SlideShare a Scribd company logo
1 of 1
Download to read offline
Ground Floor plan
Existing
0
Existing First Floor
Level
3620
Second Floor Level
6500
Wall Plate Level
9540
Silo Ridge Level
17520
Silo Floor Level
-350
Third Floor ffl
10263
Flat Roof level
15440
External Staircase
Roof Level 2
13730
K..B. C. F. G.. I. J.H.. M O PN.
Proposed External Stairwell Existing Mill
17520
18993
Proposed Roof light
with Lourves at the side
to promote ventilation in the dance studio
Proposed Double Glazed Windows
Existing Masonry Wall
Finish to the Exterior
Proposed Triple Glazed
Timber & Aluminium Windows
Proposed Glazed Roof Structure
Proposed Kalzip Roof to the
Dance Studio
Proposed Flat Roof Parapet
over the External Staircase
Timber Cladding to the Exterior
Ground Floor plan
Existing
0
Existing First Floor
Level
3620
Second Floor Level
6500
Silo Ridge Level
17520
Grain Store Level
1900
Third Floor Level NC
9740
Third Floor ffl
10263
Flat Roof level
15440
External Staircase
Roof Level 2
13730
1 17.16.2 3 5 6 7 8 9 10 11 1213. 14. 15.41a 2a 4b 4c 6a 8a 9a 11a 14a 14b 14c 16a 16b 16c4a
Proposed External Stairwell Existing Mill Block 1 & 2
43835
Proposed Kalzip Roof
to Dance Studio
Proposed Double Glazing Windows
Proposed Timber Frame Wall Construction
Proposed Roof light with Lourves at the sides
to promote ventilation in the dance studio
Existing Concrete Roof
Proposed Triple Glazed Timber
& Aluminium Windows
Original Masonry
Wall Finish to the
Exterior
Proposed Glulam Columns & Beam Structure
Proposed Flat Roof Parapet over External Staircase
Proposed Terracotta Cladding to the Exterior
Proposed Guarding to the Exterrnal
Balcony
Proposed Glazed Roof Structure
to incorporate Vents for ventilation and smoke control
Proposed Glazed Rooflight
with lourved sides to promote
natural ventilation
Proposed External Staircase to be
independent of the existing structure
Proposed Curved Roof
Proposed Glazing to dance studio
Proposed treated Curved Glulam Columns
to the exterior
Proposed Timber decking balcony
area
proposed Timber cladding to the Exterior
North
General Specification
Mill Building c1855 & c1879
Proposed Upgrade to existing External Walls:
Proposed: additional dry lining board to the internal
face of the external walls, consisting of 10mm layer
of levelling lime plaster, 50mm Calsitherm Climate
board glued to face of the lime plaster with 5mm of
calsitherm adhesive mortar, a 12 mm layer of lime
plaster is to be applied to the face of the calsitherm
with reinforcing mesh in between the two layers of
plaster, a diffusion natural paint shall then be
applied to the plaster , colour as decided by client.
Proposed upgrade to Existing Floor.
Proposed: Existing flagstones that occur in the
three bays to the South side of the mill are to be
accurately surveyed, numbered and taken up from
the floor carefully and stored in a safe place, the
flagstone are to be reused on top of the new
proposed floor. Removal of existing assumed
concrete ground floor, 150mm of compacted light
expanded clay aggregate to be laid on top of a
geotextile breathable membrane which is to be
taped and sealed up the sides of the proposed
floor. 150mm Hydraulic lime screed is then to be
poured on top with a 50mm hydraulic lime screed to
be laid in the area where the flagstones do not
occur. The Existing flagstones are to be laid on top
of a hydraulic screed and are to be laid at the
same level as the new proposed floor. The existing
flagstones are to repointed with lime mortar.
Proposed Upgrade to Existing Silo Floor
Proposed: 150mm Sand Blinding is to be placed
on top of existing concrete floor, 200mm Rigid PIR
Insulation is then placed on top with a DPC/DPM
Membrane placed on top which is to be wrapped up
the side , a 100mm Concrete screed is then to be
poured on top. The Concrete screed is finished
with a tightly bound wearing finish.
Proposed upgrade to Existing windows
Proposed - Upgrading to Triple glazed argon filled
Timber and aluminium window frame with 30 mm
thick polyethylene foam insulation on outside
Which will achieve a u-value of 0.8w/m²k. Install
draught proofing strips around all windows to help
prevent heat loss. Proposed Aluminium Cill to be
fixed on top of existing granite cills to drain away
rain water.
Proposed Upgrade to Existing Silo Walls:
Proposed - 150mm Rigid PIR Insulation to be
packed tightly between 150 x 100 mm Steel C
Channells, vertical Timber Pine Cladding to be
attached back to the structure using 25 x 75mm
Horizontal treated Counterbattons attached to 50 x
25mm Vertical treated Battons which are attached
back to 15mm Cement Particle
Board.Waterproofing membrane placed on the face
of the Cement Particle Board which is then
attached back to the Steel C Channels. This
Structure is supported independently from the
existing structure by Steel Columns which are
supported individually by a Concrete Pad
Foundation wherever possible to engineers
specification.
Proposed Upgrade to Existing First & Second
Floor
Mill Block: 30mm Eco Underfloor heating system
panel is placed on top of the existing floor
structure, 10mm Plywood distribution board is the
laid on top, the boards are to be staggered and
taped together, 13mm Oakwood floor is then laid
as a clip system as per manufactureres
specification.
www.autodesk.com/revit
Scale
LECTURER
Drawn by
Date
Project number
Institute of Technology Carlow
BSc. (Hons) in Architectural Technology
Year 4 2014-2015
1
Sinéad Byrne
Noel Dunne, Sujana Sudhir
16-01-15
As indicated
05/06/201516:33:33
PROPOSED EAST &
SOUTH ELEVATIONS
Change of use of a Protected
Structure
A107
1 : 100
PROPOSED SOUTH ELEVATION.
1 : 100
PROPOSED EAST ELEVATION
3D SOUTH AND EAST VIEW
1 : 1000
Keyplan Elevations
Window & Door Specification
Windows to be
Triple Glazed Aluminium casement window with two openable bottom sections complete with a
multipoint locking facility for added security. This system has a polyamide assembly, which ensures that
it is thermally efficient. Window U- Value 0.8 W/M2K. Window Glazing to be 28mm double glazed; soft
coat low 'E' 90% argon filled glazing units.
Doors to be:
East Facade : Rebated Open Out aluminium door system with anti-finger trap
North Facade Rebated Open Out aluminium door system with anti-finger trap
South Facade: Rebated Open Out aluminium door system with anti-finger trap

More Related Content

What's hot

Presentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingPresentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingShane Madden
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213Adam Barnett
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1David Dinsdale
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor planDanny Chiverton
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline KH
 
Base UFH Brochure 2016
Base UFH Brochure 2016Base UFH Brochure 2016
Base UFH Brochure 2016James Canny
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
Visual dictionary - Sb10Hip
Visual dictionary - Sb10HipVisual dictionary - Sb10Hip
Visual dictionary - Sb10HipDustin Day
 
Winter Panel Complete Guide
Winter Panel Complete GuideWinter Panel Complete Guide
Winter Panel Complete GuideWinterPanelChile
 
visual dictionary- cavitywall
visual dictionary- cavitywallvisual dictionary- cavitywall
visual dictionary- cavitywallcavitywall
 
(Power Shrink) Visual Dictionary Done
(Power Shrink)   Visual Dictionary Done(Power Shrink)   Visual Dictionary Done
(Power Shrink) Visual Dictionary DoneAuburn University
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad SubmissionYolanda Sewpersad
 

What's hot (20)

Presentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingPresentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural Drawing
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
final dcc
final dccfinal dcc
final dcc
 
Versaloc
VersalocVersaloc
Versaloc
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
MOMBASA BLUE PRINT elevation
MOMBASA BLUE PRINT elevationMOMBASA BLUE PRINT elevation
MOMBASA BLUE PRINT elevation
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 
Details
DetailsDetails
Details
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
Base UFH Brochure 2016
Base UFH Brochure 2016Base UFH Brochure 2016
Base UFH Brochure 2016
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Visual dictionary - Sb10Hip
Visual dictionary - Sb10HipVisual dictionary - Sb10Hip
Visual dictionary - Sb10Hip
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Winter Panel Complete Guide
Winter Panel Complete GuideWinter Panel Complete Guide
Winter Panel Complete Guide
 
visual dictionary- cavitywall
visual dictionary- cavitywallvisual dictionary- cavitywall
visual dictionary- cavitywall
 
(Power Shrink) Visual Dictionary Done
(Power Shrink)   Visual Dictionary Done(Power Shrink)   Visual Dictionary Done
(Power Shrink) Visual Dictionary Done
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
Polyform Presentation
Polyform PresentationPolyform Presentation
Polyform Presentation
 

Viewers also liked

Comparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel siloComparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel siloIAEME Publication
 
Vibrating machinery steel skid on piles
Vibrating machinery steel skid on pilesVibrating machinery steel skid on piles
Vibrating machinery steel skid on pilesr2d22
 
E n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsE n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsDaniel DRAGOSIN
 
Seismic response of reinforced concrete silos
Seismic response of reinforced concrete silosSeismic response of reinforced concrete silos
Seismic response of reinforced concrete siloseSAT Journals
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study Khaled Eid
 
Sap tutorial for dynamics
Sap tutorial for dynamicsSap tutorial for dynamics
Sap tutorial for dynamicscolosimoricardo
 
Post Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdPost Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdSathish Kumar
 
Company presentation fabricator feb20_2016
Company presentation fabricator feb20_2016Company presentation fabricator feb20_2016
Company presentation fabricator feb20_2016Pravin Patel
 
Silo at narrow space
Silo at narrow spaceSilo at narrow space
Silo at narrow spacechandra manik
 
Construction Methodology Scheduling1
Construction Methodology Scheduling1Construction Methodology Scheduling1
Construction Methodology Scheduling1Allan Leyte
 
A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingSiddhartha Kamat
 
Structure Analysis-Deflection using SAP2000
Structure Analysis-Deflection using  SAP2000Structure Analysis-Deflection using  SAP2000
Structure Analysis-Deflection using SAP2000Batoul Alshamali
 
Tekla structure models
Tekla structure modelsTekla structure models
Tekla structure modelsJanusz Majcher
 
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016Bimo Radifan A
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project reportShubham Parab
 
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...Duy Dang
 
The tekla training guide
The tekla training guideThe tekla training guide
The tekla training guidePhuc An
 

Viewers also liked (20)

Comparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel siloComparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel silo
 
Vibrating machinery steel skid on piles
Vibrating machinery steel skid on pilesVibrating machinery steel skid on piles
Vibrating machinery steel skid on piles
 
E n e r g o Cement Plant - Projects
E n e r g o Cement Plant - ProjectsE n e r g o Cement Plant - Projects
E n e r g o Cement Plant - Projects
 
The Ins & Outs of Concrete Silo Inspection
The Ins & Outs of Concrete Silo InspectionThe Ins & Outs of Concrete Silo Inspection
The Ins & Outs of Concrete Silo Inspection
 
Seismic response of reinforced concrete silos
Seismic response of reinforced concrete silosSeismic response of reinforced concrete silos
Seismic response of reinforced concrete silos
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study
 
Sap tutorial for dynamics
Sap tutorial for dynamicsSap tutorial for dynamics
Sap tutorial for dynamics
 
Post Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdPost Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt Ltd
 
Company presentation fabricator feb20_2016
Company presentation fabricator feb20_2016Company presentation fabricator feb20_2016
Company presentation fabricator feb20_2016
 
Silo at narrow space
Silo at narrow spaceSilo at narrow space
Silo at narrow space
 
Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro. Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro.
 
Construction Methodology Scheduling1
Construction Methodology Scheduling1Construction Methodology Scheduling1
Construction Methodology Scheduling1
 
A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information Modelling
 
Storage structre
Storage structreStorage structre
Storage structre
 
Structure Analysis-Deflection using SAP2000
Structure Analysis-Deflection using  SAP2000Structure Analysis-Deflection using  SAP2000
Structure Analysis-Deflection using SAP2000
 
Tekla structure models
Tekla structure modelsTekla structure models
Tekla structure models
 
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project report
 
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
 
The tekla training guide
The tekla training guideThe tekla training guide
The tekla training guide
 

Similar to Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS

House Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsHouse Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsAyla Damon
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlowTej Raj Upreti
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Colin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project WorkColin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project WorkColin Harkin
 
1371-Scarewater Vean - Sections
1371-Scarewater Vean - Sections1371-Scarewater Vean - Sections
1371-Scarewater Vean - SectionsMalcolm Sargeant
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilionSakshi Singh
 
BR06 Existing and Proposed Elevation
BR06 Existing and Proposed ElevationBR06 Existing and Proposed Elevation
BR06 Existing and Proposed Elevationsarah ralphs
 
Everhaus catalogue
Everhaus catalogueEverhaus catalogue
Everhaus catalogueMatis Velt
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurantkristienadana
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lastslharback
 
BR02 Proposed Foundation Plan
BR02 Proposed Foundation PlanBR02 Proposed Foundation Plan
BR02 Proposed Foundation Plansarah ralphs
 
Revit project No. 3 Thesis - Exhibition posters
 Revit project No. 3 Thesis - Exhibition posters Revit project No. 3 Thesis - Exhibition posters
Revit project No. 3 Thesis - Exhibition postersTej Raj Upreti
 
Repairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupRepairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupLouisGilmore
 

Similar to Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS (20)

House Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsHouse Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & Elevations
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlow
 
Structural glazing details
Structural glazing detailsStructural glazing details
Structural glazing details
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Colin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project WorkColin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project Work
 
1371-Scarewater Vean - Sections
1371-Scarewater Vean - Sections1371-Scarewater Vean - Sections
1371-Scarewater Vean - Sections
 
15-106 3
15-106 315-106 3
15-106 3
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilion
 
BR06 Existing and Proposed Elevation
BR06 Existing and Proposed ElevationBR06 Existing and Proposed Elevation
BR06 Existing and Proposed Elevation
 
Everhaus catalogue
Everhaus catalogueEverhaus catalogue
Everhaus catalogue
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurant
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lasts
 
BR02 Proposed Foundation Plan
BR02 Proposed Foundation PlanBR02 Proposed Foundation Plan
BR02 Proposed Foundation Plan
 
Revit project No. 3 Thesis - Exhibition posters
 Revit project No. 3 Thesis - Exhibition posters Revit project No. 3 Thesis - Exhibition posters
Revit project No. 3 Thesis - Exhibition posters
 
Repairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupRepairs Renovation Gilmore Backup
Repairs Renovation Gilmore Backup
 
dan palmer
dan palmerdan palmer
dan palmer
 
Elevations & sections
Elevations & sectionsElevations & sections
Elevations & sections
 

Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS

  • 1. Ground Floor plan Existing 0 Existing First Floor Level 3620 Second Floor Level 6500 Wall Plate Level 9540 Silo Ridge Level 17520 Silo Floor Level -350 Third Floor ffl 10263 Flat Roof level 15440 External Staircase Roof Level 2 13730 K..B. C. F. G.. I. J.H.. M O PN. Proposed External Stairwell Existing Mill 17520 18993 Proposed Roof light with Lourves at the side to promote ventilation in the dance studio Proposed Double Glazed Windows Existing Masonry Wall Finish to the Exterior Proposed Triple Glazed Timber & Aluminium Windows Proposed Glazed Roof Structure Proposed Kalzip Roof to the Dance Studio Proposed Flat Roof Parapet over the External Staircase Timber Cladding to the Exterior Ground Floor plan Existing 0 Existing First Floor Level 3620 Second Floor Level 6500 Silo Ridge Level 17520 Grain Store Level 1900 Third Floor Level NC 9740 Third Floor ffl 10263 Flat Roof level 15440 External Staircase Roof Level 2 13730 1 17.16.2 3 5 6 7 8 9 10 11 1213. 14. 15.41a 2a 4b 4c 6a 8a 9a 11a 14a 14b 14c 16a 16b 16c4a Proposed External Stairwell Existing Mill Block 1 & 2 43835 Proposed Kalzip Roof to Dance Studio Proposed Double Glazing Windows Proposed Timber Frame Wall Construction Proposed Roof light with Lourves at the sides to promote ventilation in the dance studio Existing Concrete Roof Proposed Triple Glazed Timber & Aluminium Windows Original Masonry Wall Finish to the Exterior Proposed Glulam Columns & Beam Structure Proposed Flat Roof Parapet over External Staircase Proposed Terracotta Cladding to the Exterior Proposed Guarding to the Exterrnal Balcony Proposed Glazed Roof Structure to incorporate Vents for ventilation and smoke control Proposed Glazed Rooflight with lourved sides to promote natural ventilation Proposed External Staircase to be independent of the existing structure Proposed Curved Roof Proposed Glazing to dance studio Proposed treated Curved Glulam Columns to the exterior Proposed Timber decking balcony area proposed Timber cladding to the Exterior North General Specification Mill Building c1855 & c1879 Proposed Upgrade to existing External Walls: Proposed: additional dry lining board to the internal face of the external walls, consisting of 10mm layer of levelling lime plaster, 50mm Calsitherm Climate board glued to face of the lime plaster with 5mm of calsitherm adhesive mortar, a 12 mm layer of lime plaster is to be applied to the face of the calsitherm with reinforcing mesh in between the two layers of plaster, a diffusion natural paint shall then be applied to the plaster , colour as decided by client. Proposed upgrade to Existing Floor. Proposed: Existing flagstones that occur in the three bays to the South side of the mill are to be accurately surveyed, numbered and taken up from the floor carefully and stored in a safe place, the flagstone are to be reused on top of the new proposed floor. Removal of existing assumed concrete ground floor, 150mm of compacted light expanded clay aggregate to be laid on top of a geotextile breathable membrane which is to be taped and sealed up the sides of the proposed floor. 150mm Hydraulic lime screed is then to be poured on top with a 50mm hydraulic lime screed to be laid in the area where the flagstones do not occur. The Existing flagstones are to be laid on top of a hydraulic screed and are to be laid at the same level as the new proposed floor. The existing flagstones are to repointed with lime mortar. Proposed Upgrade to Existing Silo Floor Proposed: 150mm Sand Blinding is to be placed on top of existing concrete floor, 200mm Rigid PIR Insulation is then placed on top with a DPC/DPM Membrane placed on top which is to be wrapped up the side , a 100mm Concrete screed is then to be poured on top. The Concrete screed is finished with a tightly bound wearing finish. Proposed upgrade to Existing windows Proposed - Upgrading to Triple glazed argon filled Timber and aluminium window frame with 30 mm thick polyethylene foam insulation on outside Which will achieve a u-value of 0.8w/m²k. Install draught proofing strips around all windows to help prevent heat loss. Proposed Aluminium Cill to be fixed on top of existing granite cills to drain away rain water. Proposed Upgrade to Existing Silo Walls: Proposed - 150mm Rigid PIR Insulation to be packed tightly between 150 x 100 mm Steel C Channells, vertical Timber Pine Cladding to be attached back to the structure using 25 x 75mm Horizontal treated Counterbattons attached to 50 x 25mm Vertical treated Battons which are attached back to 15mm Cement Particle Board.Waterproofing membrane placed on the face of the Cement Particle Board which is then attached back to the Steel C Channels. This Structure is supported independently from the existing structure by Steel Columns which are supported individually by a Concrete Pad Foundation wherever possible to engineers specification. Proposed Upgrade to Existing First & Second Floor Mill Block: 30mm Eco Underfloor heating system panel is placed on top of the existing floor structure, 10mm Plywood distribution board is the laid on top, the boards are to be staggered and taped together, 13mm Oakwood floor is then laid as a clip system as per manufactureres specification. www.autodesk.com/revit Scale LECTURER Drawn by Date Project number Institute of Technology Carlow BSc. (Hons) in Architectural Technology Year 4 2014-2015 1 Sinéad Byrne Noel Dunne, Sujana Sudhir 16-01-15 As indicated 05/06/201516:33:33 PROPOSED EAST & SOUTH ELEVATIONS Change of use of a Protected Structure A107 1 : 100 PROPOSED SOUTH ELEVATION. 1 : 100 PROPOSED EAST ELEVATION 3D SOUTH AND EAST VIEW 1 : 1000 Keyplan Elevations Window & Door Specification Windows to be Triple Glazed Aluminium casement window with two openable bottom sections complete with a multipoint locking facility for added security. This system has a polyamide assembly, which ensures that it is thermally efficient. Window U- Value 0.8 W/M2K. Window Glazing to be 28mm double glazed; soft coat low 'E' 90% argon filled glazing units. Doors to be: East Facade : Rebated Open Out aluminium door system with anti-finger trap North Facade Rebated Open Out aluminium door system with anti-finger trap South Facade: Rebated Open Out aluminium door system with anti-finger trap