5. Motorway from Lahore to Islamabad.
Executive Summary
When this project is start first built the both boundary of the road
.the road is start to build from Lahore. We has sponsors is pak Industry.
In work breakdown structure we divide the work in subtask that is
equipment, planning, foods, worker, staff, security, engineer, and
team member. In worker the work is dividing into number of work
in the person. Worker has divided into server, sweeper, shopper and
sub engineer.
6. we complete project if the some people using the
motorway.
The mostly people which using the road is citizen
of Lahore and Islamabad
Exceptive
The profit for built motorway also increasing .
Some of popular company also introduce at
different place of the motorway.
7. The export and Import Company is also
using the motorway from Lahore to
Islamabad.
Petrol pump is also open so that people can
refill our vehicles.
Less traffic
Pakistan's Motorways are part of Pakistan's
National Trade Corridor Project
8. It is macro level of work dividing.
We have divided the project by staff,
foods, equipment, planning, engineer, workers
and security
9. It is micro level of work dividing.
We have divided the project by staff,
foods, equipment, planning, engineer, workers
and security
10. RAM WBS
1. In Detail
2. Worker Name
3. Lower level
1. Assign Work to head
2. Worker head
3. It is upper level
11. Employee can easly reach lahore to islamabad on daily basis.
Islamabad to lahore motorway have economical Inflation impact
wealth accumulation and distribution is also impact.
Transport of our country also improve and reduce other expensive .
Industry level also increasing when lahore to islamabad motoway
bulit.
In social this project Impact on services health and education.
12. If material is not good for motorway
If the track of the motorway is turn because the soil
of some city is not good for the motorway.
If the motorway is bend because used material is
low.
13. When we built the bridge on the rivers of
the Ravi and Chenab. The bridge will be fall
down.
Season is not suitable.
If our Budget will be less for complete the
project.