SlideShare a Scribd company logo
1 of 5
Download to read offline
Name Rusli
Passport A223391
Address BTN Narogong Indah, Jl Megah 6 No 4
E19 , Bekasi (Indonesia) 17115
Email ruslij2000@gmail.com, rusli.jmd@cimbniaga.co.id
Nationality Indonesia
Experience 22 years IT
Birthday Palembang, 23-03-1970
Phone +6281905057104
Role Co PM Project Office & IT Lead
H/w & S/W AS/400 & RPG, RPGLE, Cobol, C++ ech
COORs SIBS SILVERLAKE & ITM Sigma
Assessment
(1). I am person how has motivated of purpose of organization and hard work and commitment
for schedule and also always Team work. Prepare before do action and always more sprite for
team to do what I delegation the job. All the jobs from user requirement have to clear as:
Specification, requirement, design after everything clear form User and I discuses with Team
to Do Action what the User require. I always do job follow SDLC (system development life
Cycle).
(2).As usually I do add value for organization, Full Support all User and run smoothly the
System. Always go around to User and Ask what we must be delivery to achieve user
satisfaction. Run well Project as Schedule or time frame Maximal the budget of project
(3) Expected Salary and Allowance as Minimun in CIMBNiaga above
Expected salary Rp.xx.000.000,- Nett
(4). Notice a month as possible.
Experiences
IT PROJECT
Bank CIMB NIAGA TBK Indonesia August 2011 – Present
Project Office and Analyst Operation and Risk
Scope Of Work :
As IT Lead handle for Project running as smoothly and Manage team to project schedule as
timeline. Conduct vendor for deciding negotiable as for Man-day and design and Development
project.
I. Project Upgrade Citynet to Rec7 June 2016 – Jan 2017
- Speed up and improve the results of automatic reconciliation of CityNet application to
verify every transaction and the difference which can then conduct as the basis for
adjustment, reversal, refund or claim against transactions of CIMB Niaga with a third
party by way of renewal of hardware and software systems existing reconciliation IE
CityNet 3 to Broad ridge Reconciliation 7 (REC7).
- The application can perform a reconciliation for the data associated with the transactions
listed earlier
- Third-party Data (external) downloaded manually can in automation with the provisions
of the agreement have done the Exchange/sending data with third parties and with the
standard format that has been specified by the related Business Unit
Reconciliation there are some Features LIVE On Schedule
- Reconciliation of transactions via ATM/CDM good channel On/Off Premises by using data
source: GFMS (GL Posting) ITM vs. Electronic Journal (EJ) of the ATM Machine.
- Phase 1.A
o Reconciliation Nostro with data Source swift MT940 & MT950
o Reconciliation NOP (Net Open Position) with Source Data : GL Position
(LBT) Branch VS GL Position (LBT) Murex
o Reconciliation Transaction Mobile Banking MBMC/Go Mobile/MERCHANT
o Reconciliation Transaction ATM Bersama & ATM Prima Switching & ATM NK - IPU
o Reconciliation Money Gram & Bill Payment Offline & Western Union
o Reconciliation ATM/CDM /CRM Transaction OffUS (Non Branch) and OnUS
(Branch)
o Reconciliation Credit Card : Transaction Debit & Credit & Payment
- Phase 1.B
o Reconciliation SKN & RTGS
o Reconciliation Replenish Refund ATM Machine
o Reconciliation Biller Online and Offline
o Reconciliation EDC Prima Debit & Siskohat
II. Project 1P SIBS Coor Silverlake Upgrade August 2015 – Jun 2016
o Project 1P Involves account changes from 15 to 10 digits so that all application
upgrade both in the dbase or Software supported on that all channel have to
upgrade from existing Account to account Changed as for :
 End Of Day processing to changes and Post General Ledger (GL)
 Master Account and the CIF Master
 Master Card Middleware Dbase changes
 Changes the Menu to update the parameters
 Change Flow Update Dbase.
III. Project GFMS (General Finance Management System ). Feb 2014 – Jun 2015
o The Project application get source data Transaction Via Channel Switching (ITM)
and create file transaction as Online jobs and the file result will be send by using
FTP as automatically. The end of the day data detail Transaction and Balance
Check send by Ftp to Sever Finance (GFMS). At Sever GFMS will be Processed
General ledger for Finance Recon.
Bank OF Tokyo Indonesia Jan 2008 - August 2011.
Project SMILE COOR Banking
o Foreign Remittance enable Future Value.
- Project generates source data at PC and uploads to As/400 after that processing
data by register with remit value date and then use swift message.
o Domestic Remittance Auto Numbering.
- Project data Customer will be proceed by SKN or RTGS .This process with Auto
numbering as by workstation ID Number.
o Internal Transfer Future Value.
- Project register by today and process Debit and Credit Account customer with
remit Value Date.
o AML Search Space Project.
- Generate Transaction file to deliver as online to Tokyo Japan, the Files as Coors
Smile produce format Data.
o Swift Massages for MT 940, MT942 and MT998 and Support for All transactions Swift
International Consultant Sdn Bhd
Client as –(PT. BANK NIAGA Indonesia)
Project Delivery Channel including:
ATM, Internet Banking, Phone Banking, Auto Debit such as deliver Project:
o Implementation of online Billers such as Electronic voucher and PLN (Electric).
o Design and implementation payment online Credit Card Visa CITIBANK
o Manage project delivering Visa, Payment Online Credit card Niaga
o Project Credit card Online payment
o Project ELECTRIC online Payment for East Indonesia
o Project Payment online Credit Card and Visa TCP/IP Protocol.
o GL parameter Setting to host teller (Coors Banking)
o Project EMV Credit card.
Client : < RHB Bank – Malaysia and Singapore >
- Project Visa Acquire and Issuer Mobile Whoops and ESA( Electronic Share App)
Client: < BIDV Bank – Vietnam Hanoi>
- Project Visa Acquire via ATM and Project Batch Job Core Silverlake and also
Development reporting Visa .
PT. BANK MEGA Tbk. Indonesia Jun 2003 – August 2008
 Implementation Card Management System and Delivery Channel.
 Project Transfer Via Bank online and other Card holder.
Tools used: System Architect for Database Design, Programming Language: RPG, RPGLE, ,
Cobol, C++, Dbase : Db2
MAYBANK of Singapore Jun 2002 - Jun 2003
 Hand of Maintenance of Delivery Channel.
o Error Requested APPLIX robotic and handling from any delivery Channel as ATM or
Deposit Machine Time-out , Insufficient fund, Wrong Pin and Cash handler Error.
o As Information Request for enhancement Project as request change pin to 6 Digits,
automatic check Cash for Deposit Machine for case pseudo Money and Change
Denomination for ATM.
o As Project Passbook Machine when Print Passbook on transaction day by day.
o As Regional Interface as Online with messaging use ISO8583 for country Singapore and
Malaysia.
PT SILVERLAKE INDONESIA
All project at Client Base
o Implementation both of Bank Mega and UNIBANK for Project Card Management.
o Implementation Switching POS and EDC and Payment System
o Manage project Visa as credit card
o Provide Transaction Billing payment for TELKOM and Flexi telecoms
Tools used: System Architect for Database Design, Programming Language: RPG, RPGLE,
Cobol, C++, Dbase : Db2, ISO8583.
PROJECT TRACK RECORD
1. Upgrade Recon Citynet to REC7
2. Upgrade AS400 V5i to AS400 V7
3. Card Management system as ATM
4. Visa Credit card
Main activities:
1. Planning and controlling of survey, installation, testing, development and Designed
2. Supervision and control over sub-contractors to strictly comply with the relevant conditions
of the time frame project.
3. Migration Of ATM from RS-600 to ATM (Silverlake)
4. Migration POS/EDC Bank Mega for 200 Branches
5. Migration POS/EDC CIMB NIAGA
6. Migration Credit card Visa With Card Pro and Silverlake Bank Niaga and Bank Mega.
QUALIFICATION AND EXPERTISE:
1. Wide knowledge in Telecommunication and payment online and IT System and technologies
for system integration and total solution business, for Card Management , card Business on
Delivery channel
2. Capability of handling several projects at the same time and works under pressure.
3. Capability of working individually and also possesses strong leadership in managing a team
to achieve main objectives.
4. Wide relations and contacts with local and foreign telecommunication companies having a
strong presentation and reporting skill (English and Indonesian).
Competencies
Languages Indonesia and English
Computer AS/400, Mainframe, PABX, ATM , TCP/IP, SNA, Racal (HSM), Network,
VTAM , Router. NDC++, DDC, NCR , NCR 2in 1 , Diebold, TCP/IP Protocol,
Visa , Master, EDC, pos Switching
Software  C++, COBOL, RPGI/LE, RPG, CLP, DDSF. SQL/Cobol, Sql RPG/ILE,
Aldon, Thenon.
DB2, DL/1,.
Message Base : ISO8583
Education
2005-2007 Institute of Bani Saleh (System Information)
Sep 1995 Academic of Bani Saleh Legalize of Singapore Embassy , degree
Trainings
Smart learning Project Management Leadership
Project Management Communication Skills.

More Related Content

Viewers also liked

Prosci_CaseStudy_Final(withGraphicsDesign)
Prosci_CaseStudy_Final(withGraphicsDesign)Prosci_CaseStudy_Final(withGraphicsDesign)
Prosci_CaseStudy_Final(withGraphicsDesign)Martha Roden
 
Media evaluation
Media evaluationMedia evaluation
Media evaluationJack Street
 
Highproof High Range Pressure Switch MD Series
Highproof High Range Pressure Switch MD SeriesHighproof High Range Pressure Switch MD Series
Highproof High Range Pressure Switch MD SeriesNK Instruments Pvt. Ltd.
 
Proyecto de inventario wil terminado
Proyecto de inventario wil terminadoProyecto de inventario wil terminado
Proyecto de inventario wil terminadoWilmar Molina Vargas
 
Toubia sequence 5 slide moi ça
Toubia sequence 5 slide moi çaToubia sequence 5 slide moi ça
Toubia sequence 5 slide moi çaBobylhome
 
What Technology Will Look Like in 2026
What Technology Will Look Like in 2026What Technology Will Look Like in 2026
What Technology Will Look Like in 2026Gdclem01
 
Ed 114 fasciculo-cap-vii-equipamentos-para-subestacoes-de-t&amp;d
Ed 114 fasciculo-cap-vii-equipamentos-para-subestacoes-de-t&amp;dEd 114 fasciculo-cap-vii-equipamentos-para-subestacoes-de-t&amp;d
Ed 114 fasciculo-cap-vii-equipamentos-para-subestacoes-de-t&amp;dCarlos Roberto Gonçalves
 
Block & Bleed type Manifold without Shut Off Valve (MF29G)
Block & Bleed type Manifold without Shut Off Valve (MF29G)Block & Bleed type Manifold without Shut Off Valve (MF29G)
Block & Bleed type Manifold without Shut Off Valve (MF29G)NK Instruments Pvt. Ltd.
 

Viewers also liked (19)

El korfball
El korfballEl korfball
El korfball
 
Prosci_CaseStudy_Final(withGraphicsDesign)
Prosci_CaseStudy_Final(withGraphicsDesign)Prosci_CaseStudy_Final(withGraphicsDesign)
Prosci_CaseStudy_Final(withGraphicsDesign)
 
Media evaluation
Media evaluationMedia evaluation
Media evaluation
 
Doingmentalhealth2015
Doingmentalhealth2015Doingmentalhealth2015
Doingmentalhealth2015
 
R type Three Valve Manifold (3VMN)
R type Three Valve Manifold (3VMN)R type Three Valve Manifold (3VMN)
R type Three Valve Manifold (3VMN)
 
Vacuum Switch MZ Series
Vacuum Switch MZ SeriesVacuum Switch MZ Series
Vacuum Switch MZ Series
 
High Range Pressure Switches MD Series
High Range Pressure Switches MD SeriesHigh Range Pressure Switches MD Series
High Range Pressure Switches MD Series
 
T type Three Valve Manifold (3VQ)
T type Three Valve Manifold (3VQ)T type Three Valve Manifold (3VQ)
T type Three Valve Manifold (3VQ)
 
Highproof High Range Pressure Switch MD Series
Highproof High Range Pressure Switch MD SeriesHighproof High Range Pressure Switch MD Series
Highproof High Range Pressure Switch MD Series
 
Informix and PHP
Informix and PHPInformix and PHP
Informix and PHP
 
H type Five Valve Manifold (5VH)
H type Five Valve Manifold (5VH)H type Five Valve Manifold (5VH)
H type Five Valve Manifold (5VH)
 
Proyecto de inventario wil terminado
Proyecto de inventario wil terminadoProyecto de inventario wil terminado
Proyecto de inventario wil terminado
 
Toubia sequence 5 slide moi ça
Toubia sequence 5 slide moi çaToubia sequence 5 slide moi ça
Toubia sequence 5 slide moi ça
 
What Technology Will Look Like in 2026
What Technology Will Look Like in 2026What Technology Will Look Like in 2026
What Technology Will Look Like in 2026
 
Ed 114 fasciculo-cap-vii-equipamentos-para-subestacoes-de-t&amp;d
Ed 114 fasciculo-cap-vii-equipamentos-para-subestacoes-de-t&amp;dEd 114 fasciculo-cap-vii-equipamentos-para-subestacoes-de-t&amp;d
Ed 114 fasciculo-cap-vii-equipamentos-para-subestacoes-de-t&amp;d
 
H type Three Valve Manifold (3VH)
H type Three Valve Manifold (3VH)H type Three Valve Manifold (3VH)
H type Three Valve Manifold (3VH)
 
Block & Bleed type Manifold without Shut Off Valve (MF29G)
Block & Bleed type Manifold without Shut Off Valve (MF29G)Block & Bleed type Manifold without Shut Off Valve (MF29G)
Block & Bleed type Manifold without Shut Off Valve (MF29G)
 
R type Five Valve Manifold (5VR)
R type Five Valve Manifold (5VR)R type Five Valve Manifold (5VR)
R type Five Valve Manifold (5VR)
 
Appsbar
AppsbarAppsbar
Appsbar
 

Similar to Resume-update

E secure transaction project ppt(Design and implementation of e-secure trans...
E secure transaction project  ppt(Design and implementation of e-secure trans...E secure transaction project  ppt(Design and implementation of e-secure trans...
E secure transaction project ppt(Design and implementation of e-secure trans...AJIT Singh
 
Raghunath resume
Raghunath resumeRaghunath resume
Raghunath resumeraghunath2u
 
Digital platform and mobile app for banks and credit unions
Digital platform and mobile app for banks and credit unionsDigital platform and mobile app for banks and credit unions
Digital platform and mobile app for banks and credit unionsMikhail Miroshnichenko
 
Resume_Suman_Dutta
Resume_Suman_DuttaResume_Suman_Dutta
Resume_Suman_DuttaSuman Dutta
 
Shankar 13 yrs - portfolio
Shankar   13 yrs - portfolioShankar   13 yrs - portfolio
Shankar 13 yrs - portfolios_shankar1977
 
Vivek Hegde's Profile
Vivek Hegde's ProfileVivek Hegde's Profile
Vivek Hegde's ProfileVivek Hegde
 
AutoDCR (Building Plan Approval system)
AutoDCR (Building Plan Approval system)AutoDCR (Building Plan Approval system)
AutoDCR (Building Plan Approval system)SoftTech Engineers
 
Presentation 23 11_10.34265106 (1)
Presentation 23 11_10.34265106 (1)Presentation 23 11_10.34265106 (1)
Presentation 23 11_10.34265106 (1)Juman Mohammed Azad
 
BizDay: Digital Micro-Lending and Debt Crowd Funding Platform, JVentures
BizDay: Digital Micro-Lending and Debt Crowd Funding Platform, JVenturesBizDay: Digital Micro-Lending and Debt Crowd Funding Platform, JVentures
BizDay: Digital Micro-Lending and Debt Crowd Funding Platform, JVenturesR3
 
GeofrreyManlapaz_CV
GeofrreyManlapaz_CVGeofrreyManlapaz_CV
GeofrreyManlapaz_CVGeofrrey M.
 

Similar to Resume-update (20)

E secure transaction project ppt(Design and implementation of e-secure trans...
E secure transaction project  ppt(Design and implementation of e-secure trans...E secure transaction project  ppt(Design and implementation of e-secure trans...
E secure transaction project ppt(Design and implementation of e-secure trans...
 
Guruprasad_Srinivasamurthy - CV
Guruprasad_Srinivasamurthy - CVGuruprasad_Srinivasamurthy - CV
Guruprasad_Srinivasamurthy - CV
 
Raghunath resume
Raghunath resumeRaghunath resume
Raghunath resume
 
Ramakrishnan k 3
Ramakrishnan k 3Ramakrishnan k 3
Ramakrishnan k 3
 
Rami Yasser C.V
Rami Yasser C.VRami Yasser C.V
Rami Yasser C.V
 
Digital platform and mobile app for banks and credit unions
Digital platform and mobile app for banks and credit unionsDigital platform and mobile app for banks and credit unions
Digital platform and mobile app for banks and credit unions
 
Mohan dhawle
Mohan dhawleMohan dhawle
Mohan dhawle
 
Resume_Suman_Dutta
Resume_Suman_DuttaResume_Suman_Dutta
Resume_Suman_Dutta
 
SG_SrBA Role
SG_SrBA RoleSG_SrBA Role
SG_SrBA Role
 
Shankar 13 yrs - portfolio
Shankar   13 yrs - portfolioShankar   13 yrs - portfolio
Shankar 13 yrs - portfolio
 
Vivek Hegde's Profile
Vivek Hegde's ProfileVivek Hegde's Profile
Vivek Hegde's Profile
 
Piyush_Belkhede_CV
Piyush_Belkhede_CVPiyush_Belkhede_CV
Piyush_Belkhede_CV
 
AutoDCR (Building Plan Approval system)
AutoDCR (Building Plan Approval system)AutoDCR (Building Plan Approval system)
AutoDCR (Building Plan Approval system)
 
Presentation 23 11_10.34265106 (1)
Presentation 23 11_10.34265106 (1)Presentation 23 11_10.34265106 (1)
Presentation 23 11_10.34265106 (1)
 
BizDay: Digital Micro-Lending and Debt Crowd Funding Platform, JVentures
BizDay: Digital Micro-Lending and Debt Crowd Funding Platform, JVenturesBizDay: Digital Micro-Lending and Debt Crowd Funding Platform, JVentures
BizDay: Digital Micro-Lending and Debt Crowd Funding Platform, JVentures
 
Abhishek_New CV
Abhishek_New CVAbhishek_New CV
Abhishek_New CV
 
Rakesh_talele_PM
Rakesh_talele_PMRakesh_talele_PM
Rakesh_talele_PM
 
Yousri Mesbah CV
Yousri Mesbah CV Yousri Mesbah CV
Yousri Mesbah CV
 
GeofrreyManlapaz_CV
GeofrreyManlapaz_CVGeofrreyManlapaz_CV
GeofrreyManlapaz_CV
 
WeiYapResume
WeiYapResumeWeiYapResume
WeiYapResume
 

Resume-update

  • 1. Name Rusli Passport A223391 Address BTN Narogong Indah, Jl Megah 6 No 4 E19 , Bekasi (Indonesia) 17115 Email ruslij2000@gmail.com, rusli.jmd@cimbniaga.co.id Nationality Indonesia Experience 22 years IT Birthday Palembang, 23-03-1970 Phone +6281905057104 Role Co PM Project Office & IT Lead H/w & S/W AS/400 & RPG, RPGLE, Cobol, C++ ech COORs SIBS SILVERLAKE & ITM Sigma Assessment (1). I am person how has motivated of purpose of organization and hard work and commitment for schedule and also always Team work. Prepare before do action and always more sprite for team to do what I delegation the job. All the jobs from user requirement have to clear as: Specification, requirement, design after everything clear form User and I discuses with Team to Do Action what the User require. I always do job follow SDLC (system development life Cycle). (2).As usually I do add value for organization, Full Support all User and run smoothly the System. Always go around to User and Ask what we must be delivery to achieve user satisfaction. Run well Project as Schedule or time frame Maximal the budget of project (3) Expected Salary and Allowance as Minimun in CIMBNiaga above Expected salary Rp.xx.000.000,- Nett (4). Notice a month as possible. Experiences IT PROJECT Bank CIMB NIAGA TBK Indonesia August 2011 – Present Project Office and Analyst Operation and Risk Scope Of Work : As IT Lead handle for Project running as smoothly and Manage team to project schedule as timeline. Conduct vendor for deciding negotiable as for Man-day and design and Development project.
  • 2. I. Project Upgrade Citynet to Rec7 June 2016 – Jan 2017 - Speed up and improve the results of automatic reconciliation of CityNet application to verify every transaction and the difference which can then conduct as the basis for adjustment, reversal, refund or claim against transactions of CIMB Niaga with a third party by way of renewal of hardware and software systems existing reconciliation IE CityNet 3 to Broad ridge Reconciliation 7 (REC7). - The application can perform a reconciliation for the data associated with the transactions listed earlier - Third-party Data (external) downloaded manually can in automation with the provisions of the agreement have done the Exchange/sending data with third parties and with the standard format that has been specified by the related Business Unit Reconciliation there are some Features LIVE On Schedule - Reconciliation of transactions via ATM/CDM good channel On/Off Premises by using data source: GFMS (GL Posting) ITM vs. Electronic Journal (EJ) of the ATM Machine. - Phase 1.A o Reconciliation Nostro with data Source swift MT940 & MT950 o Reconciliation NOP (Net Open Position) with Source Data : GL Position (LBT) Branch VS GL Position (LBT) Murex o Reconciliation Transaction Mobile Banking MBMC/Go Mobile/MERCHANT o Reconciliation Transaction ATM Bersama & ATM Prima Switching & ATM NK - IPU o Reconciliation Money Gram & Bill Payment Offline & Western Union o Reconciliation ATM/CDM /CRM Transaction OffUS (Non Branch) and OnUS (Branch) o Reconciliation Credit Card : Transaction Debit & Credit & Payment - Phase 1.B o Reconciliation SKN & RTGS o Reconciliation Replenish Refund ATM Machine o Reconciliation Biller Online and Offline o Reconciliation EDC Prima Debit & Siskohat II. Project 1P SIBS Coor Silverlake Upgrade August 2015 – Jun 2016 o Project 1P Involves account changes from 15 to 10 digits so that all application upgrade both in the dbase or Software supported on that all channel have to upgrade from existing Account to account Changed as for :  End Of Day processing to changes and Post General Ledger (GL)  Master Account and the CIF Master  Master Card Middleware Dbase changes  Changes the Menu to update the parameters  Change Flow Update Dbase. III. Project GFMS (General Finance Management System ). Feb 2014 – Jun 2015 o The Project application get source data Transaction Via Channel Switching (ITM) and create file transaction as Online jobs and the file result will be send by using FTP as automatically. The end of the day data detail Transaction and Balance Check send by Ftp to Sever Finance (GFMS). At Sever GFMS will be Processed General ledger for Finance Recon.
  • 3. Bank OF Tokyo Indonesia Jan 2008 - August 2011. Project SMILE COOR Banking o Foreign Remittance enable Future Value. - Project generates source data at PC and uploads to As/400 after that processing data by register with remit value date and then use swift message. o Domestic Remittance Auto Numbering. - Project data Customer will be proceed by SKN or RTGS .This process with Auto numbering as by workstation ID Number. o Internal Transfer Future Value. - Project register by today and process Debit and Credit Account customer with remit Value Date. o AML Search Space Project. - Generate Transaction file to deliver as online to Tokyo Japan, the Files as Coors Smile produce format Data. o Swift Massages for MT 940, MT942 and MT998 and Support for All transactions Swift International Consultant Sdn Bhd Client as –(PT. BANK NIAGA Indonesia) Project Delivery Channel including: ATM, Internet Banking, Phone Banking, Auto Debit such as deliver Project: o Implementation of online Billers such as Electronic voucher and PLN (Electric). o Design and implementation payment online Credit Card Visa CITIBANK o Manage project delivering Visa, Payment Online Credit card Niaga o Project Credit card Online payment o Project ELECTRIC online Payment for East Indonesia o Project Payment online Credit Card and Visa TCP/IP Protocol. o GL parameter Setting to host teller (Coors Banking) o Project EMV Credit card. Client : < RHB Bank – Malaysia and Singapore > - Project Visa Acquire and Issuer Mobile Whoops and ESA( Electronic Share App) Client: < BIDV Bank – Vietnam Hanoi> - Project Visa Acquire via ATM and Project Batch Job Core Silverlake and also Development reporting Visa . PT. BANK MEGA Tbk. Indonesia Jun 2003 – August 2008  Implementation Card Management System and Delivery Channel.  Project Transfer Via Bank online and other Card holder. Tools used: System Architect for Database Design, Programming Language: RPG, RPGLE, , Cobol, C++, Dbase : Db2 MAYBANK of Singapore Jun 2002 - Jun 2003  Hand of Maintenance of Delivery Channel. o Error Requested APPLIX robotic and handling from any delivery Channel as ATM or Deposit Machine Time-out , Insufficient fund, Wrong Pin and Cash handler Error.
  • 4. o As Information Request for enhancement Project as request change pin to 6 Digits, automatic check Cash for Deposit Machine for case pseudo Money and Change Denomination for ATM. o As Project Passbook Machine when Print Passbook on transaction day by day. o As Regional Interface as Online with messaging use ISO8583 for country Singapore and Malaysia. PT SILVERLAKE INDONESIA All project at Client Base o Implementation both of Bank Mega and UNIBANK for Project Card Management. o Implementation Switching POS and EDC and Payment System o Manage project Visa as credit card o Provide Transaction Billing payment for TELKOM and Flexi telecoms Tools used: System Architect for Database Design, Programming Language: RPG, RPGLE, Cobol, C++, Dbase : Db2, ISO8583. PROJECT TRACK RECORD 1. Upgrade Recon Citynet to REC7 2. Upgrade AS400 V5i to AS400 V7 3. Card Management system as ATM 4. Visa Credit card Main activities: 1. Planning and controlling of survey, installation, testing, development and Designed 2. Supervision and control over sub-contractors to strictly comply with the relevant conditions of the time frame project. 3. Migration Of ATM from RS-600 to ATM (Silverlake) 4. Migration POS/EDC Bank Mega for 200 Branches 5. Migration POS/EDC CIMB NIAGA 6. Migration Credit card Visa With Card Pro and Silverlake Bank Niaga and Bank Mega. QUALIFICATION AND EXPERTISE: 1. Wide knowledge in Telecommunication and payment online and IT System and technologies for system integration and total solution business, for Card Management , card Business on Delivery channel 2. Capability of handling several projects at the same time and works under pressure. 3. Capability of working individually and also possesses strong leadership in managing a team to achieve main objectives. 4. Wide relations and contacts with local and foreign telecommunication companies having a strong presentation and reporting skill (English and Indonesian). Competencies Languages Indonesia and English Computer AS/400, Mainframe, PABX, ATM , TCP/IP, SNA, Racal (HSM), Network, VTAM , Router. NDC++, DDC, NCR , NCR 2in 1 , Diebold, TCP/IP Protocol, Visa , Master, EDC, pos Switching Software  C++, COBOL, RPGI/LE, RPG, CLP, DDSF. SQL/Cobol, Sql RPG/ILE,
  • 5. Aldon, Thenon. DB2, DL/1,. Message Base : ISO8583 Education 2005-2007 Institute of Bani Saleh (System Information) Sep 1995 Academic of Bani Saleh Legalize of Singapore Embassy , degree Trainings Smart learning Project Management Leadership Project Management Communication Skills.