through Development Monitoring
Protecting
Expectations
The Fund
Guaranteeing an institutional
saleable asset for maximum
return on investment.
The Bank
Limiting exposure to construction
cost, ensuring a product for loan
security purposes.
The Occupier
Ensuring fit for purpose good
quality occupational space.
Whether fund, bank or occupier, it’s fundamental to you that projects are scrutinised, understood and monitored
to protect your investment.You want to understand risk, whether cost, time or quality and you need to understand
what your options are when things veer off track.
At Lambert Smith Hampton we are restless, relentless and reluctant to settle for the obvious. We’re lateral thinkers.
We’re skilful spotters of opportunity for our clients and we’re highly profit focused. Which is why we are dedicated
to finding more ways to add value to our clients property interests.
Conversion of 1920’s 8 Storey
office into 9 luxury apartments
next door to Buckingham Palace
Bank fully advised of the cost required to complete
against a shifting cost background, mitigating their
risk of financial exposure.
›› A detailed review of specifications,drawings and
contractor’s proposals against brief to ensure you’re getting
what you’re paying for.
›› Commentary on flexibility,future proofing and maintenance
in use requirements.
›› Review of design against institutional standards and how
this may impact future use.
£7.5m
›› Review of existing steel frame and clay pot floors to
determine capability and confirm costs.
›› Advise to the bank on additional spending to upgrade the
specification,matched by increased GDV.
›› Advice in relation to knock on delay from splitting
contracts between shell & core and fit out,to ensure
quality runs through.
Full review of project costs against market norm and
identification of value engineering options to support
your development appraisal.
Results
Results
Return on investment increased by 12%.
c/o Orchard Street Investment Management
120,000sqft£30m
›› A review of the risk register and the mitigation
measures in place by the project team.
›› Detail on how health and safety is to be
managed.
Control of risk throughout. Bankers able to
withstand scrutiny from credit on control
measures in place during construction from
our detailed monitoring reports.
£80m
Graham French
In all of these years I have never received the level
of understanding,support and flexibility as I have
on this project,an absolute pleasure to deal with.
Metropolitan Police
The Occupier
John Asplin
The service provided by Lambert Smith Hampton
means that we can get questions answered
quickly,can have ongoing dialogue throughout
projects to provide clarity and provide quick
responses to any issues as and when they arise,
without causing project delays or increasing costs.
Relationship Manager,
Co-operative bank
The Bank
The Fund
Marcus Langlands-Pearse
The combination of delivering the basics well
whilst driving added value initiatives through a
team effort produces regular out performance.
TIAA Henderson
STACK UP?
DOES IT
YOU GET
WHAT YOU PAY FOR KEY RISKS?
WHAT ARE THE
Value
Value
Value Size
Results
›› Identification of a developer lead investment
proposal. Thorough review of tendered construction
costs benchmarked against market rates.
›› Review of specification to produce headline
cost:benefit analysis, identifying value engineering
options to align with development appraisal.
›› Review of tenants fit out requirements and
incorporation to base build to avoid duplication of
works.
6-Storey Flagship Office
Building in Cambridge
›› Appointment of a well established construction
team with proven track record was key on this
innovative landmark project.
›› Monitoring of robust testing procedures
incorporated into the scheme including; load
testing and plant cranage.
›› Detailed review of EFTE installation.
›› Scrutiny of risk register and mitigation measures
reported, ensuring this remained relevant
throughout construction.
The Eden Project
Scroll over the questions where indicated to find
out more about our development monitoring
services and where we’ve done it before.
A detailed review of specifications,
drawings and contractor’s proposals
against brief to ensure you’re getting
what you’re paying for.
Commentary on flexibility, future proofing
and maintenance in use requirements.
Review of design against institutional
standards and how this may impact future
use.
YOU GET
WHAT YOU PAY FOR
A review of the risk register and the
mitigation measures in place by the
project team.
Detail on how health and safety is to be
managed.
KEY RISKS?
WHAT ARE THE
BACK NEXT
Interactive roll over
Full review of project costs against
market norm and identification of
value engineering options to support
your development appraisal.
STACK UP?
DOES IT
Occupiers interests protected from breach of
legislation and fully signed off scheme delivered.
›› Review of all environmental assessments and remediation
strategies agreed with the Environmental Agency.
›› Review of planning consent and conditions attached and
measures required for discharge.
›› Building Control status review.
›› Consideration to party wall and other neighbourly matters.
£6m
Value
›› Complex planning requirements requiring technical
design solutions were closely monitored to ensure
buildability and robust performance against a compliant
solution.
›› Compliance with Natural England requirements
pre-construction to ensure wild bird and bat surveys
completed and recommended measures implemented.
›› Full plans review with building control before
construction to ensure no design variations would be
required to meet building regulations.
Historic Building Refurbishment
to create contemporary student
accommodation
200,000sqft distribution facility
and associated offices
Fit for purpose, well built, on time and on budget
with full suite of construction documentation for
institutional investment.
›› Monthly reviews on site to assess quality of
construction and progress against programme.
›› Discussion on variations and implications to cost
programme,quality and risk.
›› Review of cost status.
›› Update on issues raised in our initial technical due
diligence report.
£8m
Value
›› Review of progress of works on site against developers
programme and advice when acceleration works needed.
›› Review of works completed against contractors valuation
and drawdown request.
›› Confirmation of costs required to build scheme out to
ensure fund never over exposed.
›› Review of quality of workmanship on site
›› Pro-active management of queries raised and compliance
with specification.
›› Update of outstanding information and queries raised in
initial technical due diligence report through to close out
of all issues.
South Yorkshire
Pension Authority
120,000 sqft manufacturing
facility including 20,000 sqft
of offices
Completed facility delivered on time within tight
timeframe, avoiding financial and operational penalties
for the client if former site was not decommissioned in
time.
›› Discussion around the procurement method chosen and
what this might mean for you.
›› A review of construction programme to ensure it is
realistic.
›› Comment on the project team,their experience and
credentials.
›› Procurement review undertaken with 2 stage tender
process recommended to achieve mobilisation quickly.
›› Identification of a contractor with proven track record
and credentials in building a facility of this kind.
›› Negotiation of fixed price contract through collaborative
working.
›› Critical Path identification allowing project progress to
be closely monitored and measures implemented to
meet key milestones.
Home Decor
£7.75m
Value
Everybody at Home Decor joins me in offering our sincere thanks for all of your efforts
in helping bring this project to a timely conclusion.
64 Apartments close to the
Olympic Stadium, Stratford
Full protection afforded to the bank during
construction in the contract and afterwards with
institutionally acceptable suite of warranties.
›› Commentary on contract conditions and the benefits
of these to you.
›› Details of Warranties being provided and the
protection afforded to you.
›› A review of cash flow forecast against programme to
ensure you’re never over exposed.
£10m
Value
›› Scrutiny of construction documentation,in particular
design solutions for substantial concrete cantilever
and balcony construction.
›› Detailed review of construction contract and
negotiation of step in rights for funder.
›› Review of warranties and protection afforded,
ensuring that warranties reflected appointment
documentation leaving no gaps in responsibility.
Max Crosby-Browne
CEO of Home Decor
CAN IT BE
DELIVERED? PROTECTED?
ARE WE
LEGISLATION?
WHAT ABOUT WATCHING
BRIEF
Results
Results
Results Results
Interactive roll over
Monthly reviews on site to assess quality
of construction and progress against
programme.
Discussion on variations and implications
to cost programme,quality and risk.
Review of cost status.
Update on issues raised in our initial
technical due diligence report.
WATCHING
BRIEF
Review of all environmental assessments
and remediation strategies agreed with
the Environmental Agency.
Review of planning consent and conditions
attached and measures required for
discharge.
Building Control status review.
Consideration to party wall and other
neighbourly matters.
LEGISLATION?
WHAT ABOUT
BACK NEXT
Discussion around the procurement
method chosen and what this might mean
for you.
A review of construction programme
to ensure it is realistic.
Comment on the project team,
their experience and credentials.
CAN IT BE
DELIVERED?
Commentary on contract conditions
and the benefits of these to you.
Details of Warranties being provided
and the protection afforded to you.
A review of cash flow forecast against
programme to ensure you’re never over
exposed.
PROTECTED?
ARE WE
At Lambert Smith Hampton we have 34 specialist project monitoring surveyors covering the
length and breadth of the UK and Ireland. If you would like further information or to discuss
a requirement please contact one of our key contacts below.
Contact
The North
Central
South
Brennan
Tony
Northampton
01604 664 357
abrennan@lsh.co.uk
Daniels
Richard
Northampton
01604 664 359
rdaniels@lsh.co.uk
Bates
Ian
Northampton
01604 664 395
ibates@lsh.co.uk
Taylor
Gayle
Manchester
0161 228 6411
gtaylor@lsh.co.uk
Pincott
David
London
0207 955 8446
dpincott@lsh.co.uk
Anderson
Jon
Leeds
0113 887 6718
janderson@lsh.co.uk
Myles
Steven
London
0207 198 2375
smyles@lsh.co.uk
BACK

More Related Content

Viewers also liked

Мысли как пользователь
Мысли как пользовательМысли как пользователь
Мысли как пользовательAlexandra Miracle
 
В мечтах о "голубых океанах" или поиск рыночного пространства, в котором нет ...
В мечтах о "голубых океанах" или поиск рыночного пространства, в котором нет ...В мечтах о "голубых океанах" или поиск рыночного пространства, в котором нет ...
В мечтах о "голубых океанах" или поиск рыночного пространства, в котором нет ...Vasikinbox
 
Менеджмент и бизнес в слабоструктурированном мире - актуальные сечения, парад...
Менеджмент и бизнес в слабоструктурированном мире - актуальные сечения, парад...Менеджмент и бизнес в слабоструктурированном мире - актуальные сечения, парад...
Менеджмент и бизнес в слабоструктурированном мире - актуальные сечения, парад...Vasikinbox
 
Командообразование топ-менеджеров, или Фантазии невозможно согласовать
Командообразование топ-менеджеров, или Фантазии невозможно согласоватьКомандообразование топ-менеджеров, или Фантазии невозможно согласовать
Командообразование топ-менеджеров, или Фантазии невозможно согласоватьSTRADIS
 
Принципы эффективной типографики
Принципы эффективной типографикиПринципы эффективной типографики
Принципы эффективной типографикиAlexandra Chudinova
 
английский для строителей мусихина ч.2
английский для строителей мусихина ч.2английский для строителей мусихина ч.2
английский для строителей мусихина ч.2Natali290986
 
The Conference - Business Innovation
The Conference - Business Innovation The Conference - Business Innovation
The Conference - Business Innovation Carole Lamarque
 
Bankir презентация
Bankir презентацияBankir презентация
Bankir презентацияBankir_Ru
 
Lab influencer marketing antwerpen
Lab influencer marketing antwerpenLab influencer marketing antwerpen
Lab influencer marketing antwerpenFlandersDC
 
Bongo R&D – Fintech [Финтех]
Bongo R&D – Fintech [Финтех]Bongo R&D – Fintech [Финтех]
Bongo R&D – Fintech [Финтех]Pavel Guzhikov
 
How not to suck at working with bloggers
How not to suck at working with bloggersHow not to suck at working with bloggers
How not to suck at working with bloggersLotta Heikkeri
 
Entrepreneurship fintech & islamic finance v1.4
Entrepreneurship   fintech & islamic finance v1.4Entrepreneurship   fintech & islamic finance v1.4
Entrepreneurship fintech & islamic finance v1.4Jamal Nassar
 
Трекшн карта и проблемное интервью
Трекшн карта и проблемное интервьюТрекшн карта и проблемное интервью
Трекшн карта и проблемное интервьюEugene Kalinin
 
The State of the Play: The World FinTech Report Key Findings
The State of the Play: The World FinTech Report Key FindingsThe State of the Play: The World FinTech Report Key Findings
The State of the Play: The World FinTech Report Key FindingsLinkedIn
 
Infusing content marketing into your social strategies
Infusing content marketing into your social strategiesInfusing content marketing into your social strategies
Infusing content marketing into your social strategiesLinkedIn
 

Viewers also liked (17)

Мысли как пользователь
Мысли как пользовательМысли как пользователь
Мысли как пользователь
 
В мечтах о "голубых океанах" или поиск рыночного пространства, в котором нет ...
В мечтах о "голубых океанах" или поиск рыночного пространства, в котором нет ...В мечтах о "голубых океанах" или поиск рыночного пространства, в котором нет ...
В мечтах о "голубых океанах" или поиск рыночного пространства, в котором нет ...
 
Менеджмент и бизнес в слабоструктурированном мире - актуальные сечения, парад...
Менеджмент и бизнес в слабоструктурированном мире - актуальные сечения, парад...Менеджмент и бизнес в слабоструктурированном мире - актуальные сечения, парад...
Менеджмент и бизнес в слабоструктурированном мире - актуальные сечения, парад...
 
Командообразование топ-менеджеров, или Фантазии невозможно согласовать
Командообразование топ-менеджеров, или Фантазии невозможно согласоватьКомандообразование топ-менеджеров, или Фантазии невозможно согласовать
Командообразование топ-менеджеров, или Фантазии невозможно согласовать
 
Принципы эффективной типографики
Принципы эффективной типографикиПринципы эффективной типографики
Принципы эффективной типографики
 
управление проектом часть 3
управление проектом часть 3управление проектом часть 3
управление проектом часть 3
 
английский для строителей мусихина ч.2
английский для строителей мусихина ч.2английский для строителей мусихина ч.2
английский для строителей мусихина ч.2
 
The Conference - Business Innovation
The Conference - Business Innovation The Conference - Business Innovation
The Conference - Business Innovation
 
Bankir презентация
Bankir презентацияBankir презентация
Bankir презентация
 
Lab influencer marketing antwerpen
Lab influencer marketing antwerpenLab influencer marketing antwerpen
Lab influencer marketing antwerpen
 
Bongo R&D – Fintech [Финтех]
Bongo R&D – Fintech [Финтех]Bongo R&D – Fintech [Финтех]
Bongo R&D – Fintech [Финтех]
 
How not to suck at working with bloggers
How not to suck at working with bloggersHow not to suck at working with bloggers
How not to suck at working with bloggers
 
Entrepreneurship fintech & islamic finance v1.4
Entrepreneurship   fintech & islamic finance v1.4Entrepreneurship   fintech & islamic finance v1.4
Entrepreneurship fintech & islamic finance v1.4
 
Генетика и генетическое образование в России: конец 19 - начало 21 века
Генетика и генетическое образование в России: конец 19 -  начало 21 векаГенетика и генетическое образование в России: конец 19 -  начало 21 века
Генетика и генетическое образование в России: конец 19 - начало 21 века
 
Трекшн карта и проблемное интервью
Трекшн карта и проблемное интервьюТрекшн карта и проблемное интервью
Трекшн карта и проблемное интервью
 
The State of the Play: The World FinTech Report Key Findings
The State of the Play: The World FinTech Report Key FindingsThe State of the Play: The World FinTech Report Key Findings
The State of the Play: The World FinTech Report Key Findings
 
Infusing content marketing into your social strategies
Infusing content marketing into your social strategiesInfusing content marketing into your social strategies
Infusing content marketing into your social strategies
 

Similar to LSH Project Monitoring Capability Brochure

Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMMohamed Riyaz
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016Chris Nash
 
Systech International Corporate Profile
Systech International Corporate ProfileSystech International Corporate Profile
Systech International Corporate Profilejason_eve3
 
Systech International Corporate Profile
Systech International Corporate ProfileSystech International Corporate Profile
Systech International Corporate Profilejason_eve
 
092811 Updated Contech Brochure
092811 Updated Contech Brochure092811 Updated Contech Brochure
092811 Updated Contech BrochurePaul Smith
 
Quantycosts consultants Profile
Quantycosts consultants ProfileQuantycosts consultants Profile
Quantycosts consultants ProfileMaina Wanjama
 
Josh Higgins Resume
Josh Higgins ResumeJosh Higgins Resume
Josh Higgins ResumeJosh Higgins
 
Industrial Advisory Services Introduction
Industrial Advisory Services IntroductionIndustrial Advisory Services Introduction
Industrial Advisory Services IntroductionWes Hunnicutt
 
PRDnationwide Strata and FM Consultancy Capability Statement 2015
PRDnationwide Strata and FM Consultancy Capability Statement 2015PRDnationwide Strata and FM Consultancy Capability Statement 2015
PRDnationwide Strata and FM Consultancy Capability Statement 2015stephen_french
 
KOW Building Consultants Overview
KOW Building Consultants OverviewKOW Building Consultants Overview
KOW Building Consultants OverviewKevin Wille
 
KOW Building Consultants Overview
KOW Building Consultants OverviewKOW Building Consultants Overview
KOW Building Consultants OverviewKevin Wille
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
MBM Brochure 2010
MBM Brochure 2010MBM Brochure 2010
MBM Brochure 2010AnthonyKent
 
World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanRobert Jutson
 

Similar to LSH Project Monitoring Capability Brochure (20)

Credicon Introduction
Credicon  IntroductionCredicon  Introduction
Credicon Introduction
 
Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AM
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
 
Systech International Corporate Profile
Systech International Corporate ProfileSystech International Corporate Profile
Systech International Corporate Profile
 
Systech International Corporate Profile
Systech International Corporate ProfileSystech International Corporate Profile
Systech International Corporate Profile
 
Mohammed Ramzy - CV1
Mohammed Ramzy - CV1Mohammed Ramzy - CV1
Mohammed Ramzy - CV1
 
092811 Updated Contech Brochure
092811 Updated Contech Brochure092811 Updated Contech Brochure
092811 Updated Contech Brochure
 
Quantycosts consultants Profile
Quantycosts consultants ProfileQuantycosts consultants Profile
Quantycosts consultants Profile
 
Josh Higgins Resume
Josh Higgins ResumeJosh Higgins Resume
Josh Higgins Resume
 
Industrial Advisory Services Introduction
Industrial Advisory Services IntroductionIndustrial Advisory Services Introduction
Industrial Advisory Services Introduction
 
PRDnationwide Strata and FM Consultancy Capability Statement 2015
PRDnationwide Strata and FM Consultancy Capability Statement 2015PRDnationwide Strata and FM Consultancy Capability Statement 2015
PRDnationwide Strata and FM Consultancy Capability Statement 2015
 
CV Resume
CV ResumeCV Resume
CV Resume
 
CJM Construction Consulting Presentation
CJM Construction Consulting PresentationCJM Construction Consulting Presentation
CJM Construction Consulting Presentation
 
KOW Building Consultants Overview
KOW Building Consultants OverviewKOW Building Consultants Overview
KOW Building Consultants Overview
 
KOW Building Consultants Overview
KOW Building Consultants OverviewKOW Building Consultants Overview
KOW Building Consultants Overview
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
MBM Brochure 2010
MBM Brochure 2010MBM Brochure 2010
MBM Brochure 2010
 
V3 capabilities
V3 capabilitiesV3 capabilities
V3 capabilities
 
World Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 KazakhstanWorld Finance Review Sep_2014 Kazakhstan
World Finance Review Sep_2014 Kazakhstan
 

LSH Project Monitoring Capability Brochure

  • 1. through Development Monitoring Protecting Expectations The Fund Guaranteeing an institutional saleable asset for maximum return on investment. The Bank Limiting exposure to construction cost, ensuring a product for loan security purposes. The Occupier Ensuring fit for purpose good quality occupational space.
  • 2. Whether fund, bank or occupier, it’s fundamental to you that projects are scrutinised, understood and monitored to protect your investment.You want to understand risk, whether cost, time or quality and you need to understand what your options are when things veer off track. At Lambert Smith Hampton we are restless, relentless and reluctant to settle for the obvious. We’re lateral thinkers. We’re skilful spotters of opportunity for our clients and we’re highly profit focused. Which is why we are dedicated to finding more ways to add value to our clients property interests. Conversion of 1920’s 8 Storey office into 9 luxury apartments next door to Buckingham Palace Bank fully advised of the cost required to complete against a shifting cost background, mitigating their risk of financial exposure. ›› A detailed review of specifications,drawings and contractor’s proposals against brief to ensure you’re getting what you’re paying for. ›› Commentary on flexibility,future proofing and maintenance in use requirements. ›› Review of design against institutional standards and how this may impact future use. £7.5m ›› Review of existing steel frame and clay pot floors to determine capability and confirm costs. ›› Advise to the bank on additional spending to upgrade the specification,matched by increased GDV. ›› Advice in relation to knock on delay from splitting contracts between shell & core and fit out,to ensure quality runs through. Full review of project costs against market norm and identification of value engineering options to support your development appraisal. Results Results Return on investment increased by 12%. c/o Orchard Street Investment Management 120,000sqft£30m ›› A review of the risk register and the mitigation measures in place by the project team. ›› Detail on how health and safety is to be managed. Control of risk throughout. Bankers able to withstand scrutiny from credit on control measures in place during construction from our detailed monitoring reports. £80m Graham French In all of these years I have never received the level of understanding,support and flexibility as I have on this project,an absolute pleasure to deal with. Metropolitan Police The Occupier John Asplin The service provided by Lambert Smith Hampton means that we can get questions answered quickly,can have ongoing dialogue throughout projects to provide clarity and provide quick responses to any issues as and when they arise, without causing project delays or increasing costs. Relationship Manager, Co-operative bank The Bank The Fund Marcus Langlands-Pearse The combination of delivering the basics well whilst driving added value initiatives through a team effort produces regular out performance. TIAA Henderson STACK UP? DOES IT YOU GET WHAT YOU PAY FOR KEY RISKS? WHAT ARE THE Value Value Value Size Results ›› Identification of a developer lead investment proposal. Thorough review of tendered construction costs benchmarked against market rates. ›› Review of specification to produce headline cost:benefit analysis, identifying value engineering options to align with development appraisal. ›› Review of tenants fit out requirements and incorporation to base build to avoid duplication of works. 6-Storey Flagship Office Building in Cambridge ›› Appointment of a well established construction team with proven track record was key on this innovative landmark project. ›› Monitoring of robust testing procedures incorporated into the scheme including; load testing and plant cranage. ›› Detailed review of EFTE installation. ›› Scrutiny of risk register and mitigation measures reported, ensuring this remained relevant throughout construction. The Eden Project Scroll over the questions where indicated to find out more about our development monitoring services and where we’ve done it before. A detailed review of specifications, drawings and contractor’s proposals against brief to ensure you’re getting what you’re paying for. Commentary on flexibility, future proofing and maintenance in use requirements. Review of design against institutional standards and how this may impact future use. YOU GET WHAT YOU PAY FOR A review of the risk register and the mitigation measures in place by the project team. Detail on how health and safety is to be managed. KEY RISKS? WHAT ARE THE BACK NEXT Interactive roll over Full review of project costs against market norm and identification of value engineering options to support your development appraisal. STACK UP? DOES IT
  • 3. Occupiers interests protected from breach of legislation and fully signed off scheme delivered. ›› Review of all environmental assessments and remediation strategies agreed with the Environmental Agency. ›› Review of planning consent and conditions attached and measures required for discharge. ›› Building Control status review. ›› Consideration to party wall and other neighbourly matters. £6m Value ›› Complex planning requirements requiring technical design solutions were closely monitored to ensure buildability and robust performance against a compliant solution. ›› Compliance with Natural England requirements pre-construction to ensure wild bird and bat surveys completed and recommended measures implemented. ›› Full plans review with building control before construction to ensure no design variations would be required to meet building regulations. Historic Building Refurbishment to create contemporary student accommodation 200,000sqft distribution facility and associated offices Fit for purpose, well built, on time and on budget with full suite of construction documentation for institutional investment. ›› Monthly reviews on site to assess quality of construction and progress against programme. ›› Discussion on variations and implications to cost programme,quality and risk. ›› Review of cost status. ›› Update on issues raised in our initial technical due diligence report. £8m Value ›› Review of progress of works on site against developers programme and advice when acceleration works needed. ›› Review of works completed against contractors valuation and drawdown request. ›› Confirmation of costs required to build scheme out to ensure fund never over exposed. ›› Review of quality of workmanship on site ›› Pro-active management of queries raised and compliance with specification. ›› Update of outstanding information and queries raised in initial technical due diligence report through to close out of all issues. South Yorkshire Pension Authority 120,000 sqft manufacturing facility including 20,000 sqft of offices Completed facility delivered on time within tight timeframe, avoiding financial and operational penalties for the client if former site was not decommissioned in time. ›› Discussion around the procurement method chosen and what this might mean for you. ›› A review of construction programme to ensure it is realistic. ›› Comment on the project team,their experience and credentials. ›› Procurement review undertaken with 2 stage tender process recommended to achieve mobilisation quickly. ›› Identification of a contractor with proven track record and credentials in building a facility of this kind. ›› Negotiation of fixed price contract through collaborative working. ›› Critical Path identification allowing project progress to be closely monitored and measures implemented to meet key milestones. Home Decor £7.75m Value Everybody at Home Decor joins me in offering our sincere thanks for all of your efforts in helping bring this project to a timely conclusion. 64 Apartments close to the Olympic Stadium, Stratford Full protection afforded to the bank during construction in the contract and afterwards with institutionally acceptable suite of warranties. ›› Commentary on contract conditions and the benefits of these to you. ›› Details of Warranties being provided and the protection afforded to you. ›› A review of cash flow forecast against programme to ensure you’re never over exposed. £10m Value ›› Scrutiny of construction documentation,in particular design solutions for substantial concrete cantilever and balcony construction. ›› Detailed review of construction contract and negotiation of step in rights for funder. ›› Review of warranties and protection afforded, ensuring that warranties reflected appointment documentation leaving no gaps in responsibility. Max Crosby-Browne CEO of Home Decor CAN IT BE DELIVERED? PROTECTED? ARE WE LEGISLATION? WHAT ABOUT WATCHING BRIEF Results Results Results Results Interactive roll over Monthly reviews on site to assess quality of construction and progress against programme. Discussion on variations and implications to cost programme,quality and risk. Review of cost status. Update on issues raised in our initial technical due diligence report. WATCHING BRIEF Review of all environmental assessments and remediation strategies agreed with the Environmental Agency. Review of planning consent and conditions attached and measures required for discharge. Building Control status review. Consideration to party wall and other neighbourly matters. LEGISLATION? WHAT ABOUT BACK NEXT Discussion around the procurement method chosen and what this might mean for you. A review of construction programme to ensure it is realistic. Comment on the project team, their experience and credentials. CAN IT BE DELIVERED? Commentary on contract conditions and the benefits of these to you. Details of Warranties being provided and the protection afforded to you. A review of cash flow forecast against programme to ensure you’re never over exposed. PROTECTED? ARE WE
  • 4. At Lambert Smith Hampton we have 34 specialist project monitoring surveyors covering the length and breadth of the UK and Ireland. If you would like further information or to discuss a requirement please contact one of our key contacts below. Contact The North Central South Brennan Tony Northampton 01604 664 357 abrennan@lsh.co.uk Daniels Richard Northampton 01604 664 359 rdaniels@lsh.co.uk Bates Ian Northampton 01604 664 395 ibates@lsh.co.uk Taylor Gayle Manchester 0161 228 6411 gtaylor@lsh.co.uk Pincott David London 0207 955 8446 dpincott@lsh.co.uk Anderson Jon Leeds 0113 887 6718 janderson@lsh.co.uk Myles Steven London 0207 198 2375 smyles@lsh.co.uk BACK