Jacketing
• Increase bearing load
• Concrete jacketing is needed to increase
bearing load capacity following a modification
of the structural design or to restore structural
design integrity due to a failure in the
structural member.
• This technique is used on vertical surfaces
such as walls, columns and other combinations
such as beam sides and bottoms.
• The initial concrete substrate should e repaired
• - All cracks should be treated
• - All weak, damaged and easily removable
concrete should be chipped away
• - Clean any corroded steel by abrasion or
replace any damaged steel bars
• Installation of reinforcement
• We recommend the use of weberanc 405
BFX. It is applied as follows:
• Drill hole to correct diameter and depth
• Clean the drilled hole and remove all dust
• Inject the weberanc 405 BFX
• Install the rebar
•
• Formwork placement
• Formwork is best attached directly to the
concrete surface with expansion anchors or
standard form ties. Shoring or scaffolding can
be used to support the formwork.
• Pumping application
• The placement of material into the formed
cavity depends on the geometries. Vertical
surfaces start at the lowest point. We
recommend the use of webertec MC1. It is a
pumpable, self-compacting micro concrete.
• Curing ad protection
• Curing is recommended immediately after
removal of framework.
• Column strengthening is a process used to add
or restore ultimate load capacity of reinforced
concrete columns. It is used for seismic
retrofitting, supporting additional live load or
dead load that not included in the original
design, to relieve stresses generated by design
or construction errors, or to restore original
load capacity to damaged structural elements.
• There are several techniques which are used to
strengthen reinforced concrete columns like
reinforced concrete jacketing, steel jacketing,
and FRP confining or jacketing.
When strengthening of R.C. Column
is needed?
• The load carried by the column is increased due
to either increasing the number of floors or due to
mistakes in the design.
• The compressive strength of the concrete or the
percent and type of reinforcement are not
according to the codes’ requirements.
• The inclination of the column is more than the
allowable.
• The settlement in the foundation is more than the
allowable.
• Strengthening Techniques for R.C. Columns
• There are three major techniques for
strengthening reinforced concrete columns
which are discussed below:
• 1. Reinforced Concrete Jacketing
• 2. Steel Jacketing
• 3. FRP Confining or Jacketing
1. Reinforced Concrete Jacketing
• It is one of the techniques used to improve or
restore capacity of reinforced concrete column.
The size of the jacket and the number and
diameter of the steel bars used in the jacketing
process depend on the structural analysis that
was made to the column.
Reinforced Concrete Jacketing
Process
• Initially, reduce or eliminate loads on columns
temporarily if it is required. This is done
by putting mechanical jacks and additional props
between floors.
• After that, if it is found out that reinforcements
are corroded, the remove the concrete cover and
clean the steel bars using a wire brush or sand
compressor.
• Then, coat the steel bars with an epoxy material
that would prevent corrosion.
• If reducing loads and cleaning reinforcement is
not needed, the jacketing process begin by
adding steel connectors into the existing
column.
• The steel connectors are added into the column
by making holes 3-4mm larger than the
diameter of the used steel connectors and 10-
15cm depth.
• The spacing of new stirrups of the jacket in
both the vertical and horizontal directions
should not be more than 50cm.
• Filling the holes with an appropriate epoxy
material then inserting the connectors into the
holes.
• Adding vertical steel connectors to fasten the
vertical steel bars of the jacket following the
same procedure in step 5 and 6.
• Installing the new vertical steel bars and
stirrups of the jacket according to the designed
dimensions and diameters.
• Coating the existing column with an
appropriate epoxy material that would
guarantee the bond between the old and new
concrete.
• Pouring the concrete of the jacket before the
epoxy material dries. The concrete used should
be of low shrinkage and consists of small
aggregates, sand, cement and additional
materials to prevent shrinkage. Steps of
reinforced concrete jacketing are illustrated
in Fig. 1.
Fig. 1: Increasing the Cross-sectional Area of Column by RC Jacketing
2. Steel Jacketing
• This technique is chosen when the loads
applied to the column will be increased, and at
the same time, increasing the cross sectional
area of the column is not permitted.
• Steel Jacketing Process
• Removing the concrete cover.
• Cleaning the reinforcement steel bars using a
wire brush or a sand compressor.
• Coating the steel bars with an epoxy material
that would prevent corrosion.
• Installing the steel jacket with the required size
and thickness, according to the design, and
making openings to pour through them the
epoxy material that would guarantee the
needed bond between the concrete column and
the steel jacket.
• Filling the space between the concrete column
and the steel jacket with an appropriate epoxy
material.
Fig. 2: Increasing the cross-sectional area of column by steel jacketing
• In some cases, where the column is needed to
carry bending moment and transfer it
successfully through the floors, one should
install a steel collar at the neck of the column
by means of bolts or a suitable bonding
material.
Fig. 3: Column strengthened with steel angles
Fig. 4: Welding steel jacket
Fig. 5: Welding process
Fig 6.Placement of Steel Jacket After Welding process
ended
• 3. FRP Confining or Jacketing
• FRP axial strengthening systems are used to
improve or enhance the capacity of reinforced
concrete columns. It can be used for both
circular and rectangular shaped columns but it
is more effective in the former shape.
Fig.7: Applying Continuous FRP Systems for Axial Strengthening of RCC
Columns
Advantages of FRPAxial Strengthening
Systems for Columns
• Increases the ultimate load carrying capacity of
reinforced concrete member
• Improves shear capacity of reinforced concrete
element
• Reinforcement bar lap splice capacity of the
member is improved due to FRP axial
strengthening system application
• The ductility of reinforced concrete column is
improved considerably.
• THANKS!
• Gmail: ramkumawat001@gmail.com

More Related Content

What's hot

Deterioration of concrete ppt
Deterioration of concrete pptDeterioration of concrete ppt
Deterioration of concrete pptwasim shaikh
 
Techniques for various structural repair
Techniques for various  structural repairTechniques for various  structural repair
Techniques for various structural repairUdayram Patil
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concreteAglaia Connect
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structureshlok patel
 
Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresShahrukh Niaz
 
shotcreting and guniting ppt
shotcreting and guniting pptshotcreting and guniting ppt
shotcreting and guniting pptPunit Sharnagat
 
Seismic retrofitting techniques of rcc
Seismic retrofitting techniques of rccSeismic retrofitting techniques of rcc
Seismic retrofitting techniques of rccKorrapati Pratyusha
 
Seismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationSeismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationShuvam Sarkar
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildingsSUPREETH Suppi
 
Chapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairsChapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairsAnkit Patel
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESbrijlata sharma
 
Types of Concrete
Types of ConcreteTypes of Concrete
Types of ConcreteMaliha Mehr
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniquesNayana 54321
 

What's hot (20)

Deterioration of concrete ppt
Deterioration of concrete pptDeterioration of concrete ppt
Deterioration of concrete ppt
 
Retrofitting
Retrofitting Retrofitting
Retrofitting
 
Techniques for various structural repair
Techniques for various  structural repairTechniques for various  structural repair
Techniques for various structural repair
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concrete
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
 
shotcreting and guniting ppt
shotcreting and guniting pptshotcreting and guniting ppt
shotcreting and guniting ppt
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
Seismic retrofitting techniques of rcc
Seismic retrofitting techniques of rccSeismic retrofitting techniques of rcc
Seismic retrofitting techniques of rcc
 
Seismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitationSeismic retrofitting techniques & rehabilitation
Seismic retrofitting techniques & rehabilitation
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildings
 
Epoxy injection crack repair
Epoxy injection crack repairEpoxy injection crack repair
Epoxy injection crack repair
 
Chapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairsChapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairs
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Special Concretes
Special Concretes Special Concretes
Special Concretes
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 
Repair and Rehabilitation
Repair and RehabilitationRepair and Rehabilitation
Repair and Rehabilitation
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
 
Types of Concrete
Types of ConcreteTypes of Concrete
Types of Concrete
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
 

Similar to Jacketing (RR&S)

Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed ConcreteRavi Savani
 
prestressed concrete and precast concrete technology.pptx
prestressed concrete and precast concrete technology.pptxprestressed concrete and precast concrete technology.pptx
prestressed concrete and precast concrete technology.pptxPRASANNABHAVANGR1
 
precastconstruction-150403143707-conversion-gate01 (1).pdf
precastconstruction-150403143707-conversion-gate01 (1).pdfprecastconstruction-150403143707-conversion-gate01 (1).pdf
precastconstruction-150403143707-conversion-gate01 (1).pdfVinayak247538
 
Practical aspects of PSC.ppt
Practical aspects of PSC.pptPractical aspects of PSC.ppt
Practical aspects of PSC.pptAdityaJoshi320204
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 
Reinforcement ppt assignment
Reinforcement ppt assignmentReinforcement ppt assignment
Reinforcement ppt assignmenthailnur1794
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxanik7nziza
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...Arman Hashmi
 
Strenghtening measures sm
Strenghtening measures smStrenghtening measures sm
Strenghtening measures smsafna k.a
 
Prestressed-concrete-1 (1).pdf structure design
Prestressed-concrete-1 (1).pdf structure designPrestressed-concrete-1 (1).pdf structure design
Prestressed-concrete-1 (1).pdf structure design632k18BilalAhmad
 
Seminar_Repair & Restoration_of_Structure
Seminar_Repair & Restoration_of_StructureSeminar_Repair & Restoration_of_Structure
Seminar_Repair & Restoration_of_StructureIssar Kapadia
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdfPrakashM970621
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 

Similar to Jacketing (RR&S) (20)

Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
prestressed concrete and precast concrete technology.pptx
prestressed concrete and precast concrete technology.pptxprestressed concrete and precast concrete technology.pptx
prestressed concrete and precast concrete technology.pptx
 
Harshitha_Presentation-3.pptx
Harshitha_Presentation-3.pptxHarshitha_Presentation-3.pptx
Harshitha_Presentation-3.pptx
 
precastconstruction-150403143707-conversion-gate01 (1).pdf
precastconstruction-150403143707-conversion-gate01 (1).pdfprecastconstruction-150403143707-conversion-gate01 (1).pdf
precastconstruction-150403143707-conversion-gate01 (1).pdf
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Practical aspects of PSC.ppt
Practical aspects of PSC.pptPractical aspects of PSC.ppt
Practical aspects of PSC.ppt
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
BEAM.pptx
BEAM.pptxBEAM.pptx
BEAM.pptx
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Reinforcement ppt assignment
Reinforcement ppt assignmentReinforcement ppt assignment
Reinforcement ppt assignment
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptx
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
 
Strenghtening measures sm
Strenghtening measures smStrenghtening measures sm
Strenghtening measures sm
 
Joints
JointsJoints
Joints
 
Prestressed-concrete-1 (1).pdf structure design
Prestressed-concrete-1 (1).pdf structure designPrestressed-concrete-1 (1).pdf structure design
Prestressed-concrete-1 (1).pdf structure design
 
Seminar_Repair & Restoration_of_Structure
Seminar_Repair & Restoration_of_StructureSeminar_Repair & Restoration_of_Structure
Seminar_Repair & Restoration_of_Structure
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdf
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 

More from RAMPRASAD KUMAWAT

Construction Material: timber
Construction Material: timber Construction Material: timber
Construction Material: timber RAMPRASAD KUMAWAT
 
Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction RAMPRASAD KUMAWAT
 
Conventional Construction : steel
Conventional Construction : steelConventional Construction : steel
Conventional Construction : steelRAMPRASAD KUMAWAT
 
Conventional construction of Timber
Conventional construction of TimberConventional construction of Timber
Conventional construction of TimberRAMPRASAD KUMAWAT
 
Working Drawing Building Layout Architectural
Working Drawing Building Layout ArchitecturalWorking Drawing Building Layout Architectural
Working Drawing Building Layout ArchitecturalRAMPRASAD KUMAWAT
 
Building Planning Proportion Orientation Site Plan
Building Planning Proportion Orientation Site PlanBuilding Planning Proportion Orientation Site Plan
Building Planning Proportion Orientation Site PlanRAMPRASAD KUMAWAT
 
Infrastructure of Tunnel & Sewage System
Infrastructure of Tunnel & Sewage SystemInfrastructure of Tunnel & Sewage System
Infrastructure of Tunnel & Sewage SystemRAMPRASAD KUMAWAT
 
Infrastructure of Building & canal
Infrastructure of  Building & canalInfrastructure of  Building & canal
Infrastructure of Building & canalRAMPRASAD KUMAWAT
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...RAMPRASAD KUMAWAT
 
Parks and Recreation center
Parks and Recreation center Parks and Recreation center
Parks and Recreation center RAMPRASAD KUMAWAT
 
element of commercial building
element of commercial buildingelement of commercial building
element of commercial buildingRAMPRASAD KUMAWAT
 

More from RAMPRASAD KUMAWAT (20)

fault & faulting
fault & faultingfault & faulting
fault & faulting
 
Fold
FoldFold
Fold
 
Construction Material: timber
Construction Material: timber Construction Material: timber
Construction Material: timber
 
Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction
 
Conventional Construction : steel
Conventional Construction : steelConventional Construction : steel
Conventional Construction : steel
 
Conventional construction of Timber
Conventional construction of TimberConventional construction of Timber
Conventional construction of Timber
 
Construction Masonry
Construction MasonryConstruction Masonry
Construction Masonry
 
concept of green buildings
concept of green buildingsconcept of green buildings
concept of green buildings
 
Building Bye-laws
Building  Bye-lawsBuilding  Bye-laws
Building Bye-laws
 
Working Drawing Building Layout Architectural
Working Drawing Building Layout ArchitecturalWorking Drawing Building Layout Architectural
Working Drawing Building Layout Architectural
 
Building Planning Proportion Orientation Site Plan
Building Planning Proportion Orientation Site PlanBuilding Planning Proportion Orientation Site Plan
Building Planning Proportion Orientation Site Plan
 
Ground Support System
Ground Support System Ground Support System
Ground Support System
 
Infrastructure of Dam
Infrastructure of DamInfrastructure of Dam
Infrastructure of Dam
 
Infrastructure of Tunnel & Sewage System
Infrastructure of Tunnel & Sewage SystemInfrastructure of Tunnel & Sewage System
Infrastructure of Tunnel & Sewage System
 
Infrastructure of Bridges
Infrastructure of BridgesInfrastructure of Bridges
Infrastructure of Bridges
 
Infrastructure of Building & canal
Infrastructure of  Building & canalInfrastructure of  Building & canal
Infrastructure of Building & canal
 
water resources
water resourceswater resources
water resources
 
Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...Transportation system Transportation system consisting road, railway track, c...
Transportation system Transportation system consisting road, railway track, c...
 
Parks and Recreation center
Parks and Recreation center Parks and Recreation center
Parks and Recreation center
 
element of commercial building
element of commercial buildingelement of commercial building
element of commercial building
 

Recently uploaded

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Recently uploaded (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Jacketing (RR&S)

  • 2. Jacketing • Increase bearing load • Concrete jacketing is needed to increase bearing load capacity following a modification of the structural design or to restore structural design integrity due to a failure in the structural member. • This technique is used on vertical surfaces such as walls, columns and other combinations such as beam sides and bottoms.
  • 3. • The initial concrete substrate should e repaired • - All cracks should be treated • - All weak, damaged and easily removable concrete should be chipped away • - Clean any corroded steel by abrasion or replace any damaged steel bars
  • 4. • Installation of reinforcement • We recommend the use of weberanc 405 BFX. It is applied as follows: • Drill hole to correct diameter and depth • Clean the drilled hole and remove all dust • Inject the weberanc 405 BFX • Install the rebar •
  • 5. • Formwork placement • Formwork is best attached directly to the concrete surface with expansion anchors or standard form ties. Shoring or scaffolding can be used to support the formwork.
  • 6. • Pumping application • The placement of material into the formed cavity depends on the geometries. Vertical surfaces start at the lowest point. We recommend the use of webertec MC1. It is a pumpable, self-compacting micro concrete.
  • 7. • Curing ad protection • Curing is recommended immediately after removal of framework.
  • 8. • Column strengthening is a process used to add or restore ultimate load capacity of reinforced concrete columns. It is used for seismic retrofitting, supporting additional live load or dead load that not included in the original design, to relieve stresses generated by design or construction errors, or to restore original load capacity to damaged structural elements.
  • 9. • There are several techniques which are used to strengthen reinforced concrete columns like reinforced concrete jacketing, steel jacketing, and FRP confining or jacketing.
  • 10. When strengthening of R.C. Column is needed? • The load carried by the column is increased due to either increasing the number of floors or due to mistakes in the design. • The compressive strength of the concrete or the percent and type of reinforcement are not according to the codes’ requirements. • The inclination of the column is more than the allowable. • The settlement in the foundation is more than the allowable.
  • 11. • Strengthening Techniques for R.C. Columns • There are three major techniques for strengthening reinforced concrete columns which are discussed below: • 1. Reinforced Concrete Jacketing • 2. Steel Jacketing • 3. FRP Confining or Jacketing
  • 12. 1. Reinforced Concrete Jacketing • It is one of the techniques used to improve or restore capacity of reinforced concrete column. The size of the jacket and the number and diameter of the steel bars used in the jacketing process depend on the structural analysis that was made to the column.
  • 13. Reinforced Concrete Jacketing Process • Initially, reduce or eliminate loads on columns temporarily if it is required. This is done by putting mechanical jacks and additional props between floors. • After that, if it is found out that reinforcements are corroded, the remove the concrete cover and clean the steel bars using a wire brush or sand compressor. • Then, coat the steel bars with an epoxy material that would prevent corrosion.
  • 14. • If reducing loads and cleaning reinforcement is not needed, the jacketing process begin by adding steel connectors into the existing column. • The steel connectors are added into the column by making holes 3-4mm larger than the diameter of the used steel connectors and 10- 15cm depth. • The spacing of new stirrups of the jacket in both the vertical and horizontal directions should not be more than 50cm.
  • 15. • Filling the holes with an appropriate epoxy material then inserting the connectors into the holes. • Adding vertical steel connectors to fasten the vertical steel bars of the jacket following the same procedure in step 5 and 6. • Installing the new vertical steel bars and stirrups of the jacket according to the designed dimensions and diameters.
  • 16. • Coating the existing column with an appropriate epoxy material that would guarantee the bond between the old and new concrete. • Pouring the concrete of the jacket before the epoxy material dries. The concrete used should be of low shrinkage and consists of small aggregates, sand, cement and additional materials to prevent shrinkage. Steps of reinforced concrete jacketing are illustrated in Fig. 1.
  • 17. Fig. 1: Increasing the Cross-sectional Area of Column by RC Jacketing
  • 18. 2. Steel Jacketing • This technique is chosen when the loads applied to the column will be increased, and at the same time, increasing the cross sectional area of the column is not permitted.
  • 19. • Steel Jacketing Process • Removing the concrete cover. • Cleaning the reinforcement steel bars using a wire brush or a sand compressor. • Coating the steel bars with an epoxy material that would prevent corrosion.
  • 20. • Installing the steel jacket with the required size and thickness, according to the design, and making openings to pour through them the epoxy material that would guarantee the needed bond between the concrete column and the steel jacket. • Filling the space between the concrete column and the steel jacket with an appropriate epoxy material.
  • 21. Fig. 2: Increasing the cross-sectional area of column by steel jacketing
  • 22. • In some cases, where the column is needed to carry bending moment and transfer it successfully through the floors, one should install a steel collar at the neck of the column by means of bolts or a suitable bonding material.
  • 23. Fig. 3: Column strengthened with steel angles
  • 24. Fig. 4: Welding steel jacket
  • 25. Fig. 5: Welding process
  • 26. Fig 6.Placement of Steel Jacket After Welding process ended
  • 27. • 3. FRP Confining or Jacketing • FRP axial strengthening systems are used to improve or enhance the capacity of reinforced concrete columns. It can be used for both circular and rectangular shaped columns but it is more effective in the former shape.
  • 28. Fig.7: Applying Continuous FRP Systems for Axial Strengthening of RCC Columns
  • 29. Advantages of FRPAxial Strengthening Systems for Columns • Increases the ultimate load carrying capacity of reinforced concrete member • Improves shear capacity of reinforced concrete element • Reinforcement bar lap splice capacity of the member is improved due to FRP axial strengthening system application • The ductility of reinforced concrete column is improved considerably.
  • 30. • THANKS! • Gmail: ramkumawat001@gmail.com