TAYLOR’S UNIVERSITY
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
BUILDING CONSTRUCTION II (BLD 60703)
PROJECT ONE: TEMPORARY BUS SHELTER
NG LEK YUEN
NG PUI YAN
SARAH BINTI MOHAMED ESA
MELISA BINTI FAISAL
ARINA NADIA BINTI FARID
0324010
0324785
0324805
0325983
0324105
SKELETAL
CONSTRUCTION.
INTRODUCTION
SKELETAL STRUCTURES
A skeletal structure is a skeletal frame used to resist vertical
and lateral forces. It works alongside the foundation, providing
strength and stability for the structure. The framing transfers all
load gravity, uplift, and lateral loads to the foundation; by
transferring loads from structural elements to the foundation,
and then to the ground. For this project, in a group of six, we are
required to design and construct a temporary bus shelter in a 1:5
scale as well as perform load-testing, to demonstrate our
understanding on how a skeletal structure reacts with load, and
skeletal construction as a design solution. Our bus shelter was
constructed using a mix of steel and timber as the materials. The
floor is covered by timber decking; and the framing is made by
steel.
01.
TABLE OF CONTENT
01INTRODUCTION
02TABLE OF CONTENT
03DESIGN PROCESS
- Inspiration and Case Studies
- Proposed Designs
08TECHNICAL
DRAWINGS
12DETAILS AND
JOINTS
15MATERIAL
SELECTION
17CONSTRUCTION
PROCESS
- Assembling process
- Construction process
23FORCE
ANALYSIS
26WEATHER
CONSIDERATION
AND
ACCESSIBILITY
02.
28CONCLUSION
30REFERENCES
DESIGN
PROCESS
Design Inspirations -
Proposed Designs -
03.
DESIGN INSPIRATIONS // TIMBER STRUCTURE
Our initial ideas were to design the bus shelter by using grids formation as we found the form interesting to explore on in terms of construction. We have
looked into several design inspirations and analysed their construction details with emphasis on joint connection methods.
Timber joint connections inspration
04.
PROBLEMS:
- materials used are
not really suitable and
the proposed ideas
have too many
unneccessary
collumns
- collumns and raft-
er joint sizes are not
suitable to be used
PROPOSED DESIGN // INITIAL IDEA (Rejected)
We came up with our initial design of our bus shelter whereby we took account of important factors such as weather durabillity and underground
considerations like moisture and termite control.
05.
Rough sketch of the
connection of the
collumns and bench
Tilted roof
to channel
the rainwater
away from the
seating area.
collumn
arrangement
DESIGN INSPIRATIONS // METAL STRUCTURE
We eventually changed our form from being grided into a simple geometric form. We also ammended our choice of materials from being full timber to being
partially timber. As for the collumns and the rest of the roof elements, we have decided to use steel instead.
06.
PROPOSED DESIGN // FINAL IDEA
For the final idea, we have improved the design and construction of our bus shelter to overcome the problems faced by the previous design.
07.
Here, we have ammended the position of the
roof to be more stable and also by adding the
roof details.
elevation view of the bus stop perspective view of the bus stop
We came up with the roof details and
the method of construction
We have also looked into the column and
foundation contruction as well as the load
transmission throughout the bus stop.
TECHNICAL
DRAWINGS
08.
09.
ROOF PLAN
SCALE 1:25
SIDE ELEVATION
SCALE 1:25
ORTHOGRAPHIC DRAWINGS
10.
FRONT ELEVATION
SCALE 1:25
ORTHOGRAPHIC DRAWINGS
EXPLODED AXONOMETRIC
ROOF
PURLIN
ROOF RAFTER
ROOF BEAM
COLUMN
SEATING
FLOORING
FLOOR JOIST
PAD
FOUNDATION
1 1 .
PERSPECTIVE DRAWINGS
DETAILS AND
JOINTS
12.
13.
PAD FOUNDATION
We used a shallow foundation for our proposal. The pad foundation is
suitable where the bearing capacity of ground is sufficient at relatively low
depths. Not much excavation is needed; hence why it was chosen.
WOODEN FLOORING
Reinforced Concrete Foundation
Timber Block
Steel Column Connector
Timber block is
embedded into the
concrete.
Timber was used as
the base as it is
resistant to moisture
from the ground.
floor to joist
connection
joist to
header joist
connection
floor
joist
header joist
14.
STEEL COLUMN ROOF
The roof of the bus shelter is slanted. It sits on a roof frame that is
supported by a purlin and rafter, which are welded together and attached
to two supporting columns using nuts and bolts.
A steel pipe is used for the columns
The column is welded onto the
beam. To further strengthen the
connection, brackets are bolted
to the rafters and welded to the
columns as well
The base plate is connected to the
lifted concrete footing via nut and bolt
connection is to avoid getting rust
The columns are welded
onto a metal base plate
Rafter-to Column
Connection
Column-to-Floor
Connection
Welded to Rafters and Purlins
Steel Socket Bolts and Nuts
MATERIAL
SELECTION
15.
MATERIAL USED
STEEL STRUCTURE
Steel structure is used as the framing as it
is able to withstand extreme forces or harsh
weather conditions, such as strong winds,
earthquakes, and hurricanes.
They are also unreceptive to rust and are not
affected by termites, bugs, mildew, mould
and fungi. In addition, they are more fire-re-
sistant compared to wooden frames.
TIMBER DECKING
Timber decking is used for the floor as
it is strong, durable, and biodegrada-
ble, making it suitable for temporary
structures. It is also able to withstand
high temperatures, and lasts for a very
long time. In addition, it is weather and
stain resistant.
CONCRETE FOUNDATION
A concrete pad foundation is used as
it has a high durability, adequate for
foundation use. It provides the highest
level of strength for foundations
16.
Round Head
Nails
for wooden
flooring
Round Screw
Bolts and Nuts
for connection
of wooden seat
on the metal
Brackets
for connection
of foundation to
wooden header
Flat Head Screws
for connection
of foundation to
wooden header
P0LYCARB0NATE R00f
Polycabonate roofing sheets are used
for the roof. it is a lightweight
material that has high durability, able
to withstand harsh weather
conditions without discolouring.
Because of this, it is suitable as it can
withstand the weather outdoors and
provide comfort to users by blocking
out uv rays.
CONSTRUCTION
PROCESS
17. Assembling process -
Construction process -
ASSEMBLING PROCESS
18.
Our final design is composed of timber deck and steel structure.
CONSTRUCTION PROCESS
FOUNDATION
FLOOR JOIST
19.
We have mixed the cement powder (to replace concrete) with suitable amount of water and the mixture is then poured into the formwork with reinforcement. After pouring the mixture, the foundation wall is added
to be conneted to the floor jois once the mixture dries and hardens.
The floor joists is measured and cut to be attached to the header joists by nailing.
FLOORING
COLUMN, ROOF BEAM and ROOF RAFTER
20.
Timber wood pieces were cut piece by piece and screwed into place to create the wooden flooring ; two 100 x 100 mm holes were made on the flooring to allow the column to connect to the foundation.
Roof, roof beam and raftar: Firstly we have chosen the suitable metal to be used for our bus shelter. The dimensions for each elements are measured to be cut. After the cutting process comes the installa-
tion process where we screw all the metal pieces together to form the complete structure of the roof.
COLUMN, ROOF BEAM and ROOF RAFTER
ROOFING
21.
The polycarbonate roof is screwed onto the purlin located above the rafter and roof beam.
Welding : The columns and beams are connected by welding. Once the welding is done, we spray painted the structure to make it look clean.
SEATING
FINAL PRODUCT
22.
Wooden panels are cut into two pieces of 700 x 80 mm and screwed to the column using bolts and nuts.
The overall final product of the bus stop consists of components from the foundation to the flooring, columns, rafters and roofings. All the parts are connected by welding and mostly screws, bolts and nuts to create a
stable bus stop.
FORCE
ANALYSIS
23.
24.
LOAD DISTRIBUTION
The dead load acting on the structure is transferred from the roof, column, and floor to it’s foundation. The use of polycarbonate as the roof doesn’t exert much force due
to it’s light weight as compared to the column and beam which uses steel. Live load is limited to the number of people the bus stop can shelter at any one time and the
frequency of users.
Live Load
Dead Load
CONCENTRATED LOADS
25.
concentrated loads : concentrated loads are the force acting on two perpendicular components or a small area. When a beam transmits its load to a point of
suppose which is typically a column, the perpendicular angle will cause one side to be under tension and the other in compression
WEATHER
CONSIDERATION
AND
ACCESSIBILITY
26.
morning
noon
evening
The form of our roof is designed in such way that it reflects the sunlight outwards throughout the day. In terms of the roof
materiality, we have used polycarbonated roof as it has the ability to reflect sun radiation on sunny days.
WEATHER CONSIDERATION // SUN
WEATHER CONSIDERATION // RAIN AND WIND
Floor Plan
not to scale
ACCESSIBILITY
The roof incorporates a butterfly design where it is angled
inwards. This design allows rainwater to easily flow off the roof through a
gutter and prevents water buildup as well. The choice of material also plays
a part as polycarbonate sheets have high resistance to weather which is
necessary for our tropical climate.
These roofs are also aerodynamic allowing the structure to have high wind
resistance. Malaysia’s wind speed and frequency is relatively low on nor-
mal days unless it is raining or experiencing storm.
27.
CONCLUSION
28.
By doing this project, it has allowed us to explore and learn the actual construction methods of an actual bus stop. The different methods of putting the whole
bus stop together mimicking the real life bus stop has taught us of the many different joints as well as the components that are needed to build a complete bus
stop. Overall, the details of prepping the bus stop was not an easy task eg: creating a formwork to cast concrete, also making sure that the dried concrete does not
crack. Furthermore, another difficulty was that we had to figure out the proper joining methods of the joints of the bus stop to ensure stability in the correct way.
Throughout the process of building the bus stop, we learnt that the little details makes a huge difference during the construction processes. Lastly, by using the
correct methods and joineries, the end product is a stable and functional 1:5 bus stop.
CONCLUSION
29.
REFERENCES
30.
1. Chudley, R. 2006, Construction Technology. 4th edition. Pearson
and Prentice Hall.
2. Seeley, Ivor H. 1995, Building Technology. 5th edition. Basingstoke,
Hants : MacMillan
3. Ching, Francis D.K. 1991. Building Construction Illustrated. New
York. Van Nostrand Reinhold.

More Related Content

What's hot

Building construction report
Building construction reportBuilding construction report
Building construction reportChong Yi Hui
 
Cape Rachado Site A Analysis
Cape Rachado Site A AnalysisCape Rachado Site A Analysis
Cape Rachado Site A AnalysisJoe Onn Lim
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 reportYq Chong
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design SolutionJia Xin Chee
 
Bus shelter report
Bus shelter reportBus shelter report
Bus shelter reportJy Chong
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportKelvin Ng
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportJoyeeLee0131
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsGrace Henry
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Digital Space Consultancy Ltd
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemIan Toisa
 
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORTBUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORTemily9199
 
Curtain walls - Advanced structural systems
Curtain walls - Advanced structural systemsCurtain walls - Advanced structural systems
Curtain walls - Advanced structural systemsPratibha Mohan
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
Form Active system
Form Active systemForm Active system
Form Active systemDanishPathan7
 
Formwork for Bridge and Centering Of Arch
Formwork for Bridge and Centering Of ArchFormwork for Bridge and Centering Of Arch
Formwork for Bridge and Centering Of ArchYash Patel
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems TypesMazin Elbashkatib
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1Gertrude Lee
 
CT assignment
CT assignmentCT assignment
CT assignmentyongseenyee
 

What's hot (18)

Building construction report
Building construction reportBuilding construction report
Building construction report
 
Cape Rachado Site A Analysis
Cape Rachado Site A AnalysisCape Rachado Site A Analysis
Cape Rachado Site A Analysis
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 report
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 
Bus shelter report
Bus shelter reportBus shelter report
Bus shelter report
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design Report
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter Report
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORTBUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
 
Curtain walls - Advanced structural systems
Curtain walls - Advanced structural systemsCurtain walls - Advanced structural systems
Curtain walls - Advanced structural systems
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Form Active system
Form Active systemForm Active system
Form Active system
 
Formwork for Bridge and Centering Of Arch
Formwork for Bridge and Centering Of ArchFormwork for Bridge and Centering Of Arch
Formwork for Bridge and Centering Of Arch
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems Types
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
CT assignment
CT assignmentCT assignment
CT assignment
 

Similar to Building construction 02

Bcon
BconBcon
BconYowHue
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Ow Cong
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13Minhal Haider
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1Bolin Loong
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx2022786965
 
Site Report
Site Report Site Report
Site Report Sow Wei Henn
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1Carlson Ko
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop reportAmelisa Collins
 
Shinchan presentation.pptx
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptxRAKESHPANDEY754083
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxLokeswarSaha1
 
04. superstructure
04. superstructure04. superstructure
04. superstructureThien Hee
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxVinayak247538
 
BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1Yen Min Khor
 
Final bcon 1 busstop
Final bcon 1 busstopFinal bcon 1 busstop
Final bcon 1 busstopchuenmin
 
Wall materials
Wall materialsWall materials
Wall materialsSaloniHosmani
 
Costruction ppt
Costruction pptCostruction ppt
Costruction pptSwathey1995
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxanik7nziza
 

Similar to Building construction 02 (20)

Bcon
BconBcon
Bcon
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx
 
Site Report
Site Report Site Report
Site Report
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop report
 
Shinchan presentation.pptx
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptx
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
Suraj presentation.pptx
Suraj presentation.pptxSuraj presentation.pptx
Suraj presentation.pptx
 
BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1
 
Final bcon 1 busstop
Final bcon 1 busstopFinal bcon 1 busstop
Final bcon 1 busstop
 
Bcon report
Bcon reportBcon report
Bcon report
 
Wall materials
Wall materialsWall materials
Wall materials
 
Costruction ppt
Costruction pptCostruction ppt
Costruction ppt
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptx
 

More from Sarah Esa

A3 report sarah
A3 report sarahA3 report sarah
A3 report sarahSarah Esa
 
1. architecture or revolution
1. architecture or revolution1. architecture or revolution
1. architecture or revolutionSarah Esa
 
3. the geometry of feeling
3. the geometry of feeling3. the geometry of feeling
3. the geometry of feelingSarah Esa
 
2. complexity and contradiction in architecture synopsis
2. complexity and contradiction in architecture synopsis2. complexity and contradiction in architecture synopsis
2. complexity and contradiction in architecture synopsisSarah Esa
 
A4 report
A4 reportA4 report
A4 reportSarah Esa
 
A3 report
A3 reportA3 report
A3 reportSarah Esa
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
bservice
bservicebservice
bserviceSarah Esa
 
Parliament building
Parliament buildingParliament building
Parliament buildingSarah Esa
 
Atelier tekuto's
Atelier tekuto'sAtelier tekuto's
Atelier tekuto'sSarah Esa
 
portfolio
portfolioportfolio
portfolioSarah Esa
 
Design project one ab official brief
Design project one ab   official briefDesign project one ab   official brief
Design project one ab official briefSarah Esa
 
Galdiator final
Galdiator finalGaldiator final
Galdiator finalSarah Esa
 
Cnc project 2 jan 2016 revised
Cnc project 2 jan 2016 revisedCnc project 2 jan 2016 revised
Cnc project 2 jan 2016 revisedSarah Esa
 
314704209 online-discuss-summary
314704209 online-discuss-summary314704209 online-discuss-summary
314704209 online-discuss-summarySarah Esa
 
Online discussion assignment
Online discussion assignmentOnline discussion assignment
Online discussion assignmentSarah Esa
 

More from Sarah Esa (20)

A3 report sarah
A3 report sarahA3 report sarah
A3 report sarah
 
Tay
TayTay
Tay
 
1. architecture or revolution
1. architecture or revolution1. architecture or revolution
1. architecture or revolution
 
3. the geometry of feeling
3. the geometry of feeling3. the geometry of feeling
3. the geometry of feeling
 
2. complexity and contradiction in architecture synopsis
2. complexity and contradiction in architecture synopsis2. complexity and contradiction in architecture synopsis
2. complexity and contradiction in architecture synopsis
 
Essay
EssayEssay
Essay
 
A4 report
A4 reportA4 report
A4 report
 
A3 report
A3 reportA3 report
A3 report
 
Btech report final
Btech report finalBtech report final
Btech report final
 
bservice
bservicebservice
bservice
 
Eport
EportEport
Eport
 
Final
FinalFinal
Final
 
Parliament building
Parliament buildingParliament building
Parliament building
 
Atelier tekuto's
Atelier tekuto'sAtelier tekuto's
Atelier tekuto's
 
portfolio
portfolioportfolio
portfolio
 
Design project one ab official brief
Design project one ab   official briefDesign project one ab   official brief
Design project one ab official brief
 
Galdiator final
Galdiator finalGaldiator final
Galdiator final
 
Cnc project 2 jan 2016 revised
Cnc project 2 jan 2016 revisedCnc project 2 jan 2016 revised
Cnc project 2 jan 2016 revised
 
314704209 online-discuss-summary
314704209 online-discuss-summary314704209 online-discuss-summary
314704209 online-discuss-summary
 
Online discussion assignment
Online discussion assignmentOnline discussion assignment
Online discussion assignment
 

Recently uploaded

Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Green Banking
Green Banking Green Banking
Green Banking
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 

Building construction 02

  • 1. TAYLOR’S UNIVERSITY SCHOOL OF ARCHITECTURE, BUILDING & DESIGN BUILDING CONSTRUCTION II (BLD 60703) PROJECT ONE: TEMPORARY BUS SHELTER NG LEK YUEN NG PUI YAN SARAH BINTI MOHAMED ESA MELISA BINTI FAISAL ARINA NADIA BINTI FARID 0324010 0324785 0324805 0325983 0324105 SKELETAL CONSTRUCTION.
  • 2. INTRODUCTION SKELETAL STRUCTURES A skeletal structure is a skeletal frame used to resist vertical and lateral forces. It works alongside the foundation, providing strength and stability for the structure. The framing transfers all load gravity, uplift, and lateral loads to the foundation; by transferring loads from structural elements to the foundation, and then to the ground. For this project, in a group of six, we are required to design and construct a temporary bus shelter in a 1:5 scale as well as perform load-testing, to demonstrate our understanding on how a skeletal structure reacts with load, and skeletal construction as a design solution. Our bus shelter was constructed using a mix of steel and timber as the materials. The floor is covered by timber decking; and the framing is made by steel. 01.
  • 3. TABLE OF CONTENT 01INTRODUCTION 02TABLE OF CONTENT 03DESIGN PROCESS - Inspiration and Case Studies - Proposed Designs 08TECHNICAL DRAWINGS 12DETAILS AND JOINTS 15MATERIAL SELECTION 17CONSTRUCTION PROCESS - Assembling process - Construction process 23FORCE ANALYSIS 26WEATHER CONSIDERATION AND ACCESSIBILITY 02. 28CONCLUSION 30REFERENCES
  • 5. DESIGN INSPIRATIONS // TIMBER STRUCTURE Our initial ideas were to design the bus shelter by using grids formation as we found the form interesting to explore on in terms of construction. We have looked into several design inspirations and analysed their construction details with emphasis on joint connection methods. Timber joint connections inspration 04.
  • 6. PROBLEMS: - materials used are not really suitable and the proposed ideas have too many unneccessary collumns - collumns and raft- er joint sizes are not suitable to be used PROPOSED DESIGN // INITIAL IDEA (Rejected) We came up with our initial design of our bus shelter whereby we took account of important factors such as weather durabillity and underground considerations like moisture and termite control. 05. Rough sketch of the connection of the collumns and bench Tilted roof to channel the rainwater away from the seating area. collumn arrangement
  • 7. DESIGN INSPIRATIONS // METAL STRUCTURE We eventually changed our form from being grided into a simple geometric form. We also ammended our choice of materials from being full timber to being partially timber. As for the collumns and the rest of the roof elements, we have decided to use steel instead. 06.
  • 8. PROPOSED DESIGN // FINAL IDEA For the final idea, we have improved the design and construction of our bus shelter to overcome the problems faced by the previous design. 07. Here, we have ammended the position of the roof to be more stable and also by adding the roof details. elevation view of the bus stop perspective view of the bus stop We came up with the roof details and the method of construction We have also looked into the column and foundation contruction as well as the load transmission throughout the bus stop.
  • 10. 09. ROOF PLAN SCALE 1:25 SIDE ELEVATION SCALE 1:25 ORTHOGRAPHIC DRAWINGS
  • 11. 10. FRONT ELEVATION SCALE 1:25 ORTHOGRAPHIC DRAWINGS EXPLODED AXONOMETRIC ROOF PURLIN ROOF RAFTER ROOF BEAM COLUMN SEATING FLOORING FLOOR JOIST PAD FOUNDATION
  • 12. 1 1 . PERSPECTIVE DRAWINGS
  • 14. 13. PAD FOUNDATION We used a shallow foundation for our proposal. The pad foundation is suitable where the bearing capacity of ground is sufficient at relatively low depths. Not much excavation is needed; hence why it was chosen. WOODEN FLOORING Reinforced Concrete Foundation Timber Block Steel Column Connector Timber block is embedded into the concrete. Timber was used as the base as it is resistant to moisture from the ground. floor to joist connection joist to header joist connection floor joist header joist
  • 15. 14. STEEL COLUMN ROOF The roof of the bus shelter is slanted. It sits on a roof frame that is supported by a purlin and rafter, which are welded together and attached to two supporting columns using nuts and bolts. A steel pipe is used for the columns The column is welded onto the beam. To further strengthen the connection, brackets are bolted to the rafters and welded to the columns as well The base plate is connected to the lifted concrete footing via nut and bolt connection is to avoid getting rust The columns are welded onto a metal base plate Rafter-to Column Connection Column-to-Floor Connection Welded to Rafters and Purlins Steel Socket Bolts and Nuts
  • 17. MATERIAL USED STEEL STRUCTURE Steel structure is used as the framing as it is able to withstand extreme forces or harsh weather conditions, such as strong winds, earthquakes, and hurricanes. They are also unreceptive to rust and are not affected by termites, bugs, mildew, mould and fungi. In addition, they are more fire-re- sistant compared to wooden frames. TIMBER DECKING Timber decking is used for the floor as it is strong, durable, and biodegrada- ble, making it suitable for temporary structures. It is also able to withstand high temperatures, and lasts for a very long time. In addition, it is weather and stain resistant. CONCRETE FOUNDATION A concrete pad foundation is used as it has a high durability, adequate for foundation use. It provides the highest level of strength for foundations 16. Round Head Nails for wooden flooring Round Screw Bolts and Nuts for connection of wooden seat on the metal Brackets for connection of foundation to wooden header Flat Head Screws for connection of foundation to wooden header P0LYCARB0NATE R00f Polycabonate roofing sheets are used for the roof. it is a lightweight material that has high durability, able to withstand harsh weather conditions without discolouring. Because of this, it is suitable as it can withstand the weather outdoors and provide comfort to users by blocking out uv rays.
  • 19. ASSEMBLING PROCESS 18. Our final design is composed of timber deck and steel structure.
  • 20. CONSTRUCTION PROCESS FOUNDATION FLOOR JOIST 19. We have mixed the cement powder (to replace concrete) with suitable amount of water and the mixture is then poured into the formwork with reinforcement. After pouring the mixture, the foundation wall is added to be conneted to the floor jois once the mixture dries and hardens. The floor joists is measured and cut to be attached to the header joists by nailing.
  • 21. FLOORING COLUMN, ROOF BEAM and ROOF RAFTER 20. Timber wood pieces were cut piece by piece and screwed into place to create the wooden flooring ; two 100 x 100 mm holes were made on the flooring to allow the column to connect to the foundation. Roof, roof beam and raftar: Firstly we have chosen the suitable metal to be used for our bus shelter. The dimensions for each elements are measured to be cut. After the cutting process comes the installa- tion process where we screw all the metal pieces together to form the complete structure of the roof.
  • 22. COLUMN, ROOF BEAM and ROOF RAFTER ROOFING 21. The polycarbonate roof is screwed onto the purlin located above the rafter and roof beam. Welding : The columns and beams are connected by welding. Once the welding is done, we spray painted the structure to make it look clean.
  • 23. SEATING FINAL PRODUCT 22. Wooden panels are cut into two pieces of 700 x 80 mm and screwed to the column using bolts and nuts. The overall final product of the bus stop consists of components from the foundation to the flooring, columns, rafters and roofings. All the parts are connected by welding and mostly screws, bolts and nuts to create a stable bus stop.
  • 25. 24. LOAD DISTRIBUTION The dead load acting on the structure is transferred from the roof, column, and floor to it’s foundation. The use of polycarbonate as the roof doesn’t exert much force due to it’s light weight as compared to the column and beam which uses steel. Live load is limited to the number of people the bus stop can shelter at any one time and the frequency of users. Live Load Dead Load
  • 26. CONCENTRATED LOADS 25. concentrated loads : concentrated loads are the force acting on two perpendicular components or a small area. When a beam transmits its load to a point of suppose which is typically a column, the perpendicular angle will cause one side to be under tension and the other in compression
  • 28. morning noon evening The form of our roof is designed in such way that it reflects the sunlight outwards throughout the day. In terms of the roof materiality, we have used polycarbonated roof as it has the ability to reflect sun radiation on sunny days. WEATHER CONSIDERATION // SUN WEATHER CONSIDERATION // RAIN AND WIND Floor Plan not to scale ACCESSIBILITY The roof incorporates a butterfly design where it is angled inwards. This design allows rainwater to easily flow off the roof through a gutter and prevents water buildup as well. The choice of material also plays a part as polycarbonate sheets have high resistance to weather which is necessary for our tropical climate. These roofs are also aerodynamic allowing the structure to have high wind resistance. Malaysia’s wind speed and frequency is relatively low on nor- mal days unless it is raining or experiencing storm. 27.
  • 30. By doing this project, it has allowed us to explore and learn the actual construction methods of an actual bus stop. The different methods of putting the whole bus stop together mimicking the real life bus stop has taught us of the many different joints as well as the components that are needed to build a complete bus stop. Overall, the details of prepping the bus stop was not an easy task eg: creating a formwork to cast concrete, also making sure that the dried concrete does not crack. Furthermore, another difficulty was that we had to figure out the proper joining methods of the joints of the bus stop to ensure stability in the correct way. Throughout the process of building the bus stop, we learnt that the little details makes a huge difference during the construction processes. Lastly, by using the correct methods and joineries, the end product is a stable and functional 1:5 bus stop. CONCLUSION 29.
  • 31. REFERENCES 30. 1. Chudley, R. 2006, Construction Technology. 4th edition. Pearson and Prentice Hall. 2. Seeley, Ivor H. 1995, Building Technology. 5th edition. Basingstoke, Hants : MacMillan 3. Ching, Francis D.K. 1991. Building Construction Illustrated. New York. Van Nostrand Reinhold.