What is Total Productive
Maintenance?
TPM is a plant improvement methodology which
enables continuous and rapid improvement of the
manufacturing process through use of employee
involvement, employee empowerment, and
closed-loop measurement of results.
Breakdown of TPM
TOTAL = All encompassing by maintenance and
production individuals working together
PRODUCTIVE = Production goods and services that
meet or exceed customers’ expectations
MAINTENANCE = Keeping equipment and plant in as
good as or better than the original conditions at all
times
Goals of TPM
1. Aims at getting the most effective use of equipment
2. Builds a comprehensive PM system
3. Brings together people from all departments concerned
with equipment
4. Requires the support and cooperation of everyone from
top managers down
5. Promotes and implements PM activities based on
autonomous small group activities.
6. Maintaining Equipment for life
7. Encouraging input from all employees
8. Using teams for continuous improvement
TPM Basic Policy and Objectives
o To maximize overall equipment effectiveness (Zero
breakdowns and failures, Zero accident, and Zero
defects etc) through total employee involvement
o To improve equipment reliability and maintainability
as contributors to quality and to raise productivity
o To aim for maximum economy in equipment for its
entire life
o To cultivate equipment-related expertise and skills
among operators
o To create a vigorous and enthusiastic work environment
TPM Corporate policy
• To aim for world-class maintenance, manufacturing performance
and quality
• To plan for corporate growth through business leadership
• To promote greater efficiency through greater flexibility
• Revitalize the workshop and make the most of employee talents
TPM - Evolution
• Breakdown maintenance
• Preventive maintenance (PM)
• Productive maintenance
• Total productive maintenance
12 TPM Development Program Steps
Preparation
1. Formally announce the decision to introduce TPM
2. Conduct TPM introductory education and publicity campaign
3. Create TPM promotion organization
4. Establish basic TPM policy and goals
5. Draft a master plan for implementing TPM
Introduction
6. Kick off TPM initiatives
(to cultivate the atmosphere to raise morale, inspiration and
dedication)
Implementation
7.Build a corporate constitution designed to maximize the effectiveness of facilities
- Conduct focused improvement activities
- Establish and deploy autonomous maintenance program
- Implement planned maintenance program
- Conduct operation and maintenance skills training
8.Build an early management system for new products and equipment
9. Build a quality maintenance system
10. Build an effective administration and support system
11. Develop a system for managing health, safety, and the
environment
Consolidation
12. Sustain a full TPM implementation and raise levels (Prize)
Five fundamental TPM
activities
1. Autonomous maintenance
2. Equipment improvement
3. Quality maintenance
4. MP(Maintenance Prevention) system-building
5. Education and training
Pillars of TPM
PILLAR 1 - Autonomous Maintenance
A collaborative team activity involving production, maintenance,
and engineering Maintaining Basic conditions on shop floor & in
Machines. All over participation through TPM Circles.
PILLAR 2 - Focused Improvement
Improvement on every one’s activity.
Improvement is to eliminate Production losses and cost
reduction. Improvement in Reliability, Maintainability, and cost.
PILLAR 3 - Planned Maintenance
Logical analysis “Real causes for real counter measures”.
Focus on Prevention. It is aimed to have trouble free machines and
equipments producing defect free products for total customer satisfaction.
Example: Preventive Maintenance, Breakdown Maintenance, etc.,
Six steps in Planned maintenance :
1.Equipment evaluation and recoding present status.
2.Restore deterioration and improve weakness.
3.Building up information management system.
4.Prepare time based information system, select equipment, parts
and members and map out plan.
5.Prepare predictive maintenance system by introducing equipment
diagnostic techniques.
6.Evaluation of planned maintenance.
PILLAR 4 - Quality Maintenance
-Developing perfect machine for perfect Quality.
-Eliminating In – Process defects and custom complaints.
PILLAR 5 - Education & Training
-Skills development for uniformity of work practices on machines.
-Skills for Zero defects, Zero breakdowns & Zero accidents.
-Multi Skilled employees in all departments
PILLAR 6 - Development Management
-Developing machines for “high equipment effectiveness”.
-Quick process for developing new products.
Example: KAIZEN
PILLAR 7 - Safety, Health & Environment
-Zero accidents and Zero hazards at works.
-Zero Pollution at Plant and Environment.
PILLAR 8 - Office TPM
-Office TPM must be followed to improve productivity,
efficiency in the administrative functions and identify and
eliminate losses. This includes analyzing processes and
procedures towards increased office automation
TPM and Traditional Maintenance
Reactive maintenance inherently wasteful and
ineffective with following disadvantages:
1.No warning of failure
2.Possible safety risk
3.Unscheduled downtime of machinery
4.Production loss or delay
5.Possible secondary damage
Need for:
-Stand-by machinery
-A stand-by maintenance team
-A stock of spare parts
Costs include:
-Post production
-Disrupted schedule
-Repair cost
-Stand-by machinery
-Spare parts
Real cost of reactive maintenance is more than the
cost of maintenance resources and spare parts
Pro-active maintenance (planned, preventive and
predictive) more desirable than reactive maintenance
TPM enables or provides:
The traditional maintenance practices to change from reactive to pro-active
A number of mechanisms whereby
Breakdowns are analyzed
Causes investigated
Actions taken to prevent further breakdowns
Preventive maintenance schedule to be made more meaningful
To ‘free up’ maintenance professionals to:
Carry out scheduled and preventive maintenance
Gather relevant information as important input to the maintenance system
Keep the system up to date
To review cost effectiveness
To develop and operate a very effective maintenance system an integral
part of manufacturing
Establish and maintain a clean,
neat and tidy workplace
Translation of 5 Japanese S’s
1. Seiso => Shine / Cleanliness
(Thoroughly clean the workplace)
Advantages:
– Pleasant and safer workplace and improved morale
– No wear, corrosion and failure of machinery due to dirt and debris
– Easy detection of oil leakage and spilage
– Psychological effects for improved reactions and performances
– Reduced hazards and more visible warning signs
2.Seiri => Sort / Arrangement
(Eliminate unnecessary items)
Better arrangement for ease of access and use of:
-Facilities, tools, fixtures and materials etc.
which brings substantial benefits
3.Seiton => Set In Order / Neatness
Efficient and effective storage method
-Defined location for storage of every facility required for production process
-Encourage people to return the facility after use
4.Shitsuke => Sustain / Discipline
(Sustain new status quo ‘everything in its place’)
Required to ensured that facilities are:
-Returned in proper location after use
-Kept clean and tidy
-Repaired / replaced if damaged
5.Seiketsu => Standardize / Order
Order and control to be established for:
-The above procedures and mechanisms
-Introduction of CAN DO activities at early stage
-Part of the company culture
Tangible and Intangible Benefits of TPM
 Tangible benefits:
1.Productivity up due to
 Sudden breakdowns down
 Overall facilities effectiveness up
2.Process defect rate down
3.Customer compliant/claims down
4.Products and work-in-process down
5.Shutdown accidents down
6.Pollution incidents down
7.Improvement suggestions up
Tangible benefits (contd.):
8.Financial losses drop due to reduction in breakdowns
9.Repair costs drop
10.Maintenance labour-hours reduce
11.Energy costs reduce
12. Company’s manufacturing profit ratio up
Intangible benefits:
1.Achieving full-self management
2.Operators have ownership of their equipments
3.They look after it by themselves without direction
4.Eliminating breakdowns and defects
5.Growing confidence and ‘can-do’ attitude
6.Making previously dirty and oily workplaces to a unrecognizably
clean, bright and lively
7.Giving better image to the visitors and thereby getting more orders
Why is TPM so popular and important ?
Three main reasons:
1. It guarantees dramatic results (Significant tangible results)
 Reduce equipment breakdowns
 Minimize idle time and minor stops
 Less quality defects and claims
 Increase productivity
 Reduce manpower and cost
 Lower inventory
 Reduce accidents
Why is TPM so popular and important ?
2. Visibly transform the workplace
(plant environment)
Through TPM, a filthy, rusty plant covered in oil and grease, leaking fluids
and spilt powders can be reborn as a pleasant and safe working
environment
Customers and other visitors are impressed by the change
Confidence on plant’s product increases
3. Raises the level of workers knowledge and skills
As TPM activities begin to yield above concrete results, it helps:
 The workers to become motivated
 Involvement increases
 Improvement suggestions proliferate
 People begin to think of TPM as part of the job
What is OEE
OEE (overall equipment efficiency) is a “best practices” way
to monitor and improve the efficiency of your manufacturing
processes
-machines
-manufacturing cells
-assembly lines
Why use OEE?
Productivity Increases of 10-50%
 Reduce Unplanned Downtime
Reduce Setup and Changeover Times
Better Management of Resource Allocation, Planning and Scheduling
Operator Productivity Increases
Efficiency with Automated Data Collection
Better Root Cause Analysis
Improve Quality, Minimize Rejects
Identify Bottlenecks and Constraints
Improve On-Time Delivery
Manage Operations Pre-emptively & Proactively
Measurably Improve Profitability
Why use OEE?
 OEE is integral to Successful LEAN manufacturing
 Used adroitly, Strategic OEE means Millions of $$ of Profits
 ‘Financial OEE’ becomes a Navigational tool for Success
 OEE = Quality, Reliability and Manufacturing Best Practices
 World Class OEE = “Least Price Provider” of products
Why use OEE?
Characteristics of Top Quartile Manufacturing Organizations
OEE is the visual metric of Total Productive Manufacturing
TPM is integrated to successful LEAN Manufacturing
 Constantly improving their ‘Best Ever’ performance
 Synergizing every player’s contribution
 Effectively Communicating new ideas or conditions
Why is OEE so important?
 If you were told that your department was running flat out you might
reasonably assume that the equipment was running efficiently and
effectively.
 What if the equipment only ran for 65% of the time?
 What if when it ran it ran at 80% of its speed ?
 What if only 90% of the parts it made are good?
 Individually these performance measures seem to indicate an OK
piece of equipment, but is it a true picture?
 What is having an impact on these performance figures?
How do I measure OEE?
Overall Equipment Effectiveness
OEE % = Availability x Performance x Quality
Shows group or plant output as a percentage of maximum capacity
World Class = 85% (= 95% x 95% x 95%)
It is not uncommon to > 90%!
Availability %
Percentage of scheduled time that the operation is actually operating.
Availability % = Run Time / Scheduled Time
Performance %
Speed at which the Work Center runs as a percentage of its designed
speed or ideal cycle time or most often considered the “Standard”.
Performance % = (Parts Made x Standard) / Run Time
Quality %
Good Units produced as a percentage of the Total Units Started.
Quality % = Good Units / Units Started

More Related Content

What's hot

Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
What is total productive maintenance?
What is total productive maintenance?What is total productive maintenance?
What is total productive maintenance?ThreadSol
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenChetanMehta39
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)Shreya Chaudhary
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive MaintenanceRAHMAT EIE
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities博行 門眞
 
TPM by Chandan Jha
TPM by Chandan JhaTPM by Chandan Jha
TPM by Chandan JhaChanand Jha
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTimothy Wooi
 

What's hot (20)

Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Tpm
TpmTpm
Tpm
 
What is total productive maintenance?
What is total productive maintenance?What is total productive maintenance?
What is total productive maintenance?
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Tpm Presentation
Tpm PresentationTpm Presentation
Tpm Presentation
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
TPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARANTPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARAN
 
TPM by Chandan Jha
TPM by Chandan JhaTPM by Chandan Jha
TPM by Chandan Jha
 
Autonomous maintenance preview
Autonomous maintenance previewAutonomous maintenance preview
Autonomous maintenance preview
 
Tpm
TpmTpm
Tpm
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
My machine camp
My machine campMy machine camp
My machine camp
 
The 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation PosterThe 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation Poster
 

Viewers also liked

Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsPaul Robere
 
05 Seminar Slide
05 Seminar Slide05 Seminar Slide
05 Seminar Slidepraful_m_n
 
ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)Ashish Gupta
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Akhil Yelisetti
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)TechnoSysCon
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)ranviry49
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.Hal Frohreich
 
Autonomous Maintenance Presentation
Autonomous Maintenance PresentationAutonomous Maintenance Presentation
Autonomous Maintenance PresentationAbdul Rehman Ghauri
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive MaintenanceMahendra K SHUKLA
 
Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar PresentationOrange Slides
 

Viewers also liked (20)

Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
05 Seminar Slide
05 Seminar Slide05 Seminar Slide
05 Seminar Slide
 
Tpm
TpmTpm
Tpm
 
ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
Autonomous Maintenance Presentation
Autonomous Maintenance PresentationAutonomous Maintenance Presentation
Autonomous Maintenance Presentation
 
Maintenance Planner Job Description
Maintenance Planner Job DescriptionMaintenance Planner Job Description
Maintenance Planner Job Description
 
Tpm final
Tpm finalTpm final
Tpm final
 
5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke5S, Kaizen, PokaYoke
5S, Kaizen, PokaYoke
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
Quality Circles
Quality CirclesQuality Circles
Quality Circles
 
Kaizen training
Kaizen trainingKaizen training
Kaizen training
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Quality circle
Quality circle Quality circle
Quality circle
 
Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar Presentation
 

Similar to TPM & OEE

Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise WiredTotal Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise WiredEnterprise Wired
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity MaintenanceGohelYash1
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdfmihirpatel306953
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsPaul Robere
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfHimanshuGupta26467
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)Ankur Kumar
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsMarvin Norona
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenanceShankha Goswami
 
Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)Ashwin Ashok Kumar
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Timothy Wooi
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 

Similar to TPM & OEE (20)

Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise WiredTotal Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdf
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
 
TPM-PPT-4.pptx
TPM-PPT-4.pptxTPM-PPT-4.pptx
TPM-PPT-4.pptx
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdf
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenance
 
Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)Total productive maintenance (Total Quality Management)
Total productive maintenance (Total Quality Management)
 
TPM.pptx
TPM.pptxTPM.pptx
TPM.pptx
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

TPM & OEE

  • 1. What is Total Productive Maintenance? TPM is a plant improvement methodology which enables continuous and rapid improvement of the manufacturing process through use of employee involvement, employee empowerment, and closed-loop measurement of results.
  • 2. Breakdown of TPM TOTAL = All encompassing by maintenance and production individuals working together PRODUCTIVE = Production goods and services that meet or exceed customers’ expectations MAINTENANCE = Keeping equipment and plant in as good as or better than the original conditions at all times
  • 3. Goals of TPM 1. Aims at getting the most effective use of equipment 2. Builds a comprehensive PM system 3. Brings together people from all departments concerned with equipment 4. Requires the support and cooperation of everyone from top managers down 5. Promotes and implements PM activities based on autonomous small group activities. 6. Maintaining Equipment for life 7. Encouraging input from all employees 8. Using teams for continuous improvement
  • 4. TPM Basic Policy and Objectives o To maximize overall equipment effectiveness (Zero breakdowns and failures, Zero accident, and Zero defects etc) through total employee involvement o To improve equipment reliability and maintainability as contributors to quality and to raise productivity o To aim for maximum economy in equipment for its entire life o To cultivate equipment-related expertise and skills among operators o To create a vigorous and enthusiastic work environment
  • 5. TPM Corporate policy • To aim for world-class maintenance, manufacturing performance and quality • To plan for corporate growth through business leadership • To promote greater efficiency through greater flexibility • Revitalize the workshop and make the most of employee talents
  • 6. TPM - Evolution • Breakdown maintenance • Preventive maintenance (PM) • Productive maintenance • Total productive maintenance
  • 7.
  • 8. 12 TPM Development Program Steps Preparation 1. Formally announce the decision to introduce TPM 2. Conduct TPM introductory education and publicity campaign 3. Create TPM promotion organization 4. Establish basic TPM policy and goals 5. Draft a master plan for implementing TPM
  • 9. Introduction 6. Kick off TPM initiatives (to cultivate the atmosphere to raise morale, inspiration and dedication) Implementation 7.Build a corporate constitution designed to maximize the effectiveness of facilities - Conduct focused improvement activities - Establish and deploy autonomous maintenance program - Implement planned maintenance program - Conduct operation and maintenance skills training 8.Build an early management system for new products and equipment
  • 10. 9. Build a quality maintenance system 10. Build an effective administration and support system 11. Develop a system for managing health, safety, and the environment Consolidation 12. Sustain a full TPM implementation and raise levels (Prize)
  • 11.
  • 12. Five fundamental TPM activities 1. Autonomous maintenance 2. Equipment improvement 3. Quality maintenance 4. MP(Maintenance Prevention) system-building 5. Education and training
  • 13.
  • 15. PILLAR 1 - Autonomous Maintenance A collaborative team activity involving production, maintenance, and engineering Maintaining Basic conditions on shop floor & in Machines. All over participation through TPM Circles. PILLAR 2 - Focused Improvement Improvement on every one’s activity. Improvement is to eliminate Production losses and cost reduction. Improvement in Reliability, Maintainability, and cost.
  • 16. PILLAR 3 - Planned Maintenance Logical analysis “Real causes for real counter measures”. Focus on Prevention. It is aimed to have trouble free machines and equipments producing defect free products for total customer satisfaction. Example: Preventive Maintenance, Breakdown Maintenance, etc., Six steps in Planned maintenance : 1.Equipment evaluation and recoding present status. 2.Restore deterioration and improve weakness. 3.Building up information management system. 4.Prepare time based information system, select equipment, parts and members and map out plan. 5.Prepare predictive maintenance system by introducing equipment diagnostic techniques. 6.Evaluation of planned maintenance.
  • 17. PILLAR 4 - Quality Maintenance -Developing perfect machine for perfect Quality. -Eliminating In – Process defects and custom complaints. PILLAR 5 - Education & Training -Skills development for uniformity of work practices on machines. -Skills for Zero defects, Zero breakdowns & Zero accidents. -Multi Skilled employees in all departments PILLAR 6 - Development Management -Developing machines for “high equipment effectiveness”. -Quick process for developing new products. Example: KAIZEN
  • 18. PILLAR 7 - Safety, Health & Environment -Zero accidents and Zero hazards at works. -Zero Pollution at Plant and Environment. PILLAR 8 - Office TPM -Office TPM must be followed to improve productivity, efficiency in the administrative functions and identify and eliminate losses. This includes analyzing processes and procedures towards increased office automation
  • 19. TPM and Traditional Maintenance Reactive maintenance inherently wasteful and ineffective with following disadvantages: 1.No warning of failure 2.Possible safety risk 3.Unscheduled downtime of machinery 4.Production loss or delay 5.Possible secondary damage Need for: -Stand-by machinery -A stand-by maintenance team -A stock of spare parts
  • 20. Costs include: -Post production -Disrupted schedule -Repair cost -Stand-by machinery -Spare parts Real cost of reactive maintenance is more than the cost of maintenance resources and spare parts Pro-active maintenance (planned, preventive and predictive) more desirable than reactive maintenance
  • 21. TPM enables or provides: The traditional maintenance practices to change from reactive to pro-active A number of mechanisms whereby Breakdowns are analyzed Causes investigated Actions taken to prevent further breakdowns Preventive maintenance schedule to be made more meaningful To ‘free up’ maintenance professionals to: Carry out scheduled and preventive maintenance Gather relevant information as important input to the maintenance system Keep the system up to date To review cost effectiveness To develop and operate a very effective maintenance system an integral part of manufacturing
  • 22. Establish and maintain a clean, neat and tidy workplace Translation of 5 Japanese S’s 1. Seiso => Shine / Cleanliness (Thoroughly clean the workplace) Advantages: – Pleasant and safer workplace and improved morale – No wear, corrosion and failure of machinery due to dirt and debris – Easy detection of oil leakage and spilage – Psychological effects for improved reactions and performances – Reduced hazards and more visible warning signs
  • 23. 2.Seiri => Sort / Arrangement (Eliminate unnecessary items) Better arrangement for ease of access and use of: -Facilities, tools, fixtures and materials etc. which brings substantial benefits 3.Seiton => Set In Order / Neatness Efficient and effective storage method -Defined location for storage of every facility required for production process -Encourage people to return the facility after use
  • 24. 4.Shitsuke => Sustain / Discipline (Sustain new status quo ‘everything in its place’) Required to ensured that facilities are: -Returned in proper location after use -Kept clean and tidy -Repaired / replaced if damaged 5.Seiketsu => Standardize / Order Order and control to be established for: -The above procedures and mechanisms -Introduction of CAN DO activities at early stage -Part of the company culture
  • 25. Tangible and Intangible Benefits of TPM  Tangible benefits: 1.Productivity up due to  Sudden breakdowns down  Overall facilities effectiveness up 2.Process defect rate down 3.Customer compliant/claims down 4.Products and work-in-process down 5.Shutdown accidents down 6.Pollution incidents down 7.Improvement suggestions up
  • 26. Tangible benefits (contd.): 8.Financial losses drop due to reduction in breakdowns 9.Repair costs drop 10.Maintenance labour-hours reduce 11.Energy costs reduce 12. Company’s manufacturing profit ratio up
  • 27. Intangible benefits: 1.Achieving full-self management 2.Operators have ownership of their equipments 3.They look after it by themselves without direction 4.Eliminating breakdowns and defects 5.Growing confidence and ‘can-do’ attitude 6.Making previously dirty and oily workplaces to a unrecognizably clean, bright and lively 7.Giving better image to the visitors and thereby getting more orders
  • 28. Why is TPM so popular and important ? Three main reasons: 1. It guarantees dramatic results (Significant tangible results)  Reduce equipment breakdowns  Minimize idle time and minor stops  Less quality defects and claims  Increase productivity  Reduce manpower and cost  Lower inventory  Reduce accidents
  • 29. Why is TPM so popular and important ? 2. Visibly transform the workplace (plant environment) Through TPM, a filthy, rusty plant covered in oil and grease, leaking fluids and spilt powders can be reborn as a pleasant and safe working environment Customers and other visitors are impressed by the change Confidence on plant’s product increases 3. Raises the level of workers knowledge and skills As TPM activities begin to yield above concrete results, it helps:  The workers to become motivated  Involvement increases  Improvement suggestions proliferate  People begin to think of TPM as part of the job
  • 30. What is OEE OEE (overall equipment efficiency) is a “best practices” way to monitor and improve the efficiency of your manufacturing processes -machines -manufacturing cells -assembly lines
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44. Why use OEE? Productivity Increases of 10-50%  Reduce Unplanned Downtime Reduce Setup and Changeover Times Better Management of Resource Allocation, Planning and Scheduling Operator Productivity Increases Efficiency with Automated Data Collection Better Root Cause Analysis Improve Quality, Minimize Rejects Identify Bottlenecks and Constraints Improve On-Time Delivery Manage Operations Pre-emptively & Proactively Measurably Improve Profitability
  • 45. Why use OEE?  OEE is integral to Successful LEAN manufacturing  Used adroitly, Strategic OEE means Millions of $$ of Profits  ‘Financial OEE’ becomes a Navigational tool for Success  OEE = Quality, Reliability and Manufacturing Best Practices  World Class OEE = “Least Price Provider” of products
  • 46. Why use OEE? Characteristics of Top Quartile Manufacturing Organizations OEE is the visual metric of Total Productive Manufacturing TPM is integrated to successful LEAN Manufacturing  Constantly improving their ‘Best Ever’ performance  Synergizing every player’s contribution  Effectively Communicating new ideas or conditions
  • 47. Why is OEE so important?  If you were told that your department was running flat out you might reasonably assume that the equipment was running efficiently and effectively.  What if the equipment only ran for 65% of the time?  What if when it ran it ran at 80% of its speed ?  What if only 90% of the parts it made are good?  Individually these performance measures seem to indicate an OK piece of equipment, but is it a true picture?  What is having an impact on these performance figures?
  • 48. How do I measure OEE? Overall Equipment Effectiveness OEE % = Availability x Performance x Quality Shows group or plant output as a percentage of maximum capacity World Class = 85% (= 95% x 95% x 95%) It is not uncommon to > 90%! Availability % Percentage of scheduled time that the operation is actually operating. Availability % = Run Time / Scheduled Time Performance % Speed at which the Work Center runs as a percentage of its designed speed or ideal cycle time or most often considered the “Standard”. Performance % = (Parts Made x Standard) / Run Time Quality % Good Units produced as a percentage of the Total Units Started. Quality % = Good Units / Units Started