Confined Space Drill and other activities -FSO-Prem Pride-22nd March 2014 -
1. FSO- Prem Pride –Confined Space Drill
, Entry and other Activities
22nd March 2014
2. Activities of 22nd March -2014
Tool Box talks conducted for the following activities carried
out :
• Enclosed space rescue drill.
• 3P C.O.T Entry/Inspection
• v/v operation inside of 3P C.O.T
• Renewal of cargo line dresser coupling .
• Hydraulic line maintenance/renewal .
• Securing of 3P cargo tank
• Removal of I.G blank of cargo tanks.