Whenever you’re taking a Decision to start a Mineral Water Plant, there is always question in your mind i.e. "What is Plant Cost?' This article will helps you to get answer.
==> http://mineralwaterprojectinformation.org/mineral-water-plant-cost/
International Business Environments and Operations 16th Global Edition test b...
What will be the cost of your Mineral Water Plant in India
1. Mineral Water Project Information
http://mineralwaterprojectinformation.org/
PLANT COST
Whenever you’re taking a Decision to establish a Mineral Water
Plant, obliviously few questions will come to your mind like:
To know the Profit Margin please refer the Chart Below
Cost of Production/ 1 Ltr Bottle
The Table highlights the Cost incurred per 1 ltr bottle. Kindly Note, that the
costs are not exact, also vary from plant to plant, season to season also. You are
suggested to talk to your Turn-key supplier to get these.
2. http://mineralwaterprojectinformation.org/
Cost of Production/250 ml Pouch
The Table highlights the Cost incurred per 250 ml Pouch. Kindly Note, that the
costs are not exact, also vary from plant to plant, season to seaso
suggested to talk to your Turn
Mineral Water Project Information
http://mineralwaterprojectinformation.org/
Cost of Production/250 ml Pouch
The Table highlights the Cost incurred per 250 ml Pouch. Kindly Note, that the
costs are not exact, also vary from plant to plant, season to seaso
talk to your Turn-key supplier to get these.
Mineral Water Project Information
http://mineralwaterprojectinformation.org/
Cost of Production/250 ml Pouch
The Table highlights the Cost incurred per 250 ml Pouch. Kindly Note, that the
costs are not exact, also vary from plant to plant, season to season also. You are
3. http://mineralwaterprojectinformation.org/
Cost of Production/20 ltr Jar
The Table highlights the Cost incur
are not exact, also vary from plant to plant, season to season also. You are
suggested to talk to your Turn
2. How much is the investment?
The investment truly depends upon the type of plant & the Capacity of plant
Let me explain this in details.
• Type of Plant:
Some people may look at a prosperous
other may feel that they should go for
may feel that they will start with just
where as some will want to have complete bottle making Set as well.
Mineral Water Project Information
http://mineralwaterprojectinformation.org/
Cost of Production/20 ltr Jar
The Table highlights the Cost incurred per 20 ltr Jar. Kindly Note
are not exact, also vary from plant to plant, season to season also. You are
suggested to talk to your Turn-key supplier to get these.
2. How much is the investment?
The investment truly depends upon the type of plant & the Capacity of plant
Let me explain this in details.
Some people may look at a prosperous Jar Market, at the same time some
other may feel that they should go for bottles, jars & Pouches
may feel that they will start with just bottle filling. Empty Bottles bought out
where as some will want to have complete bottle making Set as well.
Mineral Water Project Information
http://mineralwaterprojectinformation.org/
red per 20 ltr Jar. Kindly Note, that the costs
are not exact, also vary from plant to plant, season to season also. You are
The investment truly depends upon the type of plant & the Capacity of plant
at the same time some
bottles, jars & Pouches. Some of you
. Empty Bottles bought out
where as some will want to have complete bottle making Set as well.
4. http://mineralwaterprojectinformation.org/
Cost for
If you are starting out n
packaged drinking water plant
exactly you wish to start
Mineral Water Project Information
http://mineralwaterprojectinformation.org/
Cost for Major 3 Plant Types
If you are starting out new mineral water plant in India, which is called as
packaged drinking water plant, your further decisions will depend upon
exactly you wish to start. In fact you have the following plant options:
Mineral Water Project Information
http://mineralwaterprojectinformation.org/
, which is called as a
, your further decisions will depend upon what
. In fact you have the following plant options:-
5. Mineral Water Project Information
http://mineralwaterprojectinformation.org/
Are you looking out for detailed Machinery Specifications? We are offering
them in our Training Course. Just Look at them here:-
1000,2000 & 5000 LPH Plant Specifications
Water Treatment Plant Specs
Filling Machine
Bottle Blowing Machine
Lab Equipment List as per IS : 14543
& Also other plenty of useful material for your mineral water plant.
So the decision of “Which type of Plant” Truly depends upon your targeted
Market segments. Once you decide what to have in your product mix, you
can decide the machinery and other things.
Now to arrive at the Mineral Water Plant Cost, These are the elements
which are combined each other.
Machinery & Equipment
All machines like Water Treatment, Bottling, Lab equipment etc. will come
under this.
Utilities: Water Electricity Air Conditioning, air Compressor etc.
Liaison Expenses: ISI License & other Government License expenditure.
Consultancy Charges: Like ISI Consultancy project funding etc.
Building Cost: Construction, interior cost
6. Mineral Water Project Information
http://mineralwaterprojectinformation.org/
3. How much is the ROI (Return on Investment)?
Usually, if the business is run professionally, the invested money will be
returned to the investor by the business in 3.5 years. So you can say that ROI
is 30 % per annum.
We have a Sample FREE Project Report for Download from where you will
get a projected figure also. Work with this with your CA.
4. What are the Risk Factors?
After working closely in this industry, I have observed that the TOP risk factor
in this business is Improfessional Management of the business. I will highlight
main elements in this:-
a. Execution Failure:-
Such a plant calls for detailed steps to get executed in time, with
detailed clear-cut duties explained. If not, there is a mess of things &
plant fails to get executed in time, in turn you will be left with LOSSES.
b. No Proper Co-ordination :-
After you finalize the plant supplier
(http://mineralwaterprojectinformation.org/article/10-point-
checklist-to-find-the-right-mineral-water-plant-manufacturers-for-
your-mineral-water-project/) failing to do a proper co-ordination with
7. Mineral Water Project Information
http://mineralwaterprojectinformation.org/
him is the major reason. Non-appointment of a Project Guy OR not
maintaining schedules will result in delay in execution
c. No Documentation :-
People go by intuition, without doing proper study on what they have
to sell, what market they have, how are they going about it etc. And
they do not keep any documentation about this. Then
misunderstandings and all……
d. Absence of Parallel execution system :-
It means, at a time you will need to carry out various cycles, absence of
this will again increase project period.
e. Habit of doing everything on your own :-
Keep in mind, you are a businessman, and a businessman delegates,
does not do everything. As an entrepreneur, your job is to get people,
tools. And giving the tools to the best people who are going to do that.
5. How to minimize the Risk Factors?
I know, 100 % risks can’t be avoided, but can be reduced to a great extent, no
doubts. Here is how you can do it:-
8. http://mineralwaterprojectinformation.org/
b. Do a Proper Project Execution P
Step by step. Prepare an excel sheet, note down all duties, steps etc,
who to do what, what date etc. If you do not want to spend time and
need readymade steps for a packaged drinking water plant, we also
have execution plan
mentioned Training Course
course over here.
Conclusion:
It is advisable to properly study the market, then appoint best possible
turnkey project consultant.
a. Invest in Education :
Just keep eyes around you, there are many people
conducting courses in Packaged Drinking Water
Business from time to time. Keep an eye on that.
Even we also do have a
Packaged Drinking Water. The course is fully
online, has a great content. The best part is:
delivered through mail, so you can learn at your
own pace.
Mineral Water Project Information
http://mineralwaterprojectinformation.org/
Do a Proper Project Execution Plan
tep by step. Prepare an excel sheet, note down all duties, steps etc,
who to do what, what date etc. If you do not want to spend time and
need readymade steps for a packaged drinking water plant, we also
plan software; it is included in the course above
Training Course But You can see a Video Demo
It is advisable to properly study the market, then appoint best possible
project consultant.
Invest in Education :
Just keep eyes around you, there are many people
conducting courses in Packaged Drinking Water
Business from time to time. Keep an eye on that.
Even we also do have a Training Course on
Packaged Drinking Water. The course is fully
reat content. The best part is: It’s
delivered through mail, so you can learn at your
Mineral Water Project Information
http://mineralwaterprojectinformation.org/
tep by step. Prepare an excel sheet, note down all duties, steps etc,
who to do what, what date etc. If you do not want to spend time and
need readymade steps for a packaged drinking water plant, we also
course above
Video Demo (of the
It is advisable to properly study the market, then appoint best possible