Introduction
Site Engineering Solution For Mobilink
BY
Faran Ul Ghani/Du Erning
Purpose
• This ppt will describe in detail the site
engineering swap solutions from existing BTS
to new ZTE BTS/NodeB
Key Points
• Difference between Integrated Solution and
Distributed Solution.
• Original BTS swapped with ZTE BS8700
• BBU Installed in 8910A cabinet.
BTS Swap Scenarios
• Outdoor Macro Site swapped to Outdoor
distributed site (IDU Installed in BC Cab)
• Outdoor Macro Site swapped to Outdoor
distributed site (IDU Installed in Rectifier)
• Indoor Macro Site Swap to Outdoor
Distributed Site
• Indoor Macro Site Swap to Outdoor
Distributed Site (After New Rec Move ZTE BTS
Outdoor
Outdoor Scenario Before Swap
After Swap
Outdoor to Outdoor
Scenario -2
After Swap
Note: If IDU are less than 3, we will remain the IDU in REC
Indoor to Outdoor
Scenario -3
After Swap
Note: Pre Install recti and ZTE BTS to prop location, IDU will remain in shelter
Indoor to Outdoor
Scenario -4
After Swap-1
After Swap-2
Secondary Swap
Note: Secondary Swap need after new recti ready
Indoor to Indoor
Scenario -5
After Swap
RF System Swap Solution
There are 6 RF system scenarios during the Site Swap
RF Scenario
900M 1800M 1 Sector 2 or 3 Sectors
• Single band S1-S4 R8881 R8863
• Single band S5-S8 R8881 x2 R8863 x2
• S1~S4 S1~S4 R8881 x2 R8863 x2
• S1~S4 S5~S8 R8881 x3 R8863 x3
• S5~S8 S1~S4 R8881 x3 R8863 x3
• S5~S8 S5~S8 R8881 x4 R8863 x4
• Any sector has a configure which is more than 8 TRXs, R8881 will be used
for all the sectors.
Scenario-1
Single band 900M or 1800M sector
only.S1-S4
Scenario-2
Single band 900M or 1800M S5-S8
Scenario-3
Dual band 900M S1-S4 +1800M S1-S4
Scenario-4
Dual band 900M S1-S4, 1800M S5-S8
Scenario-5
Dual band 900M S5-8, 1800M S1-4
Scenario-5 CONT
Scenario-6
Dual band 900M S5-S8 , 1800M S5-S8
Scenario-6 CONT
Scenario-7
UMTS swap
This scenario is showing the 3G swap
• Distributed site: Original 3G RU is installed on
the tower.
During the swap, dismantle the original RRU and install ZTE R8881/R8863
in the old location. Connect the jumpers from RRU to the 2100M port of
the antenna.
• Macro site: Original 3G RU in the cabinet
For some sharing site, there is no space on the tower to install RRU, The RRUs will
be installed on the ground with a pole. During the swap, original feeders will be
reused, connect the jumpers from RRU to original feeders.
FS- RRU Relations
• R8881 connection
The connections between FS and R8881 should comply with the following rules:
• In case of using one FS board: The FS board is placed at slot3 of BBU, An additional
FS board will be configured at slot 4 when there are more than 6 sectors.
• Each sector takes one FS port. The secondary R8881 for the same sector will be
cascaded to the first R8881.
• The ports of FS board are numbered from 0 to 5 (from right to left).The RRU units
are connected to the FS ports in the following order from port No. 0 to port No. 5:
• Not more than 6 sectors:
GSM 900 R8881 in order of cells (lower at first) takes 0, 1, and 2
DCS1800 R8881 in order of cells (lower at first) takes 3, 4, and 5
R8881 connection CONT
• More than 6 sectors:
GSM 900 R8881 in order of cells (lower at first) takes 0, 1, 2, 3…..(FS board in slot3)
DCS1800 R8881 in order of cells (lower at first) takes 0, 1, 2, 3…..(FS board in slot4)
UMTS2100 R8881 in order of cells (lower at first) takes 3,4,5 ports of the FS board in
slot4.
R8863 connection
The connections between FS and R8863 should comply with the following rules:
• In case of using one FS board: The FS board is placed at slot3 of BBU.
• Each R8863 takes one FS port. The secondary R8863 will directly connect to the FS
board instead of cascading.
• The ports of FS board are numbered from 0 to 5 (from right to left).The RRU units
are connected to the FS ports in the following order from port No. 0 to port No. 5:
• An additional FS board will be added in the 3G site.
GSM 900 R8863 in order of cells (lower at first) takes 0, 1, and 2
DCS1800 R8863 in order of cells (lower at first) takes 3, 4, and 5
UMTS2100 R8863 in order of cells (lower at first) takes 0,1, and 2 of FS in slot4
RET connection
• R8881
The distance between RRU to Antenna is less
than 6m ,One standard AISG cable for each
sector.
R8881 CONT
The distance between RRU and Antenna is more than 6m ,NSBT and ASBT will be
configured for each sector, connect RRU and NSBT with a AISG special cable (DB15 to
AISG), and ASBT to the RCU with a AISG standard cable (AISG to AISG).
RET R8863
An AISG special cable connect the R8863 to the
RCU for sector A, then cascade the RCU for
sector B and C.
Power Supply Solution
All RRUs will be connected to the LLVD 25A breakers
on existing rectifier.
IF more than 6 RRUs are configured
• R8881: parallel connect two RRUs to one breaker.
• R8863: connect one RRU to one 25A breaker, add
additional breaker when there are more than 6
R8863.
DCPD7 will be used in the BC cabinet for the BBU&IDU power supply,
which is connected to the BLVD breaker of the existing rectifier.
DCPD7
New power system swap.
As Mobilink planned, the new Rectifier will be
installed.
Before new rectifier installed, an new ATS and DB
will be installed outdoor which will provide the
power to the new rectifier.
During the secondary swap, reconnect the power
cable of original rectifier to the new built ATS and
DB. After all equipments working normally,
dismantle the original ATS and DB.
New Power System Swap
New Power System Swap
Transmission solution
In the phase 2, Ericson is using IP for the BTS
transmission. All the phase 2 site will use an
Ethernet cable connecting from IDU to CC
board.
For the outdoor sites, a LPU will be configured
for the Lightning protection Unit (LPU). All the
signalling cables which is lying out of the BC
cabinet, should be connected to the LPU first
Transmission Solution
External Alarm Solution
For Outdoor Sites
PIN and Colour definition
SA board
Labels Guideline
The following items should be abided when fix labels:
• Labels shall be affixed facing the same direction, and the side that
indicates the cabling direction shall face upward or face the side of
operation and maintenance for ease of reading.
• Both ends of each cable (power cable, grounding cable,
transmission cable, jumper wire, and so on) shall be affixed with
labels.
• Labels shall be affixed in a neat and workmanlike manner.
• A label shall be affixed 200 mm from each end of a feeder, or 20
mm from each end of a power cable, network cable, signal cable or
fibre.
• Affix labels on the cables distributed vertically and horizontally in
the way shown in the following figure.
Feeder and Jumper Labels
Requirement
[Label Format]
Sector ID- ANT1/2
[Labelling Conditions]
• Sector ID: Ranges from S1 to S4
• ANT1 for TX/RX, ANT2 for RX
Optical Fibre Labels Requirement
[Label Format]
Sector ID- OPB/OPR
[Labelling Conditions]
• Sector ID: Ranges from S1 to S4
• OPB: Used on BBU side; OPR: Used on RRU
side
Optical Fibre Labels Requirement
CONT
When connect RRUs to BBU FS board with optical fibre, it’s very easy to make
mistake. So ZTE require all the partners use temporary labels on the fibre's
when lay them.
The temporary label for fibres requirements are as follows:
[Label Format]
Fiber-SystemID-SectorID-1/2
[Labelling Conditions]
• System ID:GSM900 DCS1800
• Sector ID: Ranges from S1 to S4
• 1/2 means the fiber quantity in one sector
[Labelling Conditions]
Label of Main DC Cable
[Label Format]
PWR
[Labelling Conditions]
• Main DC cable include DC power cable of
BS8800, ILP ,DCPD4 and so on.
Label of Outdoor LPB (OLP)
[Label Format]
Sector ID-PWR
[Labeling Conditions]
• Sector ID: Ranges from S1 to S4
• PWR means power.
Label of GPS feeder
Label of Alarm Cable
Label of MW IF Cable
[Label Format]
MU1-ODU1
[Labelling Conditions]
• If IDU more than one, A red remark used to
identify them
Label of Grounding Cable
THE END
Have a Good DAY

More Related Content

What's hot

Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.pptAIRTEL
 
Huawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware StructureHuawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware Structureibrahimnabil17
 
Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000ibrahimnabil17
 
TRM MINI-LINK TN Presentation By Khalil Al-Alami
TRM MINI-LINK TN Presentation By Khalil Al-AlamiTRM MINI-LINK TN Presentation By Khalil Al-Alami
TRM MINI-LINK TN Presentation By Khalil Al-AlamiKhalil Al-Alami
 
ZTE BTS Cards Description
ZTE BTS Cards DescriptionZTE BTS Cards Description
ZTE BTS Cards Descriptionibrahimnabil17
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini linkAhmed Nabeeh
 
Zte product description
Zte product descriptionZte product description
Zte product descriptionWijaya Kusuma
 
Huawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware StructureHuawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware Structureibrahimnabil17
 
2.3 zxsdr bs8700 product description
2.3 zxsdr bs8700 product description2.3 zxsdr bs8700 product description
2.3 zxsdr bs8700 product descriptionPeoples Aikido
 
Implementation of-mw-link-and-bts
Implementation of-mw-link-and-btsImplementation of-mw-link-and-bts
Implementation of-mw-link-and-btsMusfiqur Rahman
 
494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdfmehdiberenji
 
5G NR parameters
5G NR parameters5G NR parameters
5G NR parametersSasi Reddy
 
Ericsson Mini-link 6600 Nodes
Ericsson Mini-link 6600 NodesEricsson Mini-link 6600 Nodes
Ericsson Mini-link 6600 Nodesibrahimnabil17
 
Ericsson RBS RET Alarms Troubleshooting Guide Flow Chart v2
Ericsson RBS RET Alarms Troubleshooting Guide   Flow Chart v2Ericsson RBS RET Alarms Troubleshooting Guide   Flow Chart v2
Ericsson RBS RET Alarms Troubleshooting Guide Flow Chart v2Mohamed Abd El Razek Bakry
 
ZTE FDD INSTALLATION
ZTE FDD INSTALLATION ZTE FDD INSTALLATION
ZTE FDD INSTALLATION Ali Kausar
 
Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1mohameddawood35
 
5G Huawei BTS5900
5G Huawei BTS5900 5G Huawei BTS5900
5G Huawei BTS5900 Aziz Abamni
 
Huawei umts node b configuration principle
Huawei umts node b configuration principleHuawei umts node b configuration principle
Huawei umts node b configuration principleYaser Al-Abdali
 

What's hot (20)

Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
Huawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware StructureHuawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware Structure
 
Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000
 
TRM MINI-LINK TN Presentation By Khalil Al-Alami
TRM MINI-LINK TN Presentation By Khalil Al-AlamiTRM MINI-LINK TN Presentation By Khalil Al-Alami
TRM MINI-LINK TN Presentation By Khalil Al-Alami
 
ZTE BTS Cards Description
ZTE BTS Cards DescriptionZTE BTS Cards Description
ZTE BTS Cards Description
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini link
 
Zte product description
Zte product descriptionZte product description
Zte product description
 
Huawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware StructureHuawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware Structure
 
2.3 zxsdr bs8700 product description
2.3 zxsdr bs8700 product description2.3 zxsdr bs8700 product description
2.3 zxsdr bs8700 product description
 
Implementation of-mw-link-and-bts
Implementation of-mw-link-and-btsImplementation of-mw-link-and-bts
Implementation of-mw-link-and-bts
 
HUAWEI BTS3012
HUAWEI BTS3012HUAWEI BTS3012
HUAWEI BTS3012
 
494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf
 
5G NR parameters
5G NR parameters5G NR parameters
5G NR parameters
 
Ericsson Mini-link 6600 Nodes
Ericsson Mini-link 6600 NodesEricsson Mini-link 6600 Nodes
Ericsson Mini-link 6600 Nodes
 
Ericsson RBS RET Alarms Troubleshooting Guide Flow Chart v2
Ericsson RBS RET Alarms Troubleshooting Guide   Flow Chart v2Ericsson RBS RET Alarms Troubleshooting Guide   Flow Chart v2
Ericsson RBS RET Alarms Troubleshooting Guide Flow Chart v2
 
ZTE FDD INSTALLATION
ZTE FDD INSTALLATION ZTE FDD INSTALLATION
ZTE FDD INSTALLATION
 
Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1
 
5G Huawei BTS5900
5G Huawei BTS5900 5G Huawei BTS5900
5G Huawei BTS5900
 
Ericsson RBS 6000
Ericsson RBS 6000Ericsson RBS 6000
Ericsson RBS 6000
 
Huawei umts node b configuration principle
Huawei umts node b configuration principleHuawei umts node b configuration principle
Huawei umts node b configuration principle
 

Similar to zte mobilink bts swap

eNB Introduction and I&C.tejas networkpptx
eNB Introduction and I&C.tejas networkpptxeNB Introduction and I&C.tejas networkpptx
eNB Introduction and I&C.tejas networkpptxunnikrishnanM25
 
American Fibertek MTX-91685C-SL User Manual
American Fibertek MTX-91685C-SL User ManualAmerican Fibertek MTX-91685C-SL User Manual
American Fibertek MTX-91685C-SL User ManualJMAC Supply
 
45555555555-4G-Training .pptx
45555555555-4G-Training            .pptx45555555555-4G-Training            .pptx
45555555555-4G-Training .pptxwafawafa52
 
SSDACPart B Installation.pdf
SSDACPart B Installation.pdfSSDACPart B Installation.pdf
SSDACPart B Installation.pdfzubersana
 
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdfluckychandel2
 
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdftoaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdfwafawafa52
 
American Fibertek MRX986UTP User Manual
American Fibertek MRX986UTP User ManualAmerican Fibertek MRX986UTP User Manual
American Fibertek MRX986UTP User ManualJMAC Supply
 
Mobilink Project On Site Swap SOP V2_4
Mobilink Project On Site Swap SOP V2_4Mobilink Project On Site Swap SOP V2_4
Mobilink Project On Site Swap SOP V2_4ij qkka
 
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...CBO GmbH
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptxssuser2b76bb
 
American Fibertek RR944C User Manual
American Fibertek RR944C User ManualAmerican Fibertek RR944C User Manual
American Fibertek RR944C User ManualJMAC Supply
 
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...CBO GmbH
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxssuser8298f2
 
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...Allen He
 

Similar to zte mobilink bts swap (20)

Rmu710 b 1-autres_fiches_en
Rmu710 b 1-autres_fiches_enRmu710 b 1-autres_fiches_en
Rmu710 b 1-autres_fiches_en
 
eNB Introduction and I&C.tejas networkpptx
eNB Introduction and I&C.tejas networkpptxeNB Introduction and I&C.tejas networkpptx
eNB Introduction and I&C.tejas networkpptx
 
American Fibertek MTX-91685C-SL User Manual
American Fibertek MTX-91685C-SL User ManualAmerican Fibertek MTX-91685C-SL User Manual
American Fibertek MTX-91685C-SL User Manual
 
45555555555-4G-Training .pptx
45555555555-4G-Training            .pptx45555555555-4G-Training            .pptx
45555555555-4G-Training .pptx
 
Rms705 b 1-autres_fiches_en
Rms705 b 1-autres_fiches_enRms705 b 1-autres_fiches_en
Rms705 b 1-autres_fiches_en
 
SSDACPart B Installation.pdf
SSDACPart B Installation.pdfSSDACPart B Installation.pdf
SSDACPart B Installation.pdf
 
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
 
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdftoaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
 
American Fibertek MRX986UTP User Manual
American Fibertek MRX986UTP User ManualAmerican Fibertek MRX986UTP User Manual
American Fibertek MRX986UTP User Manual
 
Mobilink Project On Site Swap SOP V2_4
Mobilink Project On Site Swap SOP V2_4Mobilink Project On Site Swap SOP V2_4
Mobilink Project On Site Swap SOP V2_4
 
Drive Training - Copy.pptx
Drive Training - Copy.pptxDrive Training - Copy.pptx
Drive Training - Copy.pptx
 
IBS Training
IBS TrainingIBS Training
IBS Training
 
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
 
Ipmu ic procedure
Ipmu ic procedureIpmu ic procedure
Ipmu ic procedure
 
American Fibertek RR944C User Manual
American Fibertek RR944C User ManualAmerican Fibertek RR944C User Manual
American Fibertek RR944C User Manual
 
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
 
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
 
Gpon Network
Gpon NetworkGpon Network
Gpon Network
 

Recently uploaded

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Recently uploaded (20)

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

zte mobilink bts swap

  • 1. Introduction Site Engineering Solution For Mobilink BY Faran Ul Ghani/Du Erning
  • 2. Purpose • This ppt will describe in detail the site engineering swap solutions from existing BTS to new ZTE BTS/NodeB
  • 3. Key Points • Difference between Integrated Solution and Distributed Solution. • Original BTS swapped with ZTE BS8700 • BBU Installed in 8910A cabinet.
  • 4. BTS Swap Scenarios • Outdoor Macro Site swapped to Outdoor distributed site (IDU Installed in BC Cab) • Outdoor Macro Site swapped to Outdoor distributed site (IDU Installed in Rectifier) • Indoor Macro Site Swap to Outdoor Distributed Site • Indoor Macro Site Swap to Outdoor Distributed Site (After New Rec Move ZTE BTS Outdoor
  • 8. After Swap Note: If IDU are less than 3, we will remain the IDU in REC
  • 10. After Swap Note: Pre Install recti and ZTE BTS to prop location, IDU will remain in shelter
  • 13. After Swap-2 Secondary Swap Note: Secondary Swap need after new recti ready
  • 16. RF System Swap Solution There are 6 RF system scenarios during the Site Swap RF Scenario 900M 1800M 1 Sector 2 or 3 Sectors • Single band S1-S4 R8881 R8863 • Single band S5-S8 R8881 x2 R8863 x2 • S1~S4 S1~S4 R8881 x2 R8863 x2 • S1~S4 S5~S8 R8881 x3 R8863 x3 • S5~S8 S1~S4 R8881 x3 R8863 x3 • S5~S8 S5~S8 R8881 x4 R8863 x4 • Any sector has a configure which is more than 8 TRXs, R8881 will be used for all the sectors.
  • 17. Scenario-1 Single band 900M or 1800M sector only.S1-S4
  • 18. Scenario-2 Single band 900M or 1800M S5-S8
  • 19. Scenario-3 Dual band 900M S1-S4 +1800M S1-S4
  • 20. Scenario-4 Dual band 900M S1-S4, 1800M S5-S8
  • 21. Scenario-5 Dual band 900M S5-8, 1800M S1-4
  • 23. Scenario-6 Dual band 900M S5-S8 , 1800M S5-S8
  • 25. Scenario-7 UMTS swap This scenario is showing the 3G swap • Distributed site: Original 3G RU is installed on the tower. During the swap, dismantle the original RRU and install ZTE R8881/R8863 in the old location. Connect the jumpers from RRU to the 2100M port of the antenna. • Macro site: Original 3G RU in the cabinet For some sharing site, there is no space on the tower to install RRU, The RRUs will be installed on the ground with a pole. During the swap, original feeders will be reused, connect the jumpers from RRU to original feeders.
  • 26. FS- RRU Relations • R8881 connection The connections between FS and R8881 should comply with the following rules: • In case of using one FS board: The FS board is placed at slot3 of BBU, An additional FS board will be configured at slot 4 when there are more than 6 sectors. • Each sector takes one FS port. The secondary R8881 for the same sector will be cascaded to the first R8881. • The ports of FS board are numbered from 0 to 5 (from right to left).The RRU units are connected to the FS ports in the following order from port No. 0 to port No. 5: • Not more than 6 sectors: GSM 900 R8881 in order of cells (lower at first) takes 0, 1, and 2 DCS1800 R8881 in order of cells (lower at first) takes 3, 4, and 5
  • 27. R8881 connection CONT • More than 6 sectors: GSM 900 R8881 in order of cells (lower at first) takes 0, 1, 2, 3…..(FS board in slot3) DCS1800 R8881 in order of cells (lower at first) takes 0, 1, 2, 3…..(FS board in slot4) UMTS2100 R8881 in order of cells (lower at first) takes 3,4,5 ports of the FS board in slot4.
  • 28. R8863 connection The connections between FS and R8863 should comply with the following rules: • In case of using one FS board: The FS board is placed at slot3 of BBU. • Each R8863 takes one FS port. The secondary R8863 will directly connect to the FS board instead of cascading. • The ports of FS board are numbered from 0 to 5 (from right to left).The RRU units are connected to the FS ports in the following order from port No. 0 to port No. 5: • An additional FS board will be added in the 3G site. GSM 900 R8863 in order of cells (lower at first) takes 0, 1, and 2 DCS1800 R8863 in order of cells (lower at first) takes 3, 4, and 5 UMTS2100 R8863 in order of cells (lower at first) takes 0,1, and 2 of FS in slot4
  • 29. RET connection • R8881 The distance between RRU to Antenna is less than 6m ,One standard AISG cable for each sector.
  • 30. R8881 CONT The distance between RRU and Antenna is more than 6m ,NSBT and ASBT will be configured for each sector, connect RRU and NSBT with a AISG special cable (DB15 to AISG), and ASBT to the RCU with a AISG standard cable (AISG to AISG).
  • 31. RET R8863 An AISG special cable connect the R8863 to the RCU for sector A, then cascade the RCU for sector B and C.
  • 32. Power Supply Solution All RRUs will be connected to the LLVD 25A breakers on existing rectifier. IF more than 6 RRUs are configured • R8881: parallel connect two RRUs to one breaker. • R8863: connect one RRU to one 25A breaker, add additional breaker when there are more than 6 R8863. DCPD7 will be used in the BC cabinet for the BBU&IDU power supply, which is connected to the BLVD breaker of the existing rectifier.
  • 33. DCPD7
  • 34. New power system swap. As Mobilink planned, the new Rectifier will be installed. Before new rectifier installed, an new ATS and DB will be installed outdoor which will provide the power to the new rectifier. During the secondary swap, reconnect the power cable of original rectifier to the new built ATS and DB. After all equipments working normally, dismantle the original ATS and DB.
  • 37. Transmission solution In the phase 2, Ericson is using IP for the BTS transmission. All the phase 2 site will use an Ethernet cable connecting from IDU to CC board. For the outdoor sites, a LPU will be configured for the Lightning protection Unit (LPU). All the signalling cables which is lying out of the BC cabinet, should be connected to the LPU first
  • 41. PIN and Colour definition SA board
  • 42. Labels Guideline The following items should be abided when fix labels: • Labels shall be affixed facing the same direction, and the side that indicates the cabling direction shall face upward or face the side of operation and maintenance for ease of reading. • Both ends of each cable (power cable, grounding cable, transmission cable, jumper wire, and so on) shall be affixed with labels. • Labels shall be affixed in a neat and workmanlike manner. • A label shall be affixed 200 mm from each end of a feeder, or 20 mm from each end of a power cable, network cable, signal cable or fibre. • Affix labels on the cables distributed vertically and horizontally in the way shown in the following figure.
  • 43. Feeder and Jumper Labels Requirement [Label Format] Sector ID- ANT1/2 [Labelling Conditions] • Sector ID: Ranges from S1 to S4 • ANT1 for TX/RX, ANT2 for RX
  • 44. Optical Fibre Labels Requirement [Label Format] Sector ID- OPB/OPR [Labelling Conditions] • Sector ID: Ranges from S1 to S4 • OPB: Used on BBU side; OPR: Used on RRU side
  • 45. Optical Fibre Labels Requirement CONT When connect RRUs to BBU FS board with optical fibre, it’s very easy to make mistake. So ZTE require all the partners use temporary labels on the fibre's when lay them. The temporary label for fibres requirements are as follows: [Label Format] Fiber-SystemID-SectorID-1/2 [Labelling Conditions] • System ID:GSM900 DCS1800 • Sector ID: Ranges from S1 to S4 • 1/2 means the fiber quantity in one sector [Labelling Conditions]
  • 46. Label of Main DC Cable [Label Format] PWR [Labelling Conditions] • Main DC cable include DC power cable of BS8800, ILP ,DCPD4 and so on.
  • 47. Label of Outdoor LPB (OLP) [Label Format] Sector ID-PWR [Labeling Conditions] • Sector ID: Ranges from S1 to S4 • PWR means power.
  • 48. Label of GPS feeder
  • 49. Label of Alarm Cable
  • 50. Label of MW IF Cable [Label Format] MU1-ODU1 [Labelling Conditions] • If IDU more than one, A red remark used to identify them