Scripting the Critical Moves
One of the key principles in Chip and Dan
Heath's book "Switch" is that if you want people
to change then you should shape their path.
We're more likely to see change if we have
specific behaviors to practice.
This was the same finding in the "Toyota Kata"
research, and is the thinking behind the
structured practice routines of the Improvement
Kata and Coaching Kata.
This SlideShare is about key pencil & paper tools
that are used when you go through the
Improvement Kata & Coaching Kata patterns.

CONFIDENTIAL © B/E Aerospace

2
Hello!
I worked for Toyota Motor Manufacturing UK for 18 years, at a
management level, and then moved into the Aerospace industry.
At my company we've embraced the Improvement Kata / Coaching
Kata approach and have experienced rapid deployment.
With this SlideShare I'd like to share some key points with regard to
the forms and the routines they mirror, which are used to support
development of Kata practitioners. It's about how to maintain strong
guidance and standards moving forward. I'm a systems-oriented
person; probably through working at Toyota for so long!
Specifically, I created how-to annotation for documents used with the
Improvement Kata and Coaching Kata on the Learner's Storyboard. I
find that clear how-to instructions support a deployment greatly, and
even allow self-help in the absence of immediate coaching support.
I love the Toyota Kata approach and hope the annotated forms in this
SlideShare help you a bit in achieving successful deployment of the
Improvement Kata and Coaching Kata.
Richard Green
CONFIDENTIAL © B/E Aerospace

3
The Pattern of the Improvement Kata
The Improvement Kata models a scientific way of thinking and
acting so that, with practice, anyone can learn it and use it

From the Improvement Kata Handbook
CONFIDENTIAL © B/E Aerospace

4
The Learner's Storyboard
The layout and information on the storyboard follow
the steps of the Improvement Kata and flow naturally
with the sequence of the Five Coaching Kata Questions

Illustration from the Improvement Kata Handbook
CONFIDENTIAL © B/E Aerospace

5
Where the Forms Go on the Storyboard
The forms/routines are also effective within an A3

CONFIDENTIAL © B/E Aerospace

6
Let's look at
how to use each form...

CONFIDENTIAL © B/E Aerospace

7
CONFIDENTIAL © B/E Aerospace

8
Something you
measure every cycle

Something you measure
periodically (eg units/day)

A description / statement of a desired state people can rally around,
not just a number. A good challenge focuses our attention and effort.
The rate of customer demand for the group or family of parts produced by one process. Takt time is
calculated by dividing the total working time by the quantity of parts required by the customer.
The desired production rate, usually faster than Takt time as it accommodates changeover time
and perhaps some planned downtime. Sometimes simply set at 15% below Takt.
The process being worked on.

Number of shifts currently worked, i.e. "1 shift" (Days) "2 shifts" (Days & Nights) etc.
• Here you're just trying to figure out the current work pattern and flow, not so much the physical layout.
• Get to know the process by sketching a block diagram, process map, etc. Detail to show current batch sizes,
operators, cycle times, etc., can be added successively.
• Remember this is a process-level diagram, not a value stream map!
What is the build batch size? Where does WIPaccumulate in the process?
Number of operators currently used to carry out the process.
Plus & minus variation % at end of line [( highest point -Pc/t) / Pc/t] & [(Lowest point -Pc/t) / Pc/t]
What else do you notice about the the pattern of how the process is operating? These are not issues or problems but simply
characteristics of how the process currently works. Note your observations about how it currently operates in bullet form.
Are there any machine constraints ? What are they (data)? What is the fastest Pc/t the automated equipment can
currently support? Do not include machines that operators run, like hand tools, hand welders, arbor presses.

Total operator time to process 1 piece, divided by the planned cycle time.
Maintain a run chart of output per shift.
Maintain a run chart of overtime per shift, or any other desired outcome metric

CONFIDENTIAL © B/E Aerospace

9
CONFIDENTIAL © B/E Aerospace

10
Visually describe the steps and sequence of how the work is done
At this stage all you're trying to do is figure out the current work pattern and
flow, not so much the physical layout. Observe the process' operation and
capture as much information as possible. This will allow you to become
acquainted with the process .
The block diagram sketch doesn't have to resemble the actual layout, it just
needs to show how the process flows. Draw each box the same size to simply
represent a work station, table, fixture or machine.

CONFIDENTIAL © B/E Aerospace

11
Exit-Cycle Observation Sheet
Process Name / No

Unit of Measure

Observed Times
Exit Cycle

Wait Time

Cycle

Notes

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
CONFIDENTIAL © B/E Aerospace

12
Exit-Cycle Observation Sheet
Process Name / No

BMFT Station 4

Write in details of
process observing
for traceability/ref

Unit of Measure

Observed Times
Exit Cycle

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

92
63
56
69
78
53
87
73
68
73

CONFIDENTIAL © B/E Aerospace

Wait Time

18

21
12

Notes

Cycle

92
45
56
69
78
53
87
52
56
73

Had to change empty applicator
Waiting on previous process
Cleaning applicator nozzle
Cleaning applicator nozzle

Seconds (60)
Unit of measure for
awareness of
current operational
time and guideline
for timing cycles.

Note: What you're measuring here is "Exit
Cycles." Pick a point in the operator's work
cycle and measure the total time from
when this point is reached until it is reached
again. This is done to capture variability in
the process, not to measure the operator.

Cleaning applicator nozzle

Almost every process has a work pattern
Waiting on previous process that you can measure this way. In some
processes it's difficult to see the pattern.
Waiting on previous process

Incorrect rivet fitted / mixed parts in box

Record times inclusive of any wait
time, document individually so you
can learn about actual process cycle
time for work. Saves having to retime
after analysis of all process timings to
understand reasons for or which
process was creating waiting.

Record observed details for
reasons of delay, to support
analysis of current condition.
Note if waiting for pre (starved)
or post (blocked) process.

13
How to Make a Run Chart (Step 1)

Run charts are an excellent way to gather and communicate
information about variation in any work process

v
u
Seconds

Draw simple X & Y
axes. Use the
same vertical
scale as your
unit of measure.

100
90

Transfer data points from the ExitCycle observation sheet to your
run chart, using the "Exit Cycle"
values. This gives you a picture of
the variation in the process at the
time you observed it.

w
x

80
70
60
50
40

Draw in the PC/T line (BLUE)
(e.g. 85% of Takt). This shows
the actual rate at which you
would like this process to
cycle.

Allow an additional run after
initial data so data can
continue to be monitored to
show trend during experiments

30
20
10

1

CONFIDENTIAL © B/E Aerospace

Draw in the Takt Time line
(RED)

2

3

4

5

6

7

8

9

10

14
How to Make a Run Chart (Step 2)
Summarize process variation with two vertical bars
100
90

v

v

80
70

Seconds

60
50

u

40

u

Find the "lowest repeatable time."
Simply move a ruler up the page
until you find 2 or more times
aligned with each other (or nearly)
and then draw the vertical bar to
represent this time (blue).

30

The lowest repeatable time is an
estimate of the actual cycle time it
takes to do this work IF EVERYTHING
GOES AS PLANNED. Note: If there is
waiting time in the lowest repeatable
times it should be subtracted.

20
10

1

CONFIDENTIAL © B/E Aerospace

2

3

4

5

Draw in a second vertical bar
inlaid into the initial bar to show
the highest time and the lowest
time (red), this gives you a visual
of the range of variation in the
process

6

7

8

9

10

15
How to Make a Run Chart (Step 3)
Add the + and – variation calculations
EXAMPLE: % Plus Variation = [Highest point (here 92) – Planned
Cycle Time (here 51)] / Planned Cycle Time (51) = 0.80 (+80%)

100
90
80
70

Seconds

60
50
40
30
20

EXAMPLE: % Minus Variation = [Lowest point (here 45)
– Planned cycle time (here 51)] / Planned cycle time
51 = -0.11 (-11%)

10

1

CONFIDENTIAL © B/E Aerospace

2

3

4

5

6

7

8

9

10

16
CONFIDENTIAL © B/E Aerospace

17
The process being focused on

(Same as on the the Current Condition form)

Describe how you want this process to be functioning on the achieve-by date
à Pretend you travel forward in time to visit the process. What do you see?
What is the sequence of steps required to complete one cycle through the entire process,
how long should each step take, and who is to perform that step?
New block diagram / Fluctuations / # of Operators / Quality / Safety / etc.
Try to avoid a lot of words. Figures are good and measurable. Be creative & stretch, but realistic.
What does it look like compared to your Current Condition observations? For instance...
• Number of operators
• Number of shifts
• Where 1 x 1 flow is planned
• Where buffers are to be held
• Lot sizes / EPEI / Change over times
• Heijunka / Leveling pattern
For checking the condition of the process in real-time increments while the process is running , to help guide
improvement efforts. Examples: Actual cycle time for each step/piece/standard quantity of pieces i.e. a box.
For checking the output of the process periodically. Number of pieces produced per time increment,
productivity, Quality indicators, Cost, fluctuation in output from shift to shift. etc. Graph it!

CONFIDENTIAL © B/E Aerospace

18
CONFIDENTIAL © B/E Aerospace

19
• Review what you believe may be potential obstacles that may prevent you from
reaching the Target Condition.
• This should ideally be derived from direct observations / experiences.
• Involve the operators in the process as they may have superior knowledge of
the process.
• The Learner maintains the Obstacle Parking Lot throughout the Improvement
Kata.
• The purpose of the Obstacle Parking Lot is to help the Learner see the limits of
prediction and prevent him/her from chasing several ideas at once. Only one idea
can be experimented on at any one time.
• This is not an action-item list! It's simply a place to note and hold perceived
obstacles that are discovered throughout the IK process
• If you try to focus on more than just one obstacle at a time how do you
understand which action has given you the positive or adverse result? Doing this
may result in you following the wrong path

CONFIDENTIAL © B/E Aerospace

20
PDCA Cycles Record
DATE:

FOCUS
OBSTACLE:

PROCESS
METRIC:

PROCESS:

Date, Step & Metric What do you expect?

What happened?

What we learned

	
  

	
  

	
  

	
  

	
  

Conduct the E X P E R I M E N T

	
  

Do a C O A C H I N G C Y C L E

	
  

Date:

Time:

	
  

Time:

	
  

Time:

	
  

	
  

Date:

	
  

Date:

	
  

	
  

CONFIDENTIAL © B/E Aerospace

	
  

Date:

Time:

	
  

21
PDCA Cycles Record
(Each Row = One Experiment)

Date sheet
is started
DATE:

Current Obstacle being worked on
FOCUS
OBSTACLE: (ONE Obstacle per sheet)

PROCESS
METRIC:

PROCESS:

Date, Step & Metric What do you expect?

	
  

The 2nd step is
derived from your
learning from the 1st
step.
	
  

	
  

	
  

	
  

Conduct the E X P E R I M E N T

	
  

What do you expect the
step to do? Remember,
you won't know until the
step has been taken.

What happened?

Do a C O A C H I N G C Y C L E

1st step (experiment)
toward achieving the
Target condition, against
the Focus Obstacle. Do not
try to think too far ahead.
Take the first step A.S.A.P.

Same metric used on Target Condition
and Current Condition forms

What we learned

Summarize the actual
results from the step.
Capture important points
	
  
and key occurrences.

What did you learn about
the focus process or
improving it? This learning
is important... it leads to the
next step and advances your
knowledge threshhold.

Date:

Time:

	
  

Date and time planned
	
  
for the experiment
Date:

Time:

	
  

Time:

	
  

	
  

Date:

	
  

	
  

CONFIDENTIAL © B/E Aerospace

	
  

Date:

Time:

	
  

22
The 5 Coaching Kata Questions
The Coach asks the Learner these questions
in daily "Coaching Cycles"

CONFIDENTIAL © B/E Aerospace

23
Watch a Coaching Cycle
The 5-minute video on the next page illustrates
how the forms are used in a daily Coaching Cycle

On Next
Page

CONFIDENTIAL © B/E Aerospace

24
Conclusion: Developing Strong Skills
The standard Improvement Kata / Coaching Kata forms presented in this
SlideShare help you operationalize the IK/CK patterns in your organization.
They are being used by Kata practitioners worldwide, and within the A3 format.
Coaching in this case is not an informal conversation, but a structured
dialogue designed for (a) effective and efficient information exchange, and
(b) training the Learner in the systematic, scientific pattern of the Improvement
Kata. The Learner knows the Five Questions that will be asked and updates the
forms on their storyboard before the next coaching cycle begins.
The Coach's goal is to develop a scientific thought process as a skill or habit
in both the Learner and the Coach. The routine of the Coach asking the Five
Coaching Kata Questions in sequence (plus clarifying questions as needed)
and the Learner responding by pointing to information on the storyboard helps
to ingrain the pattern of the Improvement Kata.
As in sports and music, this kind of practice may seem a bit mechanical at first.
As you practice it though, you'll see that it keeps your coaching cycles short
and focused on key information relevant to your current target condition and
challenge.
Best wishes for achieving your next target condition!
Richard Green
CONFIDENTIAL © B/E Aerospace

25
Best wishes for achieving
your next Target Condition

CONFIDENTIAL © B/E Aerospace

26

More Related Content

What's hot

Turning Value Stream Maps into Reality
Turning Value Stream Maps into RealityTurning Value Stream Maps into Reality
Turning Value Stream Maps into RealityMike Rother
 
Kata Creates Culture
Kata Creates CultureKata Creates Culture
Kata Creates CultureMike Rother
 
Why Your A3 Needs the IK
Why Your A3 Needs the IKWhy Your A3 Needs the IK
Why Your A3 Needs the IKMike Rother
 
The Improvement Kata Pattern
The Improvement Kata PatternThe Improvement Kata Pattern
The Improvement Kata PatternMike Rother
 
The Five Whys - Are We Doing it Wrong?
The Five Whys - Are We Doing it Wrong?The Five Whys - Are We Doing it Wrong?
The Five Whys - Are We Doing it Wrong?Mike Rother
 
Toyota Kata at University
Toyota Kata at UniversityToyota Kata at University
Toyota Kata at UniversityMike Rother
 
Make your A3 work as it should!
Make your A3 work as it should!Make your A3 work as it should!
Make your A3 work as it should!Mike Rother
 
Toyota kata 5 coaching cycles
Toyota kata 5 coaching cyclesToyota kata 5 coaching cycles
Toyota kata 5 coaching cyclesCogent Power Inc
 
How Kata Fits In
How Kata Fits InHow Kata Fits In
How Kata Fits InMike Rother
 
The Five Coaching Kata Questions
The Five Coaching Kata QuestionsThe Five Coaching Kata Questions
The Five Coaching Kata QuestionsMike Rother
 
How to Use VSM Correctly
How to Use VSM CorrectlyHow to Use VSM Correctly
How to Use VSM CorrectlyMike Rother
 
Starter Kata for Scientific Thinking
Starter Kata for Scientific ThinkingStarter Kata for Scientific Thinking
Starter Kata for Scientific ThinkingMike Rother
 
Toyota Kata Five Question Card
Toyota Kata Five Question CardToyota Kata Five Question Card
Toyota Kata Five Question CardMike Rother
 
Improvement Kata Reference Guide
Improvement Kata Reference GuideImprovement Kata Reference Guide
Improvement Kata Reference GuideMike Rother
 
PDCA - Learning Along the Way
PDCA - Learning Along the WayPDCA - Learning Along the Way
PDCA - Learning Along the WayMike Rother
 
The Toyota Kata Starter Kata
The Toyota Kata Starter KataThe Toyota Kata Starter Kata
The Toyota Kata Starter KataMike Rother
 

What's hot (20)

Turning Value Stream Maps into Reality
Turning Value Stream Maps into RealityTurning Value Stream Maps into Reality
Turning Value Stream Maps into Reality
 
Kata Creates Culture
Kata Creates CultureKata Creates Culture
Kata Creates Culture
 
Why Your A3 Needs the IK
Why Your A3 Needs the IKWhy Your A3 Needs the IK
Why Your A3 Needs the IK
 
The Wrong Kata
The Wrong KataThe Wrong Kata
The Wrong Kata
 
The Improvement Kata Pattern
The Improvement Kata PatternThe Improvement Kata Pattern
The Improvement Kata Pattern
 
The Five Whys - Are We Doing it Wrong?
The Five Whys - Are We Doing it Wrong?The Five Whys - Are We Doing it Wrong?
The Five Whys - Are We Doing it Wrong?
 
Toyota Kata Coaching & PDCA
Toyota Kata Coaching & PDCAToyota Kata Coaching & PDCA
Toyota Kata Coaching & PDCA
 
Toyota Kata at University
Toyota Kata at UniversityToyota Kata at University
Toyota Kata at University
 
Make your A3 work as it should!
Make your A3 work as it should!Make your A3 work as it should!
Make your A3 work as it should!
 
Toyota kata 5 coaching cycles
Toyota kata 5 coaching cyclesToyota kata 5 coaching cycles
Toyota kata 5 coaching cycles
 
Kata Walks
Kata WalksKata Walks
Kata Walks
 
How Kata Fits In
How Kata Fits InHow Kata Fits In
How Kata Fits In
 
The Five Coaching Kata Questions
The Five Coaching Kata QuestionsThe Five Coaching Kata Questions
The Five Coaching Kata Questions
 
How to Use VSM Correctly
How to Use VSM CorrectlyHow to Use VSM Correctly
How to Use VSM Correctly
 
Starter Kata for Scientific Thinking
Starter Kata for Scientific ThinkingStarter Kata for Scientific Thinking
Starter Kata for Scientific Thinking
 
Toyota Kata Five Question Card
Toyota Kata Five Question CardToyota Kata Five Question Card
Toyota Kata Five Question Card
 
Toyota Kata
Toyota KataToyota Kata
Toyota Kata
 
Improvement Kata Reference Guide
Improvement Kata Reference GuideImprovement Kata Reference Guide
Improvement Kata Reference Guide
 
PDCA - Learning Along the Way
PDCA - Learning Along the WayPDCA - Learning Along the Way
PDCA - Learning Along the Way
 
The Toyota Kata Starter Kata
The Toyota Kata Starter KataThe Toyota Kata Starter Kata
The Toyota Kata Starter Kata
 

Similar to Toyota Kata How to Use the Key Improvement Kata Forms

Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping TechniquesStephen Deas
 
How I Improve and Manage a Production Area
How I Improve and Manage a Production AreaHow I Improve and Manage a Production Area
How I Improve and Manage a Production AreaStephen Sikorski
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
H0432045055
H0432045055H0432045055
H0432045055theijes
 
Supporting Facility and Process Flows Chapter 7McG.docx
Supporting Facility and Process Flows Chapter 7McG.docxSupporting Facility and Process Flows Chapter 7McG.docx
Supporting Facility and Process Flows Chapter 7McG.docxmattinsonjanel
 
ImportantSummary discussion of chapter not article or sectio.docx
ImportantSummary discussion of chapter not article or sectio.docxImportantSummary discussion of chapter not article or sectio.docx
ImportantSummary discussion of chapter not article or sectio.docxbradburgess22840
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & ChecklistsAnand Subramaniam
 
Problem solving tools 112411
Problem solving tools 112411Problem solving tools 112411
Problem solving tools 112411Khriztel NaTsu
 
Useful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence ConsultingUseful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence ConsultingOperational Excellence Consulting
 
IE431 Final Presentation
IE431 Final PresentationIE431 Final Presentation
IE431 Final PresentationArnaud Marquet
 
Summer 2013 Internship Reflection
Summer 2013 Internship ReflectionSummer 2013 Internship Reflection
Summer 2013 Internship ReflectionTrevor Huggins
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGFuratAj
 
Response Surface Regression
Response Surface RegressionResponse Surface Regression
Response Surface RegressionRonald Shewchuk
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 

Similar to Toyota Kata How to Use the Key Improvement Kata Forms (20)

Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping Techniques
 
How I Improve and Manage a Production Area
How I Improve and Manage a Production AreaHow I Improve and Manage a Production Area
How I Improve and Manage a Production Area
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
H0432045055
H0432045055H0432045055
H0432045055
 
vignesh conference
vignesh conferencevignesh conference
vignesh conference
 
Supporting Facility and Process Flows Chapter 7McG.docx
Supporting Facility and Process Flows Chapter 7McG.docxSupporting Facility and Process Flows Chapter 7McG.docx
Supporting Facility and Process Flows Chapter 7McG.docx
 
Mareeswaran
MareeswaranMareeswaran
Mareeswaran
 
ImportantSummary discussion of chapter not article or sectio.docx
ImportantSummary discussion of chapter not article or sectio.docxImportantSummary discussion of chapter not article or sectio.docx
ImportantSummary discussion of chapter not article or sectio.docx
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Problem solving tools 112411
Problem solving tools 112411Problem solving tools 112411
Problem solving tools 112411
 
Useful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence ConsultingUseful Tools for Problem Solving by Operational Excellence Consulting
Useful Tools for Problem Solving by Operational Excellence Consulting
 
IE431 Final Presentation
IE431 Final PresentationIE431 Final Presentation
IE431 Final Presentation
 
Summer 2013 Internship Reflection
Summer 2013 Internship ReflectionSummer 2013 Internship Reflection
Summer 2013 Internship Reflection
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPING
 
Work measurement
Work measurementWork measurement
Work measurement
 
Response Surface Regression
Response Surface RegressionResponse Surface Regression
Response Surface Regression
 
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 

Recently uploaded

Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfASGITConsulting
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 

Recently uploaded (20)

Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 

Toyota Kata How to Use the Key Improvement Kata Forms

  • 1. KEY FORMS for the IMPROVEMENT KATA & COACHING KATA By Richard Green, with Mike Rother B E Aerospace United Kingdom Based on Toyota Kata and the November 2013 Improvement Kata Handbook by Mike Rother CONFIDENTIAL © B/E Aerospace
  • 2. Scripting the Critical Moves One of the key principles in Chip and Dan Heath's book "Switch" is that if you want people to change then you should shape their path. We're more likely to see change if we have specific behaviors to practice. This was the same finding in the "Toyota Kata" research, and is the thinking behind the structured practice routines of the Improvement Kata and Coaching Kata. This SlideShare is about key pencil & paper tools that are used when you go through the Improvement Kata & Coaching Kata patterns. CONFIDENTIAL © B/E Aerospace 2
  • 3. Hello! I worked for Toyota Motor Manufacturing UK for 18 years, at a management level, and then moved into the Aerospace industry. At my company we've embraced the Improvement Kata / Coaching Kata approach and have experienced rapid deployment. With this SlideShare I'd like to share some key points with regard to the forms and the routines they mirror, which are used to support development of Kata practitioners. It's about how to maintain strong guidance and standards moving forward. I'm a systems-oriented person; probably through working at Toyota for so long! Specifically, I created how-to annotation for documents used with the Improvement Kata and Coaching Kata on the Learner's Storyboard. I find that clear how-to instructions support a deployment greatly, and even allow self-help in the absence of immediate coaching support. I love the Toyota Kata approach and hope the annotated forms in this SlideShare help you a bit in achieving successful deployment of the Improvement Kata and Coaching Kata. Richard Green CONFIDENTIAL © B/E Aerospace 3
  • 4. The Pattern of the Improvement Kata The Improvement Kata models a scientific way of thinking and acting so that, with practice, anyone can learn it and use it From the Improvement Kata Handbook CONFIDENTIAL © B/E Aerospace 4
  • 5. The Learner's Storyboard The layout and information on the storyboard follow the steps of the Improvement Kata and flow naturally with the sequence of the Five Coaching Kata Questions Illustration from the Improvement Kata Handbook CONFIDENTIAL © B/E Aerospace 5
  • 6. Where the Forms Go on the Storyboard The forms/routines are also effective within an A3 CONFIDENTIAL © B/E Aerospace 6
  • 7. Let's look at how to use each form... CONFIDENTIAL © B/E Aerospace 7
  • 8. CONFIDENTIAL © B/E Aerospace 8
  • 9. Something you measure every cycle Something you measure periodically (eg units/day) A description / statement of a desired state people can rally around, not just a number. A good challenge focuses our attention and effort. The rate of customer demand for the group or family of parts produced by one process. Takt time is calculated by dividing the total working time by the quantity of parts required by the customer. The desired production rate, usually faster than Takt time as it accommodates changeover time and perhaps some planned downtime. Sometimes simply set at 15% below Takt. The process being worked on. Number of shifts currently worked, i.e. "1 shift" (Days) "2 shifts" (Days & Nights) etc. • Here you're just trying to figure out the current work pattern and flow, not so much the physical layout. • Get to know the process by sketching a block diagram, process map, etc. Detail to show current batch sizes, operators, cycle times, etc., can be added successively. • Remember this is a process-level diagram, not a value stream map! What is the build batch size? Where does WIPaccumulate in the process? Number of operators currently used to carry out the process. Plus & minus variation % at end of line [( highest point -Pc/t) / Pc/t] & [(Lowest point -Pc/t) / Pc/t] What else do you notice about the the pattern of how the process is operating? These are not issues or problems but simply characteristics of how the process currently works. Note your observations about how it currently operates in bullet form. Are there any machine constraints ? What are they (data)? What is the fastest Pc/t the automated equipment can currently support? Do not include machines that operators run, like hand tools, hand welders, arbor presses. Total operator time to process 1 piece, divided by the planned cycle time. Maintain a run chart of output per shift. Maintain a run chart of overtime per shift, or any other desired outcome metric CONFIDENTIAL © B/E Aerospace 9
  • 10. CONFIDENTIAL © B/E Aerospace 10
  • 11. Visually describe the steps and sequence of how the work is done At this stage all you're trying to do is figure out the current work pattern and flow, not so much the physical layout. Observe the process' operation and capture as much information as possible. This will allow you to become acquainted with the process . The block diagram sketch doesn't have to resemble the actual layout, it just needs to show how the process flows. Draw each box the same size to simply represent a work station, table, fixture or machine. CONFIDENTIAL © B/E Aerospace 11
  • 12. Exit-Cycle Observation Sheet Process Name / No Unit of Measure Observed Times Exit Cycle Wait Time Cycle Notes 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CONFIDENTIAL © B/E Aerospace 12
  • 13. Exit-Cycle Observation Sheet Process Name / No BMFT Station 4 Write in details of process observing for traceability/ref Unit of Measure Observed Times Exit Cycle 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 92 63 56 69 78 53 87 73 68 73 CONFIDENTIAL © B/E Aerospace Wait Time 18 21 12 Notes Cycle 92 45 56 69 78 53 87 52 56 73 Had to change empty applicator Waiting on previous process Cleaning applicator nozzle Cleaning applicator nozzle Seconds (60) Unit of measure for awareness of current operational time and guideline for timing cycles. Note: What you're measuring here is "Exit Cycles." Pick a point in the operator's work cycle and measure the total time from when this point is reached until it is reached again. This is done to capture variability in the process, not to measure the operator. Cleaning applicator nozzle Almost every process has a work pattern Waiting on previous process that you can measure this way. In some processes it's difficult to see the pattern. Waiting on previous process Incorrect rivet fitted / mixed parts in box Record times inclusive of any wait time, document individually so you can learn about actual process cycle time for work. Saves having to retime after analysis of all process timings to understand reasons for or which process was creating waiting. Record observed details for reasons of delay, to support analysis of current condition. Note if waiting for pre (starved) or post (blocked) process. 13
  • 14. How to Make a Run Chart (Step 1) Run charts are an excellent way to gather and communicate information about variation in any work process v u Seconds Draw simple X & Y axes. Use the same vertical scale as your unit of measure. 100 90 Transfer data points from the ExitCycle observation sheet to your run chart, using the "Exit Cycle" values. This gives you a picture of the variation in the process at the time you observed it. w x 80 70 60 50 40 Draw in the PC/T line (BLUE) (e.g. 85% of Takt). This shows the actual rate at which you would like this process to cycle. Allow an additional run after initial data so data can continue to be monitored to show trend during experiments 30 20 10 1 CONFIDENTIAL © B/E Aerospace Draw in the Takt Time line (RED) 2 3 4 5 6 7 8 9 10 14
  • 15. How to Make a Run Chart (Step 2) Summarize process variation with two vertical bars 100 90 v v 80 70 Seconds 60 50 u 40 u Find the "lowest repeatable time." Simply move a ruler up the page until you find 2 or more times aligned with each other (or nearly) and then draw the vertical bar to represent this time (blue). 30 The lowest repeatable time is an estimate of the actual cycle time it takes to do this work IF EVERYTHING GOES AS PLANNED. Note: If there is waiting time in the lowest repeatable times it should be subtracted. 20 10 1 CONFIDENTIAL © B/E Aerospace 2 3 4 5 Draw in a second vertical bar inlaid into the initial bar to show the highest time and the lowest time (red), this gives you a visual of the range of variation in the process 6 7 8 9 10 15
  • 16. How to Make a Run Chart (Step 3) Add the + and – variation calculations EXAMPLE: % Plus Variation = [Highest point (here 92) – Planned Cycle Time (here 51)] / Planned Cycle Time (51) = 0.80 (+80%) 100 90 80 70 Seconds 60 50 40 30 20 EXAMPLE: % Minus Variation = [Lowest point (here 45) – Planned cycle time (here 51)] / Planned cycle time 51 = -0.11 (-11%) 10 1 CONFIDENTIAL © B/E Aerospace 2 3 4 5 6 7 8 9 10 16
  • 17. CONFIDENTIAL © B/E Aerospace 17
  • 18. The process being focused on (Same as on the the Current Condition form) Describe how you want this process to be functioning on the achieve-by date à Pretend you travel forward in time to visit the process. What do you see? What is the sequence of steps required to complete one cycle through the entire process, how long should each step take, and who is to perform that step? New block diagram / Fluctuations / # of Operators / Quality / Safety / etc. Try to avoid a lot of words. Figures are good and measurable. Be creative & stretch, but realistic. What does it look like compared to your Current Condition observations? For instance... • Number of operators • Number of shifts • Where 1 x 1 flow is planned • Where buffers are to be held • Lot sizes / EPEI / Change over times • Heijunka / Leveling pattern For checking the condition of the process in real-time increments while the process is running , to help guide improvement efforts. Examples: Actual cycle time for each step/piece/standard quantity of pieces i.e. a box. For checking the output of the process periodically. Number of pieces produced per time increment, productivity, Quality indicators, Cost, fluctuation in output from shift to shift. etc. Graph it! CONFIDENTIAL © B/E Aerospace 18
  • 19. CONFIDENTIAL © B/E Aerospace 19
  • 20. • Review what you believe may be potential obstacles that may prevent you from reaching the Target Condition. • This should ideally be derived from direct observations / experiences. • Involve the operators in the process as they may have superior knowledge of the process. • The Learner maintains the Obstacle Parking Lot throughout the Improvement Kata. • The purpose of the Obstacle Parking Lot is to help the Learner see the limits of prediction and prevent him/her from chasing several ideas at once. Only one idea can be experimented on at any one time. • This is not an action-item list! It's simply a place to note and hold perceived obstacles that are discovered throughout the IK process • If you try to focus on more than just one obstacle at a time how do you understand which action has given you the positive or adverse result? Doing this may result in you following the wrong path CONFIDENTIAL © B/E Aerospace 20
  • 21. PDCA Cycles Record DATE: FOCUS OBSTACLE: PROCESS METRIC: PROCESS: Date, Step & Metric What do you expect? What happened? What we learned           Conduct the E X P E R I M E N T   Do a C O A C H I N G C Y C L E   Date: Time:   Time:   Time:     Date:   Date:     CONFIDENTIAL © B/E Aerospace   Date: Time:   21
  • 22. PDCA Cycles Record (Each Row = One Experiment) Date sheet is started DATE: Current Obstacle being worked on FOCUS OBSTACLE: (ONE Obstacle per sheet) PROCESS METRIC: PROCESS: Date, Step & Metric What do you expect?   The 2nd step is derived from your learning from the 1st step.         Conduct the E X P E R I M E N T   What do you expect the step to do? Remember, you won't know until the step has been taken. What happened? Do a C O A C H I N G C Y C L E 1st step (experiment) toward achieving the Target condition, against the Focus Obstacle. Do not try to think too far ahead. Take the first step A.S.A.P. Same metric used on Target Condition and Current Condition forms What we learned Summarize the actual results from the step. Capture important points   and key occurrences. What did you learn about the focus process or improving it? This learning is important... it leads to the next step and advances your knowledge threshhold. Date: Time:   Date and time planned   for the experiment Date: Time:   Time:     Date:     CONFIDENTIAL © B/E Aerospace   Date: Time:   22
  • 23. The 5 Coaching Kata Questions The Coach asks the Learner these questions in daily "Coaching Cycles" CONFIDENTIAL © B/E Aerospace 23
  • 24. Watch a Coaching Cycle The 5-minute video on the next page illustrates how the forms are used in a daily Coaching Cycle On Next Page CONFIDENTIAL © B/E Aerospace 24
  • 25. Conclusion: Developing Strong Skills The standard Improvement Kata / Coaching Kata forms presented in this SlideShare help you operationalize the IK/CK patterns in your organization. They are being used by Kata practitioners worldwide, and within the A3 format. Coaching in this case is not an informal conversation, but a structured dialogue designed for (a) effective and efficient information exchange, and (b) training the Learner in the systematic, scientific pattern of the Improvement Kata. The Learner knows the Five Questions that will be asked and updates the forms on their storyboard before the next coaching cycle begins. The Coach's goal is to develop a scientific thought process as a skill or habit in both the Learner and the Coach. The routine of the Coach asking the Five Coaching Kata Questions in sequence (plus clarifying questions as needed) and the Learner responding by pointing to information on the storyboard helps to ingrain the pattern of the Improvement Kata. As in sports and music, this kind of practice may seem a bit mechanical at first. As you practice it though, you'll see that it keeps your coaching cycles short and focused on key information relevant to your current target condition and challenge. Best wishes for achieving your next target condition! Richard Green CONFIDENTIAL © B/E Aerospace 25
  • 26. Best wishes for achieving your next Target Condition CONFIDENTIAL © B/E Aerospace 26