What is the purpose and why?




•   Early stage for procurement of services
•   Specification on details of the intended procurement.
•   Competitive - Selection mechanism prior to outsourcing or offshoring
•   Used in re-evaluation as part of strategic sourcing.
             http://ukhypnosis.com/2010/07/10/cbt-with-intolerance-of-uncertainty-and-chronic-worry/   5
Uncertainty & Unknowns
• Quite a challenge at RFP stage…
• They are not all bad; it just means options… more so for agile projects.
• Options need to identified, understood and communicated.




                http://militarytobusiness.blogspot.in/2010/08/dealing-with-uncertainty.html   6
Steps involved



•   Notice of RFP
•   Pre-Proposal Walkthrough
•   Written Clarifications & Questions
•   Response to Written Clarifications & Questions
•   Receipt of Written RFP Deadline
•   RFP Defence
•   RFP Evaluation
•   RFP Selection Announcements, Negotiations etc.
                 http://www.blog-bizedge.biz/2011/03/preproposal-positioning.html   7
Deal With Agile
We will do it collectively…
                                                                                 8
          http://www.webpoppy.net/2011/06/how-to-write-a-website-rfp/
Let’s Self Organize !!!
 ( 5-6 member teams)




                                                   9
  http://en.wikipedia.org/wiki/Self-organization
20 minute time boxes




• Iteration 1 – Walkthrough of RFP questions (15 min + 5 min)
• Iteration 2 – War room
• Iteration 3 – Defense
                                                                                        10
                  http://blog.agilebuddy.com/2009/01/significance-of-time-boxing.html
There is limited time …
• Solution strategy approach and NOT the
                                                  Focus !!!
solution itself.
• Highlighted questions are critical.
• Articulate the following
    • How would you approach estimation and
    release planning.
    • Thoughts on contracting & pricing
    •Testing and product quality (Independent
    Testing Teams vs. Self Contained Testers in
    Dev Teams)
    •Onsite offshore execution ,team loading.
• Pick a moderator to have a handle on things
while the discussion goes on.
                                                              11
???

http://memegenerator.net/instance/10235189         12
Vendor Discretion Advised

  Agile Project AHEAD
• Customer business participation.
• Vendor involvement in the decision making process.
• Offshore teams leveraged for only tasks/activities.

                                                        13
• Estimates & Release Plans.
• Contracting Models.
• Project execution strategy (Onsite/Offshore)




                   http://www.investinganswers.com/personal-finance/smart-consumer/5-money-   14
                   rules-are-just-plain-wrong-2482
Project Chartering
• High level system understanding
• User stories - walkthrough
• Define Acceptance Criteria


                            Story Mapping
• Identify Function Flow
• User stories grouping
• Release Plans




                                                15
Estimates
• Collective planning and estimation
• Story points (Scale 1-10) by functional y grouped teams.
• Effort classification.
                            Release Plans
• Quarterly production releases synchronized with non-agile projects
• Logical grouping based on Functional flow and Criticality.
• Only for 6 months…




                                                                       16
Execution Model
• Onsite heavy in the first few sprints.
• Frequent Onsite off shore team rotation.




                                             17
Contracts & Pricing
• T & M Initially
• Switch to FPP after stability
   • CR based pricing for changing requirements
• Frequent travels factored into pricing.
Name: Ravi Kumar
Email ID:
ravikumar.rk@gmail.com
ravikumar.rk@hcl.com

HCL Technologies Ltd.
Agile Outsourcing - Dealing with Agile RFPs
No.                                                                   General
   1 Is the supplier ready to implement the Agile project?
     The project is primarily implemented at the location of CUSTOMER at LOCATION. The supplier indicates how this is
   2 realised. Proven experience with this mode of realisation under an Agile routine is of importance.
     The supplier is in a position to independently convert the WHAT (the system must do) into HOW (this must be realised). The supplier
   3 presents his vision on this subject.
     As Agile is going to be worked in teams constituted of people with different (cultural) backgrounds, a comprehensive culture training /
     team building at the start of the project is obvious. What plans does the supplier have for the purpose and what expenditure of time
   4 and cost are involved in this connection?
   5 Please describe how you would respond to a request to set up an Agile Project in partnership
     Advantages of Agile Environment: What does your company see as the main advantage to an Agile development environment? What
   6 are the key disadvantages?
                                                                  Process & Tools
   1 How does the supplier deal with changes in the requirements (content and priority) during the project?

   2   Which Agile routine does the supplier choose for this project? The substantiation of this choice is of particular importance.
   3   In what way can the management and maintenance of the deliverable software be organised?
   4   How does the supplier ensure the guarantee for the maintainability and quality of the deliverable software?
   5   How does the supplier ensure that the preferred suppliers of CUSTOMER can maintain the system?
       Supplier has experience with tooling in an Agile process.
       What tools has the supplier used for the purpose in the earlier projects?
       For each tool, indicate the purpose for which it was employed within the Agile process.
   6
     How do you typically ensure on Agile projects that senior management in your company and the customer company have
   7 appropriate visibility to make decisions and coordinate other activity?
                                                                        Testing
     What vision does the supplier have on tests during an Agile process?
   1 Make a distinction according to system and acceptance tests.
   2 How your organization views testing as part of a scrum team?
     How your organization would develop testing requirements for a sprint. Include test techniques / methods that would be used and how
   3 they would be used?
   4 What testing should be performed as part of a scrum team?
   5 What approach do you take for agile testing?
   6 How do you achieve collaborative working relationships on agile initiatives in order to ensure quality delivery?
     How your organization view testing as part of a independent team and what will be the best strategy to work with
   7 independent testing teams.
                                                             Contracting & Estimation
     Supplier gives a detailed estimate of the time required for the formulation of all product requirements. The substantiation
     of this estimate is of particular importance.
     Assume the following while you think of a solution for this question
     Simple Requirements: 100 >> Medium Requirements: 150 >>Complex Requirements: 100
   1
     Bidders are requested to indicate their own pricing policy (initial and recurring costs) applicable to the products and services called for.
     Specify the prices and rates for the products and services called for. You should be fully prepared here and need to at least include the
   2 deliverable products and services specified by you.
     For each sprint, present a detailed summary of the costs of the proposed team effort during the turnaround time of project estimated
     on the basis of the total list of the product requirements. In addition, the rate employed for each team member of the proposed team
   3 classification must be indicated.
Contracting & Estimation contd…

  What is the contract model that the vendor would like to propose? Fixed Price will be of primary interest for the customer
  but is willing to consider other contractual models as well. Vendor must justify the different contractual models and
4 justify the most appropriate for the project and clearly articulate the risks and downside of Fixed Price model
  Supplier indicates the project organisation roles, rates, quantities, composition, phasing, sprint duration, tooling etc..
  The substantiation of this organisation and estimates are of particular importance.
  How does the supplier guarantee that the cited capacity and knowledge are indeed available in the same and stable (team) composition
  during the entire project? Consider here also the possible visa problem.
5
                                                                     Release
  Supplier indicates in detail which part of the product requirements referred can be realised within 6 months after the start
  of the project implementation. The substantiation of these assessments is of particular importance. The deadline of 6
  months is an arbitrarily chosen reference time. The starting point here is the project organisation as described and the
1 assessment of the product requirements

    The supplier needs to work together with other CUSTOMER units that do not work according to Agile.
    How does the supplier plan to deal with the units from the CUSTOMER organisation that do not work according to Agile?
2
    How does the supplier guarantee that he will deliver a working software (zero defect delivery) that is deployed in the acceptance/live
    environment made available by CUSTOMER for the purpose after every sprint?
    How does the supplier envisage to be able to contribute towards as high a delivery reliability as possible?
3
  On-Going Application Support & Maintenance: Describe your methodology for providing on-going application support and maintenance
  services, including the following:
  • Application Updates • User Management • Change Management • Problem management and communication procedures •
  Documentation management• Communication and integration with the customer and its processes
  • Problem diagnosis and root-cause analysis of production defects • Review and approval of problem-fix approach and risks • Design
4 Review, Code Inspection, Testing and other quality assurance processes supporting Application Maintenance



    We have limited time and hence I suggest the following…
    - Think about approach to arrive at solution or strategy and NOT the solution itself.
    - The questions that are in bold are critical; focus discussions to overcome the challenges. Specifically the following must be articulated
            > Approach to estimation and release planning.
            > Contracting & Pricing
            > Testing and product quality (Independent Testing Teams vs. Self Contained Testers in Dev Teams)
            > Onsite offshore execution model with emphasis on team loading.
    - Pick a moderator to have a handle on things while the discussion goes on.

More Related Content

What's hot

Digital Transformation Book of Dreams v1
Digital Transformation Book of Dreams v1Digital Transformation Book of Dreams v1
Digital Transformation Book of Dreams v1
Matt Bruns
 

What's hot (20)

An Overview of Microsoft Teams Architecture | Kushan Lahiru Perera
An Overview of Microsoft Teams Architecture | Kushan Lahiru PereraAn Overview of Microsoft Teams Architecture | Kushan Lahiru Perera
An Overview of Microsoft Teams Architecture | Kushan Lahiru Perera
 
Salesforce CPQ by yuvaraj
Salesforce CPQ by yuvarajSalesforce CPQ by yuvaraj
Salesforce CPQ by yuvaraj
 
Target Operating Model Research
Target Operating Model ResearchTarget Operating Model Research
Target Operating Model Research
 
IBM DevOps - Adopting Scaled Agile Framework (SAFe) Webinar
IBM DevOps - Adopting Scaled Agile Framework (SAFe) WebinarIBM DevOps - Adopting Scaled Agile Framework (SAFe) Webinar
IBM DevOps - Adopting Scaled Agile Framework (SAFe) Webinar
 
Strategies for Large Scale Agile Transformation
Strategies for Large Scale Agile TransformationStrategies for Large Scale Agile Transformation
Strategies for Large Scale Agile Transformation
 
How to Start Your Application Modernization Journey
How to Start Your Application Modernization JourneyHow to Start Your Application Modernization Journey
How to Start Your Application Modernization Journey
 
Cloud-migration-essentials.pdf
Cloud-migration-essentials.pdfCloud-migration-essentials.pdf
Cloud-migration-essentials.pdf
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and Meetings
 
Discover Salesforce Commerce Cloud and Vlocity Integration Patterns
Discover Salesforce Commerce Cloud and Vlocity Integration PatternsDiscover Salesforce Commerce Cloud and Vlocity Integration Patterns
Discover Salesforce Commerce Cloud and Vlocity Integration Patterns
 
Microservices for Application Modernisation
Microservices for Application ModernisationMicroservices for Application Modernisation
Microservices for Application Modernisation
 
Agile & Scrum Training
Agile & Scrum TrainingAgile & Scrum Training
Agile & Scrum Training
 
Power up! Mass Migrations at Speed and Scale - Accenture
Power up! Mass Migrations at Speed and Scale - AccenturePower up! Mass Migrations at Speed and Scale - Accenture
Power up! Mass Migrations at Speed and Scale - Accenture
 
Jira Agile
Jira AgileJira Agile
Jira Agile
 
Scaled Agile Framework Roadmap Template
Scaled Agile Framework Roadmap TemplateScaled Agile Framework Roadmap Template
Scaled Agile Framework Roadmap Template
 
Cloud Migration Strategy - IT Transformation with Cloud
Cloud Migration Strategy - IT Transformation with CloudCloud Migration Strategy - IT Transformation with Cloud
Cloud Migration Strategy - IT Transformation with Cloud
 
Vendor transition checklist final
Vendor transition checklist finalVendor transition checklist final
Vendor transition checklist final
 
Digital Transformation Book of Dreams v1
Digital Transformation Book of Dreams v1Digital Transformation Book of Dreams v1
Digital Transformation Book of Dreams v1
 
Agile Process Introduction
Agile Process IntroductionAgile Process Introduction
Agile Process Introduction
 
Salesforce CPQ
Salesforce CPQSalesforce CPQ
Salesforce CPQ
 
Platform & Application Modernization
Platform & Application ModernizationPlatform & Application Modernization
Platform & Application Modernization
 

Viewers also liked

Vendor Management Systems Best Practices
Vendor Management Systems Best PracticesVendor Management Systems Best Practices
Vendor Management Systems Best Practices
jeffmonaghan
 
IT Strategic Vendor Management
IT Strategic Vendor ManagementIT Strategic Vendor Management
IT Strategic Vendor Management
Bill Whetstone
 
Agile Vendor Selection 09 May
Agile Vendor Selection 09 MayAgile Vendor Selection 09 May
Agile Vendor Selection 09 May
nbcoenen
 

Viewers also liked (20)

Agile Vendor Management
Agile Vendor ManagementAgile Vendor Management
Agile Vendor Management
 
Vendor Management Systems Best Practices
Vendor Management Systems Best PracticesVendor Management Systems Best Practices
Vendor Management Systems Best Practices
 
Asia Agile Forum'16 Dhaka - Agile vendor management manifesto by Gaurav Rastogi
Asia Agile Forum'16  Dhaka - Agile vendor management manifesto by Gaurav RastogiAsia Agile Forum'16  Dhaka - Agile vendor management manifesto by Gaurav Rastogi
Asia Agile Forum'16 Dhaka - Agile vendor management manifesto by Gaurav Rastogi
 
IT Strategic Vendor Management
IT Strategic Vendor ManagementIT Strategic Vendor Management
IT Strategic Vendor Management
 
Money For Nothing Agile 2008
Money For Nothing Agile 2008Money For Nothing Agile 2008
Money For Nothing Agile 2008
 
Mapa infografico
Mapa infograficoMapa infografico
Mapa infografico
 
Vendor performance Management CPPC conference
Vendor performance Management CPPC conferenceVendor performance Management CPPC conference
Vendor performance Management CPPC conference
 
English мудрость мысли храним науч. школы
English мудрость мысли храним науч. школыEnglish мудрость мысли храним науч. школы
English мудрость мысли храним науч. школы
 
CapGemini SRM Survey
CapGemini SRM SurveyCapGemini SRM Survey
CapGemini SRM Survey
 
Agile Team Performance Appraisal
Agile Team Performance AppraisalAgile Team Performance Appraisal
Agile Team Performance Appraisal
 
How to Restructure and Modernize Active Directory
How to Restructure and Modernize Active DirectoryHow to Restructure and Modernize Active Directory
How to Restructure and Modernize Active Directory
 
Maa kamakhya outsourcing
Maa kamakhya outsourcing Maa kamakhya outsourcing
Maa kamakhya outsourcing
 
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 day
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 dayThe RFP is dead: A disruptive Approach for a successful sourcing in just 1 day
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 day
 
Vendor Performance Management
Vendor Performance ManagementVendor Performance Management
Vendor Performance Management
 
Agile Vendor Selection 09 May
Agile Vendor Selection 09 MayAgile Vendor Selection 09 May
Agile Vendor Selection 09 May
 
Agile ALM Tool Comparison
Agile ALM Tool ComparisonAgile ALM Tool Comparison
Agile ALM Tool Comparison
 
Seeing system patterns in organizational coaching
Seeing system patterns in organizational coachingSeeing system patterns in organizational coaching
Seeing system patterns in organizational coaching
 
Agile Development with Agile Contract
Agile Development with Agile ContractAgile Development with Agile Contract
Agile Development with Agile Contract
 
Vendor/Supplier rating
Vendor/Supplier ratingVendor/Supplier rating
Vendor/Supplier rating
 
GOTO Night with Mirko Kleiner & Joe Justice
GOTO Night with Mirko Kleiner & Joe JusticeGOTO Night with Mirko Kleiner & Joe Justice
GOTO Night with Mirko Kleiner & Joe Justice
 

Similar to Agile Project Outsourcing - Dealing with RFP and RFI

Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
Terry Bunio
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
Heidi Owens
 

Similar to Agile Project Outsourcing - Dealing with RFP and RFI (20)

Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 
Agile concepts
Agile conceptsAgile concepts
Agile concepts
 
Top 10 Agile Metrics
Top 10 Agile MetricsTop 10 Agile Metrics
Top 10 Agile Metrics
 
Nearshore Best Practices Workshop
Nearshore Best Practices WorkshopNearshore Best Practices Workshop
Nearshore Best Practices Workshop
 
BAAgileQA
BAAgileQABAAgileQA
BAAgileQA
 
Agile projects are for delivering packaged software too
Agile projects are for delivering packaged software tooAgile projects are for delivering packaged software too
Agile projects are for delivering packaged software too
 
Agile projects
Agile projectsAgile projects
Agile projects
 
Asset Finance Agile Projects
Asset Finance Agile ProjectsAsset Finance Agile Projects
Asset Finance Agile Projects
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Software Agility.pptx
Software Agility.pptxSoftware Agility.pptx
Software Agility.pptx
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
 
Top Agile Metrics
Top Agile MetricsTop Agile Metrics
Top Agile Metrics
 
Agile Introduction
Agile IntroductionAgile Introduction
Agile Introduction
 
The Dashlane Agile Journey
The Dashlane Agile JourneyThe Dashlane Agile Journey
The Dashlane Agile Journey
 
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAbout Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
 
Scaled agile implementation
Scaled agile implementationScaled agile implementation
Scaled agile implementation
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
 
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnzLecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
Lecture 5 -6(CSC205).pptx jsksnxbbxjxksnsnz
 
Agile Framework based on PMBOK 6th Edition.pdf
Agile Framework based on PMBOK 6th Edition.pdfAgile Framework based on PMBOK 6th Edition.pdf
Agile Framework based on PMBOK 6th Edition.pdf
 
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
Scrum Bangalore 14th MeetUp 05 September 2015 - Scaling Agile - Saikat Das - ...
 

More from Siddhi

Bridging the gap between your Agile project organisation and the traditional ...
Bridging the gap between your Agile project organisation and the traditional ...Bridging the gap between your Agile project organisation and the traditional ...
Bridging the gap between your Agile project organisation and the traditional ...
Siddhi
 
So you wanna build something? Now what?
So you wanna build something? Now what?So you wanna build something? Now what?
So you wanna build something? Now what?
Siddhi
 
Agile in short projects
Agile in short projectsAgile in short projects
Agile in short projects
Siddhi
 
Continuous feedback
Continuous feedbackContinuous feedback
Continuous feedback
Siddhi
 
Organizational Dysfunctions - Agile to the Rescue
Organizational Dysfunctions - Agile to the RescueOrganizational Dysfunctions - Agile to the Rescue
Organizational Dysfunctions - Agile to the Rescue
Siddhi
 
Agile is not the easy way out
Agile is not the easy way outAgile is not the easy way out
Agile is not the easy way out
Siddhi
 
The Three Amigos
The Three AmigosThe Three Amigos
The Three Amigos
Siddhi
 
Visualisation & Self Organisation
Visualisation & Self OrganisationVisualisation & Self Organisation
Visualisation & Self Organisation
Siddhi
 
Portfolio Management - Figuring Out How to Say When and Why
Portfolio Management - Figuring Out How to Say When and WhyPortfolio Management - Figuring Out How to Say When and Why
Portfolio Management - Figuring Out How to Say When and Why
Siddhi
 
Attention Middle Management Chickens
Attention Middle Management ChickensAttention Middle Management Chickens
Attention Middle Management Chickens
Siddhi
 
Migrating Legacy Code
Migrating Legacy CodeMigrating Legacy Code
Migrating Legacy Code
Siddhi
 
Big Bang Agile Roll-out
Big Bang Agile Roll-outBig Bang Agile Roll-out
Big Bang Agile Roll-out
Siddhi
 
World War 4 Talent
World War 4 TalentWorld War 4 Talent
World War 4 Talent
Siddhi
 

More from Siddhi (20)

Not all features are equal
Not all features are equalNot all features are equal
Not all features are equal
 
The end of the backlog?
The end of the backlog?The end of the backlog?
The end of the backlog?
 
Growth hacks
Growth hacksGrowth hacks
Growth hacks
 
Kanban for Startups
Kanban for StartupsKanban for Startups
Kanban for Startups
 
Venture lab tech entrepreneurship market survey
Venture lab tech entrepreneurship market surveyVenture lab tech entrepreneurship market survey
Venture lab tech entrepreneurship market survey
 
Technology Entrepreneurship: Assignment 2
Technology Entrepreneurship: Assignment 2Technology Entrepreneurship: Assignment 2
Technology Entrepreneurship: Assignment 2
 
5 steps to better user engagement
5 steps to better user engagement5 steps to better user engagement
5 steps to better user engagement
 
Bridging the gap between your Agile project organisation and the traditional ...
Bridging the gap between your Agile project organisation and the traditional ...Bridging the gap between your Agile project organisation and the traditional ...
Bridging the gap between your Agile project organisation and the traditional ...
 
So you wanna build something? Now what?
So you wanna build something? Now what?So you wanna build something? Now what?
So you wanna build something? Now what?
 
Agile in short projects
Agile in short projectsAgile in short projects
Agile in short projects
 
Continuous feedback
Continuous feedbackContinuous feedback
Continuous feedback
 
Organizational Dysfunctions - Agile to the Rescue
Organizational Dysfunctions - Agile to the RescueOrganizational Dysfunctions - Agile to the Rescue
Organizational Dysfunctions - Agile to the Rescue
 
Agile is not the easy way out
Agile is not the easy way outAgile is not the easy way out
Agile is not the easy way out
 
The Three Amigos
The Three AmigosThe Three Amigos
The Three Amigos
 
Visualisation & Self Organisation
Visualisation & Self OrganisationVisualisation & Self Organisation
Visualisation & Self Organisation
 
Portfolio Management - Figuring Out How to Say When and Why
Portfolio Management - Figuring Out How to Say When and WhyPortfolio Management - Figuring Out How to Say When and Why
Portfolio Management - Figuring Out How to Say When and Why
 
Attention Middle Management Chickens
Attention Middle Management ChickensAttention Middle Management Chickens
Attention Middle Management Chickens
 
Migrating Legacy Code
Migrating Legacy CodeMigrating Legacy Code
Migrating Legacy Code
 
Big Bang Agile Roll-out
Big Bang Agile Roll-outBig Bang Agile Roll-out
Big Bang Agile Roll-out
 
World War 4 Talent
World War 4 TalentWorld War 4 Talent
World War 4 Talent
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 

Agile Project Outsourcing - Dealing with RFP and RFI

  • 1. Presented By: RAVI KUMAR http://www.bilzits.com/servicests_en.asp HCL Technologies Ltd.
  • 2. 2
  • 3. 3
  • 4. There are better ways … wish we didn’t have to deal with it. http://www.cmsmyth.com/wp-content/uploads/2011/06/rfpgraphic2.png 4
  • 5. What is the purpose and why? • Early stage for procurement of services • Specification on details of the intended procurement. • Competitive - Selection mechanism prior to outsourcing or offshoring • Used in re-evaluation as part of strategic sourcing. http://ukhypnosis.com/2010/07/10/cbt-with-intolerance-of-uncertainty-and-chronic-worry/ 5
  • 6. Uncertainty & Unknowns • Quite a challenge at RFP stage… • They are not all bad; it just means options… more so for agile projects. • Options need to identified, understood and communicated. http://militarytobusiness.blogspot.in/2010/08/dealing-with-uncertainty.html 6
  • 7. Steps involved • Notice of RFP • Pre-Proposal Walkthrough • Written Clarifications & Questions • Response to Written Clarifications & Questions • Receipt of Written RFP Deadline • RFP Defence • RFP Evaluation • RFP Selection Announcements, Negotiations etc. http://www.blog-bizedge.biz/2011/03/preproposal-positioning.html 7
  • 8. Deal With Agile We will do it collectively… 8 http://www.webpoppy.net/2011/06/how-to-write-a-website-rfp/
  • 9. Let’s Self Organize !!! ( 5-6 member teams) 9 http://en.wikipedia.org/wiki/Self-organization
  • 10. 20 minute time boxes • Iteration 1 – Walkthrough of RFP questions (15 min + 5 min) • Iteration 2 – War room • Iteration 3 – Defense 10 http://blog.agilebuddy.com/2009/01/significance-of-time-boxing.html
  • 11. There is limited time … • Solution strategy approach and NOT the Focus !!! solution itself. • Highlighted questions are critical. • Articulate the following • How would you approach estimation and release planning. • Thoughts on contracting & pricing •Testing and product quality (Independent Testing Teams vs. Self Contained Testers in Dev Teams) •Onsite offshore execution ,team loading. • Pick a moderator to have a handle on things while the discussion goes on. 11
  • 13. Vendor Discretion Advised Agile Project AHEAD • Customer business participation. • Vendor involvement in the decision making process. • Offshore teams leveraged for only tasks/activities. 13
  • 14. • Estimates & Release Plans. • Contracting Models. • Project execution strategy (Onsite/Offshore) http://www.investinganswers.com/personal-finance/smart-consumer/5-money- 14 rules-are-just-plain-wrong-2482
  • 15. Project Chartering • High level system understanding • User stories - walkthrough • Define Acceptance Criteria Story Mapping • Identify Function Flow • User stories grouping • Release Plans 15
  • 16. Estimates • Collective planning and estimation • Story points (Scale 1-10) by functional y grouped teams. • Effort classification. Release Plans • Quarterly production releases synchronized with non-agile projects • Logical grouping based on Functional flow and Criticality. • Only for 6 months… 16
  • 17. Execution Model • Onsite heavy in the first few sprints. • Frequent Onsite off shore team rotation. 17
  • 18. Contracts & Pricing • T & M Initially • Switch to FPP after stability • CR based pricing for changing requirements • Frequent travels factored into pricing.
  • 19. Name: Ravi Kumar Email ID: ravikumar.rk@gmail.com ravikumar.rk@hcl.com HCL Technologies Ltd.
  • 20. Agile Outsourcing - Dealing with Agile RFPs No. General 1 Is the supplier ready to implement the Agile project? The project is primarily implemented at the location of CUSTOMER at LOCATION. The supplier indicates how this is 2 realised. Proven experience with this mode of realisation under an Agile routine is of importance. The supplier is in a position to independently convert the WHAT (the system must do) into HOW (this must be realised). The supplier 3 presents his vision on this subject. As Agile is going to be worked in teams constituted of people with different (cultural) backgrounds, a comprehensive culture training / team building at the start of the project is obvious. What plans does the supplier have for the purpose and what expenditure of time 4 and cost are involved in this connection? 5 Please describe how you would respond to a request to set up an Agile Project in partnership Advantages of Agile Environment: What does your company see as the main advantage to an Agile development environment? What 6 are the key disadvantages? Process & Tools 1 How does the supplier deal with changes in the requirements (content and priority) during the project? 2 Which Agile routine does the supplier choose for this project? The substantiation of this choice is of particular importance. 3 In what way can the management and maintenance of the deliverable software be organised? 4 How does the supplier ensure the guarantee for the maintainability and quality of the deliverable software? 5 How does the supplier ensure that the preferred suppliers of CUSTOMER can maintain the system? Supplier has experience with tooling in an Agile process. What tools has the supplier used for the purpose in the earlier projects? For each tool, indicate the purpose for which it was employed within the Agile process. 6 How do you typically ensure on Agile projects that senior management in your company and the customer company have 7 appropriate visibility to make decisions and coordinate other activity? Testing What vision does the supplier have on tests during an Agile process? 1 Make a distinction according to system and acceptance tests. 2 How your organization views testing as part of a scrum team? How your organization would develop testing requirements for a sprint. Include test techniques / methods that would be used and how 3 they would be used? 4 What testing should be performed as part of a scrum team? 5 What approach do you take for agile testing? 6 How do you achieve collaborative working relationships on agile initiatives in order to ensure quality delivery? How your organization view testing as part of a independent team and what will be the best strategy to work with 7 independent testing teams. Contracting & Estimation Supplier gives a detailed estimate of the time required for the formulation of all product requirements. The substantiation of this estimate is of particular importance. Assume the following while you think of a solution for this question Simple Requirements: 100 >> Medium Requirements: 150 >>Complex Requirements: 100 1 Bidders are requested to indicate their own pricing policy (initial and recurring costs) applicable to the products and services called for. Specify the prices and rates for the products and services called for. You should be fully prepared here and need to at least include the 2 deliverable products and services specified by you. For each sprint, present a detailed summary of the costs of the proposed team effort during the turnaround time of project estimated on the basis of the total list of the product requirements. In addition, the rate employed for each team member of the proposed team 3 classification must be indicated.
  • 21. Contracting & Estimation contd… What is the contract model that the vendor would like to propose? Fixed Price will be of primary interest for the customer but is willing to consider other contractual models as well. Vendor must justify the different contractual models and 4 justify the most appropriate for the project and clearly articulate the risks and downside of Fixed Price model Supplier indicates the project organisation roles, rates, quantities, composition, phasing, sprint duration, tooling etc.. The substantiation of this organisation and estimates are of particular importance. How does the supplier guarantee that the cited capacity and knowledge are indeed available in the same and stable (team) composition during the entire project? Consider here also the possible visa problem. 5 Release Supplier indicates in detail which part of the product requirements referred can be realised within 6 months after the start of the project implementation. The substantiation of these assessments is of particular importance. The deadline of 6 months is an arbitrarily chosen reference time. The starting point here is the project organisation as described and the 1 assessment of the product requirements The supplier needs to work together with other CUSTOMER units that do not work according to Agile. How does the supplier plan to deal with the units from the CUSTOMER organisation that do not work according to Agile? 2 How does the supplier guarantee that he will deliver a working software (zero defect delivery) that is deployed in the acceptance/live environment made available by CUSTOMER for the purpose after every sprint? How does the supplier envisage to be able to contribute towards as high a delivery reliability as possible? 3 On-Going Application Support & Maintenance: Describe your methodology for providing on-going application support and maintenance services, including the following: • Application Updates • User Management • Change Management • Problem management and communication procedures • Documentation management• Communication and integration with the customer and its processes • Problem diagnosis and root-cause analysis of production defects • Review and approval of problem-fix approach and risks • Design 4 Review, Code Inspection, Testing and other quality assurance processes supporting Application Maintenance We have limited time and hence I suggest the following… - Think about approach to arrive at solution or strategy and NOT the solution itself. - The questions that are in bold are critical; focus discussions to overcome the challenges. Specifically the following must be articulated > Approach to estimation and release planning. > Contracting & Pricing > Testing and product quality (Independent Testing Teams vs. Self Contained Testers in Dev Teams) > Onsite offshore execution model with emphasis on team loading. - Pick a moderator to have a handle on things while the discussion goes on.