2250 Lane 2250 Lane
4500 Roadway2500 Road Reserve
150
1200 Footpath
125 Conc. Slab
Typical Road Section - Type 3
500
2500 Road Reserve
Dish Drain
1000
2.5 %
Kerb K1
PlotBoundary
PlotBoundary
100mm Crusher run
98% PROCTOR
well compacted Subgrade to be
compacted to 90% PROCTOR
50 mm Asphalt
175mm Crusher run to be compacted to
98% PROCTOR maximum dry density
300mm Hardcore filling to be compacted to
95% PROCTOR maximum dry density
Subgrade to be compacted to 90% PROCTOR
maximum dry density (unsuitable material to be removed
& replaced with imported fill) (assumed min. CBR 10%)
450
3000 Planting Servitude3000 Planting Servitude
3000 Lane 3000 Lane
6000 Roadway
2.5 %
2500 Road Reserve
150
1200 Footpath
125 Conc. Slab
Kerb K1
50 mm Asphalt
175mm Crusher run to be compacted to
98% PROCTOR maximum dry density
300mm Hardcore filling to be compacted to
95% PROCTOR maximum dry density
Subgrade to be compacted to 90% PROCTOR
maximum dry density (unsuitable material to be removed
& replaced with imported fill) (assumed min. CBR 10%)
Typical Road Section - Type 1
100mm Crusher run
98% PROCTOR
well compacted Subgrade to be
compacted to 90% PROCTOR
PlotBoundary
500
2500 Road Reserve
PlotBoundary
Dish Drain
1000
Typical Road Section - (Type 2)
Stormwater Manhole
3000 Lane 3000 Lane
6000 Roadway
2.5 %
2500 Road Reserve
150
1200 Footpath
125 Conc. Slab
PlotBoundary
2500 Road Reserve
PlotBoundary
1000
450
1156
900
500
Potable Water
Trench Telecom
Trench
300 444
450
3000 Planting Servitude
3000 Planting Servitude
3000 Planting Servitude
3000 Planting Servitude
9500 Road 5
10000 Road 6
850
Telecom
Trench
300 700
Telecom
Trench
300
900
500
Potable Water
Trench
600
500
Potable Water
Trench
11000
11000
Kerb K1
Chamfer 25x25
Chamfer 25x25
Chamfer 25x25
50 mm Asphalt
175mm Crusher run to be compacted to
98% PROCTOR maximum dry density
300mm Hardcore filling to be compacted to
95% PROCTOR maximum dry density
Subgrade to be compacted to 90% PROCTOR
maximum dry density (unsuitable material to be removed
& replaced with imported fill) (assumed min. CBR 10%)
MV / LV CABLE
TRENCH SECTION
LV Cables for Street
22kV Cable
LV Cables for Street
LV CABLE
TRENCH SECTION
850700
LV Cables for Street
LV CABLE
TRENCH SECTION
1200 Footpath (Detail 1)
1200 Footpath (Detail 1)
1200 Footpath (Detail 1)
120
30
100100
230100
150180
Precast Concrete
Kerb K1
Hardcore
Layer Min.250
Beyond Kerb
Detail 1 - Kerb K1
1501200 Footpath
100mm Crusher run
98% PROCTOR
Subgrade to be compacted
to 90% PROCTOR
125mm Conc. Slab
Mesh A98
Polyethylene
sheeting Kerb K1
TYPICAL FOOTPATH DETAIL
100mm Compacted Crusher Run
50mm Stabilised material
(Coral Sand 0 / 3 mm +
20% Rock Sand +
Kerb K1
DETAIL 1
1200
Kerb K1
Job No
Drawing Status
Discipline
Scale at A1
Drawing No Rev
Drawing Title
Job Title
Client
Date By Chkd Appd
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Rev
CR-201 P12878
1:25
FOR APPROVAL
Civil
TYPICAL ROAD SECTION
/ /C1 03 12 12 Reza B. P.G P.G
ISSUED FOR CONSTRUCTION
/ /C2 10 04 13 Reza B. P.G P.G
FOOTPATH DETAIL ADDED
/ /P1 08 05 13 Reza B. P.G P.G
FOR APPROVAL

More Related Content

What's hot

Road types and Road networks
Road types and Road networksRoad types and Road networks
Road types and Road networksSwapnil Joshi
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-IKishor Ade
 
Kanpur cantonment - Defence Town - Settlement Pattern
Kanpur cantonment - Defence Town - Settlement Pattern Kanpur cantonment - Defence Town - Settlement Pattern
Kanpur cantonment - Defence Town - Settlement Pattern YuktaYogeesh1
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)Nikunj Rathod
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Gargee Ghosh
 
architectural design
architectural design architectural design
architectural design ganesh keskar
 
Bhopal city planning
Bhopal city planningBhopal city planning
Bhopal city planningsonika patel
 
Classification of Roads and Road patterns
Classification of Roads and Road patternsClassification of Roads and Road patterns
Classification of Roads and Road patternsRAMPRASAD KUMAWAT
 
Development Plan of Mehsana, Gujarat
Development Plan of Mehsana, GujaratDevelopment Plan of Mehsana, Gujarat
Development Plan of Mehsana, GujaratPratham Pincha
 
Assessment of participatory approach for planning of hawkers space; case area...
Assessment of participatory approach for planning of hawkers space; case area...Assessment of participatory approach for planning of hawkers space; case area...
Assessment of participatory approach for planning of hawkers space; case area...archpras
 
Building Bye Laws: Importace
Building Bye Laws: ImportaceBuilding Bye Laws: Importace
Building Bye Laws: ImportaceAbdul Rehman
 
What are Development controls
What are Development controlsWhat are Development controls
What are Development controlsJIT KUMAR GUPTA
 
IMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONIMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONSagar Kaptan
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparationNoshad Ahmed Wahocho
 

What's hot (20)

Metro presentation
Metro presentationMetro presentation
Metro presentation
 
Road types and Road networks
Road types and Road networksRoad types and Road networks
Road types and Road networks
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Kanpur cantonment - Defence Town - Settlement Pattern
Kanpur cantonment - Defence Town - Settlement Pattern Kanpur cantonment - Defence Town - Settlement Pattern
Kanpur cantonment - Defence Town - Settlement Pattern
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
 
Tendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamiaTendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamia
 
architectural design
architectural design architectural design
architectural design
 
Bhopal city planning
Bhopal city planningBhopal city planning
Bhopal city planning
 
Classification of Roads and Road patterns
Classification of Roads and Road patternsClassification of Roads and Road patterns
Classification of Roads and Road patterns
 
2.2 zoning
2.2 zoning2.2 zoning
2.2 zoning
 
Development Plan of Mehsana, Gujarat
Development Plan of Mehsana, GujaratDevelopment Plan of Mehsana, Gujarat
Development Plan of Mehsana, Gujarat
 
Assessment of participatory approach for planning of hawkers space; case area...
Assessment of participatory approach for planning of hawkers space; case area...Assessment of participatory approach for planning of hawkers space; case area...
Assessment of participatory approach for planning of hawkers space; case area...
 
Road
RoadRoad
Road
 
Building Bye Laws: Importace
Building Bye Laws: ImportaceBuilding Bye Laws: Importace
Building Bye Laws: Importace
 
What are Development controls
What are Development controlsWhat are Development controls
What are Development controls
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
IMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONIMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATION
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
 

Viewers also liked

STANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USASTANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USAYegor Shulyk
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILSReza Bassawon
 
Roads & Pavements
Roads & PavementsRoads & Pavements
Roads & PavementsAaqib Iqbal
 
HIGHWAY ENGINEERING
HIGHWAY ENGINEERINGHIGHWAY ENGINEERING
HIGHWAY ENGINEERINGAzan Shukor
 
Gkipl 5thnov2008
Gkipl 5thnov2008Gkipl 5thnov2008
Gkipl 5thnov2008Jemie73
 
2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUTReza Bassawon
 
Презентація "Методика складання та змісту плану зонування м.Києва"
Презентація "Методика складання та змісту плану зонування м.Києва"Презентація "Методика складання та змісту плану зонування м.Києва"
Презентація "Методика складання та змісту плану зонування м.Києва"Yegor Shulyk
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architectureAyman Mohamed
 
Interceptors and manholes
Interceptors and manholesInterceptors and manholes
Interceptors and manholesJem Ganacia
 
Cross section of road and sight distance
Cross section of road and sight distanceCross section of road and sight distance
Cross section of road and sight distanceSarvagya Tripathi
 
PPT on India's Drainage System (River System)
PPT on India's Drainage System (River System) PPT on India's Drainage System (River System)
PPT on India's Drainage System (River System) Rohan Karmakar
 
Road Safety Audit Malaysian
Road Safety Audit Malaysian Road Safety Audit Malaysian
Road Safety Audit Malaysian uitm pulau pinang
 
Drainage System For a Building
Drainage System For a BuildingDrainage System For a Building
Drainage System For a BuildingAroh Thombre
 
Flat slab design
Flat slab designFlat slab design
Flat slab designMoussa Rili
 

Viewers also liked (20)

STANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USASTANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USA
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS
 
Roads & Pavements
Roads & PavementsRoads & Pavements
Roads & Pavements
 
Types of roads
Types of roadsTypes of roads
Types of roads
 
HIGHWAY ENGINEERING
HIGHWAY ENGINEERINGHIGHWAY ENGINEERING
HIGHWAY ENGINEERING
 
Gkipl 5thnov2008
Gkipl 5thnov2008Gkipl 5thnov2008
Gkipl 5thnov2008
 
2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT
 
Презентація "Методика складання та змісту плану зонування м.Києва"
Презентація "Методика складання та змісту плану зонування м.Києва"Презентація "Методика складання та змісту плану зонування м.Києва"
Презентація "Методика складання та змісту плану зонування м.Києва"
 
Eazyreach swivel lighting pole
Eazyreach swivel lighting poleEazyreach swivel lighting pole
Eazyreach swivel lighting pole
 
Plumbing
PlumbingPlumbing
Plumbing
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 
transportation
transportationtransportation
transportation
 
Interceptors and manholes
Interceptors and manholesInterceptors and manholes
Interceptors and manholes
 
Cross section of road and sight distance
Cross section of road and sight distanceCross section of road and sight distance
Cross section of road and sight distance
 
PPT on India's Drainage System (River System)
PPT on India's Drainage System (River System) PPT on India's Drainage System (River System)
PPT on India's Drainage System (River System)
 
Road Safety Audit Malaysian
Road Safety Audit Malaysian Road Safety Audit Malaysian
Road Safety Audit Malaysian
 
Drainage System For a Building
Drainage System For a BuildingDrainage System For a Building
Drainage System For a Building
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
 
House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
Highway presentation
Highway presentationHighway presentation
Highway presentation
 

Similar to 2878-CR-201 TYPICAL ROAD SECTION

Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanDavid H Moloney
 
Ceramic Epoxy Presentation -- Induron Protective Coatings
Ceramic Epoxy Presentation -- Induron Protective CoatingsCeramic Epoxy Presentation -- Induron Protective Coatings
Ceramic Epoxy Presentation -- Induron Protective CoatingsIntermark Group
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019David H Moloney
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptbala506586
 
Jointing Tech - Duct Sealing Brochure
Jointing Tech - Duct Sealing BrochureJointing Tech - Duct Sealing Brochure
Jointing Tech - Duct Sealing BrochureCable Glands UK Ltd
 
Silica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingSilica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingLiGary3
 
Kwena Camping Proposal
Kwena Camping ProposalKwena Camping Proposal
Kwena Camping ProposalGrant Hepburn
 
RoadstaB - Road Stabilization
RoadstaB - Road StabilizationRoadstaB - Road Stabilization
RoadstaB - Road StabilizationNikhil Sharma
 
9. Digital Parking Vitrified Tiles (300 x 300 mm)
9. Digital Parking Vitrified Tiles (300 x 300 mm)9. Digital Parking Vitrified Tiles (300 x 300 mm)
9. Digital Parking Vitrified Tiles (300 x 300 mm)Divya Zala
 
458531017-Slipform-technology-ppt.ppt
458531017-Slipform-technology-ppt.ppt458531017-Slipform-technology-ppt.ppt
458531017-Slipform-technology-ppt.pptJerryMah1
 

Similar to 2878-CR-201 TYPICAL ROAD SECTION (20)

Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
Long Life Asphalt Pavements in California
Long Life Asphalt Pavements in CaliforniaLong Life Asphalt Pavements in California
Long Life Asphalt Pavements in California
 
Ktrimbee A-4
Ktrimbee A-4Ktrimbee A-4
Ktrimbee A-4
 
Ktrimbee A-4
Ktrimbee A-4Ktrimbee A-4
Ktrimbee A-4
 
dan palmer
dan palmerdan palmer
dan palmer
 
Ceramic Epoxy Presentation -- Induron Protective Coatings
Ceramic Epoxy Presentation -- Induron Protective CoatingsCeramic Epoxy Presentation -- Induron Protective Coatings
Ceramic Epoxy Presentation -- Induron Protective Coatings
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Jointing Tech - Duct Sealing Brochure
Jointing Tech - Duct Sealing BrochureJointing Tech - Duct Sealing Brochure
Jointing Tech - Duct Sealing Brochure
 
MEKA WET PROCESSING EQUIPMENT FLYER
MEKA WET PROCESSING EQUIPMENT FLYERMEKA WET PROCESSING EQUIPMENT FLYER
MEKA WET PROCESSING EQUIPMENT FLYER
 
Silica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extractingSilica Processing Plant and Pure silica extracting
Silica Processing Plant and Pure silica extracting
 
Kwena Camping Proposal
Kwena Camping ProposalKwena Camping Proposal
Kwena Camping Proposal
 
RoadstaB - Road Stabilization
RoadstaB - Road StabilizationRoadstaB - Road Stabilization
RoadstaB - Road Stabilization
 
Substation Line End Clamps - CE16-5.5-ESI-L5
Substation Line End Clamps - CE16-5.5-ESI-L5 Substation Line End Clamps - CE16-5.5-ESI-L5
Substation Line End Clamps - CE16-5.5-ESI-L5
 
Substation Line End Clamps - CE50
Substation Line End Clamps - CE50Substation Line End Clamps - CE50
Substation Line End Clamps - CE50
 
Substation Line End Clamps - CE51
Substation Line End Clamps - CE51Substation Line End Clamps - CE51
Substation Line End Clamps - CE51
 
Substation Line End Clamps - CE25
Substation Line End Clamps - CE25Substation Line End Clamps - CE25
Substation Line End Clamps - CE25
 
9. Digital Parking Vitrified Tiles (300 x 300 mm)
9. Digital Parking Vitrified Tiles (300 x 300 mm)9. Digital Parking Vitrified Tiles (300 x 300 mm)
9. Digital Parking Vitrified Tiles (300 x 300 mm)
 
458531017-Slipform-technology-ppt.ppt
458531017-Slipform-technology-ppt.ppt458531017-Slipform-technology-ppt.ppt
458531017-Slipform-technology-ppt.ppt
 
Tcs aurangabad 3
Tcs aurangabad 3Tcs aurangabad 3
Tcs aurangabad 3
 

More from Reza Bassawon

2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKINGReza Bassawon
 
2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORKReza Bassawon
 
2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELSReza Bassawon
 
2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTIONReza Bassawon
 
2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROADReza Bassawon
 
2878-CC-002 COORDINATED SERVICES LAYOUT
2878-CC-002 COORDINATED SERVICES LAYOUT2878-CC-002 COORDINATED SERVICES LAYOUT
2878-CC-002 COORDINATED SERVICES LAYOUTReza Bassawon
 
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELSReza Bassawon
 
2759-SW-101 LS Along Sewer Line
2759-SW-101 LS Along Sewer Line2759-SW-101 LS Along Sewer Line
2759-SW-101 LS Along Sewer LineReza Bassawon
 

More from Reza Bassawon (10)

Bagatelle Earthwork
Bagatelle EarthworkBagatelle Earthwork
Bagatelle Earthwork
 
Choisy Platform
Choisy PlatformChoisy Platform
Choisy Platform
 
2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING
 
2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK
 
2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS
 
2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION
 
2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD
 
2878-CC-002 COORDINATED SERVICES LAYOUT
2878-CC-002 COORDINATED SERVICES LAYOUT2878-CC-002 COORDINATED SERVICES LAYOUT
2878-CC-002 COORDINATED SERVICES LAYOUT
 
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
 
2759-SW-101 LS Along Sewer Line
2759-SW-101 LS Along Sewer Line2759-SW-101 LS Along Sewer Line
2759-SW-101 LS Along Sewer Line
 

2878-CR-201 TYPICAL ROAD SECTION

  • 1. 2250 Lane 2250 Lane 4500 Roadway2500 Road Reserve 150 1200 Footpath 125 Conc. Slab Typical Road Section - Type 3 500 2500 Road Reserve Dish Drain 1000 2.5 % Kerb K1 PlotBoundary PlotBoundary 100mm Crusher run 98% PROCTOR well compacted Subgrade to be compacted to 90% PROCTOR 50 mm Asphalt 175mm Crusher run to be compacted to 98% PROCTOR maximum dry density 300mm Hardcore filling to be compacted to 95% PROCTOR maximum dry density Subgrade to be compacted to 90% PROCTOR maximum dry density (unsuitable material to be removed & replaced with imported fill) (assumed min. CBR 10%) 450 3000 Planting Servitude3000 Planting Servitude 3000 Lane 3000 Lane 6000 Roadway 2.5 % 2500 Road Reserve 150 1200 Footpath 125 Conc. Slab Kerb K1 50 mm Asphalt 175mm Crusher run to be compacted to 98% PROCTOR maximum dry density 300mm Hardcore filling to be compacted to 95% PROCTOR maximum dry density Subgrade to be compacted to 90% PROCTOR maximum dry density (unsuitable material to be removed & replaced with imported fill) (assumed min. CBR 10%) Typical Road Section - Type 1 100mm Crusher run 98% PROCTOR well compacted Subgrade to be compacted to 90% PROCTOR PlotBoundary 500 2500 Road Reserve PlotBoundary Dish Drain 1000 Typical Road Section - (Type 2) Stormwater Manhole 3000 Lane 3000 Lane 6000 Roadway 2.5 % 2500 Road Reserve 150 1200 Footpath 125 Conc. Slab PlotBoundary 2500 Road Reserve PlotBoundary 1000 450 1156 900 500 Potable Water Trench Telecom Trench 300 444 450 3000 Planting Servitude 3000 Planting Servitude 3000 Planting Servitude 3000 Planting Servitude 9500 Road 5 10000 Road 6 850 Telecom Trench 300 700 Telecom Trench 300 900 500 Potable Water Trench 600 500 Potable Water Trench 11000 11000 Kerb K1 Chamfer 25x25 Chamfer 25x25 Chamfer 25x25 50 mm Asphalt 175mm Crusher run to be compacted to 98% PROCTOR maximum dry density 300mm Hardcore filling to be compacted to 95% PROCTOR maximum dry density Subgrade to be compacted to 90% PROCTOR maximum dry density (unsuitable material to be removed & replaced with imported fill) (assumed min. CBR 10%) MV / LV CABLE TRENCH SECTION LV Cables for Street 22kV Cable LV Cables for Street LV CABLE TRENCH SECTION 850700 LV Cables for Street LV CABLE TRENCH SECTION 1200 Footpath (Detail 1) 1200 Footpath (Detail 1) 1200 Footpath (Detail 1) 120 30 100100 230100 150180 Precast Concrete Kerb K1 Hardcore Layer Min.250 Beyond Kerb Detail 1 - Kerb K1 1501200 Footpath 100mm Crusher run 98% PROCTOR Subgrade to be compacted to 90% PROCTOR 125mm Conc. Slab Mesh A98 Polyethylene sheeting Kerb K1 TYPICAL FOOTPATH DETAIL 100mm Compacted Crusher Run 50mm Stabilised material (Coral Sand 0 / 3 mm + 20% Rock Sand + Kerb K1 DETAIL 1 1200 Kerb K1 Job No Drawing Status Discipline Scale at A1 Drawing No Rev Drawing Title Job Title Client Date By Chkd Appd A1 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H I J K L M N Do not scale Rev CR-201 P12878 1:25 FOR APPROVAL Civil TYPICAL ROAD SECTION / /C1 03 12 12 Reza B. P.G P.G ISSUED FOR CONSTRUCTION / /C2 10 04 13 Reza B. P.G P.G FOOTPATH DETAIL ADDED / /P1 08 05 13 Reza B. P.G P.G FOR APPROVAL