1 
Backlog, Deferred Maintenance 
& it’s use in planning 
March 29th, 2012 
Gina Matsoukas 
University of Illinois at Urbana Champaign 
The University of Maine 
University of Maine at Augusta 
University of Maine at Farmington 
University of Maine at Machias 
University of Maine at Presque Isle 
University of Maine at Fort Kent 
University of Maryland 
University of Massachusetts Amherst 
University of Massachusetts Boston 
University of Massachusetts Dartmouth 
University of Massachusetts Lowell 
University of Michigan 
University of Minnesota 
University of Missouri 
University of Missouri ‐ Kansas City 
University of Missouri ‐ St. Louis 
University of New Hampshire 
University of New Haven 
University of Notre Dame 
University of Oregon 
University of Pennsylvania 
University of Portland 
University of Redlands 
The University of Rhode Island, Narragansett Bay 
The University of Rhode Island, Feinstein Providence 
The University of Rhode Island, Kingston 
University of Rochester 
University of San Diego 
University of San Francisco 
University of St. Thomas (TX) 
University of Southern Maine 
University of Toledo 
University of Vermont 
Upper Iowa University 
Utica College 
Vassar College 
Virginia Commonwealth University 
Virginia Department of General Services 
Wagner College 
Wellesley College 
Wesleyan University 
West Chester University of Pennsylvania 
West Virginia University 
Western Oregon University 
Wheaton College (MA)
2 
Focusing on the backlog & deferred 
maintenance
33 
A vocabulary for measurement 
The Return on Physical Assets – ROPASM Asset Value Change Operations Success 
Annual 
Stewardship 
Reinvestment 
Asset 
Operating 
Effectiveness 
Service 
The annual 
investment needed 
to insure buildings 
will properly 
perform and reach 
their useful life 
“Keep‐Up Costs” 
Annual 
Stewardship 
The accumulated 
backlog of repair 
and modernization 
needs and the 
definition of 
resource capacity to 
correct them. 
“Catch‐Up Costs” 
Asset 
Reinvestment 
The effectiveness 
of the facilities 
operating budget, 
staffing, 
supervision, and 
energy 
management 
Operations 
Success 
The measure of 
service process, the 
maintenance 
quality of space and 
systems, and the 
customers opinion 
of service delivery 
Service
4 
Why it needs to be more than a backlog 
Finite Facilities Needs 
1. Catalog the needs 
2. Analyze the data 
Strategic Direction 
3. Identify building portfolios 
4. Develop targets 
Investment Capacity 
5. Define phase out plan 
Finite Facilities 
Needs 
Strategic 
Direction 
Investment 
Capacity
5 
Going beyond “deferred maintenance” 
Utility 
Infrastructure 
Develop a 
Comprehensive 
List of Needs 
Repair & 
Replacement 
Campus 
Modernization 
Master Plan
6 
Goals & Process Overview 
Backlog Goals: 
•Common Project Codification in One Database 
•Consistent Pricing & Timeframe Assignment 
•Coordination Between All Needs To Maximize Capital 
•Reconcile Need To Financial Capacity ‐ The Multi‐Year Phase‐Out Plan 
What the Full Process Should Look Like: 
1. Base Data Assembly 
1. Collection of existing studies and key planning documents 
2. Inspection of building components and characteristics 
2. Inventory Creation 
1. Incorporate existing studies and assessments 
2. Interviews with key facilities staff 
3. Project pricing and codification 
3. Development of Building Portfolios 
1. Group buildings based on investment strategy 
2. Allocation of available funding by portfolio 
4. Development of Multi‐Year Funding Plan
7 
Adding value to each project 
•Repair/Maint 
•Modernization 
• Infrastructure 
Define Work 
Classification 
•Reliability 
•Asset Preservation 
• Space Improvement 
• Economic Operations 
• Safety / Code 
Define Project 
Classifications 
•A: 1‐3 years 
•B: 4‐6 years 
•C: 7+ 
Define Project 
Priority 
What is the 
Work? 
What is the 
Impact? 
What is the 
Priority?
8 
Putting strategy to the numbers
9 
Defining a Multi‐Year Investment Plan 
Beyond Picking Projects 
Descriptive text goes here 
? 
Full Inventory 
of Projects Apply 
Building Portfolio 
& Timeframe 
Apply 
Investment 
Criteria & 
Timeframe 
Multi‐Year 
Project Plan 
Geographic, Program, 
Transitional, & Years 
Reliability, Asset 
Preservation, Program, 
Economic Operations , 
Safety/Code & Years 
Full Inventory of 
Projects 
Electrical, Plumbing, 
HVAC, Mechanical, 
Exterior, Interior, 
Safety… 
How Do You 
Target 
Projects 
Sightlines’ Process 
Proposed Solution Current Challenge 
Electrical, Plumbing, 
HVAC, Mechanical, 
Exterior, Interior, 
Safety… 
Pick 
Projects
10 
Creating a comprehensive plan 
Project 
Identification 
•Inventory 
•Interviews 
•Other studies 
Project 
Codification 
•Timeframe 
•Package 
•Investment 
Criteria 
Project 
Selection 
•Project scores 
•Meet 
investment 
objectives 
Building Portfolio 
Creation 
•Group Buildings 
•Outline investment 
strategies Funding 
Identification 
•What financial 
resources are 
available? 
Funding 
Allocation 
•By Portfolio 
•By Investment Criteria Multi‐year 
capital 
investment 
plan 
Capital 
Allocation 
Planning
11 
Core Concepts of the Building Portfolio Approach 
Funding is allocated by Building Portfolios 
• Ensures that the right buildings have funding for needs 
• Funding allocation is done by Institutional leadership 
Funding is allocated by Project Outcome (Investment Criteria) 
• Ensures that the right type of work is done within each Portfolio 
•The type of work funded will differ by Portfolio 
Project selection is done to meet the funding allocations 
• Flexibility of project selection within the appropriated funding allocation 
•Project selection completed by Facilities leadership 
Result 
• Institutional leadership has set the level of, and direction for, investments 
• Facilities leadership can control individual project selection based on their detailed 
understanding of the campus facilities 
• Campus‐wide confidence, understanding, and involvement in capital investment strategy
12 
The portfolio approach starts by 
breaking down the numbers
13 
Total Identified Needs 
Total Needs 
$86 M 
New Construction 
$625,000 
Grounds & Infrastructure 
$14.1M 
Building Needs 
$71.3 M 
Academic/Admin 
$26.4M 
407,665 GSF 
$65/GSF 
Residential 
$31.8 M 
330,354 GSF 
$96/GSF 
Student Life 
$11.5 M 
271,345 GSF 
$43/GSF 
Support 
$1.5 M 
60,924 GSF 
$25/GSF
14 
Identified Building Needs By System ‐ $71.3M 
Timeframe A,B, & C only – Excluding new construction, grounds, & infrastructure 
$21.1 
$14.2 
$12.9 
$7.0 6.7 
$3.9 $3.7 
$1.4 
$25 
$20 
$15 
$10 
$5 
$0 
$0.4 
Interior Shell Plumbing HVAC Safety/Code Exterior Shell Electrical Heating Mechanical Cooling 
$ in Millions 
Total Need by System 
$4.8 
$6.9 
$4.1 
$2.0 $2.8 
$0.9 $2.0 $0.6 
$0.2 
$4.3 
$2.0 
$2.8 
$1.4 
$2.2 
$1.7 $0.9 $0.3 $0.1 
$12.0 
$5.3 
$6.0 
$3.6 
$1.8 
$1.4 $0.8 $0.5 $0.2 
A B C
15 
Identifying Buildings with Greatest Need 
$12 
$15 
$6 
$3 
$3 
$4 
$5 
$7 
$5 
$3 
$23 
$26 
$25 
$22 
$20 
$12 
$11 
$14 
$11 
$15 
$8 
$14 
$51 
$57 
$54 
$16 
$29 
$16 
$25 
$39 
$78 
$169 
$17 
$9 
$10 
$12 
$1 
$11 
$9 
$8 
$19 
$11 
$7 
$8 
$8 
$13 
$36 
$105 
$22 
$3 
$14 
$33 
$15 
$1 
$19 
$44 
Historic Project Investments into 
$‐ $50 $100 $150 $200 $250 
Building #16 
Building #15 
Building #14 
Building #13 
Building #12 
Building #11 
Building #10 
Building #9 
Building #8 
Building #7 
Building #6 
Building #5 
Building #4 
Building #3 
Building #2 
Building #1 
Building Needs 
Envelope Building Systems Space Renewal Safety/Code 
9% 
13% 
37% 
41% 
Buildings 
FY03‐FY11
16 
Sample Campus #1 
Mission‐Driven Portfolios
17 
93% 
77% 
76% 
81% 
71% 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 
Recruiting 
Retention 
Academic 
Admin/Support 
Undetermined Future 
Average NAV by Portfolio 
NAV by Building Portfolio 
*Total Campus NAV includes infrastructure/grounds 
*Total Campus NAV – 74% 
Peer Campus NAV – 80%
18 
Allocating funding by Building Portfolio 
Remaining $9.7 M of funding allocated to portfolios based on remaining A timeframe needs 
Portfolio Average 
NAV 
“A Timeframe” Needs 
Excludes “urgent reliability” and 
“Special Interest projects” 
% of Total Funding 
Allocated 
Funding Allocated 
Recruiting 93% $8.7M 8% $0.7M 
Retention 77% $29.2M 27% $2.4M 
Academic 76% $55.7M 52% $4.5M 
Admin/Support 81% $8.0M 0% $0.0M 
Undetermined Future 71% $5.2M 0% $0.0M 
Infrastructure/Grounds n/a $14.1M 13% $1.1M 
Sub‐Total 
10% of $9.7 M as Contingency 
78% 
‐ 
$121.0M 
‐ 
100% 
‐ 
$8.7 M 
$1.0 M 
Total $9.7M 
Excludes Admin/Support and Undetermined Future Portfolios
19 
Summary of FY12‐14 $30 M Funding by Building Portfolio 
$8.7 
A Timeframe Needs vs. FY12‐FY14 Funding Allocation 
$29.2 
$55.7 
$8.0 
$5.2 
$14.1 
$2.6 
$7.8 
$3.6 $0.5 
$0.7 $4.9 
$0.4 
$0.7 
$2.4 
$4.5 
$1.1 
$60 
$50 
$40 
$30 
$20 
$10 
$0 
Recruiting Retention Academic Admin/Support Undet. Future Infra/Grounds 
$ in Millions 
Remaining Allocated Funding 
"Just In Time" Reserve 
Urgent Reliability & "Special Interest" Projects 
A Timeframe Needs 
Note: $1.0 M of “Special Interest” project funding for the Retention Portfolio, and $125 K of Infrastructure/Grounds funding is addressing B or C timeframe needs.
20 
Sample Campus #2 
Targeting NAVs by Portfolio
2211 
Understanding the Net Asset Value Index 
NAV Index = 
(Replacement Value‐Building Needs) 
Replacement Value 
X 100 
Campus leadership can set different NAV levels for different 
buildings and portfolios, helping to balance capital 
investments across campus and prioritize project selection 
Investment Strategy 
100%‐ 
85% 
85%‐ 
75% 
75%‐ 
60% 
Below 
60% 
Capital Upkeep Stage: Primarily new 
or recently renovated buildings w/ 
sporadic building repair & life cycle 
needs; “You pick the projects” 
Repair and Maintain Stage: Buildings 
are beginning to show their age and 
may require more significant 
investment on a case‐by‐case basis 
Systemic Renovation Stage: Buildings 
may require more significant repairs ; 
large‐scale capital infusions/ 
renovations are inevitable; “The 
projects pick you” 
Demolition/Transitional/ Gut 
Renovation Stage: Major buildings 
components are in jeopardy of 
complete failure. Reliability issues 
are widespread throughout the 
building. 
NAV of Index
22 
Building Portfolios 
Total Identified 
Needs 
$197.0 M 
New 
Construction 
$36.9 M 
Infrastructure & 
Grounds 
$27.7 M 
Building Needs 
$132.4 M 
Education & 
General 
$45.3 M 
Under 25 Years 
Old 
$18.6 M 
Over 25 Years Old 
$26.7 M 
Residential 
$73.6 M 
First Year 
Residences 
$22.6 M 
Upper Class 
Residences 
$51.0 M 
Auxiliary 
$13.2 M 
PAC Site 
$0.2 M 
Targeting investment to institutional priorities 
7 Buildings 
355,494 GSF 
5 Buildings 
331,140 GSF 
11 Buildings 
639,830 GSF 
3 Buildings 
138,571GSF 
10 Buildings 
504,618 GSF 
1 Building 
55,000 GSF 
Sub‐Portfolios
23 
Funding Allocation Methodology Option 
110% 
100% 
90% 
80% 
70% 
60% 
50% 
40% 
Education & 
General‐ Under 25 
Years 
Education & 
General‐ Over25 
Years 
Current NAV Index by Sub‐Portfolio 
Residential‐ First 
Year 
Residential‐ 
Upperclass 
Auxiliary PAC Site 
Sub‐Portfolio 
NAV 
Establishing Target NAV by Portfolio or Sub‐Portfolio 
E&G‐Under 
25 
E&G‐Over 
25 
Residential‐ First 
Year 
Residential‐ 
Upper Class Auxiliary PAC Site Total 
Current NAV 82% 83% 80% 73% 70% 99% 79% 
Target NAV 85% 85% 80% 80% 75% 99% 81% 
Est. Investment Need to 
Target NAV $3.4 M $2.7 M ‐ $13.9 M $2.1 M ‐ $22.1 M
24 
Sample Campus #3 
Targeting Investments based on 
Facility NAV and Value to Program
25 
Descriptive text goes here 
25 
Min, Max, & Average NAV by Portfolio 
120% 
100% 
80% 
60% 
40% 
20% 
0% 
Academic (Non‐ 
Research) 
Academic 
(Research) 
Min, Max, and Average NAV by Portfolio 
Campus Average* 
= 82% 
Dormitory Student Life Athletic Admin/Support Aux. Housing 
*Campus average includes Infrastructure & Grounds needs
26 
100% 
90% 
80% 
70% 
60% 
50% 
40% 
30% 
20% 
10% 
0% 
NAV Index by Building 
Academic (Non‐Research) 
26 
Using the NAV Within Portfolios 
Portfolio: Academic (Non‐Research) 
Portfolio Average = 88% 
Bottom 10% 
# of Buildings 6 
Investment to Bring 
Buildings to Portfolio 
Average 
$7.6 M
27 
Using the detailed analysis for multi‐year investment planning 
Investment strategy and project selection based on facts 
100% 
90% 
80% 
70% 
60% 
50% 
40% 
Net Asset Value vs. Program Value 
By Building 
High Program Value, High NAV 
Low Program Value, High NAV 
Focus on system work, minimal space 
4 5 6 7 8 9 10 
Building Condition (NAV) 
Value of Facility to Program 
1‐10 scale, 1= low, 10 = high 
Maintain & protect 
High Program Value, Low NAV 
Repairs & Space Improvement 
Low Program Value, Low NAV 
Emergency work only
28 
Sample Campus #4 
Utilizing a “Transitional” Portfolio
29 
Needs by Building Portfolio 
Total Project 
Inventory 
$2,280 M 
New Space 
$571 M 
Building Needs 
$1,627 M 
Transitional 
Facilities 
$196 M 
Building 
Renovation 
$581 M 
Repurpose 
$40 M 
Maintain 
$812 M 
Non‐housing 
facilities 
$602 M 
Housing facilities 
$208 M 
Site & 
Infrastructure 
Needs 
$80.4 M 
Transitional Portfolio contains buildings to be demolished or sold
30 
FY11 Investments by Building Portfolio 
FY11 Building Investments by Portfolio 
20% 
17% 
34% 
0.21% 
2% 
25% 
2% 
Maintain 
Maintain (Housing) 
Building Renovation 
Transitional 
Repurpose 
Infrastructure 
New Space 
Building Portfolio FY11 Investment ($/GSF) 
Maintain $3.58 
Maintain ( Housing) $4.30 
Building Renovation $14.89 
Transitional $1.54 
Repurpose $1.29
31 
Sample Campus #4 
Bringing it all together
32 
Process Summary 
Descriptive text goes here 
• Campus 
Communication 
• Portfolio “Re‐alignment” 
• Priority Revision 
• Tracking Spending 
• Communicate Results 
• Contingency Management 
• Project Impact 
• Portfolios 
• Investment Criteria 
• Financial Alignment 
•Multi‐year Plan 
• Technical Review 
• Information by System 
• Integrate Program 
• Integrate 
Infrastructure 
• Assess Urgency 
Project ID Project 
Selection 
Capital 
Budget 
Process 
Project 
Execution
33 
Sightlines Approach … 
•Utilizing trade management and staff in assessment process 
•Present material to facilities staff before bringing findings to 
senior staff or trustee level 
•Include supervisors in presentations to institutional senior staff 
Engage the people 
who know the 
buildings and 
systems 
•Incorporating campus master plans and modernization 
programs 
•Alignment between financial capabilities and facility needs 
Build support of 
Users 
•Reporting of all needs to the campus community 
• Align facility needs to the institution’s financial capacity 
Create 
Transparency
34 
The Successful Plan Will … 
•Understand how underfunding creates backlog 
• Impact of changing campus age 
Articulate the Cause of 
Backlogs ‐ Catch‐up vs. 
Keep Up 
• Comprehensive, credible and flexible 
• Illustrate operations impact 
•Benchmarking for context 
Communicate a Credible 
Inventory of Needs 
• Building Portfolios reflect institutional strategy 
• Investment Criteria define the investment outcome 
•Timeframe – aligns financial capacity to facilities needs 
Set Priorities that Create 
Investment Strategies, 
Not Picking Projects 
•Fact – Never get enough funding 
•Fact – New things always occur – contingency management is key 
•Fact – Customer support is important 
Measure and Report 
Performance Annually
35 
Questions & Discussion

More Related Content

Viewers also liked

Kakamega County Audit Report 2014/2015
Kakamega County Audit Report 2014/2015Kakamega County Audit Report 2014/2015
Kakamega County Audit Report 2014/2015The Star Newspaper
 
Make your pitch perfect, using competitive and emotional intelligence - SEOZONE
Make your pitch perfect, using competitive and emotional intelligence - SEOZONEMake your pitch perfect, using competitive and emotional intelligence - SEOZONE
Make your pitch perfect, using competitive and emotional intelligence - SEOZONEAlexandraTachalova
 
JAWS FESTA TOKAIDO 2016
JAWS FESTA TOKAIDO 2016JAWS FESTA TOKAIDO 2016
JAWS FESTA TOKAIDO 2016陽平 山口
 
Lire Rythme, une nouvelle de Chaplin
Lire Rythme, une nouvelle de ChaplinLire Rythme, une nouvelle de Chaplin
Lire Rythme, une nouvelle de ChaplinLaila Methnani
 
Spartan challenge 10 11
Spartan challenge 10 11Spartan challenge 10 11
Spartan challenge 10 11Robjenna
 
Create content according to buyer's journey
Create content according to buyer's journeyCreate content according to buyer's journey
Create content according to buyer's journeyPengyuan Zhao
 
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業 交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業 交點
 
14 Machine Learning Single Layer Perceptron
14 Machine Learning Single Layer Perceptron14 Machine Learning Single Layer Perceptron
14 Machine Learning Single Layer PerceptronAndres Mendez-Vazquez
 
Connected health
Connected healthConnected health
Connected healthDeloitte UK
 
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay GaurTOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay GaurAkshay Gaur
 

Viewers also liked (12)

Kakamega County Audit Report 2014/2015
Kakamega County Audit Report 2014/2015Kakamega County Audit Report 2014/2015
Kakamega County Audit Report 2014/2015
 
Make your pitch perfect, using competitive and emotional intelligence - SEOZONE
Make your pitch perfect, using competitive and emotional intelligence - SEOZONEMake your pitch perfect, using competitive and emotional intelligence - SEOZONE
Make your pitch perfect, using competitive and emotional intelligence - SEOZONE
 
Canvas
CanvasCanvas
Canvas
 
JAWS FESTA TOKAIDO 2016
JAWS FESTA TOKAIDO 2016JAWS FESTA TOKAIDO 2016
JAWS FESTA TOKAIDO 2016
 
Lire Rythme, une nouvelle de Chaplin
Lire Rythme, une nouvelle de ChaplinLire Rythme, une nouvelle de Chaplin
Lire Rythme, une nouvelle de Chaplin
 
Spartan challenge 10 11
Spartan challenge 10 11Spartan challenge 10 11
Spartan challenge 10 11
 
Create content according to buyer's journey
Create content according to buyer's journeyCreate content according to buyer's journey
Create content according to buyer's journey
 
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業 交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
 
14 Machine Learning Single Layer Perceptron
14 Machine Learning Single Layer Perceptron14 Machine Learning Single Layer Perceptron
14 Machine Learning Single Layer Perceptron
 
My favourite game
My favourite gameMy favourite game
My favourite game
 
Connected health
Connected healthConnected health
Connected health
 
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay GaurTOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
 

Similar to Backlog, Deferred Maintenance and its use in Planning

Planning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsPlanning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsSightlines
 
University of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedUniversity of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedSightlines
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding RequestMSCSA
 
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesGo "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesSightlines
 
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Sightlines
 
Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Sightlines
 
Success Strategies in School Capital Planning
Success Strategies in School Capital PlanningSuccess Strategies in School Capital Planning
Success Strategies in School Capital PlanningSchoolDude
 
New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012Sightlines
 
Unleash the Power of Prediction with ROPA+
Unleash the Power of Prediction with ROPA+Unleash the Power of Prediction with ROPA+
Unleash the Power of Prediction with ROPA+Sightlines
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013SchoolDude
 
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanDon't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanSightlines
 
ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...smumbahelp
 
Tough projects keeping them on course -1- mike mellin 02-18-16
Tough projects   keeping them on course -1- mike mellin 02-18-16Tough projects   keeping them on course -1- mike mellin 02-18-16
Tough projects keeping them on course -1- mike mellin 02-18-16Mike Mellin, BSEE/MS
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Software Engineering
Software Engineering Software Engineering
Software Engineering Abdul Rehman
 
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Sightlines
 
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...Sightlines
 
Financial Sustainability at UC Davis
Financial Sustainability at UC DavisFinancial Sustainability at UC Davis
Financial Sustainability at UC Davisucdavisarm
 

Similar to Backlog, Deferred Maintenance and its use in Planning (20)

Planning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's NeedsPlanning for the Future: Adapting Facilities to Tomorrow's Needs
Planning for the Future: Adapting Facilities to Tomorrow's Needs
 
University of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedUniversity of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be Managed
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding Request
 
Dartmouth webinar
Dartmouth webinarDartmouth webinar
Dartmouth webinar
 
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesGo "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
 
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
 
Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016
 
Success Strategies in School Capital Planning
Success Strategies in School Capital PlanningSuccess Strategies in School Capital Planning
Success Strategies in School Capital Planning
 
New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012New strategies for attacking deferred maintenance december 2012
New strategies for attacking deferred maintenance december 2012
 
The Journey Towards Asset Management Excellence
The Journey Towards Asset Management ExcellenceThe Journey Towards Asset Management Excellence
The Journey Towards Asset Management Excellence
 
Unleash the Power of Prediction with ROPA+
Unleash the Power of Prediction with ROPA+Unleash the Power of Prediction with ROPA+
Unleash the Power of Prediction with ROPA+
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanDon't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
 
ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...
 
Tough projects keeping them on course -1- mike mellin 02-18-16
Tough projects   keeping them on course -1- mike mellin 02-18-16Tough projects   keeping them on course -1- mike mellin 02-18-16
Tough projects keeping them on course -1- mike mellin 02-18-16
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Software Engineering
Software Engineering Software Engineering
Software Engineering
 
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
 
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
 
Financial Sustainability at UC Davis
Financial Sustainability at UC DavisFinancial Sustainability at UC Davis
Financial Sustainability at UC Davis
 

More from Sightlines

State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017Sightlines
 
2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education2017 State of Facilities in Higher Education
2017 State of Facilities in Higher EducationSightlines
 
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusPut Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusSightlines
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Sightlines
 
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]Sightlines
 
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]Sightlines
 
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetDoing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetSightlines
 
Making the Case for Campus Sustainability
Making the Case for Campus SustainabilityMaking the Case for Campus Sustainability
Making the Case for Campus SustainabilitySightlines
 
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...Sightlines
 
Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Sightlines
 
2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education2016 State of Facilities in Higher Education
2016 State of Facilities in Higher EducationSightlines
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogSightlines
 
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...Sightlines
 
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...Sightlines
 
Prepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementPrepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementSightlines
 
The State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsThe State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsSightlines
 
Sightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines
 
Data & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessData & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessSightlines
 
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Sightlines
 
Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Sightlines
 

More from Sightlines (20)

State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017
 
2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education
 
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusPut Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
 
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
 
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
 
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetDoing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
 
Making the Case for Campus Sustainability
Making the Case for Campus SustainabilityMaking the Case for Campus Sustainability
Making the Case for Campus Sustainability
 
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
 
Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016
 
2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlog
 
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
 
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
 
Prepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementPrepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th Commencement
 
The State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern InstitutionsThe State of Facilities at Midwestern Institutions
The State of Facilities at Midwestern Institutions
 
Sightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with Gordian
 
Data & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessData & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates Success
 
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
 
Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016
 

Recently uploaded

Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
The role of Geography in climate education: science and active citizenship
The role of Geography in climate education: science and active citizenshipThe role of Geography in climate education: science and active citizenship
The role of Geography in climate education: science and active citizenshipKarl Donert
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfChristalin Nelson
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
Shark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsShark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsArubSultan
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...Nguyen Thanh Tu Collection
 
BÀI TẬP BỔ TRỢ 4 KĨ NĂNG TIẾNG ANH LỚP 8 - CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC ...
BÀI TẬP BỔ TRỢ 4 KĨ NĂNG TIẾNG ANH LỚP 8 - CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC ...BÀI TẬP BỔ TRỢ 4 KĨ NĂNG TIẾNG ANH LỚP 8 - CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC ...
BÀI TẬP BỔ TRỢ 4 KĨ NĂNG TIẾNG ANH LỚP 8 - CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC ...Nguyen Thanh Tu Collection
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
The Emergence of Legislative Behavior in the Colombian Congress
The Emergence of Legislative Behavior in the Colombian CongressThe Emergence of Legislative Behavior in the Colombian Congress
The Emergence of Legislative Behavior in the Colombian CongressMaria Paula Aroca
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineCeline George
 

Recently uploaded (20)

Spearman's correlation,Formula,Advantages,
Spearman's correlation,Formula,Advantages,Spearman's correlation,Formula,Advantages,
Spearman's correlation,Formula,Advantages,
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
The role of Geography in climate education: science and active citizenship
The role of Geography in climate education: science and active citizenshipThe role of Geography in climate education: science and active citizenship
The role of Geography in climate education: science and active citizenship
 
CARNAVAL COM MAGIA E EUFORIA _
CARNAVAL COM MAGIA E EUFORIA            _CARNAVAL COM MAGIA E EUFORIA            _
CARNAVAL COM MAGIA E EUFORIA _
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdf
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
Shark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsShark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristics
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
 
BÀI TẬP BỔ TRỢ 4 KĨ NĂNG TIẾNG ANH LỚP 8 - CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC ...
BÀI TẬP BỔ TRỢ 4 KĨ NĂNG TIẾNG ANH LỚP 8 - CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC ...BÀI TẬP BỔ TRỢ 4 KĨ NĂNG TIẾNG ANH LỚP 8 - CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC ...
BÀI TẬP BỔ TRỢ 4 KĨ NĂNG TIẾNG ANH LỚP 8 - CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC ...
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
The Emergence of Legislative Behavior in the Colombian Congress
The Emergence of Legislative Behavior in the Colombian CongressThe Emergence of Legislative Behavior in the Colombian Congress
The Emergence of Legislative Behavior in the Colombian Congress
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command Line
 
Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...
 

Backlog, Deferred Maintenance and its use in Planning

  • 1. 1 Backlog, Deferred Maintenance & it’s use in planning March 29th, 2012 Gina Matsoukas University of Illinois at Urbana Champaign The University of Maine University of Maine at Augusta University of Maine at Farmington University of Maine at Machias University of Maine at Presque Isle University of Maine at Fort Kent University of Maryland University of Massachusetts Amherst University of Massachusetts Boston University of Massachusetts Dartmouth University of Massachusetts Lowell University of Michigan University of Minnesota University of Missouri University of Missouri ‐ Kansas City University of Missouri ‐ St. Louis University of New Hampshire University of New Haven University of Notre Dame University of Oregon University of Pennsylvania University of Portland University of Redlands The University of Rhode Island, Narragansett Bay The University of Rhode Island, Feinstein Providence The University of Rhode Island, Kingston University of Rochester University of San Diego University of San Francisco University of St. Thomas (TX) University of Southern Maine University of Toledo University of Vermont Upper Iowa University Utica College Vassar College Virginia Commonwealth University Virginia Department of General Services Wagner College Wellesley College Wesleyan University West Chester University of Pennsylvania West Virginia University Western Oregon University Wheaton College (MA)
  • 2. 2 Focusing on the backlog & deferred maintenance
  • 3. 33 A vocabulary for measurement The Return on Physical Assets – ROPASM Asset Value Change Operations Success Annual Stewardship Reinvestment Asset Operating Effectiveness Service The annual investment needed to insure buildings will properly perform and reach their useful life “Keep‐Up Costs” Annual Stewardship The accumulated backlog of repair and modernization needs and the definition of resource capacity to correct them. “Catch‐Up Costs” Asset Reinvestment The effectiveness of the facilities operating budget, staffing, supervision, and energy management Operations Success The measure of service process, the maintenance quality of space and systems, and the customers opinion of service delivery Service
  • 4. 4 Why it needs to be more than a backlog Finite Facilities Needs 1. Catalog the needs 2. Analyze the data Strategic Direction 3. Identify building portfolios 4. Develop targets Investment Capacity 5. Define phase out plan Finite Facilities Needs Strategic Direction Investment Capacity
  • 5. 5 Going beyond “deferred maintenance” Utility Infrastructure Develop a Comprehensive List of Needs Repair & Replacement Campus Modernization Master Plan
  • 6. 6 Goals & Process Overview Backlog Goals: •Common Project Codification in One Database •Consistent Pricing & Timeframe Assignment •Coordination Between All Needs To Maximize Capital •Reconcile Need To Financial Capacity ‐ The Multi‐Year Phase‐Out Plan What the Full Process Should Look Like: 1. Base Data Assembly 1. Collection of existing studies and key planning documents 2. Inspection of building components and characteristics 2. Inventory Creation 1. Incorporate existing studies and assessments 2. Interviews with key facilities staff 3. Project pricing and codification 3. Development of Building Portfolios 1. Group buildings based on investment strategy 2. Allocation of available funding by portfolio 4. Development of Multi‐Year Funding Plan
  • 7. 7 Adding value to each project •Repair/Maint •Modernization • Infrastructure Define Work Classification •Reliability •Asset Preservation • Space Improvement • Economic Operations • Safety / Code Define Project Classifications •A: 1‐3 years •B: 4‐6 years •C: 7+ Define Project Priority What is the Work? What is the Impact? What is the Priority?
  • 8. 8 Putting strategy to the numbers
  • 9. 9 Defining a Multi‐Year Investment Plan Beyond Picking Projects Descriptive text goes here ? Full Inventory of Projects Apply Building Portfolio & Timeframe Apply Investment Criteria & Timeframe Multi‐Year Project Plan Geographic, Program, Transitional, & Years Reliability, Asset Preservation, Program, Economic Operations , Safety/Code & Years Full Inventory of Projects Electrical, Plumbing, HVAC, Mechanical, Exterior, Interior, Safety… How Do You Target Projects Sightlines’ Process Proposed Solution Current Challenge Electrical, Plumbing, HVAC, Mechanical, Exterior, Interior, Safety… Pick Projects
  • 10. 10 Creating a comprehensive plan Project Identification •Inventory •Interviews •Other studies Project Codification •Timeframe •Package •Investment Criteria Project Selection •Project scores •Meet investment objectives Building Portfolio Creation •Group Buildings •Outline investment strategies Funding Identification •What financial resources are available? Funding Allocation •By Portfolio •By Investment Criteria Multi‐year capital investment plan Capital Allocation Planning
  • 11. 11 Core Concepts of the Building Portfolio Approach Funding is allocated by Building Portfolios • Ensures that the right buildings have funding for needs • Funding allocation is done by Institutional leadership Funding is allocated by Project Outcome (Investment Criteria) • Ensures that the right type of work is done within each Portfolio •The type of work funded will differ by Portfolio Project selection is done to meet the funding allocations • Flexibility of project selection within the appropriated funding allocation •Project selection completed by Facilities leadership Result • Institutional leadership has set the level of, and direction for, investments • Facilities leadership can control individual project selection based on their detailed understanding of the campus facilities • Campus‐wide confidence, understanding, and involvement in capital investment strategy
  • 12. 12 The portfolio approach starts by breaking down the numbers
  • 13. 13 Total Identified Needs Total Needs $86 M New Construction $625,000 Grounds & Infrastructure $14.1M Building Needs $71.3 M Academic/Admin $26.4M 407,665 GSF $65/GSF Residential $31.8 M 330,354 GSF $96/GSF Student Life $11.5 M 271,345 GSF $43/GSF Support $1.5 M 60,924 GSF $25/GSF
  • 14. 14 Identified Building Needs By System ‐ $71.3M Timeframe A,B, & C only – Excluding new construction, grounds, & infrastructure $21.1 $14.2 $12.9 $7.0 6.7 $3.9 $3.7 $1.4 $25 $20 $15 $10 $5 $0 $0.4 Interior Shell Plumbing HVAC Safety/Code Exterior Shell Electrical Heating Mechanical Cooling $ in Millions Total Need by System $4.8 $6.9 $4.1 $2.0 $2.8 $0.9 $2.0 $0.6 $0.2 $4.3 $2.0 $2.8 $1.4 $2.2 $1.7 $0.9 $0.3 $0.1 $12.0 $5.3 $6.0 $3.6 $1.8 $1.4 $0.8 $0.5 $0.2 A B C
  • 15. 15 Identifying Buildings with Greatest Need $12 $15 $6 $3 $3 $4 $5 $7 $5 $3 $23 $26 $25 $22 $20 $12 $11 $14 $11 $15 $8 $14 $51 $57 $54 $16 $29 $16 $25 $39 $78 $169 $17 $9 $10 $12 $1 $11 $9 $8 $19 $11 $7 $8 $8 $13 $36 $105 $22 $3 $14 $33 $15 $1 $19 $44 Historic Project Investments into $‐ $50 $100 $150 $200 $250 Building #16 Building #15 Building #14 Building #13 Building #12 Building #11 Building #10 Building #9 Building #8 Building #7 Building #6 Building #5 Building #4 Building #3 Building #2 Building #1 Building Needs Envelope Building Systems Space Renewal Safety/Code 9% 13% 37% 41% Buildings FY03‐FY11
  • 16. 16 Sample Campus #1 Mission‐Driven Portfolios
  • 17. 17 93% 77% 76% 81% 71% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Recruiting Retention Academic Admin/Support Undetermined Future Average NAV by Portfolio NAV by Building Portfolio *Total Campus NAV includes infrastructure/grounds *Total Campus NAV – 74% Peer Campus NAV – 80%
  • 18. 18 Allocating funding by Building Portfolio Remaining $9.7 M of funding allocated to portfolios based on remaining A timeframe needs Portfolio Average NAV “A Timeframe” Needs Excludes “urgent reliability” and “Special Interest projects” % of Total Funding Allocated Funding Allocated Recruiting 93% $8.7M 8% $0.7M Retention 77% $29.2M 27% $2.4M Academic 76% $55.7M 52% $4.5M Admin/Support 81% $8.0M 0% $0.0M Undetermined Future 71% $5.2M 0% $0.0M Infrastructure/Grounds n/a $14.1M 13% $1.1M Sub‐Total 10% of $9.7 M as Contingency 78% ‐ $121.0M ‐ 100% ‐ $8.7 M $1.0 M Total $9.7M Excludes Admin/Support and Undetermined Future Portfolios
  • 19. 19 Summary of FY12‐14 $30 M Funding by Building Portfolio $8.7 A Timeframe Needs vs. FY12‐FY14 Funding Allocation $29.2 $55.7 $8.0 $5.2 $14.1 $2.6 $7.8 $3.6 $0.5 $0.7 $4.9 $0.4 $0.7 $2.4 $4.5 $1.1 $60 $50 $40 $30 $20 $10 $0 Recruiting Retention Academic Admin/Support Undet. Future Infra/Grounds $ in Millions Remaining Allocated Funding "Just In Time" Reserve Urgent Reliability & "Special Interest" Projects A Timeframe Needs Note: $1.0 M of “Special Interest” project funding for the Retention Portfolio, and $125 K of Infrastructure/Grounds funding is addressing B or C timeframe needs.
  • 20. 20 Sample Campus #2 Targeting NAVs by Portfolio
  • 21. 2211 Understanding the Net Asset Value Index NAV Index = (Replacement Value‐Building Needs) Replacement Value X 100 Campus leadership can set different NAV levels for different buildings and portfolios, helping to balance capital investments across campus and prioritize project selection Investment Strategy 100%‐ 85% 85%‐ 75% 75%‐ 60% Below 60% Capital Upkeep Stage: Primarily new or recently renovated buildings w/ sporadic building repair & life cycle needs; “You pick the projects” Repair and Maintain Stage: Buildings are beginning to show their age and may require more significant investment on a case‐by‐case basis Systemic Renovation Stage: Buildings may require more significant repairs ; large‐scale capital infusions/ renovations are inevitable; “The projects pick you” Demolition/Transitional/ Gut Renovation Stage: Major buildings components are in jeopardy of complete failure. Reliability issues are widespread throughout the building. NAV of Index
  • 22. 22 Building Portfolios Total Identified Needs $197.0 M New Construction $36.9 M Infrastructure & Grounds $27.7 M Building Needs $132.4 M Education & General $45.3 M Under 25 Years Old $18.6 M Over 25 Years Old $26.7 M Residential $73.6 M First Year Residences $22.6 M Upper Class Residences $51.0 M Auxiliary $13.2 M PAC Site $0.2 M Targeting investment to institutional priorities 7 Buildings 355,494 GSF 5 Buildings 331,140 GSF 11 Buildings 639,830 GSF 3 Buildings 138,571GSF 10 Buildings 504,618 GSF 1 Building 55,000 GSF Sub‐Portfolios
  • 23. 23 Funding Allocation Methodology Option 110% 100% 90% 80% 70% 60% 50% 40% Education & General‐ Under 25 Years Education & General‐ Over25 Years Current NAV Index by Sub‐Portfolio Residential‐ First Year Residential‐ Upperclass Auxiliary PAC Site Sub‐Portfolio NAV Establishing Target NAV by Portfolio or Sub‐Portfolio E&G‐Under 25 E&G‐Over 25 Residential‐ First Year Residential‐ Upper Class Auxiliary PAC Site Total Current NAV 82% 83% 80% 73% 70% 99% 79% Target NAV 85% 85% 80% 80% 75% 99% 81% Est. Investment Need to Target NAV $3.4 M $2.7 M ‐ $13.9 M $2.1 M ‐ $22.1 M
  • 24. 24 Sample Campus #3 Targeting Investments based on Facility NAV and Value to Program
  • 25. 25 Descriptive text goes here 25 Min, Max, & Average NAV by Portfolio 120% 100% 80% 60% 40% 20% 0% Academic (Non‐ Research) Academic (Research) Min, Max, and Average NAV by Portfolio Campus Average* = 82% Dormitory Student Life Athletic Admin/Support Aux. Housing *Campus average includes Infrastructure & Grounds needs
  • 26. 26 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% NAV Index by Building Academic (Non‐Research) 26 Using the NAV Within Portfolios Portfolio: Academic (Non‐Research) Portfolio Average = 88% Bottom 10% # of Buildings 6 Investment to Bring Buildings to Portfolio Average $7.6 M
  • 27. 27 Using the detailed analysis for multi‐year investment planning Investment strategy and project selection based on facts 100% 90% 80% 70% 60% 50% 40% Net Asset Value vs. Program Value By Building High Program Value, High NAV Low Program Value, High NAV Focus on system work, minimal space 4 5 6 7 8 9 10 Building Condition (NAV) Value of Facility to Program 1‐10 scale, 1= low, 10 = high Maintain & protect High Program Value, Low NAV Repairs & Space Improvement Low Program Value, Low NAV Emergency work only
  • 28. 28 Sample Campus #4 Utilizing a “Transitional” Portfolio
  • 29. 29 Needs by Building Portfolio Total Project Inventory $2,280 M New Space $571 M Building Needs $1,627 M Transitional Facilities $196 M Building Renovation $581 M Repurpose $40 M Maintain $812 M Non‐housing facilities $602 M Housing facilities $208 M Site & Infrastructure Needs $80.4 M Transitional Portfolio contains buildings to be demolished or sold
  • 30. 30 FY11 Investments by Building Portfolio FY11 Building Investments by Portfolio 20% 17% 34% 0.21% 2% 25% 2% Maintain Maintain (Housing) Building Renovation Transitional Repurpose Infrastructure New Space Building Portfolio FY11 Investment ($/GSF) Maintain $3.58 Maintain ( Housing) $4.30 Building Renovation $14.89 Transitional $1.54 Repurpose $1.29
  • 31. 31 Sample Campus #4 Bringing it all together
  • 32. 32 Process Summary Descriptive text goes here • Campus Communication • Portfolio “Re‐alignment” • Priority Revision • Tracking Spending • Communicate Results • Contingency Management • Project Impact • Portfolios • Investment Criteria • Financial Alignment •Multi‐year Plan • Technical Review • Information by System • Integrate Program • Integrate Infrastructure • Assess Urgency Project ID Project Selection Capital Budget Process Project Execution
  • 33. 33 Sightlines Approach … •Utilizing trade management and staff in assessment process •Present material to facilities staff before bringing findings to senior staff or trustee level •Include supervisors in presentations to institutional senior staff Engage the people who know the buildings and systems •Incorporating campus master plans and modernization programs •Alignment between financial capabilities and facility needs Build support of Users •Reporting of all needs to the campus community • Align facility needs to the institution’s financial capacity Create Transparency
  • 34. 34 The Successful Plan Will … •Understand how underfunding creates backlog • Impact of changing campus age Articulate the Cause of Backlogs ‐ Catch‐up vs. Keep Up • Comprehensive, credible and flexible • Illustrate operations impact •Benchmarking for context Communicate a Credible Inventory of Needs • Building Portfolios reflect institutional strategy • Investment Criteria define the investment outcome •Timeframe – aligns financial capacity to facilities needs Set Priorities that Create Investment Strategies, Not Picking Projects •Fact – Never get enough funding •Fact – New things always occur – contingency management is key •Fact – Customer support is important Measure and Report Performance Annually
  • 35. 35 Questions & Discussion

Editor's Notes

  1. You’ve all seen the endless spreadsheets, thousands upon thousands of projects long….Can’t be created in isolationNeed departmental/campus buy in to be successful
  2. What is the definition of DM?
  3. Define work– the type of work of the project Define Project – define the impact the project Project priority – define the importance of eachWhat we do different – we go further by defining not only the work, but also project calssification
  4. Top down vs. bottom up
  5. #1: not all bldgs should be treated the same, leadership picks direction, facilities picks projects#2: keeps heads above water by choosing what’s important to the mission and direction of the school, not by project by project. (reliability, eco. Ops, safety/code vs. a roof/a boiler/a classroom reno)#3: flexibility is key to meet portfolio targets to be able to combine projects and realize the biggest efficiencies.Result: BUY-IN across the board. Leadership is doing their job, facilities doing theirs and both working towards the same outcome.
  6. Needs dominated by building system work, which makes sense given that historically, over the past decade, only 13% of funds have gone into that type of work. Gut checks..(qualification process)
  7. Contingency calculated using 5% of remaining reliability projects
  8. Contingency calculated using 5% of remaining reliability projectsFunding all reliability + special interest (in orange), split up the remaining funding based on % of needs in each portfolio
  9. Value assigned by institutionMay find funding in blues and letting them slip a bit.