Contents
• Aspects and Impacts
• Impact Assessment
• Techniques
• Kinds
• Prediction
• Social Assessment
• Mitigation
• Institutional Setup
• Preparation of EIA report
2
Aspects and Impacts
Aspects:
• The elements of project’s activities, products or services which interact
with the environment.
Impacts:
• Any change to the environment, whether adverse or beneficial, wholly or
partially resulting from a project’s activities, products or services.
3
Kinds and Prediction of Impact
• Direct Impact:
- Directly relating to the project.
• Indirect Impact:
- Less obvious.
- Not directly relate.
• Cumulative Impact:
- combinedly effect more then individual.
• Prediction of Impacts:
- Qualitative (experts, reasoning).
- Quantitative (simulation, modeling, statistics).
4
Determination of Significance of Potential Impact
Some Key Factor:
• Public health and safety, risk (high or unknown).
• Aesthetics and recreation, other unique characteristics.
• Resources availability, farmland, forests, wildlife.
Some Key Elements:
• Public concern/controversy/precedent-setting.
• Disturbance of protected/valued habitats.
• Disruption of local customs
Inherently a Value Judgement:
• Needs and sustainability.
• Law, policy and regulation.
5
Impact Assessment Techniques
• Professional Expert Opinion
• Questionnaires/ Case studies
• Checklists
-Advantages (simple to understand and use, good for site selection)
-Disadvantages (it doesn’t distinguish, do not link action and impact)
• Matrices
-Advantages (link action to impact, good method for displaying EIA result)
-Disadvantages (difficult to distinguish)
• Networks
- Advantages (link action to impacts, handles direct and indirect impacts)
-Disadvantages (can become very complex if used beyond simplified version)
6
Contd…
• Overlays
-Advantages (easy to understand, good display method, good sitting tools)
-Disadvantages (address only direct impact, do not address impact duration)
• GIS
-Advantages (excellent for impact analysis and identification, good for experimet)
-Disadvantages (heavy reliance on knowledge and data, often complex)
• Carrying Capacity
• Modeling
7
Social Assessment (SA)
• Approach to ensure that the social dimension of development or fully
address through out the project life cycle.
• Tools for SA.
- desk review
- household interview
- group discussion
- case study
- stakeholder workshop
- social mapping
8
Contd…
Level of public involvement
• Informing: One way flow from proponent in public.
• Consulting: Two way flow of information opportunities for public to
express views.
• Participating: proponent and public share analysis and agenda
setting, public involvement in decision maker through consensus.
9
Mitigation
• Finding better ways of doing things.
• Minimizing or eliminating the negative impacts.
• Enhancing the project benefits.
• How to mitigate?
• For example: alternative ways of meeting the needs.
• Changes in planning and designing.
• Improving monitoring and management.
• Through monitory compensation.
10
Institutional Setup
• PEPC (Pakistan Environmental Protection Council)
• Ministry of Environment
• Federal EPA.
• Provincial EPA.
• Environmental Tribunal
- Three judges in each headquarters.
- Environmental magistrate
- Environmental inspectors
11
Preparation And Review EIA Report
• Format (organization of content).
• Preparation and description of EIA draft.
• Circulation (agencies, experts, private groups, stakeholders).
• Review of EIA report
• Preparation of final EIS discuss and incorporate the comments, file
the EIA with EPA.
• Follow format as recommended by EPA.
12
Sample of Checklist
13
As pects of EIA Checklist Q uestions
Will the proje ct:
Ye s No Additiona l
Da ta ne eds
Sourc es of Impacts 1. Re qui re the a cqu isi ti on o r co nve rsi on of si gni ficant areas
of la nd for reservoi r/treatmen t works etc. (e .g . > 50 ha
rural , > 5 ha urba n)?
2. Re sul t i n sig nifi ca nt qu anti ti es of e ro ded materi al , efflu ent
or sol i d wastes?
3. Re qui re si gni ficant accommod atio n or servi ce a meni ties to
suppo rt th e workforce d urin g con structi on (eg > 10 0
man ual worke rs)?
Re ceptors of Impacts 4. Fl oo d or o th erwise affe ct areas whi ch su ppo rt
co nservati on worthy terre stria l or aqu ati c e cosyste ms,
flo ra o r faun a (eg p ro te cted area s, wil de rn ess areas,
forest re se rves, cri ti ca l ha bi ta ts, en dan gered speci es); o r
that con ta in sites of h isto ri cal or cu ltural i mpo rtan ce?
5. Fl oo d or o th erwise affe ct areas whi ch wi ll affe ct the
l ivel ih ood s of l ocal peop le (eg req ui re p opu la ti on
resettl emen t; affe ct l ocal i nd ustry, agri cul ture, l i vestock
or fi sh stocks; re duce th e avai lab il i ty of na tu ra l resource
go ods a nd servi ces)?
6. Invo lve si tin g san itati on tre atment fa ci li tie s cl ose to
hu man se ttl emen ts (pa rti cu la rl y whe re l ocatio ns a re
suscepti bl e to fl ood in g)?
7. Affect sou rces o f wa ter extracti on ?
Env ironmental Impa cts 8. Ca use a n oticeab le p ermane nt or se aso nal re ducti on i n
the vo lu me of g ro und or su rface water sup pl y?
9. Present a si gni fican t pol l utio n ri sk th ro ugh l i qui d or sol i d
wa stes to hu ma ns, source s of water e xtra ctio n,
co nservati on worthy aq uati c ecosystems and specie s, or
co mmerci al fi sh sto cks?
10 . Ch ange the l ocal h ydrol og y of surface water-b odi es (eg
streams, ri vers, l ake s) such that con serva ti on -worth y or
co mmerci al ly si gni ficant fi sh stocks a re affecte d?
11 . Increa se the risk o f di se ases i n areas of hi gh p opu la ti on
de nsi ty (eg oncho cerci asi s, fi la ri asi s, ma la ri a, hep atiti s,
ga stro in te sti nal di sea se s)?
12 . Indu ce seco nda ry d eve lo pmen t, eg al ong a ccess ro ads,
or in the form o f en trep re neu ri al services for constru ctio n
an d ope ra ti ona l activiti es?
Mitiga tion Mea sures 13 . Be l ikel y to re qui re miti gati on measures tha t may resul t i n
the proj ect be in g fi nan ci al l y or socia ll y un acceptab le ?
Comme nts
I recommend tha t the programme be a ssigned to
Ca tegory
Si gna tu re : De le gati on.........................................De sk...................................
Sample of Matrix
14
15

More Related Content

What's hot

Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Ethical Sector
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
 
EIA practice: a global review
EIA practice: a global reviewEIA practice: a global review
EIA practice: a global reviewMichael Asigbaase
 
Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEmerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEthical Sector
 
Envirornment Impact Assessment
Envirornment Impact AssessmentEnvirornment Impact Assessment
Envirornment Impact AssessmentRJ
 
Eia methods for transportation project
Eia methods for transportation projectEia methods for transportation project
Eia methods for transportation projectKushal Patel
 
Principles of environmental impact assessment
Principles of environmental impact assessmentPrinciples of environmental impact assessment
Principles of environmental impact assessmentAnirban Mandal
 
Environmental impact assessment in nepal
Environmental impact assessment in nepalEnvironmental impact assessment in nepal
Environmental impact assessment in nepalBhim Upadhyaya
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)KASHYAP V
 
environmental impact assesment
environmental impact assesment environmental impact assesment
environmental impact assesment Nisha Jindal
 
Environmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementEnvironmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementJoy Bhattacharjee
 
Assessing proposed project development under EIA
Assessing proposed project development under EIAAssessing proposed project development under EIA
Assessing proposed project development under EIAKisesa Hamis
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTgoswamikusum
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1hirencd
 
ENVIRONMENT IMPACT ASSESSMENT: CONCEPT & CHALENGES
ENVIRONMENT IMPACT ASSESSMENT:  CONCEPT & CHALENGESENVIRONMENT IMPACT ASSESSMENT:  CONCEPT & CHALENGES
ENVIRONMENT IMPACT ASSESSMENT: CONCEPT & CHALENGESAnamika Rana
 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationMizanur R. Shohel
 

What's hot (20)

Esia
EsiaEsia
Esia
 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
EIA practice: a global review
EIA practice: a global reviewEIA practice: a global review
EIA practice: a global review
 
Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEmerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
 
Envirornment Impact Assessment
Envirornment Impact AssessmentEnvirornment Impact Assessment
Envirornment Impact Assessment
 
Eia methods for transportation project
Eia methods for transportation projectEia methods for transportation project
Eia methods for transportation project
 
Principles of environmental impact assessment
Principles of environmental impact assessmentPrinciples of environmental impact assessment
Principles of environmental impact assessment
 
Environmental impact assessment in nepal
Environmental impact assessment in nepalEnvironmental impact assessment in nepal
Environmental impact assessment in nepal
 
Eia (2)
Eia (2)Eia (2)
Eia (2)
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
environmental impact assesment
environmental impact assesment environmental impact assesment
environmental impact assesment
 
Environmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementEnvironmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project Management
 
Eia requirements
Eia requirementsEia requirements
Eia requirements
 
EIA process
EIA processEIA process
EIA process
 
Assessing proposed project development under EIA
Assessing proposed project development under EIAAssessing proposed project development under EIA
Assessing proposed project development under EIA
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
 
ENVIRONMENT IMPACT ASSESSMENT: CONCEPT & CHALENGES
ENVIRONMENT IMPACT ASSESSMENT:  CONCEPT & CHALENGESENVIRONMENT IMPACT ASSESSMENT:  CONCEPT & CHALENGES
ENVIRONMENT IMPACT ASSESSMENT: CONCEPT & CHALENGES
 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigration
 

Similar to Environmental Impact Assessment

Mwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdfMwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdfvijayaRaghavank10
 
WAAPP-Nigeria Environmental and Social Screening presentation
WAAPP-Nigeria Environmental and Social Screening presentationWAAPP-Nigeria Environmental and Social Screening presentation
WAAPP-Nigeria Environmental and Social Screening presentationwaapp-nigeria
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Jagriti Agarwal
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessmentParth Patel
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
1. Workshop for EIA Consultants - Vicky Bowman
1. Workshop for EIA Consultants - Vicky Bowman1. Workshop for EIA Consultants - Vicky Bowman
1. Workshop for EIA Consultants - Vicky BowmanEthical Sector
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfTausifAhmad53
 
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...Iwl Pcu
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )sandeepprasad87
 
Unit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessmentUnit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessmentHarish kumar Lekkala
 
World bank and adb safeguard policies for infrastructure projects
World bank and adb safeguard policies for infrastructure projectsWorld bank and adb safeguard policies for infrastructure projects
World bank and adb safeguard policies for infrastructure projectsBhim Upadhyaya
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaMizanur R. Shohel
 

Similar to Environmental Impact Assessment (20)

Mwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdfMwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdf
 
WAAPP-Nigeria Environmental and Social Screening presentation
WAAPP-Nigeria Environmental and Social Screening presentationWAAPP-Nigeria Environmental and Social Screening presentation
WAAPP-Nigeria Environmental and Social Screening presentation
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
Hydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing ClimateHydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing Climate
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
EIA
EIAEIA
EIA
 
Planning in eco tourism
Planning in eco tourismPlanning in eco tourism
Planning in eco tourism
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
a-i3959e
a-i3959ea-i3959e
a-i3959e
 
1. Workshop for EIA Consultants - Vicky Bowman
1. Workshop for EIA Consultants - Vicky Bowman1. Workshop for EIA Consultants - Vicky Bowman
1. Workshop for EIA Consultants - Vicky Bowman
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
 
IV Seminario Regional de Agricultura y Cambio Climático - Francisco Meza
IV Seminario Regional de Agricultura y Cambio Climático - Francisco Meza IV Seminario Regional de Agricultura y Cambio Climático - Francisco Meza
IV Seminario Regional de Agricultura y Cambio Climático - Francisco Meza
 
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
 
Unit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessmentUnit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessment
 
World bank and adb safeguard policies for infrastructure projects
World bank and adb safeguard policies for infrastructure projectsWorld bank and adb safeguard policies for infrastructure projects
World bank and adb safeguard policies for infrastructure projects
 
Question
QuestionQuestion
Question
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
 

More from Saad Farooqi

BTEX in the production of insulation bituminous
BTEX in the production of insulation bituminousBTEX in the production of insulation bituminous
BTEX in the production of insulation bituminousSaad Farooqi
 
Heavy Metals in Foodstuffs
Heavy Metals in FoodstuffsHeavy Metals in Foodstuffs
Heavy Metals in FoodstuffsSaad Farooqi
 
Water problems in Balochistan, Pakistan
Water problems in Balochistan, PakistanWater problems in Balochistan, Pakistan
Water problems in Balochistan, PakistanSaad Farooqi
 
Health safety laws and regulations (laboratory)
Health safety laws and regulations (laboratory)Health safety laws and regulations (laboratory)
Health safety laws and regulations (laboratory)Saad Farooqi
 
Air Pollution Control Technology (Marble Industry)
Air Pollution Control Technology (Marble Industry)Air Pollution Control Technology (Marble Industry)
Air Pollution Control Technology (Marble Industry)Saad Farooqi
 
Sustainable and non sustainable energy
Sustainable and non sustainable energySustainable and non sustainable energy
Sustainable and non sustainable energySaad Farooqi
 
Urban noise pollution
Urban noise pollutionUrban noise pollution
Urban noise pollutionSaad Farooqi
 
Urban land pollution and usage
Urban land pollution and usageUrban land pollution and usage
Urban land pollution and usageSaad Farooqi
 
Urban flora of pakistan
Urban flora of pakistanUrban flora of pakistan
Urban flora of pakistanSaad Farooqi
 
Ecological function in urban enivronment
Ecological function in urban enivronmentEcological function in urban enivronment
Ecological function in urban enivronmentSaad Farooqi
 
detect and identify common human bacterial pathogens in high purity water.
detect and identify common human bacterial pathogens in high purity water.detect and identify common human bacterial pathogens in high purity water.
detect and identify common human bacterial pathogens in high purity water.Saad Farooqi
 
Climatic zones of pakistan
Climatic zones of pakistanClimatic zones of pakistan
Climatic zones of pakistanSaad Farooqi
 

More from Saad Farooqi (20)

Soil conservation
Soil conservationSoil conservation
Soil conservation
 
BTEX in the production of insulation bituminous
BTEX in the production of insulation bituminousBTEX in the production of insulation bituminous
BTEX in the production of insulation bituminous
 
Heavy Metals in Foodstuffs
Heavy Metals in FoodstuffsHeavy Metals in Foodstuffs
Heavy Metals in Foodstuffs
 
Water problems in Balochistan, Pakistan
Water problems in Balochistan, PakistanWater problems in Balochistan, Pakistan
Water problems in Balochistan, Pakistan
 
Health safety laws and regulations (laboratory)
Health safety laws and regulations (laboratory)Health safety laws and regulations (laboratory)
Health safety laws and regulations (laboratory)
 
Air Pollution Control Technology (Marble Industry)
Air Pollution Control Technology (Marble Industry)Air Pollution Control Technology (Marble Industry)
Air Pollution Control Technology (Marble Industry)
 
Environment
EnvironmentEnvironment
Environment
 
Sustainable and non sustainable energy
Sustainable and non sustainable energySustainable and non sustainable energy
Sustainable and non sustainable energy
 
Urban soil
Urban soilUrban soil
Urban soil
 
Urban noise pollution
Urban noise pollutionUrban noise pollution
Urban noise pollution
 
Urban land pollution and usage
Urban land pollution and usageUrban land pollution and usage
Urban land pollution and usage
 
Soil Profile
Soil ProfileSoil Profile
Soil Profile
 
Urban flora of pakistan
Urban flora of pakistanUrban flora of pakistan
Urban flora of pakistan
 
Ecological function in urban enivronment
Ecological function in urban enivronmentEcological function in urban enivronment
Ecological function in urban enivronment
 
Hypothesis
HypothesisHypothesis
Hypothesis
 
Urban Landscape
Urban LandscapeUrban Landscape
Urban Landscape
 
ISO Certification
ISO CertificationISO Certification
ISO Certification
 
detect and identify common human bacterial pathogens in high purity water.
detect and identify common human bacterial pathogens in high purity water.detect and identify common human bacterial pathogens in high purity water.
detect and identify common human bacterial pathogens in high purity water.
 
Drought
DroughtDrought
Drought
 
Climatic zones of pakistan
Climatic zones of pakistanClimatic zones of pakistan
Climatic zones of pakistan
 

Recently uploaded

NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...Amil baba
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Hyderabad Escorts Agency
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...Envirotac Inc.
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxarnab132
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetkajal
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...Amil baba
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptxEllen Book
 
Research.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddResearch.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddMadisonHenderson5
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Open Access Research Paper
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAaimanhadi215
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Areameghakumariji156
 

Recently uploaded (20)

NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Research.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddResearch.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfdddddddddddddddddddddddddddddddddddd
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 

Environmental Impact Assessment

  • 1. Aspects and Impacts, Impact Assessment, Social Assessment, Mitigation, Institutional Setup, Preparation of EIA, Presented by, Saad Farooqi, FA18-R07-004 Izhar Aziz, FA18-R07-006 MS-Environmental Science Department of Environmental Science COMSATS University Islamabad, Abbottabad Campus 1
  • 2. Contents • Aspects and Impacts • Impact Assessment • Techniques • Kinds • Prediction • Social Assessment • Mitigation • Institutional Setup • Preparation of EIA report 2
  • 3. Aspects and Impacts Aspects: • The elements of project’s activities, products or services which interact with the environment. Impacts: • Any change to the environment, whether adverse or beneficial, wholly or partially resulting from a project’s activities, products or services. 3
  • 4. Kinds and Prediction of Impact • Direct Impact: - Directly relating to the project. • Indirect Impact: - Less obvious. - Not directly relate. • Cumulative Impact: - combinedly effect more then individual. • Prediction of Impacts: - Qualitative (experts, reasoning). - Quantitative (simulation, modeling, statistics). 4
  • 5. Determination of Significance of Potential Impact Some Key Factor: • Public health and safety, risk (high or unknown). • Aesthetics and recreation, other unique characteristics. • Resources availability, farmland, forests, wildlife. Some Key Elements: • Public concern/controversy/precedent-setting. • Disturbance of protected/valued habitats. • Disruption of local customs Inherently a Value Judgement: • Needs and sustainability. • Law, policy and regulation. 5
  • 6. Impact Assessment Techniques • Professional Expert Opinion • Questionnaires/ Case studies • Checklists -Advantages (simple to understand and use, good for site selection) -Disadvantages (it doesn’t distinguish, do not link action and impact) • Matrices -Advantages (link action to impact, good method for displaying EIA result) -Disadvantages (difficult to distinguish) • Networks - Advantages (link action to impacts, handles direct and indirect impacts) -Disadvantages (can become very complex if used beyond simplified version) 6
  • 7. Contd… • Overlays -Advantages (easy to understand, good display method, good sitting tools) -Disadvantages (address only direct impact, do not address impact duration) • GIS -Advantages (excellent for impact analysis and identification, good for experimet) -Disadvantages (heavy reliance on knowledge and data, often complex) • Carrying Capacity • Modeling 7
  • 8. Social Assessment (SA) • Approach to ensure that the social dimension of development or fully address through out the project life cycle. • Tools for SA. - desk review - household interview - group discussion - case study - stakeholder workshop - social mapping 8
  • 9. Contd… Level of public involvement • Informing: One way flow from proponent in public. • Consulting: Two way flow of information opportunities for public to express views. • Participating: proponent and public share analysis and agenda setting, public involvement in decision maker through consensus. 9
  • 10. Mitigation • Finding better ways of doing things. • Minimizing or eliminating the negative impacts. • Enhancing the project benefits. • How to mitigate? • For example: alternative ways of meeting the needs. • Changes in planning and designing. • Improving monitoring and management. • Through monitory compensation. 10
  • 11. Institutional Setup • PEPC (Pakistan Environmental Protection Council) • Ministry of Environment • Federal EPA. • Provincial EPA. • Environmental Tribunal - Three judges in each headquarters. - Environmental magistrate - Environmental inspectors 11
  • 12. Preparation And Review EIA Report • Format (organization of content). • Preparation and description of EIA draft. • Circulation (agencies, experts, private groups, stakeholders). • Review of EIA report • Preparation of final EIS discuss and incorporate the comments, file the EIA with EPA. • Follow format as recommended by EPA. 12
  • 13. Sample of Checklist 13 As pects of EIA Checklist Q uestions Will the proje ct: Ye s No Additiona l Da ta ne eds Sourc es of Impacts 1. Re qui re the a cqu isi ti on o r co nve rsi on of si gni ficant areas of la nd for reservoi r/treatmen t works etc. (e .g . > 50 ha rural , > 5 ha urba n)? 2. Re sul t i n sig nifi ca nt qu anti ti es of e ro ded materi al , efflu ent or sol i d wastes? 3. Re qui re si gni ficant accommod atio n or servi ce a meni ties to suppo rt th e workforce d urin g con structi on (eg > 10 0 man ual worke rs)? Re ceptors of Impacts 4. Fl oo d or o th erwise affe ct areas whi ch su ppo rt co nservati on worthy terre stria l or aqu ati c e cosyste ms, flo ra o r faun a (eg p ro te cted area s, wil de rn ess areas, forest re se rves, cri ti ca l ha bi ta ts, en dan gered speci es); o r that con ta in sites of h isto ri cal or cu ltural i mpo rtan ce? 5. Fl oo d or o th erwise affe ct areas whi ch wi ll affe ct the l ivel ih ood s of l ocal peop le (eg req ui re p opu la ti on resettl emen t; affe ct l ocal i nd ustry, agri cul ture, l i vestock or fi sh stocks; re duce th e avai lab il i ty of na tu ra l resource go ods a nd servi ces)? 6. Invo lve si tin g san itati on tre atment fa ci li tie s cl ose to hu man se ttl emen ts (pa rti cu la rl y whe re l ocatio ns a re suscepti bl e to fl ood in g)? 7. Affect sou rces o f wa ter extracti on ? Env ironmental Impa cts 8. Ca use a n oticeab le p ermane nt or se aso nal re ducti on i n the vo lu me of g ro und or su rface water sup pl y? 9. Present a si gni fican t pol l utio n ri sk th ro ugh l i qui d or sol i d wa stes to hu ma ns, source s of water e xtra ctio n, co nservati on worthy aq uati c ecosystems and specie s, or co mmerci al fi sh sto cks? 10 . Ch ange the l ocal h ydrol og y of surface water-b odi es (eg streams, ri vers, l ake s) such that con serva ti on -worth y or co mmerci al ly si gni ficant fi sh stocks a re affecte d? 11 . Increa se the risk o f di se ases i n areas of hi gh p opu la ti on de nsi ty (eg oncho cerci asi s, fi la ri asi s, ma la ri a, hep atiti s, ga stro in te sti nal di sea se s)? 12 . Indu ce seco nda ry d eve lo pmen t, eg al ong a ccess ro ads, or in the form o f en trep re neu ri al services for constru ctio n an d ope ra ti ona l activiti es? Mitiga tion Mea sures 13 . Be l ikel y to re qui re miti gati on measures tha t may resul t i n the proj ect be in g fi nan ci al l y or socia ll y un acceptab le ? Comme nts I recommend tha t the programme be a ssigned to Ca tegory Si gna tu re : De le gati on.........................................De sk...................................
  • 15. 15