SOLAR OFF GRID INVERTER SYSTEM
www.statconenergiaa.com
Solar present, Grid available.
Battery Charged through
Solar MPPT charger Only,
Load supplied through Grid.
AC LOADS
(Priority)
P1=0
AC LOADS
(Others)
P2 P3
P gr=P2+P3
GRID
CHARGING
INTERLOCK
DG SET
(OPTIONAL)
OFF GRID SOLAR POWER SYSTEM
CONDITION # 1
P gr
P so
P dg
P ba = P so
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
AC LOADS
(Priority)
AC LOADS
(Others)
GRID
INTERLOCK
CHARGED
Solar present, Grid available.
Battery Full Charged condition, Priority
Load supplied only through Solar.
Secondary Load Through Grid
separately
CONDITION # 2
DG SET
(OPTIONAL)
P1=P so
P2=P so P3=P gr
P gr
P so
P dg
P ba = 0
P gr=P3
OFF GRID SOLAR POWER SYSTEM
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
AC LOADS
(Priority)
AC LOADS
(Others)
GRID
INTERLOCK
CHARGING
Solar NOT present, Grid Available.
Battery Charged through GRID, Load
supplied through Grid.
CONDITION # 3
DG SET
(OPTIONAL)
P1
P2 P3
P gr=Pba +P2+P3
P gr
P so = 0
P dg
P ba
OFF GRID SOLAR POWER SYSTEM
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
AC LOADS
(Priority)
AC LOADS
(Others)
GRID
INTERLOCK
DISCHARGING
Solar NOT present, Grid NOT
available.
Priority Load supplied through
Battery.
CONDITION # 4
DG SET
(OPTIONAL)
P1=P ba
P3
P gr
P so
P dg
P ba = P2
No Interruption To LOAD during
changeover!
OFF GRID SOLAR POWER SYSTEM
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
AC LOADS
(Priority)
AC LOADS
(Others)
GRID
INTERLOCK
CHARGING
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
CONDITION #5
Solar NOT present, Grid NOT
available.
Battery level lower than Pre-set then
Charged through DG Set, All Load
supplied through DG Set.
DG SET
(OPTIONAL)
P1=0
P2 P3
P dg=Pba+P2+P3
P gr
P so
P dg
P ba = P so
OFF GRID SOLAR POWER SYSTEM
ADVANTAGES
1. Most trusted and long running technology for solar inverters
2. Maintains the battery life by using solar to reduce its charging and discharging cycles
compared to a non-solar inverter battery system.
3. Provides uninterrupted supply to the primary loads of the household
4. Can run the loads from the available sources according to the priority of the sources
in the algorithm.
5. Reduces diesel consumption by not running DG all the time.
DISADVANTAGES:
1. If the battery is already charged and the loads are few, then the excess power
produced from the Solar panels is wasted.
2. Cannot export to grid
3. No power sharing between sources. Different sources supply to different loads at
the same time.
4. Battery life not as good ( as Hybrid Inverters generally ) and it dies out early.
www.statconenergiaa.com
PH: +91 120 2427310/11
EMAIL: info@statconenergiaa.com

More Related Content

Viewers also liked

Power Electronics Chapter 7
Power Electronics  Chapter 7Power Electronics  Chapter 7
Power Electronics Chapter 7guest8ae54cfb
 
Presentation on solar cell
Presentation on solar cellPresentation on solar cell
Presentation on solar cellOmar SYED
 
Hybrid inverter
Hybrid inverterHybrid inverter
Hybrid inverterAnusha k
 
Solar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power GenerationSolar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power GenerationAnand Upadhyay
 
Power engineering assign
Power engineering assignPower engineering assign
Power engineering assignravi shankar
 
Solar inverter with autosynchronization using microcontroller
Solar inverter with autosynchronization using microcontrollerSolar inverter with autosynchronization using microcontroller
Solar inverter with autosynchronization using microcontrollerDhaval Brahmbhatt
 
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE EEE/ECE S...
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE  EEE/ECE S...LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE  EEE/ECE S...
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE EEE/ECE S...Vithalreddy Reddy's
 
A presentation on inverter by manoj
A presentation on inverter by manojA presentation on inverter by manoj
A presentation on inverter by manojIACM SmartLearn Ltd.
 
Solar Inverter Project Report
Solar Inverter Project ReportSolar Inverter Project Report
Solar Inverter Project ReportHitesh Gupta
 

Viewers also liked (16)

Inverter
InverterInverter
Inverter
 
Power Electronics Chapter 7
Power Electronics  Chapter 7Power Electronics  Chapter 7
Power Electronics Chapter 7
 
Presentation on solar cell
Presentation on solar cellPresentation on solar cell
Presentation on solar cell
 
Hybrid inverter
Hybrid inverterHybrid inverter
Hybrid inverter
 
Solar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power GenerationSolar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power Generation
 
Power engineering assign
Power engineering assignPower engineering assign
Power engineering assign
 
Solar inverter with autosynchronization using microcontroller
Solar inverter with autosynchronization using microcontrollerSolar inverter with autosynchronization using microcontroller
Solar inverter with autosynchronization using microcontroller
 
Inverter (Industrial_C_06_mid)
Inverter (Industrial_C_06_mid)Inverter (Industrial_C_06_mid)
Inverter (Industrial_C_06_mid)
 
Inverter
InverterInverter
Inverter
 
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE EEE/ECE S...
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE  EEE/ECE S...LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE  EEE/ECE S...
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE EEE/ECE S...
 
microbial fuel cell
microbial fuel cellmicrobial fuel cell
microbial fuel cell
 
Inverter 2003
Inverter 2003Inverter 2003
Inverter 2003
 
A presentation on inverter by manoj
A presentation on inverter by manojA presentation on inverter by manoj
A presentation on inverter by manoj
 
Tidal energy
Tidal energyTidal energy
Tidal energy
 
LED'S
LED'SLED'S
LED'S
 
Solar Inverter Project Report
Solar Inverter Project ReportSolar Inverter Project Report
Solar Inverter Project Report
 

Recently uploaded

Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 

Recently uploaded (20)

Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 

Solar off grid inverters

  • 1. SOLAR OFF GRID INVERTER SYSTEM www.statconenergiaa.com
  • 2. Solar present, Grid available. Battery Charged through Solar MPPT charger Only, Load supplied through Grid. AC LOADS (Priority) P1=0 AC LOADS (Others) P2 P3 P gr=P2+P3 GRID CHARGING INTERLOCK DG SET (OPTIONAL) OFF GRID SOLAR POWER SYSTEM CONDITION # 1 P gr P so P dg P ba = P so ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
  • 3. AC LOADS (Priority) AC LOADS (Others) GRID INTERLOCK CHARGED Solar present, Grid available. Battery Full Charged condition, Priority Load supplied only through Solar. Secondary Load Through Grid separately CONDITION # 2 DG SET (OPTIONAL) P1=P so P2=P so P3=P gr P gr P so P dg P ba = 0 P gr=P3 OFF GRID SOLAR POWER SYSTEM ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
  • 4. AC LOADS (Priority) AC LOADS (Others) GRID INTERLOCK CHARGING Solar NOT present, Grid Available. Battery Charged through GRID, Load supplied through Grid. CONDITION # 3 DG SET (OPTIONAL) P1 P2 P3 P gr=Pba +P2+P3 P gr P so = 0 P dg P ba OFF GRID SOLAR POWER SYSTEM ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
  • 5. AC LOADS (Priority) AC LOADS (Others) GRID INTERLOCK DISCHARGING Solar NOT present, Grid NOT available. Priority Load supplied through Battery. CONDITION # 4 DG SET (OPTIONAL) P1=P ba P3 P gr P so P dg P ba = P2 No Interruption To LOAD during changeover! OFF GRID SOLAR POWER SYSTEM ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
  • 6. AC LOADS (Priority) AC LOADS (Others) GRID INTERLOCK CHARGING ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com CONDITION #5 Solar NOT present, Grid NOT available. Battery level lower than Pre-set then Charged through DG Set, All Load supplied through DG Set. DG SET (OPTIONAL) P1=0 P2 P3 P dg=Pba+P2+P3 P gr P so P dg P ba = P so OFF GRID SOLAR POWER SYSTEM
  • 7. ADVANTAGES 1. Most trusted and long running technology for solar inverters 2. Maintains the battery life by using solar to reduce its charging and discharging cycles compared to a non-solar inverter battery system. 3. Provides uninterrupted supply to the primary loads of the household 4. Can run the loads from the available sources according to the priority of the sources in the algorithm. 5. Reduces diesel consumption by not running DG all the time. DISADVANTAGES: 1. If the battery is already charged and the loads are few, then the excess power produced from the Solar panels is wasted. 2. Cannot export to grid 3. No power sharing between sources. Different sources supply to different loads at the same time. 4. Battery life not as good ( as Hybrid Inverters generally ) and it dies out early.
  • 8. www.statconenergiaa.com PH: +91 120 2427310/11 EMAIL: info@statconenergiaa.com