SlideShare a Scribd company logo
1 of 10
Engineering on Demand
A new way to exploit high level engineering for product development
Flexibility: The advantage of in house engineering
and product development
Ideas
Actions
Results
Continuous flow of ideas fuelling actions
leading to results and new ideas, new
actions, better results.
In House Engineering is Expensive.
• To compete requires a high level of costly technical
resources;
• Expertise
• Computer hardware
• CAE software
• Downtime during project phases can be significant
• Downtime between product development cycles
even worse.
In house engineering is a high cost overhead
0
1
2
3
4
5
Timeline
Project DemandVs Engineering Cost
Demand High Cost
High maintenance cost of in house engineering is a loss during low demand periods.
The traditional contract engineering model is engineering in a ‘BOX’
Traditional solution is to contract out
projects during high demand
Without an in house resource companies are
compelled to hire external resource.
Phase 1
•Identify Project Need
•Concept frozen at start
•Project Specification Definition
Phase 2
•The size and shape of the ‘BOX’ is fixed.
•Project tender; the cost of the ‘BOX’ is fixed.
•Initial Studies; ideas constrained to fit the ‘BOX’
Phase 3
• Product Development inside the ‘BOX’
• The ‘BOX’ gets delivered, let’s hope it fits.
Engineering in a ‘BOX’
Development inside the ‘BOX’ is inflexible and unreactive to change
How do we get out of the ‘BOX’ and get
flexibility cost effectively?
Think phone plan flexibility; buy time and use it for SMS or calls or data services etc.
BuyTime Not Fixed Resource.
Cost
Demand
Hours
0
1
2
3
4
5
Timeline
Cost Demand Hours
On demand low cost, hours accrued during low demand periods are utilised when needed.
Use your time to power up ideas,
actions and results whenever and
however you need
In House StyleTotal Flexibility
Constant innovation, responsive to change, rapid time to market.
• Richard McAinsh
• Tel +39 345 5877922
• Email richmca9tz@gmail.com
For more information and to discuss how rootC
can boost your product development contact:

More Related Content

Viewers also liked

Viewers also liked (12)

How to write a business plan
How to write a business planHow to write a business plan
How to write a business plan
 
1100-07 Syllabus Levinefall 2016
1100-07 Syllabus Levinefall 20161100-07 Syllabus Levinefall 2016
1100-07 Syllabus Levinefall 2016
 
Resume
ResumeResume
Resume
 
Tax expenditure on occupational pensions in Ireland: Relevance, Cost & Distri...
Tax expenditure on occupational pensions in Ireland: Relevance, Cost & Distri...Tax expenditure on occupational pensions in Ireland: Relevance, Cost & Distri...
Tax expenditure on occupational pensions in Ireland: Relevance, Cost & Distri...
 
Monitoring-GPS ENG
Monitoring-GPS ENGMonitoring-GPS ENG
Monitoring-GPS ENG
 
Desarrollo de un programa para aumantar las habilidades
Desarrollo de un programa para aumantar las habilidadesDesarrollo de un programa para aumantar las habilidades
Desarrollo de un programa para aumantar las habilidades
 
Rapport chantepie écrit
Rapport chantepie écritRapport chantepie écrit
Rapport chantepie écrit
 
Ashok cv - 2015_
Ashok cv - 2015_Ashok cv - 2015_
Ashok cv - 2015_
 
Analytical essaysforliteraryanalysis
Analytical essaysforliteraryanalysisAnalytical essaysforliteraryanalysis
Analytical essaysforliteraryanalysis
 
Duurzaam dossier Spectro Laurens Metternich pecha kucha
Duurzaam dossier Spectro Laurens Metternich pecha kucha Duurzaam dossier Spectro Laurens Metternich pecha kucha
Duurzaam dossier Spectro Laurens Metternich pecha kucha
 
07-CV - Andresa Lyra - Civil Engineer - 2016
07-CV - Andresa Lyra - Civil Engineer - 201607-CV - Andresa Lyra - Civil Engineer - 2016
07-CV - Andresa Lyra - Civil Engineer - 2016
 
Robotics
RoboticsRobotics
Robotics
 

Recently uploaded

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

rootC: Engineering on Demand

  • 1. Engineering on Demand A new way to exploit high level engineering for product development
  • 2. Flexibility: The advantage of in house engineering and product development Ideas Actions Results Continuous flow of ideas fuelling actions leading to results and new ideas, new actions, better results.
  • 3. In House Engineering is Expensive. • To compete requires a high level of costly technical resources; • Expertise • Computer hardware • CAE software • Downtime during project phases can be significant • Downtime between product development cycles even worse.
  • 4. In house engineering is a high cost overhead 0 1 2 3 4 5 Timeline Project DemandVs Engineering Cost Demand High Cost High maintenance cost of in house engineering is a loss during low demand periods.
  • 5. The traditional contract engineering model is engineering in a ‘BOX’ Traditional solution is to contract out projects during high demand Without an in house resource companies are compelled to hire external resource.
  • 6. Phase 1 •Identify Project Need •Concept frozen at start •Project Specification Definition Phase 2 •The size and shape of the ‘BOX’ is fixed. •Project tender; the cost of the ‘BOX’ is fixed. •Initial Studies; ideas constrained to fit the ‘BOX’ Phase 3 • Product Development inside the ‘BOX’ • The ‘BOX’ gets delivered, let’s hope it fits. Engineering in a ‘BOX’ Development inside the ‘BOX’ is inflexible and unreactive to change
  • 7. How do we get out of the ‘BOX’ and get flexibility cost effectively? Think phone plan flexibility; buy time and use it for SMS or calls or data services etc.
  • 8. BuyTime Not Fixed Resource. Cost Demand Hours 0 1 2 3 4 5 Timeline Cost Demand Hours On demand low cost, hours accrued during low demand periods are utilised when needed.
  • 9. Use your time to power up ideas, actions and results whenever and however you need In House StyleTotal Flexibility Constant innovation, responsive to change, rapid time to market.
  • 10. • Richard McAinsh • Tel +39 345 5877922 • Email richmca9tz@gmail.com For more information and to discuss how rootC can boost your product development contact: