KHURAIS-GOSP PROJECT
SPOOLS TRACKING SYSTEM
Programmed by : Renee Gatdula
Spool Tracking System“Special Kind of Tool”
Gathered Data’s from:
SPOOLGEN – Master Listing of Plan Spools
PTS – Master File of Plan/Done, PK/PF (Shop/Field Weld) in Dia-inch.
GEMAPI – Master file of Issued Material
TEDFLOW – Master file of Hydrotest Status (Testpack/Laid-up/Re-ins.)
Gives Information and Data’s of:
QC Fabrication – Date Released from the Fabrication.
Material Controller – Date’s/Ref. of Spools for FBE(Liquid Coating),NDT
QC/Painting Department – Date Released from Painting Department
Testpack – Status of testpack per Line Number on Weld done/ Test Date
Re-Instated – Date Re-ins.
Material Issuance – Date release to site for installation
LAID-UP – Date Laid-up
Author by : Nicola Negri
This is the Main Screen
HEADER’S DESCRIPTION
1. TEST PACKAGE NO
2. P.I.D NO
3. LINE NUMBER
4. SPOOL NO
5. LINE Dia. (Average Diameter of the Spool)
6. PIPING CLASS (Base Material of the Spool)
7. Fab PK Plan (Dia-inch Plan as per Welding Map –Shop Welding)
8. Fab PK Done (Fabrication status if shop weld is done)
9. Fab QC Date Release
10. FBE Ref No (Document Reference for Internal FBE Coating)
11. FBE Date Send (Date of the Spool send fro FBE Coating)
12. FBE Date Received (Date of the Spool received from FBE Coating)
13. QC Paint Rel. Date (Date of the Spool Released from Painting Department)
14. LAYDOWN/ISS DATE (Date Issued/Received to WORKSITE)
15. SITE PF PLAN (Plan Field Welding as per Welding Map)
16. SITE PF DONE (Actual Field Welded Done as per PTS – Pipe Trucking System)
17. PTS Progress (Status of Weld done)
18. FAB SOP (Fabrication SCOPE OF WORK – if/or send to SUBCON)
FILTER DATA BY TEST PACKAGE DATAS:
ALL OF THE LINE NUMBER/SPOOL NO UNDER TESTPACK NO 0123 WILL BE
FILTERED AND SHOWN ON SCREEN.
FROM THIS POINT OF VIEW YOU CAN SEE/ANALYSE THE STATUS OF YOUR
TESTPACK NO 0123 PER LINE NUMBER BY SPOOL NO.
PRINTING SUMMARY REPORT BY TESTPACK
SUMMARY REPORT OF TESTPACK (TESTED, LAID-UP, RE-INSTATED)
ON SCREEN WILL APPEAR
THE SUMMARY REPORT
LAID-UP DATE
RE-INSTATED DATE
And some Info’s
TESTED DATE
SAMPLE ON SCREEN AND PRINT-OUT OF THE
SUMMARY REPORT BY TESTPACK
FILTER DATA BY LINE NUMBER
ALL OF THE INFORMATION REGUARDING LINE
NUMBER B32-SR-0378 WILL BE
DISPLAY ON SCREEN.
TAKE NOTE OF THE TESTPACK NUMBER- IN
ONE LINE NUMBER THERE MAYBE 2 OR 3
TESTPACK NO.
SAMPLE ON SCREEN AND PRINT-OUT OF THE
SUMMARY REPORT BY LINE NUMBER
SAMPLE ON SCREEN AND PRINT-OUT OF THE
SUMMARY REPORT BY LINE NUMBER

More Related Content

What's hot

Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
NISHANT SAXENA QUALITY ENGINEER RESUME
NISHANT SAXENA QUALITY ENGINEER  RESUMENISHANT SAXENA QUALITY ENGINEER  RESUME
NISHANT SAXENA QUALITY ENGINEER RESUMENISHANT SAXENA
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Pratap Biswas
 
Top 8 mep manager resume samples
Top 8 mep manager resume samplesTop 8 mep manager resume samples
Top 8 mep manager resume samplesgracetempest71
 
Solution: Boiler Tube Weld Inspection
Solution: Boiler Tube Weld InspectionSolution: Boiler Tube Weld Inspection
Solution: Boiler Tube Weld InspectionZetec Inc.
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_VEERAKAMU C
 
Lessons Learnt - Linde Engg-Piping Final.ppt
Lessons Learnt  - Linde Engg-Piping Final.pptLessons Learnt  - Linde Engg-Piping Final.ppt
Lessons Learnt - Linde Engg-Piping Final.pptgautam883482
 
Resume of Civil Engineer - BoQ
Resume of Civil Engineer - BoQResume of Civil Engineer - BoQ
Resume of Civil Engineer - BoQRezanuzzamanRupam
 
2. pipeline materials overview
2. pipeline materials overview2. pipeline materials overview
2. pipeline materials overviewWillam Le
 
Technical manager performance appraisal
Technical manager performance appraisalTechnical manager performance appraisal
Technical manager performance appraisalmolliebell246
 
Difference between code, standard & Specification
Difference between code, standard & SpecificationDifference between code, standard & Specification
Difference between code, standard & SpecificationVarun Patel
 
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Vladimir Popovic
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC SupervisorPranesh Kumar
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineerKaran Vinayak
 

What's hot (20)

Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
Grp installation procedure
Grp installation procedureGrp installation procedure
Grp installation procedure
 
NISHANT SAXENA QUALITY ENGINEER RESUME
NISHANT SAXENA QUALITY ENGINEER  RESUMENISHANT SAXENA QUALITY ENGINEER  RESUME
NISHANT SAXENA QUALITY ENGINEER RESUME
 
Api 510 study plan
Api 510 study planApi 510 study plan
Api 510 study plan
 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
Top 8 mep manager resume samples
Top 8 mep manager resume samplesTop 8 mep manager resume samples
Top 8 mep manager resume samples
 
Solution: Boiler Tube Weld Inspection
Solution: Boiler Tube Weld InspectionSolution: Boiler Tube Weld Inspection
Solution: Boiler Tube Weld Inspection
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Lessons Learnt - Linde Engg-Piping Final.ppt
Lessons Learnt  - Linde Engg-Piping Final.pptLessons Learnt  - Linde Engg-Piping Final.ppt
Lessons Learnt - Linde Engg-Piping Final.ppt
 
Resume of Civil Engineer - BoQ
Resume of Civil Engineer - BoQResume of Civil Engineer - BoQ
Resume of Civil Engineer - BoQ
 
2. pipeline materials overview
2. pipeline materials overview2. pipeline materials overview
2. pipeline materials overview
 
Technical manager performance appraisal
Technical manager performance appraisalTechnical manager performance appraisal
Technical manager performance appraisal
 
Difference between code, standard & Specification
Difference between code, standard & SpecificationDifference between code, standard & Specification
Difference between code, standard & Specification
 
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
API 653 - Material preparado.ppt
API 653 - Material preparado.pptAPI 653 - Material preparado.ppt
API 653 - Material preparado.ppt
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 

Viewers also liked

I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelCCT International
 
Lintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheetLintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheetElectromate
 
Spool barcode identify
Spool barcode identifySpool barcode identify
Spool barcode identifyAbby Phungyen
 
Piping construction-std
Piping construction-stdPiping construction-std
Piping construction-stdthanhuce
 
Welspun Presentation
Welspun PresentationWelspun Presentation
Welspun PresentationJoel Johnson
 
Pipe Spool fabrication Division Presentation for MHI 25-07-13
Pipe Spool fabrication Division Presentation for MHI 25-07-13Pipe Spool fabrication Division Presentation for MHI 25-07-13
Pipe Spool fabrication Division Presentation for MHI 25-07-13Ricardo Wagemaker
 
Welding of Similar & dissimilar - Metal filler chart
Welding of Similar & dissimilar - Metal filler chartWelding of Similar & dissimilar - Metal filler chart
Welding of Similar & dissimilar - Metal filler chartVidhi Sukhadiya
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c newJithu John
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanDavid H Moloney
 
Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturingphysics101
 
Guide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsGuide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsTonni Bruce
 
WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)Abrianto Akuan
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guideram111eg
 

Viewers also liked (19)

I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
 
AUTOSPOOL - PIPING SPOOLING SOFTWARE
AUTOSPOOL - PIPING SPOOLING SOFTWAREAUTOSPOOL - PIPING SPOOLING SOFTWARE
AUTOSPOOL - PIPING SPOOLING SOFTWARE
 
Lintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheetLintech ball screw_gs075series_specsheet
Lintech ball screw_gs075series_specsheet
 
Spool barcode identify
Spool barcode identifySpool barcode identify
Spool barcode identify
 
AGUA POTABLE
AGUA POTABLEAGUA POTABLE
AGUA POTABLE
 
Piping construction-std
Piping construction-stdPiping construction-std
Piping construction-std
 
Welspun Presentation
Welspun PresentationWelspun Presentation
Welspun Presentation
 
Pipe Spool fabrication Division Presentation for MHI 25-07-13
Pipe Spool fabrication Division Presentation for MHI 25-07-13Pipe Spool fabrication Division Presentation for MHI 25-07-13
Pipe Spool fabrication Division Presentation for MHI 25-07-13
 
Contractors: Get BIM Ready!
Contractors: Get BIM Ready!Contractors: Get BIM Ready!
Contractors: Get BIM Ready!
 
Electrode selection
Electrode selection  Electrode selection
Electrode selection
 
Welding of Similar & dissimilar - Metal filler chart
Welding of Similar & dissimilar - Metal filler chartWelding of Similar & dissimilar - Metal filler chart
Welding of Similar & dissimilar - Metal filler chart
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c new
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 
Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturing
 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
 
Guide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsGuide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wps
 
WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)WPS-PQR (welding-pengelasan)
WPS-PQR (welding-pengelasan)
 
Pressure vessels
Pressure vesselsPressure vessels
Pressure vessels
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
 

Similar to SPOOL TRACKING SYSTEM

Fsfbglexibility Improvement 06.01,24.pdf
Fsfbglexibility Improvement 06.01,24.pdfFsfbglexibility Improvement 06.01,24.pdf
Fsfbglexibility Improvement 06.01,24.pdfzzsse
 
Functional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerFunctional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerLokesh Modem
 
Import of Lead Scrap/Used Lead Acid Batteries - Requirements and Standard...
Import of Lead Scrap/Used Lead Acid Batteries  -   Requirements and Standard...Import of Lead Scrap/Used Lead Acid Batteries  -   Requirements and Standard...
Import of Lead Scrap/Used Lead Acid Batteries - Requirements and Standard...Ranveer Singh Mahwar
 
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfPROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfhasan752746
 
Balloon Project Summary
Balloon Project SummaryBalloon Project Summary
Balloon Project Summaryrhlee46
 
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfPage 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfvishveswar9
 
1.0 SPCPLUS_training_English_Verson_15032011.pdf
1.0 SPCPLUS_training_English_Verson_15032011.pdf1.0 SPCPLUS_training_English_Verson_15032011.pdf
1.0 SPCPLUS_training_English_Verson_15032011.pdfTheHoang19
 
Lincolnton Kaizen Event Final Pitch - Infographics
Lincolnton Kaizen Event Final Pitch - InfographicsLincolnton Kaizen Event Final Pitch - Infographics
Lincolnton Kaizen Event Final Pitch - InfographicsDerek Baker
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONElliott Molnar
 
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...Kalaivanan Murthy
 
Production Recapitulation Template
Production Recapitulation TemplateProduction Recapitulation Template
Production Recapitulation TemplateAndi Anriansyah
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande
 

Similar to SPOOL TRACKING SYSTEM (20)

Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
Raju Thamke_CV
Raju Thamke_CVRaju Thamke_CV
Raju Thamke_CV
 
Fsfbglexibility Improvement 06.01,24.pdf
Fsfbglexibility Improvement 06.01,24.pdfFsfbglexibility Improvement 06.01,24.pdf
Fsfbglexibility Improvement 06.01,24.pdf
 
Functional specification doc Gst purcahse register
Functional specification doc Gst purcahse registerFunctional specification doc Gst purcahse register
Functional specification doc Gst purcahse register
 
Import of Lead Scrap/Used Lead Acid Batteries - Requirements and Standard...
Import of Lead Scrap/Used Lead Acid Batteries  -   Requirements and Standard...Import of Lead Scrap/Used Lead Acid Batteries  -   Requirements and Standard...
Import of Lead Scrap/Used Lead Acid Batteries - Requirements and Standard...
 
RFP-Test-Design_Psychometrics-2011
RFP-Test-Design_Psychometrics-2011RFP-Test-Design_Psychometrics-2011
RFP-Test-Design_Psychometrics-2011
 
CV Piping Designer & Supervisor
CV Piping Designer & SupervisorCV Piping Designer & Supervisor
CV Piping Designer & Supervisor
 
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdfPROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
PROJECT DESIGN DELIVERABLES SEQUENCE (PDD).pdf
 
AGP-13-R
AGP-13-RAGP-13-R
AGP-13-R
 
Balloon Project Summary
Balloon Project SummaryBalloon Project Summary
Balloon Project Summary
 
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdfPage 1 from ANOH-KOM-4-7 JULY-19.pdf
Page 1 from ANOH-KOM-4-7 JULY-19.pdf
 
8D Catalog.pdf
8D Catalog.pdf8D Catalog.pdf
8D Catalog.pdf
 
1.0 SPCPLUS_training_English_Verson_15032011.pdf
1.0 SPCPLUS_training_English_Verson_15032011.pdf1.0 SPCPLUS_training_English_Verson_15032011.pdf
1.0 SPCPLUS_training_English_Verson_15032011.pdf
 
Lincolnton Kaizen Event Final Pitch - Infographics
Lincolnton Kaizen Event Final Pitch - InfographicsLincolnton Kaizen Event Final Pitch - Infographics
Lincolnton Kaizen Event Final Pitch - Infographics
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
 
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
Near-field Gaussian Dispersion Analysis in AERMOD: A demonstration project (I...
 
Production Recapitulation Template
Production Recapitulation TemplateProduction Recapitulation Template
Production Recapitulation Template
 
Engineering Division
Engineering DivisionEngineering Division
Engineering Division
 
LAMINE Anouar en
LAMINE Anouar enLAMINE Anouar en
LAMINE Anouar en
 
Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)Anil Lande_Piping Material Engineer(12+yrs exp)
Anil Lande_Piping Material Engineer(12+yrs exp)
 

SPOOL TRACKING SYSTEM

  • 2. Programmed by : Renee Gatdula Spool Tracking System“Special Kind of Tool” Gathered Data’s from: SPOOLGEN – Master Listing of Plan Spools PTS – Master File of Plan/Done, PK/PF (Shop/Field Weld) in Dia-inch. GEMAPI – Master file of Issued Material TEDFLOW – Master file of Hydrotest Status (Testpack/Laid-up/Re-ins.) Gives Information and Data’s of: QC Fabrication – Date Released from the Fabrication. Material Controller – Date’s/Ref. of Spools for FBE(Liquid Coating),NDT QC/Painting Department – Date Released from Painting Department Testpack – Status of testpack per Line Number on Weld done/ Test Date Re-Instated – Date Re-ins. Material Issuance – Date release to site for installation LAID-UP – Date Laid-up Author by : Nicola Negri
  • 3. This is the Main Screen HEADER’S DESCRIPTION 1. TEST PACKAGE NO 2. P.I.D NO 3. LINE NUMBER 4. SPOOL NO 5. LINE Dia. (Average Diameter of the Spool) 6. PIPING CLASS (Base Material of the Spool) 7. Fab PK Plan (Dia-inch Plan as per Welding Map –Shop Welding) 8. Fab PK Done (Fabrication status if shop weld is done) 9. Fab QC Date Release 10. FBE Ref No (Document Reference for Internal FBE Coating) 11. FBE Date Send (Date of the Spool send fro FBE Coating) 12. FBE Date Received (Date of the Spool received from FBE Coating) 13. QC Paint Rel. Date (Date of the Spool Released from Painting Department) 14. LAYDOWN/ISS DATE (Date Issued/Received to WORKSITE) 15. SITE PF PLAN (Plan Field Welding as per Welding Map) 16. SITE PF DONE (Actual Field Welded Done as per PTS – Pipe Trucking System) 17. PTS Progress (Status of Weld done) 18. FAB SOP (Fabrication SCOPE OF WORK – if/or send to SUBCON)
  • 4. FILTER DATA BY TEST PACKAGE DATAS: ALL OF THE LINE NUMBER/SPOOL NO UNDER TESTPACK NO 0123 WILL BE FILTERED AND SHOWN ON SCREEN. FROM THIS POINT OF VIEW YOU CAN SEE/ANALYSE THE STATUS OF YOUR TESTPACK NO 0123 PER LINE NUMBER BY SPOOL NO.
  • 6. SUMMARY REPORT OF TESTPACK (TESTED, LAID-UP, RE-INSTATED) ON SCREEN WILL APPEAR THE SUMMARY REPORT LAID-UP DATE RE-INSTATED DATE And some Info’s TESTED DATE
  • 7. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY TESTPACK
  • 8. FILTER DATA BY LINE NUMBER ALL OF THE INFORMATION REGUARDING LINE NUMBER B32-SR-0378 WILL BE DISPLAY ON SCREEN. TAKE NOTE OF THE TESTPACK NUMBER- IN ONE LINE NUMBER THERE MAYBE 2 OR 3 TESTPACK NO.
  • 9. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY LINE NUMBER
  • 10. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY LINE NUMBER