Weekly Safety Meeting
High-Pressure Application Safety
WSM-Erbil Office
22.12.19
• Sudden & unintended release of stored energy
• The risk of injury from a failing joint, connections, gauge, valve, fitting or
another component …
• High pressure will be considered as equal to and or greater than 1000 psi
(7000 kPa).
• The equipment which are producing high pressure in the rig are the mud
pumps, the discharge manifold lines, stand pipe manifold, rotary hose,
accumulator unit and its hydraulic lines, breathing air compressor discharge to
the cylinders of the cascade system, chicksan hoses used during pressure
testing and cementing operations, test pumps and lines used during BOP test.
Pressure Application Safety
Pressure System Hazards
• Flying object; valves, connectors, flanges, gauges and fittings
• Flying shrapnel; small pieces of pipe, pipe fittings, or other system components
that shatter into parts from pressure.
• Oxygen displacement
• Tell more…..
Common causes of Pressure system failure
• Over-pressuring a system
• Inadequate/improper pressure testing equipment
• Poor system/components design
• Operator error
• Inadequate repair/ modification to the system
• Failure to properly isolate parts being tested from other parts of the system
(segregation)
• Failure to properly isolate equipment from piping system being tested.
SSoW
• A written safety system of work for pressure
testing must be in place
• Instructions (Procedure/JSA) of the work to be
provided
• Correct Test set-up
• Proper selection of fittings
• Carrying out the initial test
• Checking for leaks
• Proper and effective supervision
Segregating the item under test
• Physical segregation is top intend
• The hierarchy of segregation:
 The use of a full enclosure to contain any projected missiles/blast energy, including protection between the
test controls and the assembly under pressure;
 The provision of temporary barriers/screens and systems for excluding nonessential personnel from the
area;
 Exclusion of people from the blast/projectile area while an item is under pressure during a test. It is good
practice to restrict personnel from the vicinity of any item while it is under pressure during a test.
Post-Test
• Follow the SOW to safely, gradually
release the pressure from the
system and collect the waste liquid
test medium when required.
•Release pressure before attempting
to fix any leak
•Drain the system
• No spill while bleeding off pressure
•Re-test the system after any repair
The requirements shall apply for use of
high-pressure equipment
• All high-pressure equipment will be equipped with appropriate high-pressure
fittings of equal or higher rating. Low pressure should rate fitting shall not be
used in a high-pressure system set-up.
• Fixed high-pressure piping shall be painted red.
• Mud pumps shall be equipped with pressure relief valves that are
appropriately set.
• The relief valves must be calibrated and tested; shall be set to discharge at a
pressure not in excess of the manufacturer’s recommended maximum working
pressure of the mud pumps and all connecting pipes and fittings.
Cont’
• The open-ended relief lines of the devices shall be appropriately sized, kept secured,
and piped in that will not endanger workers during discharge. Appropriate safety lines
shall be attached.
• Rotary hose safety lines at stand-pipe end shall be fastened to the derrick while the
swivel/ TDS end to the swivel housing.
• Chicksans used shall be secured with appropriate clamps and wire rope safety lines.
• Barrier off high pressure lines during pressure testing. Post warning sign “High Pressure
Testing in Progress”.
• Accumulator flexible hydraulic lines must be secured with whip checks at each end
connections.
Cont’
• Only trained and authorized personnel shall be allowed to test and recharge
the accumulator bottles to required pre-charge pressure.
• Breathing air compressor discharge hoses and fitting of appropriate size and
pressure shall be used in the high-pressure side of the cascade system. The
appropriate hoses and fittings shall be used as filler whip for refilling SCBA
cylinders.
“Love the life you live”

More Related Content

What's hot

SIMULTANEOUS OPERATIONS (SIMOPS) STUDY - IFLUIDS ENGINEERING
SIMULTANEOUS OPERATIONS (SIMOPS) STUDY - IFLUIDS ENGINEERINGSIMULTANEOUS OPERATIONS (SIMOPS) STUDY - IFLUIDS ENGINEERING
SIMULTANEOUS OPERATIONS (SIMOPS) STUDY - IFLUIDS ENGINEERINGiFluids
 
HIRARC_Training_SASMEC_IIUM (1).pdf
HIRARC_Training_SASMEC_IIUM (1).pdfHIRARC_Training_SASMEC_IIUM (1).pdf
HIRARC_Training_SASMEC_IIUM (1).pdfMUHAMMAD FAROOQ AZAM
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingKJP Consulting
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit SystemGagan Tanwar
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdfaashir14
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space PptDan Gauthier
 
20 Essential Hydrotest Safety Checklist
20 Essential Hydrotest Safety Checklist20 Essential Hydrotest Safety Checklist
20 Essential Hydrotest Safety ChecklistLukman Nulhakiem
 
Preventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptxPreventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptxMohsinRaza177052
 
Accident Investigation Training- Safety First!
Accident Investigation Training- Safety First!Accident Investigation Training- Safety First!
Accident Investigation Training- Safety First!davidhongwei
 
Safety in confined space
Safety in confined space   Safety in confined space
Safety in confined space The Apprentiice
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilitiesFãrük Ñäzmî
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 

What's hot (20)

Accident Investigation
Accident InvestigationAccident Investigation
Accident Investigation
 
SIMULTANEOUS OPERATIONS (SIMOPS) STUDY - IFLUIDS ENGINEERING
SIMULTANEOUS OPERATIONS (SIMOPS) STUDY - IFLUIDS ENGINEERINGSIMULTANEOUS OPERATIONS (SIMOPS) STUDY - IFLUIDS ENGINEERING
SIMULTANEOUS OPERATIONS (SIMOPS) STUDY - IFLUIDS ENGINEERING
 
HIRARC_Training_SASMEC_IIUM (1).pdf
HIRARC_Training_SASMEC_IIUM (1).pdfHIRARC_Training_SASMEC_IIUM (1).pdf
HIRARC_Training_SASMEC_IIUM (1).pdf
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
Loto training
Loto trainingLoto training
Loto training
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
Mechanical Integrity.pdf
Mechanical Integrity.pdfMechanical Integrity.pdf
Mechanical Integrity.pdf
 
Industrial Safety
Industrial SafetyIndustrial Safety
Industrial Safety
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
 
20 Essential Hydrotest Safety Checklist
20 Essential Hydrotest Safety Checklist20 Essential Hydrotest Safety Checklist
20 Essential Hydrotest Safety Checklist
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 
Preventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptxPreventive maintenence of vacuum pumps by MMR.pptx
Preventive maintenence of vacuum pumps by MMR.pptx
 
Accident Investigation Training- Safety First!
Accident Investigation Training- Safety First!Accident Investigation Training- Safety First!
Accident Investigation Training- Safety First!
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Safety in confined space
Safety in confined space   Safety in confined space
Safety in confined space
 
hot works for construction of temporary facilities
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 

Similar to WSM Yard-High-Pressure Safety-22.12.19

Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewFulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewMark Platten
 
Safety Aspects in Reactors in API & Chemical Industries
Safety Aspects in Reactors in API & Chemical IndustriesSafety Aspects in Reactors in API & Chemical Industries
Safety Aspects in Reactors in API & Chemical Industriesharish pandey
 
Derive accurate liquid and gas measurements using flow switches and meters.
Derive accurate liquid and gas measurements using flow switches and meters.Derive accurate liquid and gas measurements using flow switches and meters.
Derive accurate liquid and gas measurements using flow switches and meters.Gordy's Sensors
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valvesAmol Dudhate
 
Relief Systems.pdf
Relief Systems.pdfRelief Systems.pdf
Relief Systems.pdfKAhmedRehman
 
The humble check_valve
The humble check_valveThe humble check_valve
The humble check_valveUsama Khan
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingAbhijeet Nagle
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)SAJJAD KHUDHUR ABBAS
 
How to Calibrate a Pressure Gauge with a Pressure Comparator or Calibrator We...
How to Calibrate a Pressure Gauge with a Pressure Comparator or Calibrator We...How to Calibrate a Pressure Gauge with a Pressure Comparator or Calibrator We...
How to Calibrate a Pressure Gauge with a Pressure Comparator or Calibrator We...Transcat
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown inAkshay Kotkar
 

Similar to WSM Yard-High-Pressure Safety-22.12.19 (20)

Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewFulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For review
 
Piping hydrotest
Piping hydrotestPiping hydrotest
Piping hydrotest
 
Safety Aspects in Reactors in API & Chemical Industries
Safety Aspects in Reactors in API & Chemical IndustriesSafety Aspects in Reactors in API & Chemical Industries
Safety Aspects in Reactors in API & Chemical Industries
 
Derive accurate liquid and gas measurements using flow switches and meters.
Derive accurate liquid and gas measurements using flow switches and meters.Derive accurate liquid and gas measurements using flow switches and meters.
Derive accurate liquid and gas measurements using flow switches and meters.
 
PSV Sizing.pdf
PSV Sizing.pdfPSV Sizing.pdf
PSV Sizing.pdf
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
Relief Systems.pdf
Relief Systems.pdfRelief Systems.pdf
Relief Systems.pdf
 
Relief systems
Relief systemsRelief systems
Relief systems
 
Plant start up
Plant start upPlant start up
Plant start up
 
The humble check_valve
The humble check_valveThe humble check_valve
The humble check_valve
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / Hydrotesting
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
 
11. membrane unit
11. membrane unit11. membrane unit
11. membrane unit
 
Boiler Mountings
Boiler MountingsBoiler Mountings
Boiler Mountings
 
Leak Tests.pptx
Leak Tests.pptxLeak Tests.pptx
Leak Tests.pptx
 
How to Calibrate a Pressure Gauge with a Pressure Comparator or Calibrator We...
How to Calibrate a Pressure Gauge with a Pressure Comparator or Calibrator We...How to Calibrate a Pressure Gauge with a Pressure Comparator or Calibrator We...
How to Calibrate a Pressure Gauge with a Pressure Comparator or Calibrator We...
 
Control valve
Control valveControl valve
Control valve
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown in
 
Pressure measurement
Pressure measurement Pressure measurement
Pressure measurement
 

More from SARWAR SALAM

Drilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdfDrilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdfSARWAR SALAM
 
Drilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdfDrilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdfSARWAR SALAM
 
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdfDrilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdfSARWAR SALAM
 
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdfDrilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdfSARWAR SALAM
 
Drillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdfDrillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdfSARWAR SALAM
 
Hand and Power tools safety
Hand and Power tools safetyHand and Power tools safety
Hand and Power tools safetySARWAR SALAM
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemSARWAR SALAM
 
Endless Round Web-sling
Endless Round Web-slingEndless Round Web-sling
Endless Round Web-slingSARWAR SALAM
 
Koya university induction
Koya university inductionKoya university induction
Koya university inductionSARWAR SALAM
 
Safety in working place
Safety in working placeSafety in working place
Safety in working placeSARWAR SALAM
 
Well control equipment
Well control equipmentWell control equipment
Well control equipmentSARWAR SALAM
 
General overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering DepatmentGeneral overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering DepatmentSARWAR SALAM
 
Experiment no 3 surface tension
Experiment no 3 surface tensionExperiment no 3 surface tension
Experiment no 3 surface tensionSARWAR SALAM
 
Harvard referencing style quick guide
Harvard referencing style quick guideHarvard referencing style quick guide
Harvard referencing style quick guideSARWAR SALAM
 
Krichhoff’s voltage law
Krichhoff’s voltage lawKrichhoff’s voltage law
Krichhoff’s voltage lawSARWAR SALAM
 
Drilling fluid dilution
Drilling fluid  dilution  Drilling fluid  dilution
Drilling fluid dilution SARWAR SALAM
 

More from SARWAR SALAM (20)

Drilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdfDrilling Fluid Engineering-Viscosity & Yeild Point.pdf
Drilling Fluid Engineering-Viscosity & Yeild Point.pdf
 
Drilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdfDrilling Fluid Engineering-Rheological Proporties-M900.pdf
Drilling Fluid Engineering-Rheological Proporties-M900.pdf
 
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdfDrilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
Drilling Fluid Engineering-PH Lab-Drilling Lab#9.pdf
 
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdfDrilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
Drilling Fluid Engineering-Funnel Viscosity Lab#4.pdf
 
Drillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdfDrillling Fluid Engineering-Filtration Lab#8.pdf
Drillling Fluid Engineering-Filtration Lab#8.pdf
 
Hand and Power tools safety
Hand and Power tools safetyHand and Power tools safety
Hand and Power tools safety
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management System
 
Endless Round Web-sling
Endless Round Web-slingEndless Round Web-sling
Endless Round Web-sling
 
Lifting Safety
Lifting Safety  Lifting Safety
Lifting Safety
 
Rig move safety
Rig move safety Rig move safety
Rig move safety
 
Koya university induction
Koya university inductionKoya university induction
Koya university induction
 
Safety in working place
Safety in working placeSafety in working place
Safety in working place
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
General overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering DepatmentGeneral overview of Petroleum Engineering Depatment
General overview of Petroleum Engineering Depatment
 
Experiment no 3 surface tension
Experiment no 3 surface tensionExperiment no 3 surface tension
Experiment no 3 surface tension
 
Core plugging
Core plugging Core plugging
Core plugging
 
Harvard referencing style quick guide
Harvard referencing style quick guideHarvard referencing style quick guide
Harvard referencing style quick guide
 
Krichhoff’s voltage law
Krichhoff’s voltage lawKrichhoff’s voltage law
Krichhoff’s voltage law
 
Drilling fluid dilution
Drilling fluid  dilution  Drilling fluid  dilution
Drilling fluid dilution
 
Drilling fluid
Drilling fluidDrilling fluid
Drilling fluid
 

Recently uploaded

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Recently uploaded (20)

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

WSM Yard-High-Pressure Safety-22.12.19

  • 1. Weekly Safety Meeting High-Pressure Application Safety WSM-Erbil Office 22.12.19
  • 2. • Sudden & unintended release of stored energy • The risk of injury from a failing joint, connections, gauge, valve, fitting or another component … • High pressure will be considered as equal to and or greater than 1000 psi (7000 kPa). • The equipment which are producing high pressure in the rig are the mud pumps, the discharge manifold lines, stand pipe manifold, rotary hose, accumulator unit and its hydraulic lines, breathing air compressor discharge to the cylinders of the cascade system, chicksan hoses used during pressure testing and cementing operations, test pumps and lines used during BOP test. Pressure Application Safety
  • 3.
  • 4. Pressure System Hazards • Flying object; valves, connectors, flanges, gauges and fittings • Flying shrapnel; small pieces of pipe, pipe fittings, or other system components that shatter into parts from pressure. • Oxygen displacement • Tell more…..
  • 5. Common causes of Pressure system failure • Over-pressuring a system • Inadequate/improper pressure testing equipment • Poor system/components design • Operator error • Inadequate repair/ modification to the system • Failure to properly isolate parts being tested from other parts of the system (segregation) • Failure to properly isolate equipment from piping system being tested.
  • 6. SSoW • A written safety system of work for pressure testing must be in place • Instructions (Procedure/JSA) of the work to be provided • Correct Test set-up • Proper selection of fittings • Carrying out the initial test • Checking for leaks • Proper and effective supervision
  • 7. Segregating the item under test • Physical segregation is top intend • The hierarchy of segregation:  The use of a full enclosure to contain any projected missiles/blast energy, including protection between the test controls and the assembly under pressure;  The provision of temporary barriers/screens and systems for excluding nonessential personnel from the area;  Exclusion of people from the blast/projectile area while an item is under pressure during a test. It is good practice to restrict personnel from the vicinity of any item while it is under pressure during a test.
  • 8.
  • 9. Post-Test • Follow the SOW to safely, gradually release the pressure from the system and collect the waste liquid test medium when required. •Release pressure before attempting to fix any leak •Drain the system • No spill while bleeding off pressure •Re-test the system after any repair
  • 10.
  • 11.
  • 12. The requirements shall apply for use of high-pressure equipment • All high-pressure equipment will be equipped with appropriate high-pressure fittings of equal or higher rating. Low pressure should rate fitting shall not be used in a high-pressure system set-up. • Fixed high-pressure piping shall be painted red. • Mud pumps shall be equipped with pressure relief valves that are appropriately set. • The relief valves must be calibrated and tested; shall be set to discharge at a pressure not in excess of the manufacturer’s recommended maximum working pressure of the mud pumps and all connecting pipes and fittings.
  • 13. Cont’ • The open-ended relief lines of the devices shall be appropriately sized, kept secured, and piped in that will not endanger workers during discharge. Appropriate safety lines shall be attached. • Rotary hose safety lines at stand-pipe end shall be fastened to the derrick while the swivel/ TDS end to the swivel housing. • Chicksans used shall be secured with appropriate clamps and wire rope safety lines. • Barrier off high pressure lines during pressure testing. Post warning sign “High Pressure Testing in Progress”. • Accumulator flexible hydraulic lines must be secured with whip checks at each end connections.
  • 14. Cont’ • Only trained and authorized personnel shall be allowed to test and recharge the accumulator bottles to required pre-charge pressure. • Breathing air compressor discharge hoses and fitting of appropriate size and pressure shall be used in the high-pressure side of the cascade system. The appropriate hoses and fittings shall be used as filler whip for refilling SCBA cylinders.
  • 15.
  • 16.
  • 17.
  • 18. “Love the life you live”

Editor's Notes

  1. BMI=weight KG/(height M)2
  2. السكتة القلبية
  3. Improves blood circulation. Keeps your weight under control. Helps you quit smoking. Improves cholesterol levels. Prevents and manages high blood pressure. Prevents bone loss. Boosts energy level. Helps manage stress.