
•Running contract
• LUMP SUM CONTRACT
In a lump sum contract an owner agrees to pay a contractor a specified lump sum
after the completion of work without a cost breakdown. After work no detailed
measurements is required.
• The lump sum agreement will reduce owner risk, and the contractor has greater
control over profit expectations.
• The time to award this type of contract is also longer; however, it will
minimize change orders during construction.
Lump Sum Contract Advantages
 'Fixed' construction cost.
 Minimize change orders.
 Owner supervision is reduced when compared to Time and Material Contract.
 Bidding analysis and selection process is relatively easily.
Lump Sum Contract Disadvantages
 It presents the highest risk to the contractor.
 The Owner might reject change order requests.
 The project needs to be designed completely before the commencement of
activities.
 The contractor will select its own means and methods.
Time and Material Contracts or Unit Price Contracts:
• Unit price contracts are what we call an hourly rate. This type of contract is
typical in freelance work. The main advantage of this type of contract is that the
seller will make money for every hour he spends on the project.
• As Project Manager, it is his responsibility to enter into the right kind of
contract with a service provider to reduce risk and have the job delivered on
time
Lump sum and scheduled contract:
• In a lump sum contract an owner agrees to pay a contractor a
specified lump sum after the completion of work without a cost
breakdown with a specified time.
Lump Sum And Scheduled Contract Advantages:
 'Fixed' construction cost and time.
 Can be handovered on time.
 Owner supervision is reduced when compared to Time and
Material Contract.
Lump Sum And Scheduled Contract Disadvantages:
 It presents the highest risk to the contractor
 The Owner might reject change order requests.
COST PLUS FIXED FEE CONTRACT:
• A cost-plus-fixed-fee contract is a cost-reimbursement contract that provides for
payment to the contractor of a negotiated fee that is fixed at the inception of the
contract.
• The fixed fee does not vary with actual cost, but may be adjusted as a result of
changes in the work to be performed under the contract.
Advantages:
• A cost-plus contract is often used when long-term quality is a much higher
concern than cost.
• Final cost may be less than a fixed price contract because contractors do not
have to inflate the price to cover their risk.[
Disadvantages:
• There is limited certainty as to what the final cost will be.
• Requires additional oversight and administration to ensure that only permissible
costs are paid and that the contractor is exercising adequate overall cost
controls.
• Properly designing award or incentive fees also requires additional oversight and
administration.
COST PLUS PERCENTAGE OF COST CONTRACT:
• In construction, a method of payment to a contractor in which an additional
amount of money, expressed as a percentage, is paid by the client that is
designated to cover the contractor's overhead costs. When paid as a
predetermined profit, the client will usually require a strict accounting of
expenses.
• Suitable for small jobs.
NEGOTIATED CONTRACT:
• Contract awarded on the basis of a direct agreement with a contractor, without
going through the competitive bidding process. Also
called negotiated agreement.
PACKAGE CONTRACT:
• Packaging is normally associated with
general contractors who split a large project into a
series of work packages suitable for
obtaining tenders and placing orders with
the subcontracting and goods supply chain thereby
transferring risk for delivering some elements of the
works to others.
• However the design team, generally advised by the cost
consultant, may elect to pre-empt a
general contractor by selecting specialist systems
required for early inclusion into the evolving design.
This creates a built in package requirement.
CONTINUING CONTRACT:
• Continuing contract is
a contract calling for periodic
performances. Under such a
contract, performance is in several
units over a period of time. It is an
executory, as distinguished from an
executed contract. The following is
an example of a state law (Florida)
defining the term: According to Fla.
MEASURABLE CONTRACT
• Payment made according to actual work varied out, which is determined by physical
measurements
ITEM RATE CONTRACT
• The contractor agrees to carry out a unit quantity of particular work
(cm3,m2) for particular sum of money
• In this tender document consists of detailed BOQ , where estimated
quantity of work for each item involved in particular work are listed
along with detailed description
• Total contract value - multiply total quantity with quoted item rate
and add cost of all items
S.no Item Measuremen
t unit
Quantity Rate Amount
1 Cement Kgs 50 280 14000
2 Steel Ton 2 42000 84000
• Some items are not covered in BOQ but essential for completing job, in such
cases rates are given on basis of labour, material, equipment etc.
PERCENTAGE RATE CONTRACT
• Tender document contains scheduled rates for each work in addition to detailed
estimate for execution of work
• Contractor works out his rates for items I usual manner& arrives at total price
which is converted to total percentage by which amount differs
• Adopted by government departments & large organizations
S.no Item Measuremen
t unit
Quantity Rate Amount
1 Cement Kgs 50 280 14000
2 Steel Ton 2 42000 84000
W 14000+84000
Contractor amount -- Z
Z > W , the % rate = (z-w)/w *100 above W
Z < W , the % rate =(w-z)/w*100 below W
MANAGEMENT CONTRACT
• Managing contractor is appointed and he deals with number of small contractors
• Client deals with only contractor and designer
• Contractor provides planning, management & coordination services to client
RESPONSIBILITIES
• Preparing overall construction schedule
• Work package schedule
• Coordinating with designer
• Assistance in subcontractors selection
• Coordinating among different subcontractors
DESIGN, MANAGEMENT & CONSTRUCTION
CONTRACT
• Client appoints single contractor to
take care of design & construction
• Basic design concepts may be provided
by client himself or through an
independent agency
• After basic concepts client calls for
tender and selects appropriate agency
for designing , management &
construction services
INTEGRATED
CONTRACT
• Design- build
• In this contractor takes the
responsibilities of both design &
construction based on basic plans
drawn up by the client
• This avoids conflict b/w designer &
contractor
• Often adopted when client has no in-
house design with him
• This method Reduces the cost ,
develops the technical power in
contractor & reduces disputes
THE TURN-KEY
CONTRACT
• Responsibilities of all activities are
taken up by contracting agency
• The owner simply wants to “turn the
key” at completion to take over the
facility
• All activities related to surveying ,
drawing specifications , design ,
project planning , construction & test
operation are given to one large
organization
• They are useful in projects involving
combination of civil, electrical,
mechanical, chemical & mining
engineering
• Mostly seen in petrochemical plants
& nuclear power stations
• STEPS
• In a project client first prepares
documents regarding requirements
of facilities to be constructed
• Later he selects the best proposal
submitted by multiple bidders
TEAM MEMBERS
• ESHWAR .G
• RAKSHITH REDDY .R
• DARSHAN .R
• KETAN NAIDU .K
• N.S.S.AKHIL
• DEEPA .S

More Related Content

What's hot

Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender NoticeSakshi Kirar
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in WorksDr K M SONI
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tenderingvvsasane
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contractsAnil Kumar(6)
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
Arbitration Of Construction Disputes
Arbitration Of Construction DisputesArbitration Of Construction Disputes
Arbitration Of Construction Disputeslouchang
 
Contract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationContract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationMANNU KUMAR
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil EngineeringKailash Chander
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 

What's hot (20)

Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Construction contracts
Construction contractsConstruction contracts
Construction contracts
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Contracts
ContractsContracts
Contracts
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contracts
 
Tender
TenderTender
Tender
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Item rate contract
Item rate contractItem rate contract
Item rate contract
 
Arbitration Of Construction Disputes
Arbitration Of Construction DisputesArbitration Of Construction Disputes
Arbitration Of Construction Disputes
 
Contract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationContract - Construction Contracts and Specification
Contract - Construction Contracts and Specification
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil Engineering
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 

Similar to Construction contract

Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureHASMANIRA
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts fritzlejarso
 
Unit V - Contracts.pptx
Unit V - Contracts.pptxUnit V - Contracts.pptx
Unit V - Contracts.pptxjairam131
 
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr  ias 11 construction contract presentation by MOHSIN MUMTAZCfr  ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZmianmohsinmumtazshb
 
Measure And Pay Contract
Measure And Pay Contract Measure And Pay Contract
Measure And Pay Contract Venuri Lakshani
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentationTimun Loh
 
types-170309142854.pptx
types-170309142854.pptxtypes-170309142854.pptx
types-170309142854.pptxssuser42980c
 
Construction contract_Existing and Proposed Accounting Standards
Construction contract_Existing and Proposed Accounting StandardsConstruction contract_Existing and Proposed Accounting Standards
Construction contract_Existing and Proposed Accounting StandardsAdi Iskandar Iliyas
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract formskohwenqi
 
05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITIONByishimoBTCChef
 
Contract Conditions
Contract ConditionsContract Conditions
Contract ConditionsDr K M SONI
 
types of contracts
 types of contracts types of contracts
types of contractsKEVINMISTRY8
 

Similar to Construction contract (20)

TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts
 
Unit V - Contracts.pptx
Unit V - Contracts.pptxUnit V - Contracts.pptx
Unit V - Contracts.pptx
 
Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?
 
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr  ias 11 construction contract presentation by MOHSIN MUMTAZCfr  ias 11 construction contract presentation by MOHSIN MUMTAZ
Cfr ias 11 construction contract presentation by MOHSIN MUMTAZ
 
Measure And Pay Contract
Measure And Pay Contract Measure And Pay Contract
Measure And Pay Contract
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
types-170309142854.pptx
types-170309142854.pptxtypes-170309142854.pptx
types-170309142854.pptx
 
Construction contract_Existing and Proposed Accounting Standards
Construction contract_Existing and Proposed Accounting StandardsConstruction contract_Existing and Proposed Accounting Standards
Construction contract_Existing and Proposed Accounting Standards
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Contract- Vijay Suryawanshi
Contract- Vijay SuryawanshiContract- Vijay Suryawanshi
Contract- Vijay Suryawanshi
 
05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
 
types of contracts
 types of contracts types of contracts
types of contracts
 
Contract
Contract Contract
Contract
 

Recently uploaded

Ganga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfGanga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfsabhyara24
 
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhidelhimodel235
 
Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024VickyAulakh1
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRasmaqueen5
 
Call Girls in Anand Vihar Delhi +91 8447779280}Call Girls In Delhi Best in D...
Call Girls in Anand Vihar Delhi +91 8447779280}Call Girls In Delhi Best  in D...Call Girls in Anand Vihar Delhi +91 8447779280}Call Girls In Delhi Best  in D...
Call Girls in Anand Vihar Delhi +91 8447779280}Call Girls In Delhi Best in D...asmaqueen5
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...ApartmentWala1
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfVickyAulakh1
 
David Litt Foreclosure Specialist - Your Partner in Real Estate Success
David Litt Foreclosure Specialist - Your Partner in Real Estate SuccessDavid Litt Foreclosure Specialist - Your Partner in Real Estate Success
David Litt Foreclosure Specialist - Your Partner in Real Estate SuccessDavid Litt
 
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...asmaqueen5
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfabbu831446
 
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhidelhimodel235
 
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfThe Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfPrachiRudram
 
Kolte Patil Kharadi Pune E Brochure.pdf
Kolte Patil Kharadi Pune E  Brochure.pdfKolte Patil Kharadi Pune E  Brochure.pdf
Kolte Patil Kharadi Pune E Brochure.pdfabbu831446
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)Delhi Call girls
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfkratirudram
 
Call Girls In Gandhi Nagar↬Delhi NCR (Call Us) 8447779280 }Escorts in Delhi NcR
Call Girls In Gandhi Nagar↬Delhi NCR (Call Us) 8447779280 }Escorts in Delhi NcRCall Girls In Gandhi Nagar↬Delhi NCR (Call Us) 8447779280 }Escorts in Delhi NcR
Call Girls In Gandhi Nagar↬Delhi NCR (Call Us) 8447779280 }Escorts in Delhi NcRasmaqueen5
 
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhidelhimodel235
 
9990771857 Call Girls in Dwarka Sector 10 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 10 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 10 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 10 Delhi (Call Girls) Delhidelhimodel235
 
Cheap Rate ✨➥9711108085▻✨Call Girls In Chandni Chowk (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Chandni Chowk (Delhi)Cheap Rate ✨➥9711108085▻✨Call Girls In Chandni Chowk (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Chandni Chowk (Delhi)delhi24hrs1
 
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdfManishSaxena95
 

Recently uploaded (20)

Ganga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfGanga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdf
 
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
 
Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
 
Call Girls in Anand Vihar Delhi +91 8447779280}Call Girls In Delhi Best in D...
Call Girls in Anand Vihar Delhi +91 8447779280}Call Girls In Delhi Best  in D...Call Girls in Anand Vihar Delhi +91 8447779280}Call Girls In Delhi Best  in D...
Call Girls in Anand Vihar Delhi +91 8447779280}Call Girls In Delhi Best in D...
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdf
 
David Litt Foreclosure Specialist - Your Partner in Real Estate Success
David Litt Foreclosure Specialist - Your Partner in Real Estate SuccessDavid Litt Foreclosure Specialist - Your Partner in Real Estate Success
David Litt Foreclosure Specialist - Your Partner in Real Estate Success
 
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdf
 
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
 
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfThe Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
 
Kolte Patil Kharadi Pune E Brochure.pdf
Kolte Patil Kharadi Pune E  Brochure.pdfKolte Patil Kharadi Pune E  Brochure.pdf
Kolte Patil Kharadi Pune E Brochure.pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
 
Call Girls In Gandhi Nagar↬Delhi NCR (Call Us) 8447779280 }Escorts in Delhi NcR
Call Girls In Gandhi Nagar↬Delhi NCR (Call Us) 8447779280 }Escorts in Delhi NcRCall Girls In Gandhi Nagar↬Delhi NCR (Call Us) 8447779280 }Escorts in Delhi NcR
Call Girls In Gandhi Nagar↬Delhi NCR (Call Us) 8447779280 }Escorts in Delhi NcR
 
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
 
9990771857 Call Girls in Dwarka Sector 10 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 10 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 10 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 10 Delhi (Call Girls) Delhi
 
Cheap Rate ✨➥9711108085▻✨Call Girls In Chandni Chowk (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Chandni Chowk (Delhi)Cheap Rate ✨➥9711108085▻✨Call Girls In Chandni Chowk (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Chandni Chowk (Delhi)
 
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
 

Construction contract

  • 1. CONTRACT AND TYPES OF CONTRACT SUBJECT: ESTIMATION AND COSTING
  • 2. HISTORY OF LAW Indian Contract Act came into force on 1st Sept, 1872.  The act is applicable to whole India except the state of Jammu & Kashmir.  It contains 266 sections.
  • 3. WHAT IS CONTRACT? • A contract is a legally binding or valid agreement between two parties. The law will consider a contract to be valid if the agreement contains all of the following elements: • offer and acceptance; • an intention between the parties to create binding relations; • consideration to be paid for the promise made; • legal capacity of the parties to act; • genuine consent of the parties; and • legality of the agreement. • An agreement that lacks one or more of the elements listed above is not a valid contract.
  • 4. WHY DO WE USE CONTRACT IN CONSTRUCTION? • Describe scope of work • Establish time frame • Establish cost and payment provision • Set fourth obligations and relationship • Minimize disputes • Improve economic return of investment
  • 5. CONSTRUCTION CONTRACT A construction contract is a mutual or legally binding agreement between two parties based on policies and conditions recorded in document form. The two parties involved are one or more owners, and one or more contractors. The owner has full authority to decide what type of contract should be used for a specific development to be constructed and to set forth the legally-binding terms and conditions in a contractual agreement.
  • 6. ACTIVITIES IN CONSTRUCTION PROJECT Engineering •Issues related to process finalization, structural analysis & design, technical issues related to equipment design & selection 1 Procurement •Procurement of materials , also includes identification of suitable vendors 2 Construction •This covers construction, installation & test run of a constructed facility before handed to owner 3
  • 7. MAJOR CONTRACT TYPES (TRADITIONAL)
  • 8. CLASSIFICATION • Separated contracts • Management contracts • Integrated contracts • Discretionary contracts
  • 9. SEPARATED CONTRACTS • Lump sum contract • Measurement contract • Item rate • Percentage rate • Cost plus percentage
  • 10. MANAGEMENT CONTRACT • Management contract • Construction management contract • Design, management & construction contract. • INTEGRATED CONTRACT • Design build contract • Turn key contract • Build, operate & transfer contract.
  • 12. SEPARATED • Traditional system & sequential process • Division b/w design & construction responsibility • Design - project briefing, outlining proposal, detail design, etc. • Delay - preparation & approval of drawings, mistakes in design documentation • Lengthy tendering period & suitable for small to medium sized projects where time is not critical
  • 13. MAJOR DRAWBACKS • Time consuming aspects of development process • Effect of cost uncertainty • Effect of buildability • Fragmentation of organizational interfaces
  • 14. Lump sum and scheduled contract: This is a lump sum contract that requires a cost breakdown. Cost plus fixed fee contract: In cost plus fixed fee, the owner pays the contractor an agreed amount over and above the documented cost of work. Cost plus percentage of cost contract: In cost plus percentage, the owner pays greater than 100 percent of the documented cost, usually requiring detailed expense accounting. Special contracts: Special contracts are further classified into five types: •Turn key contract •Negotiated contract •Package contract •Continuing contract •Running contract
  • 15. • LUMP SUM CONTRACT In a lump sum contract an owner agrees to pay a contractor a specified lump sum after the completion of work without a cost breakdown. After work no detailed measurements is required. • The lump sum agreement will reduce owner risk, and the contractor has greater control over profit expectations. • The time to award this type of contract is also longer; however, it will minimize change orders during construction. Lump Sum Contract Advantages  'Fixed' construction cost.  Minimize change orders.  Owner supervision is reduced when compared to Time and Material Contract.  Bidding analysis and selection process is relatively easily. Lump Sum Contract Disadvantages  It presents the highest risk to the contractor.  The Owner might reject change order requests.  The project needs to be designed completely before the commencement of activities.  The contractor will select its own means and methods.
  • 16. Time and Material Contracts or Unit Price Contracts: • Unit price contracts are what we call an hourly rate. This type of contract is typical in freelance work. The main advantage of this type of contract is that the seller will make money for every hour he spends on the project. • As Project Manager, it is his responsibility to enter into the right kind of contract with a service provider to reduce risk and have the job delivered on time
  • 17. Lump sum and scheduled contract: • In a lump sum contract an owner agrees to pay a contractor a specified lump sum after the completion of work without a cost breakdown with a specified time. Lump Sum And Scheduled Contract Advantages:  'Fixed' construction cost and time.  Can be handovered on time.  Owner supervision is reduced when compared to Time and Material Contract. Lump Sum And Scheduled Contract Disadvantages:  It presents the highest risk to the contractor  The Owner might reject change order requests.
  • 18. COST PLUS FIXED FEE CONTRACT: • A cost-plus-fixed-fee contract is a cost-reimbursement contract that provides for payment to the contractor of a negotiated fee that is fixed at the inception of the contract. • The fixed fee does not vary with actual cost, but may be adjusted as a result of changes in the work to be performed under the contract. Advantages: • A cost-plus contract is often used when long-term quality is a much higher concern than cost. • Final cost may be less than a fixed price contract because contractors do not have to inflate the price to cover their risk.[ Disadvantages: • There is limited certainty as to what the final cost will be. • Requires additional oversight and administration to ensure that only permissible costs are paid and that the contractor is exercising adequate overall cost controls. • Properly designing award or incentive fees also requires additional oversight and administration.
  • 19. COST PLUS PERCENTAGE OF COST CONTRACT: • In construction, a method of payment to a contractor in which an additional amount of money, expressed as a percentage, is paid by the client that is designated to cover the contractor's overhead costs. When paid as a predetermined profit, the client will usually require a strict accounting of expenses. • Suitable for small jobs.
  • 20. NEGOTIATED CONTRACT: • Contract awarded on the basis of a direct agreement with a contractor, without going through the competitive bidding process. Also called negotiated agreement.
  • 21. PACKAGE CONTRACT: • Packaging is normally associated with general contractors who split a large project into a series of work packages suitable for obtaining tenders and placing orders with the subcontracting and goods supply chain thereby transferring risk for delivering some elements of the works to others. • However the design team, generally advised by the cost consultant, may elect to pre-empt a general contractor by selecting specialist systems required for early inclusion into the evolving design. This creates a built in package requirement.
  • 22. CONTINUING CONTRACT: • Continuing contract is a contract calling for periodic performances. Under such a contract, performance is in several units over a period of time. It is an executory, as distinguished from an executed contract. The following is an example of a state law (Florida) defining the term: According to Fla.
  • 23. MEASURABLE CONTRACT • Payment made according to actual work varied out, which is determined by physical measurements
  • 24. ITEM RATE CONTRACT • The contractor agrees to carry out a unit quantity of particular work (cm3,m2) for particular sum of money • In this tender document consists of detailed BOQ , where estimated quantity of work for each item involved in particular work are listed along with detailed description • Total contract value - multiply total quantity with quoted item rate and add cost of all items
  • 25. S.no Item Measuremen t unit Quantity Rate Amount 1 Cement Kgs 50 280 14000 2 Steel Ton 2 42000 84000 • Some items are not covered in BOQ but essential for completing job, in such cases rates are given on basis of labour, material, equipment etc.
  • 26. PERCENTAGE RATE CONTRACT • Tender document contains scheduled rates for each work in addition to detailed estimate for execution of work • Contractor works out his rates for items I usual manner& arrives at total price which is converted to total percentage by which amount differs • Adopted by government departments & large organizations
  • 27. S.no Item Measuremen t unit Quantity Rate Amount 1 Cement Kgs 50 280 14000 2 Steel Ton 2 42000 84000 W 14000+84000 Contractor amount -- Z Z > W , the % rate = (z-w)/w *100 above W Z < W , the % rate =(w-z)/w*100 below W
  • 28. MANAGEMENT CONTRACT • Managing contractor is appointed and he deals with number of small contractors • Client deals with only contractor and designer • Contractor provides planning, management & coordination services to client
  • 29. RESPONSIBILITIES • Preparing overall construction schedule • Work package schedule • Coordinating with designer • Assistance in subcontractors selection • Coordinating among different subcontractors
  • 30. DESIGN, MANAGEMENT & CONSTRUCTION CONTRACT • Client appoints single contractor to take care of design & construction • Basic design concepts may be provided by client himself or through an independent agency • After basic concepts client calls for tender and selects appropriate agency for designing , management & construction services
  • 31. INTEGRATED CONTRACT • Design- build • In this contractor takes the responsibilities of both design & construction based on basic plans drawn up by the client • This avoids conflict b/w designer & contractor • Often adopted when client has no in- house design with him • This method Reduces the cost , develops the technical power in contractor & reduces disputes
  • 32. THE TURN-KEY CONTRACT • Responsibilities of all activities are taken up by contracting agency • The owner simply wants to “turn the key” at completion to take over the facility • All activities related to surveying , drawing specifications , design , project planning , construction & test operation are given to one large organization
  • 33. • They are useful in projects involving combination of civil, electrical, mechanical, chemical & mining engineering • Mostly seen in petrochemical plants & nuclear power stations • STEPS • In a project client first prepares documents regarding requirements of facilities to be constructed • Later he selects the best proposal submitted by multiple bidders
  • 34. TEAM MEMBERS • ESHWAR .G • RAKSHITH REDDY .R • DARSHAN .R • KETAN NAIDU .K • N.S.S.AKHIL • DEEPA .S