E & B Oil Drilling & Production Project
Draft Environmental Impact Report

Prepared By:
Marine Research Specialists

Public Draft EIR
February 2014
SCH# 2013071038

Prepared For:
City of Hermosa Beach
Table of Contents

Table of Contents
1.0

Introduction .................................................................................................................. 1-1
1.1
Project Overview ................................................................................................. 1-1
1.2
The Environmental Impact Report Process ......................................................... 1-4
1.2.1
Purpose and Intended Uses of the Environmental Impact Report .............. 1-4
1.2.2
Notice of Preparation and Initial Study ....................................................... 1-7
1.2.3
Impacts Considered Less Than Significant................................................. 1-7
1.3
Proposed Project Approvals ................................................................................ 1-8
1.4
EIR Contents and Guide for the Reader ............................................................ 1-10
1.4.1
EIR Contents............................................................................................ 1-10
1.4.2
Significance Criteria ................................................................................. 1-12
1.5
Final EIR Preparation and Certification Process ............................................... 1-13
1.6
CEQA Findings for Proposed Project Approval ................................................. 1-14
1.7
Mitigation Monitoring ......................................................................................... 1-14
1.8
Background....................................................................................................... 1-15
1.8.1
Project History .......................................................................................... 1-15
1.8.2
Lawsuits and Settlement Agreement ........................................................ 1-15

2.0

Project Description ...................................................................................................... 2-1
2.1
Project Overview ................................................................................................. 2-2
2.2
Proposed Project Objectives ............................................................................... 2-4
2.3
Historical and Current Operations ....................................................................... 2-5
2.4
Proposed Oil Project Phases ............................................................................ 2-10
2.4.1
Phase 1 Site Preparation ......................................................................... 2-10
2.4.1.1 Phase 1 Construction Activities .......................................................... 2-10
2.4.1.2 Phase 1 Site Preparation Detailed Schedule ...................................... 2-18
2.4.1.3 Phase 1 Site Preparation Personnel and Equipment Requirements ... 2-19
2.4.1.4 Phase 1 Truck Routes ........................................................................ 2-19
2.4.2
Phase 2 Drilling and Testing .................................................................... 2-20
2.4.2.1 Phase 2 Site Geology and Drilling Objectives ..................................... 2-20
2.4.2.2 Phase 2 Construction and Drilling Activities........................................ 2-22
2.4.2.3 Phase 2 Drilling and Testing Schedule ............................................... 2-38
2.4.2.4 Phase 2 Drilling and Testing Personnel & Equipment Requirements .. 2-38
2.4.3
Phase 3 Final Design and Construction ................................................... 2-40
2.4.3.1 Phase 3 Onsite Construction .............................................................. 2-40
2.4.3.2 Phase 3 Offsite Pipeline Construction ................................................ 2-46
2.4.3.3 Phase 3 Hazardous Materials............................................................. 2-55
2.4.3.4 Phase 3 Schedule .............................................................................. 2-55
2.4.3.5 Phase 3 Personnel and Equipment Requirements ............................. 2-56
2.4.4
Phase 4 Development and Operations ..................................................... 2-56
2.4.4.1 Phase 4 Drilling .................................................................................. 2-56
2.4.5
Drill Remaining Wells ............................................................................... 2-59
2.4.5.1 Phase 4 Processing and Operations .................................................. 2-60
2.4.5.2 Phase 4 Schedule .............................................................................. 2-68
2.4.5.3 Phase 4 Vehicle Requirements .......................................................... 2-69
2.4.6
Parking Requirements .............................................................................. 2-69
2.4.7
Project Life and Decommissioning ........................................................... 2-73
2.5
Proposed City Maintenance Yard Project .......................................................... 2-75

Draft Environmental Impact Report

i

E&B Oil Drilling & Production Project
Table of Contents

2.5.1
Construction Phases ................................................................................ 2-76
2.5.2
Phase 2 Unsuccessful .............................................................................. 2-76
2.5.3
Temporary City Maintenance Yard ........................................................... 2-76
2.5.4
Permanent City Maintenance Yard ........................................................... 2-77
2.5.4.1 Parking Option.................................................................................... 2-77
2.5.4.2 No Added Parking Option ................................................................... 2-81
2.6
Agency Use of the Document ........................................................................... 2-81
2.6.1
Local and Regional .................................................................................. 2-82
2.6.2
State ........................................................................................................ 2-82
2.6.3
Federal..................................................................................................... 2-83
2.7
Potential Project Permits ................................................................................... 2-83
2.7.1
Discretionary Permits and Approvals........................................................ 2-83
3.0

Cumulative Projects ..................................................................................................... 3-1
3.1
Description of Cumulative Projects ..................................................................... 3-2
3.1.1
City of Hermosa Beach .............................................................................. 3-2
3.1.2
City of Redondo Beach .............................................................................. 3-2
3.1.3
City of Torrance.......................................................................................... 3-3

4.0

Environmental Impact Analysis/Regulatory Setting ............................................... 4.0-1
4.0.1 Assessment Methodology ................................................................................ 4.0-1
4.0.2 Oil Project Impact Analysis .............................................................................. 4.0-2
4.0.3 Formulation of Mitigation Measures and Mitigation Monitoring Program .......... 4.0-3
4.0.4 Cumulative Projects Impact Analysis ............................................................... 4.0-4

4.1

Aesthetics and Visual Resources ................................................................................ 4.1-1
4.1.1 Methodology .................................................................................................... 4.1-1
4.1.1.1 Assessing Existing Visual Environment ................................................... 4.1-1
4.1.1.2 Evaluating Project Impacts ...................................................................... 4.1-2
4.1.1.3 Assessment of Key Observation Points ................................................... 4.1-4
4.1.1.4 Lighting and Glare Methodology.............................................................. 4.1-6
4.1.2 Environmental Setting ...................................................................................... 4.1-7
4.1.2.1 Local Setting ........................................................................................... 4.1-7
4.1.2.2 Light and Glare ..................................................................................... 4.1-12
4.1.3 Regulatory Framework ................................................................................... 4.1-13
4.1.3.1 California Coastal Act ............................................................................ 4.1-13
4.1.3.2 Title 24 – Part 11 – California Green Building Standards Code ............. 4.1-13
4.1.3.3 City of Hermosa Beach ......................................................................... 4.1-14
4.1.3.4 City of Redondo Beach ......................................................................... 4.1-15
4.1.3.5 City of Torrance..................................................................................... 4.1-16
4.1.4 Significance Criteria ....................................................................................... 4.1-17
4.1.5 Project Impacts and Mitigation Measures ....................................................... 4.1-17
4.1.5.1 Proposed Oil Project and Pipeline Design Features .............................. 4.1-17
4.1.5.2 Dimensions of Major Visible CMY Project Components ........................ 4.1-27
4.1.5.3 Dimensions of Major Visible Proposed Oil Project Components ............ 4.1-28
4.1.5.4 Proposed Oil Project Viewshed Mapping .............................................. 4.1-29
4.1.5.5 Key Observation Points View Simulations ............................................. 4.1-32
4.1.5.6 Proposed Oil Project Impacts ................................................................ 4.1-90
4.1.5.7 Proposed City Maintenance Yard Project Impacts............................... 4.1-102
4.1.6 Comparison to Applicant Studies ................................................................. 4.1-105
4.1.7 Other Issue Area Mitigation Measure Impacts.............................................. 4.1-106

E&B Oil Drilling & Production Project

ii

Draft Environmental Impact Report
Table of Contents

4.1.8 Cumulative Impacts and Mitigation Measures .............................................. 4.1-106
4.1.9 Mitigation Monitoring Plan ............................................................................ 4.1-107
4.2

Air Quality and Greenhouse Gases.......................................................................... 4.2-1
4.2.1 Environmental Setting ...................................................................................... 4.2-1
4.2.1.1 Meteorological Conditions ....................................................................... 4.2-1
4.2.1.2 Existing Air Quality Criteria Pollutants and Toxic Air Contaminants ......... 4.2-3
4.2.1.3 Existing Air Quality Greenhouse Gas Emissions ................................... 4.2-12
4.2.1.4 Existing Site Emissions ......................................................................... 4.2-20
4.2.2 Regulatory Setting ......................................................................................... 4.2-20
4.2.2.1 Criteria Pollutants Regulatory Setting .................................................... 4.2-20
4.2.2.2 GHG Regulatory Setting........................................................................ 4.2-22
4.2.3 Significance Criteria ....................................................................................... 4.2-31
4.2.4 Project Impacts and Mitigation Measures ....................................................... 4.2-33
4.2.4.1 Design Features .................................................................................... 4.2-33
4.2.4.2 Conditional Use Permit (CUP) Requirements ........................................ 4.2-34
4.2.4.3 Construction Criteria Pollutant Emissions .............................................. 4.2-34
4.2.4.4 Operational Criteria Pollutant Emissions ............................................... 4.2-42
4.2.4.5 Potential Operations Greenhouse Gas Emissions ................................. 4.2-53
4.2.4.6 Compliance with Area Air Quality Management Plans ........................... 4.2-62
4.2.4.7 Valve Box Options................................................................................. 4.2-67
4.2.4.8 Pipeline Route Options.......................................................................... 4.2-67
4.2.4.9 Proposed City Maintenance Yard Parking Options ................................ 4.2-67
4.2.5 Comparison to Applicant Studies ................................................................... 4.2-67
4.2.6 Other Issue Area Mitigation Measure Impacts................................................ 4.2-68
4.2.7 Cumulative Impacts and Mitigation Measures ................................................ 4.2-68
4.2.8 Mitigation Monitoring Plan .............................................................................. 4.2-69

4.3

Biological Resources ................................................................................................ 4.3-1
4.3.1 Environmental Setting ...................................................................................... 4.3-1
4.3.1.1 Onshore Resources ................................................................................ 4.3-1
4.3.1.2 Offshore Resources ................................................................................ 4.3-3
4.3.1.3 Rare, Endangered, and Special Status Species ...................................... 4.3-7
4.3.1.4 Sensitive Habitats ................................................................................. 4.3-13
4.3.2 Regulatory Setting ......................................................................................... 4.3-13
4.3.2.1 Federal Regulations .............................................................................. 4.3-13
4.3.2.2 State Resource Regulations .................................................................. 4.3-14
4.3.2.3 Local Regulations.................................................................................. 4.3-17
4.3.3 Significance Criteria ....................................................................................... 4.3-17
4.3.4 Project Impacts and Mitigation Measures ....................................................... 4.3-17
4.3.6.
Other Issue Area Mitigation Measure Impacts ....................................... 4.3-25
4.3.7. Cumulative Impacts and Mitigation Measures ................................................ 4.3-25
4.3.8. Mitigation Monitoring Plan .............................................................................. 4.3-26

4.4

Cultural Resources ................................................................................................... 4.4-1
4.4.1 Environmental Setting ...................................................................................... 4.4-1
4.4.2 Records and Literature Search ........................................................................ 4.4-5
4.4.3 Paleontological Records Search ...................................................................... 4.4-6
4.4.4 Cultural Resources Survey .............................................................................. 4.4-8
4.4.5 Regulatory Setting ......................................................................................... 4.4-11
4.4.6 Significance Criteria ....................................................................................... 4.4-12

Draft Environmental Impact Report

iii

E&B Oil Drilling & Production Project
Table of Contents

4.4.7
4.4.8
4.4.9
4.4.10

Impacts and Mitigation Measures................................................................... 4.4-13
Other Issue Area Mitigation Measure Impacts................................................ 4.4-21
Cumulative Impacts and Mitigation Measures ................................................ 4.4-21
Mitigation Monitoring Plan .............................................................................. 4.4-24

4.5

Energy and Mineral Resources ................................................................................ 4.5-1
4.5.1 Environmental Setting ...................................................................................... 4.5-1
4.5.1.1 Electricity................................................................................................. 4.5-1
4.5.1.2 Natural Gas ............................................................................................. 4.5-2
4.5.1.3 Transportation Fuels ............................................................................... 4.5-2
4.5.1.4 Minerals .................................................................................................. 4.5-3
4.5.1.5 Energy Conservation and Alternative Energy Sources ............................ 4.5-3
4.5.2 Regulatory Setting ........................................................................................... 4.5-6
4.5.2.1 Federal.................................................................................................... 4.5-6
4.5.2.2 State ....................................................................................................... 4.5-7
4.5.3 Significance Criteria ......................................................................................... 4.5-9
4.5.4 Project Impacts and Mitigation Measures ....................................................... 4.5-10
4.5.5 Other Issue Area Mitigation Measure Impacts................................................ 4.5-12
4.5.6 Cumulative Impacts and Mitigation Measures ................................................ 4.5-12
4.5.7 Mitigation Monitoring Plan .............................................................................. 4.5-12

4.6

Fire Protection and Emergency Response .............................................................. 4.6-1
4.6.1 Environmental Setting ...................................................................................... 4.6-1
4.6.1.1 Response Capabilities............................................................................. 4.6-1
4.6.2 Regulatory Setting ........................................................................................... 4.6-5
4.6.2.1 Codes and Standards ............................................................................. 4.6-5
4.6.2.2 Federal and State Regulations ................................................................ 4.6-9
4.6.2.3 Equipment Spacing ............................................................................... 4.6-11
4.6.3 Significance Criteria ....................................................................................... 4.6-14
4.6.4 Project Impacts and Mitigation Measures ....................................................... 4.6-15
4.6.4.1 CUP Requirements ............................................................................... 4.6-15
4.6.4.2 Proposed Oil Project and Pipeline Impacts............................................ 4.6-16
4.6.4.3 Proposed City Maintenance Yard Project Impacts................................. 4.6-21
4.6.5 Other Issue Area Mitigation Measure Impacts................................................ 4.6-22
4.6.6 Cumulative Impacts and Mitigation Measures ................................................ 4.6-23
4.6.7 Mitigation Monitoring Plan .............................................................................. 4.6-23

4.7

Geological Resources/Soils ..................................................................................... 4.7-1
4.7.1 Environmental Setting ...................................................................................... 4.7-1
4.7.1.1 Regional Geology.................................................................................... 4.7-1
4.7.1.2 Local Geology ......................................................................................... 4.7-3
4.7.1.3 Geologic Hazards.................................................................................... 4.7-4
4.7.2 Regulatory Setting ........................................................................................... 4.7-9
4.7.1.4 California Building Code (CBC) ............................................................... 4.7-9
4.7.1.5 Alquist-Priolo Earthquake Fault Zoning Act of 1972 .............................. 4.7-10
4.7.1.6 Seismic Hazards Mapping Act of 1990 .................................................. 4.7-10
4.7.1.7 California Coastal Act ............................................................................ 4.7-10
4.7.1.8 California Division of Oil, Gas, and Geothermal Resources ................... 4.7-11
4.7.1.9 City of Hermosa Beach General Plan, Seismic Safety Element............. 4.7-11
4.7.2 Significance Criteria ....................................................................................... 4.7-11
4.7.3 Project Impacts and Mitigation Measures ....................................................... 4.7-12

E&B Oil Drilling & Production Project

iv

Draft Environmental Impact Report
Table of Contents

4.7.3.1 Introduction ........................................................................................... 4.7-12
4.7.3.2 Proposed Project Design Features ........................................................ 4.7-13
4.7.3.3 Applicant Prepared Studies ................................................................... 4.7-17
4.7.3.4 Impacts ................................................................................................. 4.7-17
4.7.4 Other Issue Area Mitigation Measure Impacts................................................ 4.7-30
4.7.5 Cumulative Impacts and Mitigation Measures ................................................ 4.7-30
4.7.6 Mitigation Monitoring Plan .............................................................................. 4.7-31
4.8

Safety, Risk of Upset, and Hazards .......................................................................... 4.8-1
4.8.1 Environmental Setting ...................................................................................... 4.8-2
4.8.1.1 Study Area and Scope ............................................................................ 4.8-2
4.8.1.2 Risk Assessment Methodology ............................................................... 4.8-3
4.8.1.3 Existing Site Hazards ............................................................................ 4.8-32
4.8.1.4 Existing Site Contamination .................................................................. 4.8-32
4.8.1.5 Existing Site Spill Potential .................................................................... 4.8-36
4.8.2 Regulatory Setting ......................................................................................... 4.8-38
4.8.2.1 Federal Laws and Regulations .............................................................. 4.8-38
4.8.2.2 California Laws and Regulations ........................................................... 4.8-43
4.8.2.3 Local Laws and Regulations ................................................................. 4.8-50
4.8.2.4 Other Applicable Guidelines, National Codes, and Standards ............... 4.8-52
4.8.2.5 Regulatory Oversight ............................................................................ 4.8-53
4.8.3 Significance Criteria ....................................................................................... 4.8-53
4.8.4 Proposed Project Impacts .............................................................................. 4.8-56
4.8.4.1 Design Features .................................................................................... 4.8-56
4.8.4.2 CUP Requirements ............................................................................... 4.8-56
4.8.4.3 Characteristics of Crude Oil, Natural Gas, and Odorant ........................ 4.8-58
4.8.4.4 Release Scenarios at the Proposed Oil Project Site and Pipeline Route 4.8-61
4.8.4.5 Frequency Analysis of the Proposed Oil Project Site and Pipelines ...... 4.8-67
4.8.4.6 Consequence Analysis of the Proposed Oil Project Site and Pipelines . 4.8-69
4.8.4.7 Risk Analysis of the Proposed Oil Project Site and Pipelines ................ 4.8-72
4.8.4.8 Proposed Project Impacts ..................................................................... 4.8-77
4.8.4.9 Proposed City Maintenance Yard Project Risks .................................... 4.8-87
4.8.5 Other Issue Area Mitigation Measure Impacts................................................ 4.8-87
4.8.6 Cumulative Impacts and Mitigation Measures ................................................ 4.8-88
4.8.7 Mitigation Monitoring Plan .............................................................................. 4.8-89

4.9

Hydrology and Water Quality ................................................................................... 4.9-1
4.9.1 Environmental Setting ...................................................................................... 4.9-1
4.9.1.1 Proposed Oil Project Site Topography and Drainage .............................. 4.9-1
4.9.1.2 Existing City Maintenance Yard Topography and Drainage..................... 4.9-1
4.9.1.3 Pipeline Route Topography and Drainage ............................................... 4.9-1
4.9.1.4 Surface Water and Hydrology ................................................................. 4.9-2
4.9.1.5 Groundwater ........................................................................................... 4.9-4
4.9.1.6 Water Quality .......................................................................................... 4.9-5
4.9.2 Regulatory Setting ........................................................................................... 4.9-5
4.9.2.1 Federal Regulations and Policies ............................................................ 4.9-5
4.9.2.2 State Policies and Regulations ................................................................ 4.9-6
4.9.2.3 Local Policies and Regulations................................................................ 4.9-8
4.9.3 Significance Criteria ....................................................................................... 4.9-10
4.9.4 Project Impacts and Mitigation Measures ....................................................... 4.9-10
4.9.4.1 Introduction ........................................................................................... 4.9-10

Draft Environmental Impact Report

v

E&B Oil Drilling & Production Project
Table of Contents

4.9.4.2 Proposed Project Design Features ........................................................ 4.9-11
4.9.4.3 Applicant Prepared Studies ................................................................... 4.9-11
4.9.4.4 Impacts ................................................................................................. 4.9-11
4.9.5 Other Issue Area Mitigation Measure Impacts................................................ 4.9-19
4.9.6 Cumulative Impacts and Mitigation Measures ................................................ 4.9-19
4.9.7 Mitigation Monitoring Plan .............................................................................. 4.9-20
4.10 Land Use/Recreation/Policy Consistency Analysis .............................................. 4.10-1
4.10.1 Environmental Setting .................................................................................... 4.10-1
4.10.1.1 Land Use............................................................................................... 4.10-1
4.10.1.2 Recreation............................................................................................. 4.10-5
4.10.2 Regulatory Setting ......................................................................................... 4.10-6
4.10.2.1 Federal.................................................................................................. 4.10-6
4.10.2.2 State ..................................................................................................... 4.10-6
4.10.2.3 Local ..................................................................................................... 4.10-8
4.10.3 Significance Criteria ..................................................................................... 4.10-12
4.10.4 Impact Analysis and Mitigation Measures .................................................... 4.10-12
4.10.4.1 Land Use............................................................................................. 4.10-12
4.10.4.2 Recreation........................................................................................... 4.10-21
4.10.5 Other Issue Area Mitigation Measure Impacts.............................................. 4.10-22
4.10.6 Cumulative Impacts ..................................................................................... 4.10-23
4.10.7 Land Use Policy Consistency Analysis......................................................... 4.10-23
4.10.7.1 Hermosa Beach General Plan ............................................................. 4.10-23
4.10.7.2 City of Hermosa Beach Municipal Code .............................................. 4.10-34
4.10.7.3 City of Hermosa Beach Local Coastal Plan ......................................... 4.10-35
4.10.7.4 Coastal Act.......................................................................................... 4.10-38
4.10.7.5 Redondo Beach .................................................................................. 4.10-40
4.10.7.6 Torrance ............................................................................................. 4.10-41
4.10.8 Mitigation Monitoring Plan ............................................................................ 4.10-41
4.11 Noise and Vibration................................................................................................. 4.11-1
4.11.1 Environmental Setting .................................................................................... 4.11-1
4.11.1.1 Characteristics of Noise ........................................................................ 4.11-1
4.11.1.2 Characteristics of Vibration ................................................................... 4.11-5
4.11.1.3 Project Area - Existing Noise and Vibration Environment ...................... 4.11-7
4.11.2 Regulatory Setting ....................................................................................... 4.11-17
4.11.2.1 City of Hermosa Beach Noise Standards ............................................ 4.11-17
4.11.2.2 City of Redondo Beach Noise Standards ............................................ 4.11-22
4.11.2.3 City of Torrance Noise Standards ....................................................... 4.11-25
4.11.3 Significance Criteria ..................................................................................... 4.11-28
4.11.3.1 Oil Production Site .............................................................................. 4.11-29
4.11.3.2 Pipeline Construction and Trucking Routes ......................................... 4.11-29
4.11.3.3 Relocated City Yard ............................................................................ 4.11-30
4.11.3.4 Significance Criteria Rationale ............................................................ 4.11-30
4.11.4 Project Impacts and Mitigation Measures ..................................................... 4.11-32
4.11.4.1 Proposed Oil Project Noise Impacts & Mitigation................................. 4.11-32
4.11.4.2 Traffic Noise Analysis .......................................................................... 4.11-90
4.11.4.3 Vibration Impact Analysis .................................................................... 4.11-94
4.11.4.4 Relocation of the City Yard .................................................................. 4.11-95
4.11.4.5 Temporary City Maintenance Yard .................................................... 4.11-118
4.11.4.6 Proposed City Maintenance Yard Parking Options ............................ 4.11-126

E&B Oil Drilling & Production Project

vi

Draft Environmental Impact Report
Table of Contents

4.11.5 Other Issue Area Mitigation Measure Impacts............................................ 4.11-126
4.11.6 Cumulative Impacts and Mitigation Measures ............................................ 4.11-126
4.11.7 Mitigation Monitoring Plan .......................................................................... 4.11-127
4.12 Public Services and Utilities ................................................................................... 4.12-1
4.12.1 Environmental Setting .................................................................................... 4.12-1
4.12.2 Regulatory Setting ......................................................................................... 4.12-3
4.12.3 Significance Criteria ....................................................................................... 4.12-4
4.12.4 Project Impacts and Mitigation Measures ....................................................... 4.12-5
4.12.5 Cumulative Impacts ....................................................................................... 4.12-6
4.13 Transportation and Traffic ...................................................................................... 4.13-1
4.13.1 Summary of Project-Specific Traffic Studies .................................................. 4.13-1
4.13.2 Study Area ..................................................................................................... 4.13-1
4.13.3 Environmental Setting .................................................................................... 4.13-4
4.13.3.1 Roadway Network ................................................................................. 4.13-4
4.13.3.2 Existing Levels of Service ................................................................... 4.13-11
4.13.4 Regulatory Setting ....................................................................................... 4.13-24
4.13.4.1 State ................................................................................................... 4.13-24
4.13.4.2 Regional/Local .................................................................................... 4.13-24
4.13.5 Significance Criteria ..................................................................................... 4.13-30
4.13.5.1 City of Hermosa Beach ....................................................................... 4.13-30
4.13.5.2 City of Redondo Beach ....................................................................... 4.13-30
4.13.5.3 City of Torrance................................................................................... 4.13-30
4.13.5.4 Caltrans and Los Angeles County Congestion Management Program 4.13-30
4.13.5.5 Roadway/Freeway Segments.............................................................. 4.13-31
4.13.6 Proposed Oil Project Impacts and Mitigation Measures ............................... 4.13-31
4.13.6.1 Design Features, Operational Practices, & Conditions of Approval ..... 4.13-31
4.13.6.2 Project Trip Generation ....................................................................... 4.13-36
4.13.6.3 Project Parking .................................................................................... 4.13-40
4.13.6.4 Project Traffic Conditions Roadways ................................................... 4.13-40
4.13.6.5 Project Traffic Conditions Intersections ............................................... 4.13-40
4.13.6.6 Proposed Oil Project Impacts .............................................................. 4.13-41
4.13.7 Proposed City Maintenance Yard Project ..................................................... 4.13-49
4.13.8 Impacts of Other Issue Area Mitigation Measures ........................................ 4.13-52
4.13.9 Cumulative Impacts and Mitigation Measures .............................................. 4.13-52
4.13.10 Mitigation Monitoring Plan ......................................................................... 4.13-108
4.14 Water Resources ..................................................................................................... 4.14-1
4.14.1 Environmental Setting .................................................................................... 4.14-1
4.14.1.1 Sanitary Sewer Wastewater .................................................................. 4.14-1
4.14.1.2 Water Supply ........................................................................................ 4.14-1
4.14.1.3 Surface Runoff ...................................................................................... 4.14-2
4.14.1.4 Groundwater ......................................................................................... 4.14-3
4.14.2 Regulatory Setting ......................................................................................... 4.14-3
4.14.2.1 Federal Regulations and Policies .......................................................... 4.14-3
4.14.2.2 State Policies and Regulations .............................................................. 4.14-4
4.14.2.3 Local Policies and Regulations.............................................................. 4.14-5
4.14.3 Significance Criteria ....................................................................................... 4.14-6
4.14.4 Project Impacts and Mitigation Measures ....................................................... 4.14-6
4.14.4.1 Introduction ........................................................................................... 4.14-6
Draft Environmental Impact Report

vii

E&B Oil Drilling & Production Project
Table of Contents

4.14.4.2 Proposed Project Design Features ........................................................ 4.14-7
4.14.4.3 Impacts ................................................................................................. 4.14-8
4.14.5 Other Issue Area Mitigation Measure Impacts.............................................. 4.14-16
4.14.6 Cumulative Impacts and Mitigation Measures .............................................. 4.14-16
4.14.7 Mitigation Monitoring Plan ............................................................................ 4.14-17
4.15 Environmental Justice ............................................................................................ 4.15-1
4.15.1 Background.................................................................................................... 4.15-1
4.15.2 California State Lands Commission ............................................................... 4.15-2
4.15.3 Approach ....................................................................................................... 4.15-2
4.15.4 Environmental Setting .................................................................................... 4.15-3
4.15.5 Significance Criteria ....................................................................................... 4.15-4
4.15.6 Policy Impacts................................................................................................ 4.15-5
5.0
5.1

Alternatives Screening................................................................................................. 5-1
Description of Alternatives and Screening Analysis ................................................. 5-2
5.1.1 No Project Alternative ......................................................................................... 5-3
5.1.2 Alternative Drilling and Production Locations ...................................................... 5-4
5.1.2.1 Rosecrans Alternative Location .................................................................. 5-7
5.1.2.2 Exxon/Mobil Oil Torrance Refinery Alternative Location ............................. 5-9
5.1.2.3 AES Power Generating Station Alternative Location ................................ 5-11
5.1.2.4 Other Alternative Locations ...................................................................... 5-14
5.1.3 Alternative Facility Equipment or Production Arrangements .............................. 5-16
5.1.3.1 Reduced Equipment Alternative ............................................................... 5-16
5.1.3.2 Reduced Wells Alternative ....................................................................... 5-17
5.1.3.3 Reduced Timeframe Alternative ............................................................... 5-18
5.1.4 Alternative Transportation Arrangements .......................................................... 5-18
5.1.4.1 Use of Existing Pipelines .......................................................................... 5-19
5.1.4.2 Trucking of Crude Oil ............................................................................... 5-19
5.1.4.3 Greenbelt to the North Pipeline Route ...................................................... 5-20
5.1.4.4 Greenbelt to the South Pipeline Route ..................................................... 5-20
5.1.5 Alternative City Maintenance Yard Arrangements/Locations ............................. 5-21
5.1.5.1 Other Locations for the City Maintenance Yard Alternative ...................... 5-21
5.1.5.2 Alternative Locations for the Temporary Maintenance Yard ..................... 5-23
5.1.5.3 Split Location for the Maintenance Yard Alternative ................................. 5-23
5.1.5.4 Phase 1 Construction of Permanent Yard ................................................ 5-24
5.1.6 Project Objectives ............................................................................................. 5-24
5.1.6.1 No Project Alternative and Project Objectives .......................................... 5-24
5.1.6.2 AES Site Alternative and Project Objectives............................................. 5-25
5.1.6.3 Oil Development with Reduced Wells and Project Objectives .................. 5-25
5.1.6.4 Oil Development with Reduced Timeframe and Project Objectives .......... 5-25
5.1.6.5 Use of Existing Pipelines and Project Objectives...................................... 5-25
5.1.6.6 Phase 1 Permanent Yard Construction and Project Objectives ................ 5-26

6.0

Impacts and Comparison of Alternatives ................................................................... 6-1
6.1
Impacts of Alternatives ........................................................................................ 6-2
6.1.1
No Project Alternative ................................................................................ 6-2
6.1.2
AES Site Alternative ................................................................................... 6-3
6.1.3
Reduced Wells Alternative ....................................................................... 6-15
6.1.4
Existing Pipelines Alternative ................................................................... 6-23
6.1.5
Phase 1 City Maintenance Yard Construction .......................................... 6-27

E&B Oil Drilling & Production Project

viii

Draft Environmental Impact Report
Table of Contents

6.2

Proposed Project Options and Scenarios .......................................................... 6-30
6.2.1
Valve Box Options.................................................................................... 6-30
6.2.2
Pipeline Scenarios ................................................................................... 6-30
6.2.3
City Maintenance Yard No Added Parking/Parking Option ....................... 6-30
6.2.4
Phase 2 Unsuccessful Scenario ............................................................... 6-31
6.3
Comparison of Proposed Project and Alternatives ............................................ 6-32
6.3.1
Environmentally Superior Alternative Analysis ......................................... 6-32
No Project Alternative Compared to the Proposed Project ................................ 6-34
AES Site Alternative Compared to Proposed Project ........................................ 6-34
Reduced Wells Alternative Compared to Proposed Project............................... 6-37
Reduced Timeframe Alternative Compared to Proposed Project ...................... 6-38
Existing Pipelines Alternative Compared to Proposed Project........................... 6-38
Phase 1 City Maintenance Yard Construction Compared to Proposed Project.. 6-39
6.3.2
Environmentally Superior Alternative........................................................ 6-39

7.0

Other CEQA-Mandated Sections ................................................................................. 7-1
7.1
Unavoidable Significant Adverse Effects ............................................................. 7-1
7.2
Growth Inducing Impacts .................................................................................... 7-2
7.2.1
Removal of an Impediment to Growth ........................................................ 7-2
7.2.2
Economic Growth ....................................................................................... 7-2
7.2.3
Precedent-Setting Action............................................................................ 7-3
7.2.4
Development of Open Space ..................................................................... 7-3
7.3
Known Areas of Controversy or Unresolved Issues ............................................ 7-3

8.0

Summary of Mitigation Measures and Mitigation Monitoring Plan ........................... 8-1
8.1
Mitigation Monitoring Program ............................................................................ 8-1
8.2
Monitoring Authority and Enforcement Responsibility ......................................... 8-1
8.3
Mitigation Compliance Responsibility .................................................................. 8-2
8.4
General Monitoring Procedures .......................................................................... 8-2
8.5
Mitigation Monitoring Table ................................................................................. 8-3

9.0

List of Preparers and Agencies/Individuals Consulted During EIR Preparation ..... 9-1

10.0 References .................................................................................................................. 10-1
Aesthetics and Visual Resources ................................................................................. 10-1
Air Quality and Greenhouse Gases .............................................................................. 10-1
Biological Resources .................................................................................................... 10-4
Cultural Resources ....................................................................................................... 10-6
Energy and Mineral Resources .................................................................................... 10-8
Fire Protection and Emergency Response ................................................................... 10-9
Geological Resources/Soils .......................................................................................... 10-9
Safety, Risk of Upset, and Hazards ............................................................................ 10-10
Hydrology and Water Quality ...................................................................................... 10-13
Land Use/Recreation/Policy Consistency Analysis ..................................................... 10-14
Noise and Vibration .................................................................................................... 10-14
Public Services and Utilities ....................................................................................... 10-15
Transportation and Traffic .......................................................................................... 10-15
Water Resources........................................................................................................ 10-16
Environmental Justice ................................................................................................ 10-17

Draft Environmental Impact Report

ix

E&B Oil Drilling & Production Project
Table of Contents

Appendices (on the CD)
Appendix A- Project Description Design Data
Appendix B - Air Emission Calculations
Appendix C - Risk Assessment Calculations
Appendix D - Traffic Impact Analysis
Appendix E - Noise Impact Analysis
Appendix F – Settlement Agreement and Other Entitlements
Appendix G – Cultural Resources Technical Study
Appendix H – Notice of Preparation, Scoping Document, Comments, and Responses
Appendix I – Soil Engineering and Engineering Geology Investigation
Appendix K – Public Notification List
Appendix L – 1993 Conditional Use Permit (City Council Resolution No. 93-5632)
Appendix M – Oil and Gas Lease No. 2 between the City and E&B
Appendix N – Settlement Agreement and Release executed by the City Council on March 2,
2012.
Appendix O – Aesthetics - Visual Simulations.
Appendix P – Proposed Coastal Land Use Plan policies regulating oil and gas recovery.

E&B Oil Drilling & Production Project

x

Draft Environmental Impact Report
Table of Contents

Tables
Table 1.1 Project Planning Information ................................................................................... 1-2
Table 2.1Proposed Project Schedule Summary ...................................................................... 2-4
Table 2.2Proposed Oil Project Design Parameters ............................................................... 2-11
Table 2.3Phase 1 Project Schedule ...................................................................................... 2-19
Table 2.4Phase 1 Vehicle Trip Summary .............................................................................. 2-21
Table 2.5Phase 2 Drilling Chemicals ..................................................................................... 2-32
Table 2.6Phase 2 Testing Chemicals .................................................................................... 2-37
Table 2.7Phase 2 Project Schedule ...................................................................................... 2-39
Table 2.8Phase 2 Vehicle Trip Summary .............................................................................. 2-39
Table 2.9Phase 3 and 4 Processing Equipment Listing......................................................... 2-45
Table 2.10Phase 3 Project Schedule .................................................................................... 2-57
Table 2.11Phase 3 Vehicle Trip Summary ............................................................................ 2-58
Table 2.12Phase 4 Drilling Chemicals ................................................................................... 2-68
Table 2.13Phase 4 Project Schedule .................................................................................... 2-69
Table 2.14Phase 4 Vehicle Trip Summary ............................................................................ 2-70
Table 2.15Proposed Oil Project Parking Requirements......................................................... 2-71
Table 2.15E&B Oil Development Project Permits/Approvals ................................................. 2-83
Table 2.16Relocation of City Maintenance Yard Project Permits/Approvals .......................... 2-85
Table 4.2-1Historical Meteorological Data ............................................................................ 4.2-2
Table 4.2-2State and National Ambient Air Quality Standards ............................................. 4.2-5
Table 4.2-3SCAQMD Air Quality Data for Southwest Coastal LA County Sub-Region (Project
Area)
..................................................................................................................... 4.2-7
Table 4.2-4Global Warming Potential of Various Gases..................................................... 4.2-14
Table 4.2-5Electricity Generation Resource Mix and Greenhouse Gas Emissions ............. 4.2-15
Table 4.2-6SCAQMD Air Quality Significance Thresholds ................................................. 4.2-32
Table 4.2-7Construction Criteria Emissions ....................................................................... 4.2-36
Table 4.2-8Construction Criteria Emissions: Mitigated ....................................................... 4.2-39
Table 4.2-9Operational Criteria Emissions ......................................................................... 4.2-44
Table 4.2-10Operational Criteria Emissions: Mitigated ....................................................... 4.2-46
Table 4.2-11Localized Modeling Results for Combustion Source Particulate Matter .......... 4.2-48
Table 4.2-12Localized Modeling Results for Combustion Source Particulate Matter: Mitigated ....
................................................................................................................... 4.2-49
Table 4.2-13GHG Emissions.............................................................................................. 4.2-58
Table 4.2-14Phase 4 Equipment Toxic Air Contaminants .................................................. 4.2-60
Table 4.2-15Health Risk Assessment Results: Unmitigated ............................................... 4.2-61
Table 4.2-16Health Risk Assessment Results: Mitigated ................................................... 4.2-62
Table 4.3-1 Endangered, Threatened, and Special Status Species in Project Area ............. 4.3-8
Table 4.4-1Mitigation Measures ......................................................................................... 4.4-24
Table 4.5-1California Energy Sources and Annual Consumption ......................................... 4.5-1
Table 4.5-2Energy Consumption in California by Sector and by Form ................................. 4.5-3
Table 4.6-1Fire Stations Available to Respond to an Emergency at the Project Site ............ 4.6-2

Draft Environmental Impact Report

xi

E&B Oil Drilling & Production Project
Table of Contents

Table 4.6-2Applicable Codes, Standards, and Guidelines .................................................... 4.6-5
Table 4.6-3 Applicable IRI, CCPS, NFPA, and API Equipment Spacing Requirements ...... 4.6-11
Table 4.7-1General Stratigraphic Section for Hermosa Beach Oil field Area ........................ 4.7-3
Table 4.8-1Frequencies for Common Events ....................................................................... 4.8-8
Table 4.8-2Frequencies for Fatality Events ........................................................................ 4.8-11
Table 4.8-3DOT National Gas Transmission Pipelines Incident Causes ............................ 4.8-12
Table 4.8-4Thermal Radiation Serious Injury and Impacts ................................................. 4.8-22
Table 4.8-5Overpressure Damage ..................................................................................... 4.8-23
Table 4.8-6Toxicological Effects of H2S ............................................................................. 4.8-25
Table 4.8-7Fatality and Serious Injury Rates ...................................................................... 4.8-27
Table 4.8-8Event Tree Probabilities ................................................................................... 4.8-30
Table 4.8-9Regulatory Oversight Responsibilities .............................................................. 4.8-54
Table 4.8-10Facility Release Scenarios ............................................................................. 4.8-63
Table 4.8-11Blowout and Loss of Well Control Frequencies .............................................. 4.8-67
Table 4.8-12Scenario Failure Rates ................................................................................... 4.8-68
Table 4.8-13Population Information ................................................................................... 4.8-73
Table 4.8-14Potential Proposed Oil Project Pipeline Spill Volumes .................................... 4.8-83
Table 4.10-1Proposed Project General Land Use Plan Conflicts ..................................... 4.10-13
Table 4.10-2Proposed City Maintenance Yard General Land Use Plan Conflicts ............. 4.10-18
Table 4.11-1Common Environmental Noise Levels ............................................................ 4.11-2
Table 4.11-2Noise Control Metrics ..................................................................................... 4.11-5
Table 4.11-3Typical Levels of Ground-Borne Vibration ...................................................... 4.11-6
Table 4.11-4Summary of Existing Ambient Leq Noise Levels Around the Project Site ....... 4.11-9
Table 4.11-5Summary of Existing Ambient L50 Noise Levels Around the Project Site ..... 4.11-10
Table 4.11-6Existing Ambient Noise Levels Around the Project Site - Additional Statistics ..........
................................................................................................................. 4.11-10
Table 4.11-7Comparison of Noise Monitoring Results from the Truck and Pipeline Routes .........
................................................................................................................. 4.11-11
Table 4.11-8Truck and Pipeline Route Ambient Noise Measurement Summary* ............. 4.11-14
Table 4.11-9Summary of Existing Ambient Noise Levels around the City Yard Relocation Site ...
................................................................................................................. 4.11-16
Table 4.11-10Recalculated Daytime Ambient Noise Levels around the City Yard Relocation Site
................................................................................................................. 4.11-16
Table 4.11-11Baseline Vibration Levels (2013) ................................................................ 4.11-17
Table 4.11-12Baseline Vibration Levels (2012) ................................................................ 4.11-17
Table 4.11-13Phase 1 Noise Models - Equipment Usage and Noise Level Data.............. 4.11-34
Table 4.11-14Phase 1 - Predicted Demolition Noise Impact............................................. 4.11-36
Table 4.11-15Phase 1 - Predicted Construction Noise Impact ......................................... 4.11-36
Table 4.11-16Phase 1 - Predicted Demolition Noise Impact with Additional Mitigation ..... 4.11-42
Table 4.11-17Phase 1 - Predicted Construction Noise Impact with Additional Mitigation.. 4.11-42
Table 4.11-18Phase 2 Noise Models - Equipment Usage and Noise Level Data.............. 4.11-48
Table 4.11-19Phase 2 - Predicted Drilling & Test Production Noise Impact ..................... 4.11-52
Table 4.11-20Phase 2 - Compliance with the Hermosa Beach Oil Code .......................... 4.11-52
Table 4.11-21Phase 2 - Predicted Test Production (Only) Noise Impact .......................... 4.11-53
Table 4.11-22Phase 2 - Predicted Drilling & Test Production Noise Impact with Mitigation ..........
................................................................................................................. 4.11-56

E&B Oil Drilling & Production Project

xii

Draft Environmental Impact Report
Table of Contents

Table 4.11-23Phase 2 - Compliance with the Hermosa Beach Oil Code (with Mitigation) ............
................................................................................................................. 4.11-57
Table 4.11-24Phase 3 Site Construction Noise Model - Equipment Usage and Noise Level Data
................................................................................................................. 4.11-61
Table 4.11-25Phase 3 - Predicted Site Construction Noise Impact .................................. 4.11-61
Table 4.11-26Phase 3 - Predicted Site Construction Noise Impact with Additional Mitigation.......
................................................................................................................. 4.11-64
Table 4.11-27Phase 3 Pipeline Construction Noise Models Equipment Usage and Noise Level
Data
................................................................................................................. 4.11-68
Table 4.11-28Phase 3 - Predicted Pipeline Construction Noise Impact ............................ 4.11-76
Table 4.11-29Phase 4 Noise Model - Equipment Usage and Noise Level Data ............... 4.11-78
Table 4.11-30Phase 4 - Predicted Drilling + Production Noise Impact ............................. 4.11-79
Table 4.11-31Phase 4 - Compliance with the Hermosa Beach Oil Code .......................... 4.11-79
Table 4.11-32Phase 4 - Predicted Drilling + Production Noise Impact with Mitigation ...... 4.11-85
Table 4.11-33Phase 4 - Compliance with the Hermosa Beach Oil Code (with Mitigation) 4.11-85
Table 4.11-34Phase 4 - Predicted Production (only) Noise Impact................................... 4.11-86
Table 4.11-35Phase 4 - Predicted Production (only) Noise Impact with mitigation ........... 4.11-89
Table 4.11-36Calculated Traffic CNEL Noise Level Increases on Valley Drive ................ 4.11-93
Table 4.11-37Demolition & Construction Equipment Ground Vibration Levels ................. 4.11-94
Table 4.11-38City Maintenance Yard Relocation Demolition & Construction Equipment Usage
and Noise Level Data ....................................................................................................... 4.11-97
Table 4.11-39Relocated City Yard - Predicted Demolition Noise Impact .........................4.11-102
Table 4.11-40Relocated City Yard - Predicted Construction Noise Impact ......................4.11-103
Table 4.11-41Relocated City Yard - Predicted Demolition Noise Impact with Mitigation ..4.11-105
Table 4.11-42Relocated City Yard - Predicted Construction Noise Impact With Additional Noise
Mitigation
................................................................................................................4.11-110
Table 4.11-43Relocated City Yard - Predicted Operational Noise Impact........................4.11-111
Table 4.11-44Relocated City Yard - Predicted Operational Noise Impact with Mitigation .............
................................................................................................................4.11-112
Table 4.11-45Temporary City Yard - Predicted Operational Noise Impact ......................4.11-119
Table 4.11-46Temporary City Yard - Predicted Operational Noise Impact with Mitigation ............
................................................................................................................4.11-120
Table 4.14-1Level of Service Definitions Signalized and Unsignalized Intersections ........ 4.14-11
Table 4.14-3Level of Service Descriptions ....................................................................... 4.14-13
Table 4.14-4Existing Intersection Level of Service Summary (ICU – Signalized Intersections) ....
................................................................................................................. 4.14-15
Table 4.14-5Existing Intersection Level of Service Summary (HCM – Caltrans and Torrance
Intersection) ................................................................................................................. 4.14-18
Table 4.14-6Existing Roadway/Freeway Segment Level of Service Summary ................. 4.14-20
Table 4.14-7Proposed Oil Project Trip Generation Estimates .......................................... 4.14-38
Table 4.13-8City Maintenance Yard Relocation with Proposed Oil Project – Intersection LOS
Comparison ................................................................................................................. 4.14-49
Table 4.13-9Year 2015 plus Phase 1 Intersection Level of Service Summary (ICU - Signalized
Intersections) ................................................................................................................. 4.14-63
Table 4.13-10Year 2015 plus Phase 1 Intersection Level of Service Summary (HCM – Caltrans
and Torrance Intersections .............................................................................................. 4.14-67
Table 4.13-11Year 2015 plus Phase 2 Intersection Level of Service Summary (ICU – Signalized
Intersections) ................................................................................................................. 4.14-69
Table 4.13-12Year 2015 plus Phase 2 Intersection Level of Service Summary (HCM – Caltrans
and Torrance Intersections .............................................................................................. 4.14-73

Draft Environmental Impact Report

xiii

E&B Oil Drilling & Production Project
Table of Contents

Table 4.13-13Year 2016 plus Phase 3 Intersection Level of Service Summary (ICU – Signalized
Intersections) ................................................................................................................. 4.14-75
Table 4.13-14Year 2016 plus Phase 3 Intersection Level of Service Summary (Caltrans and
Torrance Intersections) .................................................................................................... 4.14-79
Table 4.13-15Year 2018 plus Phase 4 Intersection Level of Service Summary (ICU – Signalized
Intersection) ................................................................................................................. 4.14-81
Table 4.13-16Year 2018 plus Phase 4 Intersection Level of Service Summary (HCM – Caltrans
and Torrance Intersections) ............................................................................................. 4.14-85
Table 4.13-17Build out Year 2035 plus Phase 4 Intersection Level of Service Summary (ICU –
Signalized Intersections) .................................................................................................. 4.14-87
Table 4.13-18Build out Year 2035 plus Phase 4 Intersection Level of Service Summary (HCM –
Caltrans and Torrance Intersections) ............................................................................... 4.14-91
Table 4.13-19Phase 1 Roadway Segment Analysis ......................................................... 4.14-93
Table 4.13-20Phase 2 Roadway Segment Analysis ......................................................... 4.14-98
Table 4.13-21Phase 3 Roadway Segment Analysis ........................................................4.14-103
Table 4.13-22Phase 4 Roadway Segment Analysis ........................................................4.14-108
Table 4.13-23Operations Roadway Segment Analysis....................................................4.14-113
Table 5.1Summary Results of the Alternatives Screening Analysis ......................................... 5-3
Table 6.1
Proposed Project Options - Impact Comparison .............................................. 6-31
Table 6.2
Proposed Project - Significant Unavoidable Impacts Summary ........................ 6-34
Table 6.3
Proposed Project Versus Alternatives - Significant Unavoidable Impacts Only 6-36
Table 6.4
Proposed Project Versus Project Component Alternatives - Significant
Unavoidable Impacts Only .................................................................................................... 6-37
Table 8-1
Table 8-2
Table 8-3
Table 8-4
Table 8-5
Table 8-6
Table 8-7
Table 8-8
Table 8-9
Table 8-10
Table 8-11

Aesthetics and Visual Resources ....................................................................... 8-4
Air Quality and GHG’s...................................................................................... 8-10
Biological Resources ....................................................................................... 8-16
Cultural Resources .......................................................................................... 8-18
Fire Protection and Emergency Response ....................................................... 8-21
Geological Resources/Soils ............................................................................. 8-24
Safety, Risk of Upset and Hazards .................................................................. 8-29
Hydrology and Water Quality ........................................................................... 8-31
Noise and Vibration ......................................................................................... 8-33
Transportation and Circulation ......................................................................... 8-39
Water Resources ............................................................................................. 8-41

E&B Oil Drilling & Production Project

xiv

Draft Environmental Impact Report
Table of Contents

List of Figures
Figure 2.1Proposed Project Location ...................................................................................... 2-3
Figure 2.2Historical Wells Drilled in the Los Angeles Basin ..................................................... 2-6
Figure 2.3Existing Site Conditions........................................................................................... 2-8
Figure 2.4Project Site and Area Land Uses (Zoning Map) ...................................................... 2-9
Figure 2.5Project Site and Pipeline/Electrical Connections ................................................... 2-12
Figure 2.6Proposed Oil Project Phase 1 Conceptual Site Plan ............................................. 2-15
Figure 2.7Proposed Oil Project Lease Areas ........................................................................ 2-24
Figure 2.8Applicant Proposed Oil Project Lease Areas Cross Section .................................. 2-26
Figure 2.9Proposed Conceptual Site Plan - Project Phase 2................................................. 2-27
Figure 2.10Typical Well Bore and Casing ............................................................................. 2-30
Figure 2.12Phase 2 Process Flow Diagram .......................................................................... 2-34
Figure 2.12Truck Routes from Highway 405 to Project Site .................................................. 2-35
Figure 2.13Truck Routes to Highway 405 from the Project Site ............................................ 2-35
Figure 2.14Phase 3 Proposed Conceptual Site Plan ............................................................. 2-43
Figure 2.15Proposed Pipeline Routes ................................................................................... 2-49
Figure 2.16Typical Pipeline Construction Spread .................................................................. 2-52
Figure 2.18Phase 4 Process Flow Diagram .......................................................................... 2-60
Figure 2.17Phase 4 Site Plan with Drilling Rig ...................................................................... 2-63
Figure 2-18Cypress Parking Area ........................................................................................ 2-74
Figure 2.19Estimated Production Levels ............................................................................... 2-75
Figure 2.20City Yard Relocation Conceptual Site Plan: Temporary Location ........................ 2-78
Figure 2.21City Yard Relocation Conceptual Site Plan: Permanent Facility Parking Option .. 2-79
Figure 2.22City Yard Relocation Conceptual Site Plan: Permanent Facility No Added Parking
Option
...................................................................................................................... 2-80
Figure 4.1-1Viewshed Analysis- Electric Drill Rig (Areas where the Drill Rig Can Be Seen) 4.1-30
Figure 4.1-2Viewshed Analysis- Workover Rig (Areas where the Rig Can Be Seen) ......... 4.1-31
Figure 4.1-3View Location Map .......................................................................................... 4.1-37
Figure 4.1-4aKOP 1: Proposed City Maintenance Yard Permanent Facility: Parking Option ......
................................................................................................................... 4.1-38
Figure 4.1-4bKOP 1: Proposed City Maintenance Yard Permanent Facility: No Parking Option .
................................................................................................................... 4.1-39
Figure 4.1-5aKOP 2: Proposed City Maintenance Yard Permanent Facility: Parking Option ........
................................................................................................................... 4.1-40
Figure 4.1-5bKOP 2: Proposed City Maintenance Yard Permanent Facility: No Parking Option ..
................................................................................................................... 4.1-41
Figure 4.1-6aKOP 3: Proposed City Maintenance Yard Permanent Facility: Parking Option ........
................................................................................................................... 4.1-42
Figure 4.1-6bKOP 3: Proposed City Maintenance Yard Permanent Facility: No Parking Option ..
................................................................................................................... 4.1-43
Figure 4.1-7aKOP 4: Proposed City Maintenance Yard Permanent Facility: Parking Option ........
................................................................................................................... 4.1-44
Figure 4.1-7bKOP 4: Proposed City Maintenance Yard Permanent Facility: No Parking Option ..
................................................................................................................... 4.1-45
Figure 4.1-8aKOP 5: Proposed City Maintenance Yard Permanent Facility: Parking Option ........
................................................................................................................... 4.1-46
Figure 4.1-8bKOP 5: Proposed City Maintenance Yard Permanent Facility: No Parking Option ..
................................................................................................................... 4.1-47

Draft Environmental Impact Report

xv

E&B Oil Drilling & Production Project
Table of Contents

Figure 4.1-9KOP 6: During Phase 2 and Phase 4 with Drill Rig ......................................... 4.1-48
Figure 4.1-10KOP 7: During Phase 2 and 4 with Drill Rig .................................................. 4.1-49
Figure 4.1-11KOP 10: During Phase 2 and 4 with Drill Rig ................................................ 4.1-50
Figure 4.1-12KOP 10: Phase 4 with Workover Rig During Maintenance at Well 34 ........... 4.1-51
Figure 4.1-13KOP 11: During Phase 2 or 4 with Drill Rig ................................................... 4.1-52
Figure 4.1-14KOP 11: Phase 4 with Workover Rig During Maintenance at Well 34 ........... 4.1-53
Figure 4.1-15KOP 11: Phase 4 During Ongoing Operations .............................................. 4.1-54
Figure 4.1-16KOP 12: During Phase 2 or 4 with Drill Rig ................................................... 4.1-55
Figure 4.1-17KOP 12: Phase 4 with Workover Rig During Maintenance at Well 2 ............. 4.1-56
Figure 4.1-18KOP 13: Completion of Phase 1 Improvements ............................................ 4.1-57
Figure 4.1-19KOP 13: During Phase 2 or 4 with Drill Rig ................................................... 4.1-58
Figure 4.1-20KOP 13: Phase 4 with Workover Rig During Maintenance at Well 2 ............ 4.1-59
Figure 4.1-21KOP 13: Phase 4 During Ongoing Operations .............................................. 4.1-60
Figure 4.1-22aKOP 14: During Phase 2 with Drill Rig at Well 1.......................................... 4.1-61
Figure 4.1-22bKOP 14: During Phase 2 with Drill Rig at Well 1 WIDE ANGLE................... 4.1-62
Figure 4.1-23aKOP 14: Phase 4 with Drill Rig Onsite at Well 3 .......................................... 4.1-63
Figure 4.1-23bKOP 14: Phase 4 with Drill Rig Onsite at Well 3 WIDE ANGLE ................... 4.1-64
Figure 4.1-24aKOP 14: Phase 4 with Workover Rig during Maintenance at Well 3 ............ 4.1-65
Figure 4.1-24b .... KOP 14: Phase 4 with Workover Rig during Maintenance at Well 3 WIDE
ANGLE
................................................................................................................... 4.1-66
Figure 4.1-25KOP 14: Phase 4 During Ongoing Operations .............................................. 4.1-67
Figure 4.1-26KOP 15: During Phase 2 with Drill Rig at Well 4............................................ 4.1-68
Figure 4.1-27KOP 15: Phase 4 with Drill Rig Onsite at Well 17 ......................................... 4.1-69
Figure 4.1-28KOP 15: Phase 4 with Workover Rig during Maintenance at Well 17 ............ 4.1-70
Figure 4.1-29KOP 15: Phase 4 During Ongoing Operations .............................................. 4.1-71
Figure 4.1-30KOP 17: Phase 4 with Drill Rig Onsite at Well 17 .......................................... 4.1-72
Figure 4.1-31KOP 17: Phase 4 with Workover Rig during Maintenance at Well 17 ............ 4.1-73
Figure 4.1-32KOP 17: Phase 4 During Ongoing Operations .............................................. 4.1-74
Figure 4.1-33KOP 18: During Phase 2 with Drill Rig at Well 4............................................ 4.1-75
Figure 4.1-34KOP 18: Phase 4 with Drill Rig Onsite at Well 18 .......................................... 4.1-76
Figure 4.1-35KOP 18: Phase 4 with Workover Rig during Maintenance at Well 18 ............ 4.1-77
Figure 4.1-36KOP 18: Phase 4 During Ongoing Operations .............................................. 4.1-78
Figure 4.1-37KOP 19: During Phase 2 with Drill Rig at Well 2 (rig not visible) .................... 4.1-79
Figure 4.1-38aKOP 19: Phase 4 with Drill Rig Onsite at Well 34 ........................................ 4.1-80
Figure 4.1-38bKOP 19: Phase 4 with Drill Rig Onsite at Well 34 WIDE ANGLE ................. 4.1-81
Figure 4.1-39KOP 19: Phase 4 with Workover Rig during Maintenance at Well 34 ............ 4.1-82
Figure 4.1-39KOP 19: Phase 4 with Workover Rig during Maintenance at Well 34: WIDE
ANGLE
................................................................................................................... 4.1-83
Figure 4.1-41aKOP 20: During Phase 2 or 4 with Drill Rig ................................................. 4.1-85
Figure 4.1-41bKOP 20: During Phase 2 or 4 with Drill Rig: WIDE ANGLE ......................... 4.1-86
Figure 4.1-42aKOP 20: Phase 4 with Workover Rig during Maintenance at Well 2 ............ 4.1-87
Figure 4.1-42bKOP 20: Phase 4 with Workover Rig during Maintenance at Well 2: WIDE
ANGLE
................................................................................................................... 4.1-88
Figure 4.1-43KOP 20: Phase 4 During Ongoing Operations .............................................. 4.1-89
Figure 4.2-1Wind Rose for King Harbor Meteorological Station ........................................... 4.2-3
Figure 4.2-2PM2.5 Annual Compliance Status - 2011 .......................................................... 4.2-10
Figure 4.2-3Ozone Annual Compliance Status - 2011........................................................ 4.2-11
Figure 4.2-4California GHG Emissions 2000-2011............................................................. 4.2-17
Figure 4.2-5Acute Impacts Health Index ............................................................................ 4.2-63
Figure 4.2-6Chronic Impacts Health Impacts ..................................................................... 4.2-64

E&B Oil Drilling & Production Project

xvi

Draft Environmental Impact Report
Table of Contents

Figure 4.2-7Cancer Impacts Cancer Cases: Unmitigated ................................................... 4.2-65
Figure 4.2-8Cancer Impacts Cancer Cases: Mitigated ....................................................... 4.2-66
Figure 4.7-1Regional Fault Map ........................................................................................... 4.7-2
Figure 4.7-2Liquefaction and Landslides Map ...................................................................... 4.7-8
Figure 4.8-1Steps Involved in Developing a Quantitative Risk Assessment ......................... 4.8-5
Figure 4.8-2Existing Maintenance Facility Risk Profiles: Fatalities and Injuries .................. 4.8-34
Figure 4.8-3Storm Drain System in the Facility Vicinity ...................................................... 4.8-37
Figure 4.8-4Storm Drain System Pictures .......................................................................... 4.8-38
Figure 4.8-5Consequence Analysis Results: Fatality and Serious Injury ............................ 4.8-70
Figure 4.8-6Areas That Could Be Potentially Exposed ....................................................... 4.8-71
Figure 4.8-7Risk Profiles for the Fixed Facility and Gas Pipeline: Fatalities ....................... 4.8-75
Figure 4.8-8Risk Profiles for the Fixed Facility and Pipeline: Injuries.................................. 4.8-76
Figure 4.8-9Pipeline Profile ................................................................................................ 4.8-82
Figure 4.9-1Flood Insurance Rate Map (FIRM) for the Proposed Project Area..................... 4.9-3
Figure 4.9-2Location of Barrier Injection Wells in the Proposed Project Area ....................... 4.9-4
Figure 4.10-1Proposed Project Location ............................................................................ 4.10-4
Figure 4.10-2Project Site and Area Land Uses ................................................................ 4.10-11
Figure 4.11-1Noise Monitoring Locations around the Project Site ...................................... 4.11-8
Figure 4.11-2Typical Noise Monitor Installation .................................................................. 4.11-9
Figure 4.11-4Noise Monitoring Locations along the Truck and Pipe Routes (2012 Study) 4.11-12
Figure 4.11-5Noise Monitoring Locations along the Truck and Pipe Routes (2012 Study) 4.11-12
Figure 4.11-6Noise Monitoring Locations along the Truck and Pipe Routes (2012 Study) 4.11-13
Figure 4.11-7Noise Monitoring Locations along the Truck and Pipe Routes (2012 Study) 4.11-13
Figure 4.11-8Noise Monitoring Locations around the City Yard Relocation Site ............... 4.11-15
Figure 4.11-9Phase 1 - Predicted Daily Leq Noise Contours during DEMOLITION for a Receiver
Height of 5-ft ................................................................................................................. 4.11-37
Figure 4.11-10Phase 1 - Predicted Daily Leq Noise Contours during CONSTRUCTION for a
Receiver Height of 5-ft ..................................................................................................... 4.11-38
Figure 4.11-11Phase 1 - Predicted Daily Leq Noise Contours during DEMOLITION for a
Receiver Height of 20-ft ................................................................................................... 4.11-39
Figure 4.11-12Phase 1 - Predicted Daily Leq Noise Contours during CONSTRUCTION for
Receiver Height of 20-ft ................................................................................................... 4.11-40
Figure 4.11-13Phase 1 - Predicted Daily Leq Noise Contours during DEMOLITION with
Mitigation for a Receiver Height of 5-ft ............................................................................. 4.11-42
Figure 4.11-14Phase 1 - Predicted Daily Leq Noise Contours during CONSTRUCTION with
Mitigation for a Receiver Height of 5-ft ............................................................................. 4.11-43
Figure 4.11-15Phase 1 - Predicted Daily Leq Noise Contours during DEMOLITION with
Mitigation for a Receiver Height of 20-ft ........................................................................... 4.11-44
Figure 4.11-16Phase 1 - Predicted Daily Leq Noise Contours during CONSTRUCTION with
Mitigation for a Receiver Height of 20-ft ........................................................................... 4.11-45
Figure 4.11-17Phase 2 - Leq Noise Contours during DRILLING & TEST PRODUCTION for a
Receiver Height of 5-ft ..................................................................................................... 4.11-49
Figure 4.11-18Phase 2 - Leq Noise Contours during DRILLING & TEST PRODUCTION for a
Receiver Height of 20-ft ................................................................................................... 4.11-50
Figure 4.11-19Phase 2 - Leq Noise Contours during TEST PRODUCTION (ONLY) for a
Receiver Height of 5-ft ..................................................................................................... 4.11-53

Draft Environmental Impact Report

xvii

E&B Oil Drilling & Production Project
Table of Contents

Figure 4.11-20Phase 2 - Leq Noise Contours during TEST PRODUCTION (ONLY) for a
Receiver Height of 20-ft ................................................................................................... 4.11-54
Figure 4.11-21Phase 2 - Leq Noise Contours during DRILLING & TEST PRODUCTION with
Mitigation for a Receiver Height of 5-ft ............................................................................. 4.11-57
Figure 4.11-22Phase 2 - Leq Noise Contours during DRILLING & TEST PRODUCTION with
Mitigation for a Receiver Height of 20-ft ........................................................................... 4.11-58
Figure 4.11-23Phase 3 - Leq Noise Contours during SITE CONSTRUCTION for a Receiver
Height of 5-ft ................................................................................................................. 4.11-61
Figure 4.11-24Phase 3 - Leq Noise Contours during SITE CONSTRUCTION for a Receiver
Height of 20-ft ................................................................................................................. 4.11-62
Figure 4.11-25Phase 3 - Leq Noise Contours during SITE CONSTRUCTION with Mitigation for
a Receiver Height of 5-ft .................................................................................................. 4.11-66
Figure 4.11-26Phase 3 - Leq Noise Contours during SITE CONSTRUCTION with Mitigation for
a Receiver Height of 20-ft ................................................................................................ 4.11-67
Figure 4.11-27Phase 3 - Leq Noise Contours during Pipeline Construction Valley Drive
Scenario, Receiver Height of 5-feet.................................................................................. 4.11-70
Figure 4.11-28Phase 3 - Leq Noise Contours during Pipeline Construction Valley Drive
Scenario, Receiver Height of 20-feet................................................................................ 4.11-70
Figure 4.11-29Phase 3 - Leq Noise Contours during Pipeline Construction Anita Street
Westbound Scenario, Receiver Height of 5-feet ............................................................... 4.11-71
Figure 4.11-30Phase 3 - Leq Noise Contours during Pipeline Construction Anita Street
Westbound Scenario, Receiver Height of 20-feet ............................................................. 4.11-71
Figure 4.11-31Phase 3 - Leq Noise Contours during Pipeline Construction Anita Street
Eastbound Scenario, Receiver Height of 5-feet ................................................................ 4.11-72
Figure 4.11-32Phase 3 - Leq Noise Contours during Pipeline Construction Anita Street
Eastbound Scenario, Receiver Height of 20-feet .............................................................. 4.11-72
Figure 4.11-33Phase 3 - Leq Noise Contours during Pipeline Construction Redondo Beach
Edison Corridor Scenario, Receiver Height of 5-feet ........................................................ 4.11-73
Figure 4.11-34Phase 3 - Leq Noise Contours during Pipeline Construction Redondo Beach
Edison Corridor Scenario, Receiver Height of 20-feet ...................................................... 4.11-73
Figure 4.11-35Phase 3 - Leq Noise Contours during Pipeline Construction 190th Street
Westbound Scenario, Receiver Height of 5-feet ............................................................... 4.11-74
Figure 4.11-36Phase 3 - Leq Noise Contours during Pipeline Construction 190th Street
Eastbound Scenario, Receiver Height of 5-feet ................................................................ 4.11-74
Figure 4.11-37Phase 3 - Leq Noise Contours during Pipeline Construction Torrance Edison
Corridor Scenario, Receiver Height of 5-feet .................................................................... 4.11-75
Figure 4.11-38Phase 4 - Leq Noise Contours during Long Term DRILLING & PRODUCTION for
a Receiver Height of 5-ft .................................................................................................. 4.11-80
Figure 4.11-39Phase 4 - Leq Noise Contours during Long Term DRILLING & PRODUCTION for
a Receiver Height of 20-ft ................................................................................................ 4.11-81
Figure 4.11-40Phase 4 - Leq Noise Contours during Long Term DRILLING & PRODUCTION
with Mitigation for a Receiver Height of 5-ft ...................................................................... 4.11-83
Figure 4.11-41Phase 4 - Leq Noise Contours during Long Term DRILLING & PRODUCTION
with Mitigation for a Receiver Height of 20-ft .................................................................... 4.11-84
Figure 4.11-42Phase 4 - Leq Noise Contours during Long Term PRODUCTION for a Receiver
Height of 5-ft ................................................................................................................. 4.11-87
Figure 4.11-43Phase 4 - Leq Noise Contours during Long Term PRODUCTION for a Receiver
Height of 20-ft ................................................................................................................. 4.11-88
Figure 4.11-44Phase 4 - Leq Noise Contours during Long Term PRODUCTION with Mitigation
for a Receiver Height of 5-ft ............................................................................................. 4.11-91

E&B Oil Drilling & Production Project

xviii

Draft Environmental Impact Report
Table of Contents

Figure 4.11-45Phase 4 - Leq Noise Contours during Long Term PRODUCTION with Mitigation
for a Receiver Height of 20-ft ........................................................................................... 4.11-92
Figure 4.11-46Relocated City Maintenance Yard - Leq Noise Contours during DEMOLITON for
a Receiver Height of 5-feet............................................................................................... 4.11-99
Figure 4.11-47Relocated City Yard - Leq Noise Contours during CONSTRUCTION for a
Receiver Height of 5-feet ................................................................................................4.11-100
Figure 4.11-48Relocated City Yard - Leq Noise Contours during DEMOLITON for a Receiver
Height of 20-feet .............................................................................................................4.11-101
Figure 4.11-49Relocated City Yard - Leq Noise Contours during CONSTRUCTION for a
Receiver Height of 20-feet ..............................................................................................4.11-102
Figure 4.11-50Relocated City Yard - Leq Noise Contours during DEMOLITON with Mitigation for
a Receiver Height of 5-feet..............................................................................................4.11-107
Figure 4.11-51Relocated City Yard - Leq Noise Contours during CONSTRUCTION with
Mitigation for a Receiver Height of 5-feet ........................................................................4.11-108
Figure 4.11-52Relocated City Yard - Leq Noise Contours during DEMOLITON with Mitigation for
a Receiver Height of 20-feet............................................................................................4.11-109
Figure 4.11-53Relocated City Yard - Leq Noise Contours during CONSTRUCTION with
Mitigation for a Receiver Height of 20-feet ......................................................................4.11-110
Figure 4.11-54Relocated City Yard - Leq Noise Contours during OPERATIONS For a Receiver
Height of 5-feet ...............................................................................................................4.11-114
Figure 4.11-55Relocated City Yard - Leq Noise Contours during OPERATIONS for a Receiver
Height of 20-feet .............................................................................................................4.11-115
Figure 4.11-56 Relocated City Yard - Leq Noise Contours during OPERATIONS with Mitigation
for a Receiver Height of 5-feet ........................................................................................4.11-116
Figure 4.11-57Relocated City Yard - Leq Noise Contours during OPERATIONS with Mitigation
for a Receiver Height of 20-feet ......................................................................................4.11-117
Figure 4.11-58Temporary City Yard - Leq Noise Contours during OPERATIONS for a Receiver
Height of 5-feet ...............................................................................................................4.11-122
Figure 4.11-59Temporary City Yard - Leq Noise Contours during OPERATIONS for a Receiver
Height of 20-feet .............................................................................................................4.11-123
Figure 4.11-60Temporary City Yard - Leq Noise Contours during OPERATIONS with Mitigation
for a Receiver Height of 5-feet ........................................................................................4.11-124
Figure 4.11-61Temporary City Yard - Leq Noise Contours during OPERATIONS with Mitigation
for a Receiver Height of 20-feet ......................................................................................4.11-125
Figure 4.13-1Traffic Study Intersections Locations............................................................. 4.13-5
Figure 4.13-2Location of Roadway Segments Studied ....................................................... 4.13-6
Figure 4.13-3Existing and Proposed Bike Paths in Hermosa Beach ................................ 4.13-10
Figure 4.13-4Safe Routes to School ................................................................................ 4.13-12
Figure 4.13-5Alternative Heavy Truck Traffic Routes ....................................................... 4.13-48
Figure 5-1Percent of Crude Recovery and Alternative Locations ............................................ 5-6
Figure 5-2Rosecrans Alternative Location Detail..................................................................... 5-8
Figure 5-3Exxon/Mobil Refinery Alternative Location Detail .................................................. 5-10
Figure 5-4AES Site Location Detail ....................................................................................... 5-13
Figure 6-1Simulated View of Drilling Rig at AES Site .............................................................. 6-5

Draft Environmental Impact Report

xix

E&B Oil Drilling & Production Project
Table of Contents

Acronyms
°F
AB
ANSI
APEHA
API
AQMP
bbl
BOP
BOP
bpd
CAL FIRE
Cal/EPA
Cal-ARP
CalISO
CARB
CCAA
CCPS
CDFG
CDMG
CEC
CEQA
CESA
CFR
CFR
CGS
CNDDB
CNPS
CO
CPUC
CRR
CSFM
CSR
CUP
D/C
dBA
DOGGR
DPM
DPR
eGRID
EIR
EPA

degrees Fahrenheit
Assembly Bill
American National Standards Institute
Alquist-Priolo Earthquake Hazards Act
American Petroleum Institute
Air Quality Management Plans
barrels
blow out prevention
blowout prevention
barrels per day
California Department of Forestry and Fire Prevention
California Environmental Protection Agency
California Accidental Release Program
California Independent System Operator
California Air Resources Board
California Clean Air Act
Center for Chemical Process Safety
California Department of Fish and Game
California Division of Mines and Geology
California Energy Commission
California Environmental Quality Act
California Endangered Species Act
Code of Federal Regulations
Code of Federal Regulations
California Geological Survey
California Department of Fish and Wildlife, Natural Diversity Database
California Native Plant Society
carbon monoxide
California Public Utilities Commission
Cyclic Resistance Ratio
California State Fire Marshal
Cyclic Stress Ratio
conditional use permit
demand to capacity ratio
A-weighted decibel
Division of Oil, Gas and Geothermal Resources
diesel particulate matter
Department of Parks and Recreation
Emissions & Generation Resource Integrated Database
Environmental Impact Report
Environmental Protection Agency

E&B Oil Drilling & Production Project

xx

Draft Environmental Impact Report
Table of Contents

Acronyms
ERME
fc
FERC
FESA
FMZ
Fs
ft3
g/cc
GHG
GIS
gpm
h2s
HARP
HCM
HHMD
HRA
ICU
IRI
ITE
km
kV
kW
LACoFD
LACSD
Ldn
Leq
LNG
LOS
LPG
LTs
m/s
m3
MATES
MBTA
mmscfd
MMTCE
mph
MRZ
N2O
NAAQS
NFPA
No.
NO2
NOx
NPDES
O3
OCR
OEHHA

Environmental Resource Management Element
footcandles
Federal Energy Regulatory Commission
Federal Endangered Species Act
fuel modification zone
factor of safety
cubic feet
grams per cubic centimeter
greenhouse gas
geographical information system
gallons per minutes
hydrogen sulfide
Hotspots Analysis and Reporting Program
Highway Capacity Manual
Health Hazardous Materials Division
health risk assessment
Intersection Capacity Utilization
Industrial Risk Insurers
Institute of Traffic Engineers
kilometers
kilovolt
kilowatt
County of Los Angeles Fire Department
Sanitation Districts of Los Angeles County
day-night noise level
equivalent sound level
natural gas liquids
level of service
liquefied petroleum gases
low temperature separation
meters per second
cubic meters
Multiple Air Toxics Exposure Study
Migratory Bird Treaty Act
million standard cubic feet per day
million metric tons of carbon equivalent
miles per hour
Mineral Resources Zone
nitrous oxide
national ambient air quality standards
National Fire Protection Association
number
nitrogen dioxide
nitrogen oxides
National Pollutant Discharge Elimination System Program
ozone
overconsolidation ratio
Office of Environmental Health Hazard Assessment

Draft Environmental Impact Report

xxi

E&B Oil Drilling & Production Project
Table of Contents

Acronyms
OS
PCE
PM10
PM2.5
ppm
PRC
psia
psig
QRA
RMP
RWQCB
SCAQMD
SCCIC
SCE
SCGC
SIP
SO2
SRA
SWRCB
TNT
UFC
URBEMIS
USACE
USFWS
V/C
VOC
vpd
vph
yd3
μg/m3

open space
Passenger Car Equivalent
particulate matter less than 10 micrometers in diameter
particulate matter less than 2.5 micrometers in diameter
parts per million
Public Resources Code
pounds per square inch, absolute
pounds per square inch, gauge
Quantitative Risk Analysis
Resource Management Plan
Regional Water Quality Control Board
South Coast Air Quality Management District
South Central Coastal Information Center
Southern California Edison
Southern California Gas Company
State Implementation Plan
sulfur dioxide
source receptor area
State Water Resources Control Board
Trinitrotoluene
Uniform Fire Code
Urban Emissions Software
US Army Corps of Engineers
US Fish and Wildlife Service
Vehicles to capacity ratio
volatile organic compounds
Vehicles per day
Vehicles per hour
cubic yards
micrograms per cubic meter

E&B Oil Drilling & Production Project

xxii

Draft Environmental Impact Report
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft
Environmental Impact Report - Hermosa Beach - February 2014 - Draft

More Related Content

What's hot

PhD_thesis_Giorgio_Crasto
PhD_thesis_Giorgio_CrastoPhD_thesis_Giorgio_Crasto
PhD_thesis_Giorgio_Crasto
Giorgio Crasto
 
E&Y 2013 proxy statements reports
E&Y 2013 proxy statements reportsE&Y 2013 proxy statements reports
E&Y 2013 proxy statements reports
BKoontz
 
Relazione forno orizzontale
Relazione forno orizzontaleRelazione forno orizzontale
Relazione forno orizzontale
ALESSANDRO LOTTI
 
Future Scenarios for Petroleum Development
Future Scenarios for Petroleum DevelopmentFuture Scenarios for Petroleum Development
Future Scenarios for Petroleum Development
Nicholas Varilone
 
2014 - Pearson Dogwood Policy Statement excerpts
2014 - Pearson Dogwood Policy Statement excerpts2014 - Pearson Dogwood Policy Statement excerpts
2014 - Pearson Dogwood Policy Statement excerpts
Ben Johnson
 
SPEED- Final Design Report
SPEED- Final Design ReportSPEED- Final Design Report
SPEED- Final Design Report
Leah Segerlin
 
Proxy Statement for July 2007 Annual Meeting
Proxy Statement for July 2007 Annual Meeting Proxy Statement for July 2007 Annual Meeting
Proxy Statement for July 2007 Annual Meeting
finance2
 
Executive Summary
Executive Summary Executive Summary
Executive Summary
Adam Burck
 

What's hot (20)

Dicom standards p02-conformance
Dicom standards p02-conformanceDicom standards p02-conformance
Dicom standards p02-conformance
 
DNV Liquified Gas Terminal
DNV Liquified Gas TerminalDNV Liquified Gas Terminal
DNV Liquified Gas Terminal
 
PhD_thesis_Giorgio_Crasto
PhD_thesis_Giorgio_CrastoPhD_thesis_Giorgio_Crasto
PhD_thesis_Giorgio_Crasto
 
E&Y 2013 proxy statements reports
E&Y 2013 proxy statements reportsE&Y 2013 proxy statements reports
E&Y 2013 proxy statements reports
 
Relazione forno orizzontale
Relazione forno orizzontaleRelazione forno orizzontale
Relazione forno orizzontale
 
15
1515
15
 
Biofuels: A Guide for Coordinating a Fryer to Fuel Collection Program in Sant...
Biofuels: A Guide for Coordinating a Fryer to Fuel Collection Program in Sant...Biofuels: A Guide for Coordinating a Fryer to Fuel Collection Program in Sant...
Biofuels: A Guide for Coordinating a Fryer to Fuel Collection Program in Sant...
 
Byron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design MasterByron Schaller - Challenge 1 - Virtual Design Master
Byron Schaller - Challenge 1 - Virtual Design Master
 
Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007Report on Field Investigation - Alpha Project, Palawan - September 2007
Report on Field Investigation - Alpha Project, Palawan - September 2007
 
Renewable energy technologies
Renewable energy technologiesRenewable energy technologies
Renewable energy technologies
 
OficeCentral Manual-en-Accounting v3-r3
OficeCentral Manual-en-Accounting v3-r3OficeCentral Manual-en-Accounting v3-r3
OficeCentral Manual-en-Accounting v3-r3
 
Future Scenarios for Petroleum Development
Future Scenarios for Petroleum DevelopmentFuture Scenarios for Petroleum Development
Future Scenarios for Petroleum Development
 
City of Salina-Salina, KS. Code
City of Salina-Salina, KS. Code City of Salina-Salina, KS. Code
City of Salina-Salina, KS. Code
 
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
#VirtualDesignMaster 3 Challenge 1 - Steven Viljoen
 
2014 - Pearson Dogwood Policy Statement excerpts
2014 - Pearson Dogwood Policy Statement excerpts2014 - Pearson Dogwood Policy Statement excerpts
2014 - Pearson Dogwood Policy Statement excerpts
 
SPEED- Final Design Report
SPEED- Final Design ReportSPEED- Final Design Report
SPEED- Final Design Report
 
Proxy Statement for July 2007 Annual Meeting
Proxy Statement for July 2007 Annual Meeting Proxy Statement for July 2007 Annual Meeting
Proxy Statement for July 2007 Annual Meeting
 
Executive Summary
Executive Summary Executive Summary
Executive Summary
 
Final feasiblity reprtmarina
Final feasiblity reprtmarinaFinal feasiblity reprtmarina
Final feasiblity reprtmarina
 
Mirsal 2 manual BOE
Mirsal 2 manual BOEMirsal 2 manual BOE
Mirsal 2 manual BOE
 

Viewers also liked

Carrillo ana excel
Carrillo ana excelCarrillo ana excel
Carrillo ana excel
1990bbbb
 

Viewers also liked (20)

Potatoes: Organic Production and Marketing
Potatoes: Organic Production and Marketing Potatoes: Organic Production and Marketing
Potatoes: Organic Production and Marketing
 
Cucumber Beetles: Organic and Biorational Integrated Pest Management
Cucumber Beetles: Organic and Biorational Integrated Pest ManagementCucumber Beetles: Organic and Biorational Integrated Pest Management
Cucumber Beetles: Organic and Biorational Integrated Pest Management
 
Manajemen pendidikan
Manajemen pendidikanManajemen pendidikan
Manajemen pendidikan
 
Management information system
Management information systemManagement information system
Management information system
 
Insect IPM in Apples: Kaolin Clay
Insect IPM in Apples: Kaolin ClayInsect IPM in Apples: Kaolin Clay
Insect IPM in Apples: Kaolin Clay
 
Downy Mildew Control in Cucurbits
Downy Mildew Control in CucurbitsDowny Mildew Control in Cucurbits
Downy Mildew Control in Cucurbits
 
Energy Saving Tips for Irrigators
Energy Saving Tips for IrrigatorsEnergy Saving Tips for Irrigators
Energy Saving Tips for Irrigators
 
Kresta cataloge 2014
Kresta cataloge 2014Kresta cataloge 2014
Kresta cataloge 2014
 
City Chickens for your Organic Garden
City Chickens for your Organic GardenCity Chickens for your Organic Garden
City Chickens for your Organic Garden
 
Meat Chicken Breeds for Pastured Production
Meat Chicken Breeds for Pastured ProductionMeat Chicken Breeds for Pastured Production
Meat Chicken Breeds for Pastured Production
 
Sweet Corn: Organic Production
Sweet Corn: Organic ProductionSweet Corn: Organic Production
Sweet Corn: Organic Production
 
New Markets for Your Crops
New Markets for Your CropsNew Markets for Your Crops
New Markets for Your Crops
 
Companion Planting: Basic Concepts & Resources
Companion Planting: Basic Concepts & ResourcesCompanion Planting: Basic Concepts & Resources
Companion Planting: Basic Concepts & Resources
 
142
142142
142
 
ManipM Project Two
ManipM Project TwoManipM Project Two
ManipM Project Two
 
Carrillo ana excel
Carrillo ana excelCarrillo ana excel
Carrillo ana excel
 
Worm Wicking Beds for Drought Gardening
Worm Wicking Beds for Drought Gardening Worm Wicking Beds for Drought Gardening
Worm Wicking Beds for Drought Gardening
 
Enterprise Budgets and Production Costs for Organic Production
Enterprise Budgets and Production Costs for Organic ProductionEnterprise Budgets and Production Costs for Organic Production
Enterprise Budgets and Production Costs for Organic Production
 
Facebook для бизнеса
Facebook для бизнесаFacebook для бизнеса
Facebook для бизнеса
 
Positive Practices in Farm Labor Management
Positive Practices in Farm Labor Management Positive Practices in Farm Labor Management
Positive Practices in Farm Labor Management
 

Similar to Environmental Impact Report - Hermosa Beach - February 2014 - Draft

Final Certified Environmental Impact Report
Final Certified Environmental Impact ReportFinal Certified Environmental Impact Report
Final Certified Environmental Impact Report
StopHermosaBeachOil
 
Study hydraulic fracturing study inglewood field10102012
Study hydraulic fracturing study inglewood field10102012Study hydraulic fracturing study inglewood field10102012
Study hydraulic fracturing study inglewood field10102012
cr7madrid
 
Gbr Version 060209 Addendum
Gbr Version 060209 AddendumGbr Version 060209 Addendum
Gbr Version 060209 Addendum
matthromatka
 
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
Juan Tobar
 
Annual Report on Evaluation
Annual Report on EvaluationAnnual Report on Evaluation
Annual Report on Evaluation
Dr Lendy Spires
 

Similar to Environmental Impact Report - Hermosa Beach - February 2014 - Draft (20)

Final Certified Environmental Impact Report
Final Certified Environmental Impact ReportFinal Certified Environmental Impact Report
Final Certified Environmental Impact Report
 
Beneficiation ore
Beneficiation oreBeneficiation ore
Beneficiation ore
 
Chapter 14 bridge hydraulics
Chapter 14 bridge hydraulicsChapter 14 bridge hydraulics
Chapter 14 bridge hydraulics
 
Precast carparks
Precast carparksPrecast carparks
Precast carparks
 
PCI parking structures recommended practices
PCI parking structures  recommended practicesPCI parking structures  recommended practices
PCI parking structures recommended practices
 
Guidelines Haul Rpad Design
Guidelines Haul Rpad DesignGuidelines Haul Rpad Design
Guidelines Haul Rpad Design
 
Study Showing U.S. Shale Drilling will Create 1.6M Jobs & $245B in 10 Years
Study Showing U.S. Shale Drilling will Create 1.6M Jobs & $245B in 10 YearsStudy Showing U.S. Shale Drilling will Create 1.6M Jobs & $245B in 10 Years
Study Showing U.S. Shale Drilling will Create 1.6M Jobs & $245B in 10 Years
 
chapter-7-hydrology.pdf
chapter-7-hydrology.pdfchapter-7-hydrology.pdf
chapter-7-hydrology.pdf
 
Study hydraulic fracturing study inglewood field10102012
Study hydraulic fracturing study inglewood field10102012Study hydraulic fracturing study inglewood field10102012
Study hydraulic fracturing study inglewood field10102012
 
Rules for hull 2014
Rules for hull 2014Rules for hull 2014
Rules for hull 2014
 
Methods for Monitoring Pump-and-Treat Performance
Methods for Monitoring Pump-and-Treat PerformanceMethods for Monitoring Pump-and-Treat Performance
Methods for Monitoring Pump-and-Treat Performance
 
Gbr Version 060209 Addendum
Gbr Version 060209 AddendumGbr Version 060209 Addendum
Gbr Version 060209 Addendum
 
Cooperative Station Observations - 1989
Cooperative Station Observations - 1989Cooperative Station Observations - 1989
Cooperative Station Observations - 1989
 
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
The City of Bakersfield, CA GIS Implementation Plan (1997 - 1998)
 
Pdf 1.pptx
Pdf 1.pptxPdf 1.pptx
Pdf 1.pptx
 
Georgia Rainwater Harvesting Manual
Georgia Rainwater Harvesting ManualGeorgia Rainwater Harvesting Manual
Georgia Rainwater Harvesting Manual
 
Georgia Rainwater Harvesting Manual
Georgia Rainwater Harvesting ManualGeorgia Rainwater Harvesting Manual
Georgia Rainwater Harvesting Manual
 
Annual Report on Evaluation
Annual Report on EvaluationAnnual Report on Evaluation
Annual Report on Evaluation
 
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...
 
Water-Wise Landscaping guide for water management planning - Utah State Unive...
Water-Wise Landscaping guide for water management planning - Utah State Unive...Water-Wise Landscaping guide for water management planning - Utah State Unive...
Water-Wise Landscaping guide for water management planning - Utah State Unive...
 

More from StopHermosaBeachOil

Final Health Impact Assessment - 2014
Final Health Impact Assessment - 2014Final Health Impact Assessment - 2014
Final Health Impact Assessment - 2014
StopHermosaBeachOil
 
E&B Oil Company's Legal Letter To The City Og Hermosa Beach About The FEIR
E&B Oil Company's Legal Letter To The City Og Hermosa Beach About The FEIRE&B Oil Company's Legal Letter To The City Og Hermosa Beach About The FEIR
E&B Oil Company's Legal Letter To The City Og Hermosa Beach About The FEIR
StopHermosaBeachOil
 
Surfrider Foundation - Draft Environmental Impact Report Comments - Hermosa B...
Surfrider Foundation - Draft Environmental Impact Report Comments - Hermosa B...Surfrider Foundation - Draft Environmental Impact Report Comments - Hermosa B...
Surfrider Foundation - Draft Environmental Impact Report Comments - Hermosa B...
StopHermosaBeachOil
 
Stop Hermosa Beach Oil - Draft Environmental Impact Report Comments - Hermosa...
Stop Hermosa Beach Oil - Draft Environmental Impact Report Comments - Hermosa...Stop Hermosa Beach Oil - Draft Environmental Impact Report Comments - Hermosa...
Stop Hermosa Beach Oil - Draft Environmental Impact Report Comments - Hermosa...
StopHermosaBeachOil
 
Sierra Club - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Sierra Club - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...Sierra Club - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Sierra Club - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
StopHermosaBeachOil
 
NRDC - Draft Environmental Impact Report Comments - Hermosa Beach Oil Drillin...
NRDC - Draft Environmental Impact Report Comments - Hermosa Beach Oil Drillin...NRDC - Draft Environmental Impact Report Comments - Hermosa Beach Oil Drillin...
NRDC - Draft Environmental Impact Report Comments - Hermosa Beach Oil Drillin...
StopHermosaBeachOil
 
Los Angeles Water Keepers - Draft Environmental Impact Report Comments - Herm...
Los Angeles Water Keepers - Draft Environmental Impact Report Comments - Herm...Los Angeles Water Keepers - Draft Environmental Impact Report Comments - Herm...
Los Angeles Water Keepers - Draft Environmental Impact Report Comments - Herm...
StopHermosaBeachOil
 
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
StopHermosaBeachOil
 
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
StopHermosaBeachOil
 

More from StopHermosaBeachOil (20)

Hermosa Beach Oil Drilling - Development Agreement
Hermosa Beach Oil Drilling - Development AgreementHermosa Beach Oil Drilling - Development Agreement
Hermosa Beach Oil Drilling - Development Agreement
 
Hermosa Beach - Cost Benefit Analysis - Development Supplemental Agreement
Hermosa Beach - Cost Benefit Analysis - Development Supplemental AgreementHermosa Beach - Cost Benefit Analysis - Development Supplemental Agreement
Hermosa Beach - Cost Benefit Analysis - Development Supplemental Agreement
 
Equinox Oil Company - Bankruptcy
Equinox Oil Company - BankruptcyEquinox Oil Company - Bankruptcy
Equinox Oil Company - Bankruptcy
 
Equinox Oil Spill
Equinox Oil SpillEquinox Oil Spill
Equinox Oil Spill
 
Court decision on petition for writ of mandate 12 19-14
Court decision on petition for writ of mandate  12 19-14Court decision on petition for writ of mandate  12 19-14
Court decision on petition for writ of mandate 12 19-14
 
E&B Natural Resources - Work Plan To Verify Pit Closure
E&B Natural Resources - Work Plan To Verify Pit ClosureE&B Natural Resources - Work Plan To Verify Pit Closure
E&B Natural Resources - Work Plan To Verify Pit Closure
 
Final Health Impact Assessment - 2014
Final Health Impact Assessment - 2014Final Health Impact Assessment - 2014
Final Health Impact Assessment - 2014
 
California State Lands Commission - City of Hermosa Beach State Tidelands Trust
California State Lands Commission - City of Hermosa Beach State Tidelands TrustCalifornia State Lands Commission - City of Hermosa Beach State Tidelands Trust
California State Lands Commission - City of Hermosa Beach State Tidelands Trust
 
E&B Oil Company's Legal Letter To The City Og Hermosa Beach About The FEIR
E&B Oil Company's Legal Letter To The City Og Hermosa Beach About The FEIRE&B Oil Company's Legal Letter To The City Og Hermosa Beach About The FEIR
E&B Oil Company's Legal Letter To The City Og Hermosa Beach About The FEIR
 
Surfrider Foundation - Draft Environmental Impact Report Comments - Hermosa B...
Surfrider Foundation - Draft Environmental Impact Report Comments - Hermosa B...Surfrider Foundation - Draft Environmental Impact Report Comments - Hermosa B...
Surfrider Foundation - Draft Environmental Impact Report Comments - Hermosa B...
 
Stop Hermosa Beach Oil - Draft Environmental Impact Report Comments - Hermosa...
Stop Hermosa Beach Oil - Draft Environmental Impact Report Comments - Hermosa...Stop Hermosa Beach Oil - Draft Environmental Impact Report Comments - Hermosa...
Stop Hermosa Beach Oil - Draft Environmental Impact Report Comments - Hermosa...
 
Sierra Club - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Sierra Club - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...Sierra Club - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Sierra Club - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
 
NRDC - Draft Environmental Impact Report Comments - Hermosa Beach Oil Drillin...
NRDC - Draft Environmental Impact Report Comments - Hermosa Beach Oil Drillin...NRDC - Draft Environmental Impact Report Comments - Hermosa Beach Oil Drillin...
NRDC - Draft Environmental Impact Report Comments - Hermosa Beach Oil Drillin...
 
Manhattan beach letter re deir
Manhattan beach letter re deirManhattan beach letter re deir
Manhattan beach letter re deir
 
Los Angeles Water Keepers - Draft Environmental Impact Report Comments - Herm...
Los Angeles Water Keepers - Draft Environmental Impact Report Comments - Herm...Los Angeles Water Keepers - Draft Environmental Impact Report Comments - Herm...
Los Angeles Water Keepers - Draft Environmental Impact Report Comments - Herm...
 
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
 
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
Heal The Bay - Draft Environmental Impact Report Comments - Hermosa Beach Oil...
 
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - Draft
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - DraftCost Benefit Anaylsis - Hermosa Beach - February 2014 - Draft
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - Draft
 
Health Impact Assessment - Hermosa Beach - February 2014 - Draft
Health Impact Assessment - Hermosa Beach - February 2014 - DraftHealth Impact Assessment - Hermosa Beach - February 2014 - Draft
Health Impact Assessment - Hermosa Beach - February 2014 - Draft
 
Hermosa Beach Community Dialogue: Phase II - Finance Subgroup
Hermosa Beach Community Dialogue: Phase II - Finance SubgroupHermosa Beach Community Dialogue: Phase II - Finance Subgroup
Hermosa Beach Community Dialogue: Phase II - Finance Subgroup
 

Recently uploaded

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 

Recently uploaded (20)

Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 

Environmental Impact Report - Hermosa Beach - February 2014 - Draft

  • 1. E & B Oil Drilling & Production Project Draft Environmental Impact Report Prepared By: Marine Research Specialists Public Draft EIR February 2014 SCH# 2013071038 Prepared For: City of Hermosa Beach
  • 2. Table of Contents Table of Contents 1.0 Introduction .................................................................................................................. 1-1 1.1 Project Overview ................................................................................................. 1-1 1.2 The Environmental Impact Report Process ......................................................... 1-4 1.2.1 Purpose and Intended Uses of the Environmental Impact Report .............. 1-4 1.2.2 Notice of Preparation and Initial Study ....................................................... 1-7 1.2.3 Impacts Considered Less Than Significant................................................. 1-7 1.3 Proposed Project Approvals ................................................................................ 1-8 1.4 EIR Contents and Guide for the Reader ............................................................ 1-10 1.4.1 EIR Contents............................................................................................ 1-10 1.4.2 Significance Criteria ................................................................................. 1-12 1.5 Final EIR Preparation and Certification Process ............................................... 1-13 1.6 CEQA Findings for Proposed Project Approval ................................................. 1-14 1.7 Mitigation Monitoring ......................................................................................... 1-14 1.8 Background....................................................................................................... 1-15 1.8.1 Project History .......................................................................................... 1-15 1.8.2 Lawsuits and Settlement Agreement ........................................................ 1-15 2.0 Project Description ...................................................................................................... 2-1 2.1 Project Overview ................................................................................................. 2-2 2.2 Proposed Project Objectives ............................................................................... 2-4 2.3 Historical and Current Operations ....................................................................... 2-5 2.4 Proposed Oil Project Phases ............................................................................ 2-10 2.4.1 Phase 1 Site Preparation ......................................................................... 2-10 2.4.1.1 Phase 1 Construction Activities .......................................................... 2-10 2.4.1.2 Phase 1 Site Preparation Detailed Schedule ...................................... 2-18 2.4.1.3 Phase 1 Site Preparation Personnel and Equipment Requirements ... 2-19 2.4.1.4 Phase 1 Truck Routes ........................................................................ 2-19 2.4.2 Phase 2 Drilling and Testing .................................................................... 2-20 2.4.2.1 Phase 2 Site Geology and Drilling Objectives ..................................... 2-20 2.4.2.2 Phase 2 Construction and Drilling Activities........................................ 2-22 2.4.2.3 Phase 2 Drilling and Testing Schedule ............................................... 2-38 2.4.2.4 Phase 2 Drilling and Testing Personnel & Equipment Requirements .. 2-38 2.4.3 Phase 3 Final Design and Construction ................................................... 2-40 2.4.3.1 Phase 3 Onsite Construction .............................................................. 2-40 2.4.3.2 Phase 3 Offsite Pipeline Construction ................................................ 2-46 2.4.3.3 Phase 3 Hazardous Materials............................................................. 2-55 2.4.3.4 Phase 3 Schedule .............................................................................. 2-55 2.4.3.5 Phase 3 Personnel and Equipment Requirements ............................. 2-56 2.4.4 Phase 4 Development and Operations ..................................................... 2-56 2.4.4.1 Phase 4 Drilling .................................................................................. 2-56 2.4.5 Drill Remaining Wells ............................................................................... 2-59 2.4.5.1 Phase 4 Processing and Operations .................................................. 2-60 2.4.5.2 Phase 4 Schedule .............................................................................. 2-68 2.4.5.3 Phase 4 Vehicle Requirements .......................................................... 2-69 2.4.6 Parking Requirements .............................................................................. 2-69 2.4.7 Project Life and Decommissioning ........................................................... 2-73 2.5 Proposed City Maintenance Yard Project .......................................................... 2-75 Draft Environmental Impact Report i E&B Oil Drilling & Production Project
  • 3. Table of Contents 2.5.1 Construction Phases ................................................................................ 2-76 2.5.2 Phase 2 Unsuccessful .............................................................................. 2-76 2.5.3 Temporary City Maintenance Yard ........................................................... 2-76 2.5.4 Permanent City Maintenance Yard ........................................................... 2-77 2.5.4.1 Parking Option.................................................................................... 2-77 2.5.4.2 No Added Parking Option ................................................................... 2-81 2.6 Agency Use of the Document ........................................................................... 2-81 2.6.1 Local and Regional .................................................................................. 2-82 2.6.2 State ........................................................................................................ 2-82 2.6.3 Federal..................................................................................................... 2-83 2.7 Potential Project Permits ................................................................................... 2-83 2.7.1 Discretionary Permits and Approvals........................................................ 2-83 3.0 Cumulative Projects ..................................................................................................... 3-1 3.1 Description of Cumulative Projects ..................................................................... 3-2 3.1.1 City of Hermosa Beach .............................................................................. 3-2 3.1.2 City of Redondo Beach .............................................................................. 3-2 3.1.3 City of Torrance.......................................................................................... 3-3 4.0 Environmental Impact Analysis/Regulatory Setting ............................................... 4.0-1 4.0.1 Assessment Methodology ................................................................................ 4.0-1 4.0.2 Oil Project Impact Analysis .............................................................................. 4.0-2 4.0.3 Formulation of Mitigation Measures and Mitigation Monitoring Program .......... 4.0-3 4.0.4 Cumulative Projects Impact Analysis ............................................................... 4.0-4 4.1 Aesthetics and Visual Resources ................................................................................ 4.1-1 4.1.1 Methodology .................................................................................................... 4.1-1 4.1.1.1 Assessing Existing Visual Environment ................................................... 4.1-1 4.1.1.2 Evaluating Project Impacts ...................................................................... 4.1-2 4.1.1.3 Assessment of Key Observation Points ................................................... 4.1-4 4.1.1.4 Lighting and Glare Methodology.............................................................. 4.1-6 4.1.2 Environmental Setting ...................................................................................... 4.1-7 4.1.2.1 Local Setting ........................................................................................... 4.1-7 4.1.2.2 Light and Glare ..................................................................................... 4.1-12 4.1.3 Regulatory Framework ................................................................................... 4.1-13 4.1.3.1 California Coastal Act ............................................................................ 4.1-13 4.1.3.2 Title 24 – Part 11 – California Green Building Standards Code ............. 4.1-13 4.1.3.3 City of Hermosa Beach ......................................................................... 4.1-14 4.1.3.4 City of Redondo Beach ......................................................................... 4.1-15 4.1.3.5 City of Torrance..................................................................................... 4.1-16 4.1.4 Significance Criteria ....................................................................................... 4.1-17 4.1.5 Project Impacts and Mitigation Measures ....................................................... 4.1-17 4.1.5.1 Proposed Oil Project and Pipeline Design Features .............................. 4.1-17 4.1.5.2 Dimensions of Major Visible CMY Project Components ........................ 4.1-27 4.1.5.3 Dimensions of Major Visible Proposed Oil Project Components ............ 4.1-28 4.1.5.4 Proposed Oil Project Viewshed Mapping .............................................. 4.1-29 4.1.5.5 Key Observation Points View Simulations ............................................. 4.1-32 4.1.5.6 Proposed Oil Project Impacts ................................................................ 4.1-90 4.1.5.7 Proposed City Maintenance Yard Project Impacts............................... 4.1-102 4.1.6 Comparison to Applicant Studies ................................................................. 4.1-105 4.1.7 Other Issue Area Mitigation Measure Impacts.............................................. 4.1-106 E&B Oil Drilling & Production Project ii Draft Environmental Impact Report
  • 4. Table of Contents 4.1.8 Cumulative Impacts and Mitigation Measures .............................................. 4.1-106 4.1.9 Mitigation Monitoring Plan ............................................................................ 4.1-107 4.2 Air Quality and Greenhouse Gases.......................................................................... 4.2-1 4.2.1 Environmental Setting ...................................................................................... 4.2-1 4.2.1.1 Meteorological Conditions ....................................................................... 4.2-1 4.2.1.2 Existing Air Quality Criteria Pollutants and Toxic Air Contaminants ......... 4.2-3 4.2.1.3 Existing Air Quality Greenhouse Gas Emissions ................................... 4.2-12 4.2.1.4 Existing Site Emissions ......................................................................... 4.2-20 4.2.2 Regulatory Setting ......................................................................................... 4.2-20 4.2.2.1 Criteria Pollutants Regulatory Setting .................................................... 4.2-20 4.2.2.2 GHG Regulatory Setting........................................................................ 4.2-22 4.2.3 Significance Criteria ....................................................................................... 4.2-31 4.2.4 Project Impacts and Mitigation Measures ....................................................... 4.2-33 4.2.4.1 Design Features .................................................................................... 4.2-33 4.2.4.2 Conditional Use Permit (CUP) Requirements ........................................ 4.2-34 4.2.4.3 Construction Criteria Pollutant Emissions .............................................. 4.2-34 4.2.4.4 Operational Criteria Pollutant Emissions ............................................... 4.2-42 4.2.4.5 Potential Operations Greenhouse Gas Emissions ................................. 4.2-53 4.2.4.6 Compliance with Area Air Quality Management Plans ........................... 4.2-62 4.2.4.7 Valve Box Options................................................................................. 4.2-67 4.2.4.8 Pipeline Route Options.......................................................................... 4.2-67 4.2.4.9 Proposed City Maintenance Yard Parking Options ................................ 4.2-67 4.2.5 Comparison to Applicant Studies ................................................................... 4.2-67 4.2.6 Other Issue Area Mitigation Measure Impacts................................................ 4.2-68 4.2.7 Cumulative Impacts and Mitigation Measures ................................................ 4.2-68 4.2.8 Mitigation Monitoring Plan .............................................................................. 4.2-69 4.3 Biological Resources ................................................................................................ 4.3-1 4.3.1 Environmental Setting ...................................................................................... 4.3-1 4.3.1.1 Onshore Resources ................................................................................ 4.3-1 4.3.1.2 Offshore Resources ................................................................................ 4.3-3 4.3.1.3 Rare, Endangered, and Special Status Species ...................................... 4.3-7 4.3.1.4 Sensitive Habitats ................................................................................. 4.3-13 4.3.2 Regulatory Setting ......................................................................................... 4.3-13 4.3.2.1 Federal Regulations .............................................................................. 4.3-13 4.3.2.2 State Resource Regulations .................................................................. 4.3-14 4.3.2.3 Local Regulations.................................................................................. 4.3-17 4.3.3 Significance Criteria ....................................................................................... 4.3-17 4.3.4 Project Impacts and Mitigation Measures ....................................................... 4.3-17 4.3.6. Other Issue Area Mitigation Measure Impacts ....................................... 4.3-25 4.3.7. Cumulative Impacts and Mitigation Measures ................................................ 4.3-25 4.3.8. Mitigation Monitoring Plan .............................................................................. 4.3-26 4.4 Cultural Resources ................................................................................................... 4.4-1 4.4.1 Environmental Setting ...................................................................................... 4.4-1 4.4.2 Records and Literature Search ........................................................................ 4.4-5 4.4.3 Paleontological Records Search ...................................................................... 4.4-6 4.4.4 Cultural Resources Survey .............................................................................. 4.4-8 4.4.5 Regulatory Setting ......................................................................................... 4.4-11 4.4.6 Significance Criteria ....................................................................................... 4.4-12 Draft Environmental Impact Report iii E&B Oil Drilling & Production Project
  • 5. Table of Contents 4.4.7 4.4.8 4.4.9 4.4.10 Impacts and Mitigation Measures................................................................... 4.4-13 Other Issue Area Mitigation Measure Impacts................................................ 4.4-21 Cumulative Impacts and Mitigation Measures ................................................ 4.4-21 Mitigation Monitoring Plan .............................................................................. 4.4-24 4.5 Energy and Mineral Resources ................................................................................ 4.5-1 4.5.1 Environmental Setting ...................................................................................... 4.5-1 4.5.1.1 Electricity................................................................................................. 4.5-1 4.5.1.2 Natural Gas ............................................................................................. 4.5-2 4.5.1.3 Transportation Fuels ............................................................................... 4.5-2 4.5.1.4 Minerals .................................................................................................. 4.5-3 4.5.1.5 Energy Conservation and Alternative Energy Sources ............................ 4.5-3 4.5.2 Regulatory Setting ........................................................................................... 4.5-6 4.5.2.1 Federal.................................................................................................... 4.5-6 4.5.2.2 State ....................................................................................................... 4.5-7 4.5.3 Significance Criteria ......................................................................................... 4.5-9 4.5.4 Project Impacts and Mitigation Measures ....................................................... 4.5-10 4.5.5 Other Issue Area Mitigation Measure Impacts................................................ 4.5-12 4.5.6 Cumulative Impacts and Mitigation Measures ................................................ 4.5-12 4.5.7 Mitigation Monitoring Plan .............................................................................. 4.5-12 4.6 Fire Protection and Emergency Response .............................................................. 4.6-1 4.6.1 Environmental Setting ...................................................................................... 4.6-1 4.6.1.1 Response Capabilities............................................................................. 4.6-1 4.6.2 Regulatory Setting ........................................................................................... 4.6-5 4.6.2.1 Codes and Standards ............................................................................. 4.6-5 4.6.2.2 Federal and State Regulations ................................................................ 4.6-9 4.6.2.3 Equipment Spacing ............................................................................... 4.6-11 4.6.3 Significance Criteria ....................................................................................... 4.6-14 4.6.4 Project Impacts and Mitigation Measures ....................................................... 4.6-15 4.6.4.1 CUP Requirements ............................................................................... 4.6-15 4.6.4.2 Proposed Oil Project and Pipeline Impacts............................................ 4.6-16 4.6.4.3 Proposed City Maintenance Yard Project Impacts................................. 4.6-21 4.6.5 Other Issue Area Mitigation Measure Impacts................................................ 4.6-22 4.6.6 Cumulative Impacts and Mitigation Measures ................................................ 4.6-23 4.6.7 Mitigation Monitoring Plan .............................................................................. 4.6-23 4.7 Geological Resources/Soils ..................................................................................... 4.7-1 4.7.1 Environmental Setting ...................................................................................... 4.7-1 4.7.1.1 Regional Geology.................................................................................... 4.7-1 4.7.1.2 Local Geology ......................................................................................... 4.7-3 4.7.1.3 Geologic Hazards.................................................................................... 4.7-4 4.7.2 Regulatory Setting ........................................................................................... 4.7-9 4.7.1.4 California Building Code (CBC) ............................................................... 4.7-9 4.7.1.5 Alquist-Priolo Earthquake Fault Zoning Act of 1972 .............................. 4.7-10 4.7.1.6 Seismic Hazards Mapping Act of 1990 .................................................. 4.7-10 4.7.1.7 California Coastal Act ............................................................................ 4.7-10 4.7.1.8 California Division of Oil, Gas, and Geothermal Resources ................... 4.7-11 4.7.1.9 City of Hermosa Beach General Plan, Seismic Safety Element............. 4.7-11 4.7.2 Significance Criteria ....................................................................................... 4.7-11 4.7.3 Project Impacts and Mitigation Measures ....................................................... 4.7-12 E&B Oil Drilling & Production Project iv Draft Environmental Impact Report
  • 6. Table of Contents 4.7.3.1 Introduction ........................................................................................... 4.7-12 4.7.3.2 Proposed Project Design Features ........................................................ 4.7-13 4.7.3.3 Applicant Prepared Studies ................................................................... 4.7-17 4.7.3.4 Impacts ................................................................................................. 4.7-17 4.7.4 Other Issue Area Mitigation Measure Impacts................................................ 4.7-30 4.7.5 Cumulative Impacts and Mitigation Measures ................................................ 4.7-30 4.7.6 Mitigation Monitoring Plan .............................................................................. 4.7-31 4.8 Safety, Risk of Upset, and Hazards .......................................................................... 4.8-1 4.8.1 Environmental Setting ...................................................................................... 4.8-2 4.8.1.1 Study Area and Scope ............................................................................ 4.8-2 4.8.1.2 Risk Assessment Methodology ............................................................... 4.8-3 4.8.1.3 Existing Site Hazards ............................................................................ 4.8-32 4.8.1.4 Existing Site Contamination .................................................................. 4.8-32 4.8.1.5 Existing Site Spill Potential .................................................................... 4.8-36 4.8.2 Regulatory Setting ......................................................................................... 4.8-38 4.8.2.1 Federal Laws and Regulations .............................................................. 4.8-38 4.8.2.2 California Laws and Regulations ........................................................... 4.8-43 4.8.2.3 Local Laws and Regulations ................................................................. 4.8-50 4.8.2.4 Other Applicable Guidelines, National Codes, and Standards ............... 4.8-52 4.8.2.5 Regulatory Oversight ............................................................................ 4.8-53 4.8.3 Significance Criteria ....................................................................................... 4.8-53 4.8.4 Proposed Project Impacts .............................................................................. 4.8-56 4.8.4.1 Design Features .................................................................................... 4.8-56 4.8.4.2 CUP Requirements ............................................................................... 4.8-56 4.8.4.3 Characteristics of Crude Oil, Natural Gas, and Odorant ........................ 4.8-58 4.8.4.4 Release Scenarios at the Proposed Oil Project Site and Pipeline Route 4.8-61 4.8.4.5 Frequency Analysis of the Proposed Oil Project Site and Pipelines ...... 4.8-67 4.8.4.6 Consequence Analysis of the Proposed Oil Project Site and Pipelines . 4.8-69 4.8.4.7 Risk Analysis of the Proposed Oil Project Site and Pipelines ................ 4.8-72 4.8.4.8 Proposed Project Impacts ..................................................................... 4.8-77 4.8.4.9 Proposed City Maintenance Yard Project Risks .................................... 4.8-87 4.8.5 Other Issue Area Mitigation Measure Impacts................................................ 4.8-87 4.8.6 Cumulative Impacts and Mitigation Measures ................................................ 4.8-88 4.8.7 Mitigation Monitoring Plan .............................................................................. 4.8-89 4.9 Hydrology and Water Quality ................................................................................... 4.9-1 4.9.1 Environmental Setting ...................................................................................... 4.9-1 4.9.1.1 Proposed Oil Project Site Topography and Drainage .............................. 4.9-1 4.9.1.2 Existing City Maintenance Yard Topography and Drainage..................... 4.9-1 4.9.1.3 Pipeline Route Topography and Drainage ............................................... 4.9-1 4.9.1.4 Surface Water and Hydrology ................................................................. 4.9-2 4.9.1.5 Groundwater ........................................................................................... 4.9-4 4.9.1.6 Water Quality .......................................................................................... 4.9-5 4.9.2 Regulatory Setting ........................................................................................... 4.9-5 4.9.2.1 Federal Regulations and Policies ............................................................ 4.9-5 4.9.2.2 State Policies and Regulations ................................................................ 4.9-6 4.9.2.3 Local Policies and Regulations................................................................ 4.9-8 4.9.3 Significance Criteria ....................................................................................... 4.9-10 4.9.4 Project Impacts and Mitigation Measures ....................................................... 4.9-10 4.9.4.1 Introduction ........................................................................................... 4.9-10 Draft Environmental Impact Report v E&B Oil Drilling & Production Project
  • 7. Table of Contents 4.9.4.2 Proposed Project Design Features ........................................................ 4.9-11 4.9.4.3 Applicant Prepared Studies ................................................................... 4.9-11 4.9.4.4 Impacts ................................................................................................. 4.9-11 4.9.5 Other Issue Area Mitigation Measure Impacts................................................ 4.9-19 4.9.6 Cumulative Impacts and Mitigation Measures ................................................ 4.9-19 4.9.7 Mitigation Monitoring Plan .............................................................................. 4.9-20 4.10 Land Use/Recreation/Policy Consistency Analysis .............................................. 4.10-1 4.10.1 Environmental Setting .................................................................................... 4.10-1 4.10.1.1 Land Use............................................................................................... 4.10-1 4.10.1.2 Recreation............................................................................................. 4.10-5 4.10.2 Regulatory Setting ......................................................................................... 4.10-6 4.10.2.1 Federal.................................................................................................. 4.10-6 4.10.2.2 State ..................................................................................................... 4.10-6 4.10.2.3 Local ..................................................................................................... 4.10-8 4.10.3 Significance Criteria ..................................................................................... 4.10-12 4.10.4 Impact Analysis and Mitigation Measures .................................................... 4.10-12 4.10.4.1 Land Use............................................................................................. 4.10-12 4.10.4.2 Recreation........................................................................................... 4.10-21 4.10.5 Other Issue Area Mitigation Measure Impacts.............................................. 4.10-22 4.10.6 Cumulative Impacts ..................................................................................... 4.10-23 4.10.7 Land Use Policy Consistency Analysis......................................................... 4.10-23 4.10.7.1 Hermosa Beach General Plan ............................................................. 4.10-23 4.10.7.2 City of Hermosa Beach Municipal Code .............................................. 4.10-34 4.10.7.3 City of Hermosa Beach Local Coastal Plan ......................................... 4.10-35 4.10.7.4 Coastal Act.......................................................................................... 4.10-38 4.10.7.5 Redondo Beach .................................................................................. 4.10-40 4.10.7.6 Torrance ............................................................................................. 4.10-41 4.10.8 Mitigation Monitoring Plan ............................................................................ 4.10-41 4.11 Noise and Vibration................................................................................................. 4.11-1 4.11.1 Environmental Setting .................................................................................... 4.11-1 4.11.1.1 Characteristics of Noise ........................................................................ 4.11-1 4.11.1.2 Characteristics of Vibration ................................................................... 4.11-5 4.11.1.3 Project Area - Existing Noise and Vibration Environment ...................... 4.11-7 4.11.2 Regulatory Setting ....................................................................................... 4.11-17 4.11.2.1 City of Hermosa Beach Noise Standards ............................................ 4.11-17 4.11.2.2 City of Redondo Beach Noise Standards ............................................ 4.11-22 4.11.2.3 City of Torrance Noise Standards ....................................................... 4.11-25 4.11.3 Significance Criteria ..................................................................................... 4.11-28 4.11.3.1 Oil Production Site .............................................................................. 4.11-29 4.11.3.2 Pipeline Construction and Trucking Routes ......................................... 4.11-29 4.11.3.3 Relocated City Yard ............................................................................ 4.11-30 4.11.3.4 Significance Criteria Rationale ............................................................ 4.11-30 4.11.4 Project Impacts and Mitigation Measures ..................................................... 4.11-32 4.11.4.1 Proposed Oil Project Noise Impacts & Mitigation................................. 4.11-32 4.11.4.2 Traffic Noise Analysis .......................................................................... 4.11-90 4.11.4.3 Vibration Impact Analysis .................................................................... 4.11-94 4.11.4.4 Relocation of the City Yard .................................................................. 4.11-95 4.11.4.5 Temporary City Maintenance Yard .................................................... 4.11-118 4.11.4.6 Proposed City Maintenance Yard Parking Options ............................ 4.11-126 E&B Oil Drilling & Production Project vi Draft Environmental Impact Report
  • 8. Table of Contents 4.11.5 Other Issue Area Mitigation Measure Impacts............................................ 4.11-126 4.11.6 Cumulative Impacts and Mitigation Measures ............................................ 4.11-126 4.11.7 Mitigation Monitoring Plan .......................................................................... 4.11-127 4.12 Public Services and Utilities ................................................................................... 4.12-1 4.12.1 Environmental Setting .................................................................................... 4.12-1 4.12.2 Regulatory Setting ......................................................................................... 4.12-3 4.12.3 Significance Criteria ....................................................................................... 4.12-4 4.12.4 Project Impacts and Mitigation Measures ....................................................... 4.12-5 4.12.5 Cumulative Impacts ....................................................................................... 4.12-6 4.13 Transportation and Traffic ...................................................................................... 4.13-1 4.13.1 Summary of Project-Specific Traffic Studies .................................................. 4.13-1 4.13.2 Study Area ..................................................................................................... 4.13-1 4.13.3 Environmental Setting .................................................................................... 4.13-4 4.13.3.1 Roadway Network ................................................................................. 4.13-4 4.13.3.2 Existing Levels of Service ................................................................... 4.13-11 4.13.4 Regulatory Setting ....................................................................................... 4.13-24 4.13.4.1 State ................................................................................................... 4.13-24 4.13.4.2 Regional/Local .................................................................................... 4.13-24 4.13.5 Significance Criteria ..................................................................................... 4.13-30 4.13.5.1 City of Hermosa Beach ....................................................................... 4.13-30 4.13.5.2 City of Redondo Beach ....................................................................... 4.13-30 4.13.5.3 City of Torrance................................................................................... 4.13-30 4.13.5.4 Caltrans and Los Angeles County Congestion Management Program 4.13-30 4.13.5.5 Roadway/Freeway Segments.............................................................. 4.13-31 4.13.6 Proposed Oil Project Impacts and Mitigation Measures ............................... 4.13-31 4.13.6.1 Design Features, Operational Practices, & Conditions of Approval ..... 4.13-31 4.13.6.2 Project Trip Generation ....................................................................... 4.13-36 4.13.6.3 Project Parking .................................................................................... 4.13-40 4.13.6.4 Project Traffic Conditions Roadways ................................................... 4.13-40 4.13.6.5 Project Traffic Conditions Intersections ............................................... 4.13-40 4.13.6.6 Proposed Oil Project Impacts .............................................................. 4.13-41 4.13.7 Proposed City Maintenance Yard Project ..................................................... 4.13-49 4.13.8 Impacts of Other Issue Area Mitigation Measures ........................................ 4.13-52 4.13.9 Cumulative Impacts and Mitigation Measures .............................................. 4.13-52 4.13.10 Mitigation Monitoring Plan ......................................................................... 4.13-108 4.14 Water Resources ..................................................................................................... 4.14-1 4.14.1 Environmental Setting .................................................................................... 4.14-1 4.14.1.1 Sanitary Sewer Wastewater .................................................................. 4.14-1 4.14.1.2 Water Supply ........................................................................................ 4.14-1 4.14.1.3 Surface Runoff ...................................................................................... 4.14-2 4.14.1.4 Groundwater ......................................................................................... 4.14-3 4.14.2 Regulatory Setting ......................................................................................... 4.14-3 4.14.2.1 Federal Regulations and Policies .......................................................... 4.14-3 4.14.2.2 State Policies and Regulations .............................................................. 4.14-4 4.14.2.3 Local Policies and Regulations.............................................................. 4.14-5 4.14.3 Significance Criteria ....................................................................................... 4.14-6 4.14.4 Project Impacts and Mitigation Measures ....................................................... 4.14-6 4.14.4.1 Introduction ........................................................................................... 4.14-6 Draft Environmental Impact Report vii E&B Oil Drilling & Production Project
  • 9. Table of Contents 4.14.4.2 Proposed Project Design Features ........................................................ 4.14-7 4.14.4.3 Impacts ................................................................................................. 4.14-8 4.14.5 Other Issue Area Mitigation Measure Impacts.............................................. 4.14-16 4.14.6 Cumulative Impacts and Mitigation Measures .............................................. 4.14-16 4.14.7 Mitigation Monitoring Plan ............................................................................ 4.14-17 4.15 Environmental Justice ............................................................................................ 4.15-1 4.15.1 Background.................................................................................................... 4.15-1 4.15.2 California State Lands Commission ............................................................... 4.15-2 4.15.3 Approach ....................................................................................................... 4.15-2 4.15.4 Environmental Setting .................................................................................... 4.15-3 4.15.5 Significance Criteria ....................................................................................... 4.15-4 4.15.6 Policy Impacts................................................................................................ 4.15-5 5.0 5.1 Alternatives Screening................................................................................................. 5-1 Description of Alternatives and Screening Analysis ................................................. 5-2 5.1.1 No Project Alternative ......................................................................................... 5-3 5.1.2 Alternative Drilling and Production Locations ...................................................... 5-4 5.1.2.1 Rosecrans Alternative Location .................................................................. 5-7 5.1.2.2 Exxon/Mobil Oil Torrance Refinery Alternative Location ............................. 5-9 5.1.2.3 AES Power Generating Station Alternative Location ................................ 5-11 5.1.2.4 Other Alternative Locations ...................................................................... 5-14 5.1.3 Alternative Facility Equipment or Production Arrangements .............................. 5-16 5.1.3.1 Reduced Equipment Alternative ............................................................... 5-16 5.1.3.2 Reduced Wells Alternative ....................................................................... 5-17 5.1.3.3 Reduced Timeframe Alternative ............................................................... 5-18 5.1.4 Alternative Transportation Arrangements .......................................................... 5-18 5.1.4.1 Use of Existing Pipelines .......................................................................... 5-19 5.1.4.2 Trucking of Crude Oil ............................................................................... 5-19 5.1.4.3 Greenbelt to the North Pipeline Route ...................................................... 5-20 5.1.4.4 Greenbelt to the South Pipeline Route ..................................................... 5-20 5.1.5 Alternative City Maintenance Yard Arrangements/Locations ............................. 5-21 5.1.5.1 Other Locations for the City Maintenance Yard Alternative ...................... 5-21 5.1.5.2 Alternative Locations for the Temporary Maintenance Yard ..................... 5-23 5.1.5.3 Split Location for the Maintenance Yard Alternative ................................. 5-23 5.1.5.4 Phase 1 Construction of Permanent Yard ................................................ 5-24 5.1.6 Project Objectives ............................................................................................. 5-24 5.1.6.1 No Project Alternative and Project Objectives .......................................... 5-24 5.1.6.2 AES Site Alternative and Project Objectives............................................. 5-25 5.1.6.3 Oil Development with Reduced Wells and Project Objectives .................. 5-25 5.1.6.4 Oil Development with Reduced Timeframe and Project Objectives .......... 5-25 5.1.6.5 Use of Existing Pipelines and Project Objectives...................................... 5-25 5.1.6.6 Phase 1 Permanent Yard Construction and Project Objectives ................ 5-26 6.0 Impacts and Comparison of Alternatives ................................................................... 6-1 6.1 Impacts of Alternatives ........................................................................................ 6-2 6.1.1 No Project Alternative ................................................................................ 6-2 6.1.2 AES Site Alternative ................................................................................... 6-3 6.1.3 Reduced Wells Alternative ....................................................................... 6-15 6.1.4 Existing Pipelines Alternative ................................................................... 6-23 6.1.5 Phase 1 City Maintenance Yard Construction .......................................... 6-27 E&B Oil Drilling & Production Project viii Draft Environmental Impact Report
  • 10. Table of Contents 6.2 Proposed Project Options and Scenarios .......................................................... 6-30 6.2.1 Valve Box Options.................................................................................... 6-30 6.2.2 Pipeline Scenarios ................................................................................... 6-30 6.2.3 City Maintenance Yard No Added Parking/Parking Option ....................... 6-30 6.2.4 Phase 2 Unsuccessful Scenario ............................................................... 6-31 6.3 Comparison of Proposed Project and Alternatives ............................................ 6-32 6.3.1 Environmentally Superior Alternative Analysis ......................................... 6-32 No Project Alternative Compared to the Proposed Project ................................ 6-34 AES Site Alternative Compared to Proposed Project ........................................ 6-34 Reduced Wells Alternative Compared to Proposed Project............................... 6-37 Reduced Timeframe Alternative Compared to Proposed Project ...................... 6-38 Existing Pipelines Alternative Compared to Proposed Project........................... 6-38 Phase 1 City Maintenance Yard Construction Compared to Proposed Project.. 6-39 6.3.2 Environmentally Superior Alternative........................................................ 6-39 7.0 Other CEQA-Mandated Sections ................................................................................. 7-1 7.1 Unavoidable Significant Adverse Effects ............................................................. 7-1 7.2 Growth Inducing Impacts .................................................................................... 7-2 7.2.1 Removal of an Impediment to Growth ........................................................ 7-2 7.2.2 Economic Growth ....................................................................................... 7-2 7.2.3 Precedent-Setting Action............................................................................ 7-3 7.2.4 Development of Open Space ..................................................................... 7-3 7.3 Known Areas of Controversy or Unresolved Issues ............................................ 7-3 8.0 Summary of Mitigation Measures and Mitigation Monitoring Plan ........................... 8-1 8.1 Mitigation Monitoring Program ............................................................................ 8-1 8.2 Monitoring Authority and Enforcement Responsibility ......................................... 8-1 8.3 Mitigation Compliance Responsibility .................................................................. 8-2 8.4 General Monitoring Procedures .......................................................................... 8-2 8.5 Mitigation Monitoring Table ................................................................................. 8-3 9.0 List of Preparers and Agencies/Individuals Consulted During EIR Preparation ..... 9-1 10.0 References .................................................................................................................. 10-1 Aesthetics and Visual Resources ................................................................................. 10-1 Air Quality and Greenhouse Gases .............................................................................. 10-1 Biological Resources .................................................................................................... 10-4 Cultural Resources ....................................................................................................... 10-6 Energy and Mineral Resources .................................................................................... 10-8 Fire Protection and Emergency Response ................................................................... 10-9 Geological Resources/Soils .......................................................................................... 10-9 Safety, Risk of Upset, and Hazards ............................................................................ 10-10 Hydrology and Water Quality ...................................................................................... 10-13 Land Use/Recreation/Policy Consistency Analysis ..................................................... 10-14 Noise and Vibration .................................................................................................... 10-14 Public Services and Utilities ....................................................................................... 10-15 Transportation and Traffic .......................................................................................... 10-15 Water Resources........................................................................................................ 10-16 Environmental Justice ................................................................................................ 10-17 Draft Environmental Impact Report ix E&B Oil Drilling & Production Project
  • 11. Table of Contents Appendices (on the CD) Appendix A- Project Description Design Data Appendix B - Air Emission Calculations Appendix C - Risk Assessment Calculations Appendix D - Traffic Impact Analysis Appendix E - Noise Impact Analysis Appendix F – Settlement Agreement and Other Entitlements Appendix G – Cultural Resources Technical Study Appendix H – Notice of Preparation, Scoping Document, Comments, and Responses Appendix I – Soil Engineering and Engineering Geology Investigation Appendix K – Public Notification List Appendix L – 1993 Conditional Use Permit (City Council Resolution No. 93-5632) Appendix M – Oil and Gas Lease No. 2 between the City and E&B Appendix N – Settlement Agreement and Release executed by the City Council on March 2, 2012. Appendix O – Aesthetics - Visual Simulations. Appendix P – Proposed Coastal Land Use Plan policies regulating oil and gas recovery. E&B Oil Drilling & Production Project x Draft Environmental Impact Report
  • 12. Table of Contents Tables Table 1.1 Project Planning Information ................................................................................... 1-2 Table 2.1Proposed Project Schedule Summary ...................................................................... 2-4 Table 2.2Proposed Oil Project Design Parameters ............................................................... 2-11 Table 2.3Phase 1 Project Schedule ...................................................................................... 2-19 Table 2.4Phase 1 Vehicle Trip Summary .............................................................................. 2-21 Table 2.5Phase 2 Drilling Chemicals ..................................................................................... 2-32 Table 2.6Phase 2 Testing Chemicals .................................................................................... 2-37 Table 2.7Phase 2 Project Schedule ...................................................................................... 2-39 Table 2.8Phase 2 Vehicle Trip Summary .............................................................................. 2-39 Table 2.9Phase 3 and 4 Processing Equipment Listing......................................................... 2-45 Table 2.10Phase 3 Project Schedule .................................................................................... 2-57 Table 2.11Phase 3 Vehicle Trip Summary ............................................................................ 2-58 Table 2.12Phase 4 Drilling Chemicals ................................................................................... 2-68 Table 2.13Phase 4 Project Schedule .................................................................................... 2-69 Table 2.14Phase 4 Vehicle Trip Summary ............................................................................ 2-70 Table 2.15Proposed Oil Project Parking Requirements......................................................... 2-71 Table 2.15E&B Oil Development Project Permits/Approvals ................................................. 2-83 Table 2.16Relocation of City Maintenance Yard Project Permits/Approvals .......................... 2-85 Table 4.2-1Historical Meteorological Data ............................................................................ 4.2-2 Table 4.2-2State and National Ambient Air Quality Standards ............................................. 4.2-5 Table 4.2-3SCAQMD Air Quality Data for Southwest Coastal LA County Sub-Region (Project Area) ..................................................................................................................... 4.2-7 Table 4.2-4Global Warming Potential of Various Gases..................................................... 4.2-14 Table 4.2-5Electricity Generation Resource Mix and Greenhouse Gas Emissions ............. 4.2-15 Table 4.2-6SCAQMD Air Quality Significance Thresholds ................................................. 4.2-32 Table 4.2-7Construction Criteria Emissions ....................................................................... 4.2-36 Table 4.2-8Construction Criteria Emissions: Mitigated ....................................................... 4.2-39 Table 4.2-9Operational Criteria Emissions ......................................................................... 4.2-44 Table 4.2-10Operational Criteria Emissions: Mitigated ....................................................... 4.2-46 Table 4.2-11Localized Modeling Results for Combustion Source Particulate Matter .......... 4.2-48 Table 4.2-12Localized Modeling Results for Combustion Source Particulate Matter: Mitigated .... ................................................................................................................... 4.2-49 Table 4.2-13GHG Emissions.............................................................................................. 4.2-58 Table 4.2-14Phase 4 Equipment Toxic Air Contaminants .................................................. 4.2-60 Table 4.2-15Health Risk Assessment Results: Unmitigated ............................................... 4.2-61 Table 4.2-16Health Risk Assessment Results: Mitigated ................................................... 4.2-62 Table 4.3-1 Endangered, Threatened, and Special Status Species in Project Area ............. 4.3-8 Table 4.4-1Mitigation Measures ......................................................................................... 4.4-24 Table 4.5-1California Energy Sources and Annual Consumption ......................................... 4.5-1 Table 4.5-2Energy Consumption in California by Sector and by Form ................................. 4.5-3 Table 4.6-1Fire Stations Available to Respond to an Emergency at the Project Site ............ 4.6-2 Draft Environmental Impact Report xi E&B Oil Drilling & Production Project
  • 13. Table of Contents Table 4.6-2Applicable Codes, Standards, and Guidelines .................................................... 4.6-5 Table 4.6-3 Applicable IRI, CCPS, NFPA, and API Equipment Spacing Requirements ...... 4.6-11 Table 4.7-1General Stratigraphic Section for Hermosa Beach Oil field Area ........................ 4.7-3 Table 4.8-1Frequencies for Common Events ....................................................................... 4.8-8 Table 4.8-2Frequencies for Fatality Events ........................................................................ 4.8-11 Table 4.8-3DOT National Gas Transmission Pipelines Incident Causes ............................ 4.8-12 Table 4.8-4Thermal Radiation Serious Injury and Impacts ................................................. 4.8-22 Table 4.8-5Overpressure Damage ..................................................................................... 4.8-23 Table 4.8-6Toxicological Effects of H2S ............................................................................. 4.8-25 Table 4.8-7Fatality and Serious Injury Rates ...................................................................... 4.8-27 Table 4.8-8Event Tree Probabilities ................................................................................... 4.8-30 Table 4.8-9Regulatory Oversight Responsibilities .............................................................. 4.8-54 Table 4.8-10Facility Release Scenarios ............................................................................. 4.8-63 Table 4.8-11Blowout and Loss of Well Control Frequencies .............................................. 4.8-67 Table 4.8-12Scenario Failure Rates ................................................................................... 4.8-68 Table 4.8-13Population Information ................................................................................... 4.8-73 Table 4.8-14Potential Proposed Oil Project Pipeline Spill Volumes .................................... 4.8-83 Table 4.10-1Proposed Project General Land Use Plan Conflicts ..................................... 4.10-13 Table 4.10-2Proposed City Maintenance Yard General Land Use Plan Conflicts ............. 4.10-18 Table 4.11-1Common Environmental Noise Levels ............................................................ 4.11-2 Table 4.11-2Noise Control Metrics ..................................................................................... 4.11-5 Table 4.11-3Typical Levels of Ground-Borne Vibration ...................................................... 4.11-6 Table 4.11-4Summary of Existing Ambient Leq Noise Levels Around the Project Site ....... 4.11-9 Table 4.11-5Summary of Existing Ambient L50 Noise Levels Around the Project Site ..... 4.11-10 Table 4.11-6Existing Ambient Noise Levels Around the Project Site - Additional Statistics .......... ................................................................................................................. 4.11-10 Table 4.11-7Comparison of Noise Monitoring Results from the Truck and Pipeline Routes ......... ................................................................................................................. 4.11-11 Table 4.11-8Truck and Pipeline Route Ambient Noise Measurement Summary* ............. 4.11-14 Table 4.11-9Summary of Existing Ambient Noise Levels around the City Yard Relocation Site ... ................................................................................................................. 4.11-16 Table 4.11-10Recalculated Daytime Ambient Noise Levels around the City Yard Relocation Site ................................................................................................................. 4.11-16 Table 4.11-11Baseline Vibration Levels (2013) ................................................................ 4.11-17 Table 4.11-12Baseline Vibration Levels (2012) ................................................................ 4.11-17 Table 4.11-13Phase 1 Noise Models - Equipment Usage and Noise Level Data.............. 4.11-34 Table 4.11-14Phase 1 - Predicted Demolition Noise Impact............................................. 4.11-36 Table 4.11-15Phase 1 - Predicted Construction Noise Impact ......................................... 4.11-36 Table 4.11-16Phase 1 - Predicted Demolition Noise Impact with Additional Mitigation ..... 4.11-42 Table 4.11-17Phase 1 - Predicted Construction Noise Impact with Additional Mitigation.. 4.11-42 Table 4.11-18Phase 2 Noise Models - Equipment Usage and Noise Level Data.............. 4.11-48 Table 4.11-19Phase 2 - Predicted Drilling & Test Production Noise Impact ..................... 4.11-52 Table 4.11-20Phase 2 - Compliance with the Hermosa Beach Oil Code .......................... 4.11-52 Table 4.11-21Phase 2 - Predicted Test Production (Only) Noise Impact .......................... 4.11-53 Table 4.11-22Phase 2 - Predicted Drilling & Test Production Noise Impact with Mitigation .......... ................................................................................................................. 4.11-56 E&B Oil Drilling & Production Project xii Draft Environmental Impact Report
  • 14. Table of Contents Table 4.11-23Phase 2 - Compliance with the Hermosa Beach Oil Code (with Mitigation) ............ ................................................................................................................. 4.11-57 Table 4.11-24Phase 3 Site Construction Noise Model - Equipment Usage and Noise Level Data ................................................................................................................. 4.11-61 Table 4.11-25Phase 3 - Predicted Site Construction Noise Impact .................................. 4.11-61 Table 4.11-26Phase 3 - Predicted Site Construction Noise Impact with Additional Mitigation....... ................................................................................................................. 4.11-64 Table 4.11-27Phase 3 Pipeline Construction Noise Models Equipment Usage and Noise Level Data ................................................................................................................. 4.11-68 Table 4.11-28Phase 3 - Predicted Pipeline Construction Noise Impact ............................ 4.11-76 Table 4.11-29Phase 4 Noise Model - Equipment Usage and Noise Level Data ............... 4.11-78 Table 4.11-30Phase 4 - Predicted Drilling + Production Noise Impact ............................. 4.11-79 Table 4.11-31Phase 4 - Compliance with the Hermosa Beach Oil Code .......................... 4.11-79 Table 4.11-32Phase 4 - Predicted Drilling + Production Noise Impact with Mitigation ...... 4.11-85 Table 4.11-33Phase 4 - Compliance with the Hermosa Beach Oil Code (with Mitigation) 4.11-85 Table 4.11-34Phase 4 - Predicted Production (only) Noise Impact................................... 4.11-86 Table 4.11-35Phase 4 - Predicted Production (only) Noise Impact with mitigation ........... 4.11-89 Table 4.11-36Calculated Traffic CNEL Noise Level Increases on Valley Drive ................ 4.11-93 Table 4.11-37Demolition & Construction Equipment Ground Vibration Levels ................. 4.11-94 Table 4.11-38City Maintenance Yard Relocation Demolition & Construction Equipment Usage and Noise Level Data ....................................................................................................... 4.11-97 Table 4.11-39Relocated City Yard - Predicted Demolition Noise Impact .........................4.11-102 Table 4.11-40Relocated City Yard - Predicted Construction Noise Impact ......................4.11-103 Table 4.11-41Relocated City Yard - Predicted Demolition Noise Impact with Mitigation ..4.11-105 Table 4.11-42Relocated City Yard - Predicted Construction Noise Impact With Additional Noise Mitigation ................................................................................................................4.11-110 Table 4.11-43Relocated City Yard - Predicted Operational Noise Impact........................4.11-111 Table 4.11-44Relocated City Yard - Predicted Operational Noise Impact with Mitigation ............. ................................................................................................................4.11-112 Table 4.11-45Temporary City Yard - Predicted Operational Noise Impact ......................4.11-119 Table 4.11-46Temporary City Yard - Predicted Operational Noise Impact with Mitigation ............ ................................................................................................................4.11-120 Table 4.14-1Level of Service Definitions Signalized and Unsignalized Intersections ........ 4.14-11 Table 4.14-3Level of Service Descriptions ....................................................................... 4.14-13 Table 4.14-4Existing Intersection Level of Service Summary (ICU – Signalized Intersections) .... ................................................................................................................. 4.14-15 Table 4.14-5Existing Intersection Level of Service Summary (HCM – Caltrans and Torrance Intersection) ................................................................................................................. 4.14-18 Table 4.14-6Existing Roadway/Freeway Segment Level of Service Summary ................. 4.14-20 Table 4.14-7Proposed Oil Project Trip Generation Estimates .......................................... 4.14-38 Table 4.13-8City Maintenance Yard Relocation with Proposed Oil Project – Intersection LOS Comparison ................................................................................................................. 4.14-49 Table 4.13-9Year 2015 plus Phase 1 Intersection Level of Service Summary (ICU - Signalized Intersections) ................................................................................................................. 4.14-63 Table 4.13-10Year 2015 plus Phase 1 Intersection Level of Service Summary (HCM – Caltrans and Torrance Intersections .............................................................................................. 4.14-67 Table 4.13-11Year 2015 plus Phase 2 Intersection Level of Service Summary (ICU – Signalized Intersections) ................................................................................................................. 4.14-69 Table 4.13-12Year 2015 plus Phase 2 Intersection Level of Service Summary (HCM – Caltrans and Torrance Intersections .............................................................................................. 4.14-73 Draft Environmental Impact Report xiii E&B Oil Drilling & Production Project
  • 15. Table of Contents Table 4.13-13Year 2016 plus Phase 3 Intersection Level of Service Summary (ICU – Signalized Intersections) ................................................................................................................. 4.14-75 Table 4.13-14Year 2016 plus Phase 3 Intersection Level of Service Summary (Caltrans and Torrance Intersections) .................................................................................................... 4.14-79 Table 4.13-15Year 2018 plus Phase 4 Intersection Level of Service Summary (ICU – Signalized Intersection) ................................................................................................................. 4.14-81 Table 4.13-16Year 2018 plus Phase 4 Intersection Level of Service Summary (HCM – Caltrans and Torrance Intersections) ............................................................................................. 4.14-85 Table 4.13-17Build out Year 2035 plus Phase 4 Intersection Level of Service Summary (ICU – Signalized Intersections) .................................................................................................. 4.14-87 Table 4.13-18Build out Year 2035 plus Phase 4 Intersection Level of Service Summary (HCM – Caltrans and Torrance Intersections) ............................................................................... 4.14-91 Table 4.13-19Phase 1 Roadway Segment Analysis ......................................................... 4.14-93 Table 4.13-20Phase 2 Roadway Segment Analysis ......................................................... 4.14-98 Table 4.13-21Phase 3 Roadway Segment Analysis ........................................................4.14-103 Table 4.13-22Phase 4 Roadway Segment Analysis ........................................................4.14-108 Table 4.13-23Operations Roadway Segment Analysis....................................................4.14-113 Table 5.1Summary Results of the Alternatives Screening Analysis ......................................... 5-3 Table 6.1 Proposed Project Options - Impact Comparison .............................................. 6-31 Table 6.2 Proposed Project - Significant Unavoidable Impacts Summary ........................ 6-34 Table 6.3 Proposed Project Versus Alternatives - Significant Unavoidable Impacts Only 6-36 Table 6.4 Proposed Project Versus Project Component Alternatives - Significant Unavoidable Impacts Only .................................................................................................... 6-37 Table 8-1 Table 8-2 Table 8-3 Table 8-4 Table 8-5 Table 8-6 Table 8-7 Table 8-8 Table 8-9 Table 8-10 Table 8-11 Aesthetics and Visual Resources ....................................................................... 8-4 Air Quality and GHG’s...................................................................................... 8-10 Biological Resources ....................................................................................... 8-16 Cultural Resources .......................................................................................... 8-18 Fire Protection and Emergency Response ....................................................... 8-21 Geological Resources/Soils ............................................................................. 8-24 Safety, Risk of Upset and Hazards .................................................................. 8-29 Hydrology and Water Quality ........................................................................... 8-31 Noise and Vibration ......................................................................................... 8-33 Transportation and Circulation ......................................................................... 8-39 Water Resources ............................................................................................. 8-41 E&B Oil Drilling & Production Project xiv Draft Environmental Impact Report
  • 16. Table of Contents List of Figures Figure 2.1Proposed Project Location ...................................................................................... 2-3 Figure 2.2Historical Wells Drilled in the Los Angeles Basin ..................................................... 2-6 Figure 2.3Existing Site Conditions........................................................................................... 2-8 Figure 2.4Project Site and Area Land Uses (Zoning Map) ...................................................... 2-9 Figure 2.5Project Site and Pipeline/Electrical Connections ................................................... 2-12 Figure 2.6Proposed Oil Project Phase 1 Conceptual Site Plan ............................................. 2-15 Figure 2.7Proposed Oil Project Lease Areas ........................................................................ 2-24 Figure 2.8Applicant Proposed Oil Project Lease Areas Cross Section .................................. 2-26 Figure 2.9Proposed Conceptual Site Plan - Project Phase 2................................................. 2-27 Figure 2.10Typical Well Bore and Casing ............................................................................. 2-30 Figure 2.12Phase 2 Process Flow Diagram .......................................................................... 2-34 Figure 2.12Truck Routes from Highway 405 to Project Site .................................................. 2-35 Figure 2.13Truck Routes to Highway 405 from the Project Site ............................................ 2-35 Figure 2.14Phase 3 Proposed Conceptual Site Plan ............................................................. 2-43 Figure 2.15Proposed Pipeline Routes ................................................................................... 2-49 Figure 2.16Typical Pipeline Construction Spread .................................................................. 2-52 Figure 2.18Phase 4 Process Flow Diagram .......................................................................... 2-60 Figure 2.17Phase 4 Site Plan with Drilling Rig ...................................................................... 2-63 Figure 2-18Cypress Parking Area ........................................................................................ 2-74 Figure 2.19Estimated Production Levels ............................................................................... 2-75 Figure 2.20City Yard Relocation Conceptual Site Plan: Temporary Location ........................ 2-78 Figure 2.21City Yard Relocation Conceptual Site Plan: Permanent Facility Parking Option .. 2-79 Figure 2.22City Yard Relocation Conceptual Site Plan: Permanent Facility No Added Parking Option ...................................................................................................................... 2-80 Figure 4.1-1Viewshed Analysis- Electric Drill Rig (Areas where the Drill Rig Can Be Seen) 4.1-30 Figure 4.1-2Viewshed Analysis- Workover Rig (Areas where the Rig Can Be Seen) ......... 4.1-31 Figure 4.1-3View Location Map .......................................................................................... 4.1-37 Figure 4.1-4aKOP 1: Proposed City Maintenance Yard Permanent Facility: Parking Option ...... ................................................................................................................... 4.1-38 Figure 4.1-4bKOP 1: Proposed City Maintenance Yard Permanent Facility: No Parking Option . ................................................................................................................... 4.1-39 Figure 4.1-5aKOP 2: Proposed City Maintenance Yard Permanent Facility: Parking Option ........ ................................................................................................................... 4.1-40 Figure 4.1-5bKOP 2: Proposed City Maintenance Yard Permanent Facility: No Parking Option .. ................................................................................................................... 4.1-41 Figure 4.1-6aKOP 3: Proposed City Maintenance Yard Permanent Facility: Parking Option ........ ................................................................................................................... 4.1-42 Figure 4.1-6bKOP 3: Proposed City Maintenance Yard Permanent Facility: No Parking Option .. ................................................................................................................... 4.1-43 Figure 4.1-7aKOP 4: Proposed City Maintenance Yard Permanent Facility: Parking Option ........ ................................................................................................................... 4.1-44 Figure 4.1-7bKOP 4: Proposed City Maintenance Yard Permanent Facility: No Parking Option .. ................................................................................................................... 4.1-45 Figure 4.1-8aKOP 5: Proposed City Maintenance Yard Permanent Facility: Parking Option ........ ................................................................................................................... 4.1-46 Figure 4.1-8bKOP 5: Proposed City Maintenance Yard Permanent Facility: No Parking Option .. ................................................................................................................... 4.1-47 Draft Environmental Impact Report xv E&B Oil Drilling & Production Project
  • 17. Table of Contents Figure 4.1-9KOP 6: During Phase 2 and Phase 4 with Drill Rig ......................................... 4.1-48 Figure 4.1-10KOP 7: During Phase 2 and 4 with Drill Rig .................................................. 4.1-49 Figure 4.1-11KOP 10: During Phase 2 and 4 with Drill Rig ................................................ 4.1-50 Figure 4.1-12KOP 10: Phase 4 with Workover Rig During Maintenance at Well 34 ........... 4.1-51 Figure 4.1-13KOP 11: During Phase 2 or 4 with Drill Rig ................................................... 4.1-52 Figure 4.1-14KOP 11: Phase 4 with Workover Rig During Maintenance at Well 34 ........... 4.1-53 Figure 4.1-15KOP 11: Phase 4 During Ongoing Operations .............................................. 4.1-54 Figure 4.1-16KOP 12: During Phase 2 or 4 with Drill Rig ................................................... 4.1-55 Figure 4.1-17KOP 12: Phase 4 with Workover Rig During Maintenance at Well 2 ............. 4.1-56 Figure 4.1-18KOP 13: Completion of Phase 1 Improvements ............................................ 4.1-57 Figure 4.1-19KOP 13: During Phase 2 or 4 with Drill Rig ................................................... 4.1-58 Figure 4.1-20KOP 13: Phase 4 with Workover Rig During Maintenance at Well 2 ............ 4.1-59 Figure 4.1-21KOP 13: Phase 4 During Ongoing Operations .............................................. 4.1-60 Figure 4.1-22aKOP 14: During Phase 2 with Drill Rig at Well 1.......................................... 4.1-61 Figure 4.1-22bKOP 14: During Phase 2 with Drill Rig at Well 1 WIDE ANGLE................... 4.1-62 Figure 4.1-23aKOP 14: Phase 4 with Drill Rig Onsite at Well 3 .......................................... 4.1-63 Figure 4.1-23bKOP 14: Phase 4 with Drill Rig Onsite at Well 3 WIDE ANGLE ................... 4.1-64 Figure 4.1-24aKOP 14: Phase 4 with Workover Rig during Maintenance at Well 3 ............ 4.1-65 Figure 4.1-24b .... KOP 14: Phase 4 with Workover Rig during Maintenance at Well 3 WIDE ANGLE ................................................................................................................... 4.1-66 Figure 4.1-25KOP 14: Phase 4 During Ongoing Operations .............................................. 4.1-67 Figure 4.1-26KOP 15: During Phase 2 with Drill Rig at Well 4............................................ 4.1-68 Figure 4.1-27KOP 15: Phase 4 with Drill Rig Onsite at Well 17 ......................................... 4.1-69 Figure 4.1-28KOP 15: Phase 4 with Workover Rig during Maintenance at Well 17 ............ 4.1-70 Figure 4.1-29KOP 15: Phase 4 During Ongoing Operations .............................................. 4.1-71 Figure 4.1-30KOP 17: Phase 4 with Drill Rig Onsite at Well 17 .......................................... 4.1-72 Figure 4.1-31KOP 17: Phase 4 with Workover Rig during Maintenance at Well 17 ............ 4.1-73 Figure 4.1-32KOP 17: Phase 4 During Ongoing Operations .............................................. 4.1-74 Figure 4.1-33KOP 18: During Phase 2 with Drill Rig at Well 4............................................ 4.1-75 Figure 4.1-34KOP 18: Phase 4 with Drill Rig Onsite at Well 18 .......................................... 4.1-76 Figure 4.1-35KOP 18: Phase 4 with Workover Rig during Maintenance at Well 18 ............ 4.1-77 Figure 4.1-36KOP 18: Phase 4 During Ongoing Operations .............................................. 4.1-78 Figure 4.1-37KOP 19: During Phase 2 with Drill Rig at Well 2 (rig not visible) .................... 4.1-79 Figure 4.1-38aKOP 19: Phase 4 with Drill Rig Onsite at Well 34 ........................................ 4.1-80 Figure 4.1-38bKOP 19: Phase 4 with Drill Rig Onsite at Well 34 WIDE ANGLE ................. 4.1-81 Figure 4.1-39KOP 19: Phase 4 with Workover Rig during Maintenance at Well 34 ............ 4.1-82 Figure 4.1-39KOP 19: Phase 4 with Workover Rig during Maintenance at Well 34: WIDE ANGLE ................................................................................................................... 4.1-83 Figure 4.1-41aKOP 20: During Phase 2 or 4 with Drill Rig ................................................. 4.1-85 Figure 4.1-41bKOP 20: During Phase 2 or 4 with Drill Rig: WIDE ANGLE ......................... 4.1-86 Figure 4.1-42aKOP 20: Phase 4 with Workover Rig during Maintenance at Well 2 ............ 4.1-87 Figure 4.1-42bKOP 20: Phase 4 with Workover Rig during Maintenance at Well 2: WIDE ANGLE ................................................................................................................... 4.1-88 Figure 4.1-43KOP 20: Phase 4 During Ongoing Operations .............................................. 4.1-89 Figure 4.2-1Wind Rose for King Harbor Meteorological Station ........................................... 4.2-3 Figure 4.2-2PM2.5 Annual Compliance Status - 2011 .......................................................... 4.2-10 Figure 4.2-3Ozone Annual Compliance Status - 2011........................................................ 4.2-11 Figure 4.2-4California GHG Emissions 2000-2011............................................................. 4.2-17 Figure 4.2-5Acute Impacts Health Index ............................................................................ 4.2-63 Figure 4.2-6Chronic Impacts Health Impacts ..................................................................... 4.2-64 E&B Oil Drilling & Production Project xvi Draft Environmental Impact Report
  • 18. Table of Contents Figure 4.2-7Cancer Impacts Cancer Cases: Unmitigated ................................................... 4.2-65 Figure 4.2-8Cancer Impacts Cancer Cases: Mitigated ....................................................... 4.2-66 Figure 4.7-1Regional Fault Map ........................................................................................... 4.7-2 Figure 4.7-2Liquefaction and Landslides Map ...................................................................... 4.7-8 Figure 4.8-1Steps Involved in Developing a Quantitative Risk Assessment ......................... 4.8-5 Figure 4.8-2Existing Maintenance Facility Risk Profiles: Fatalities and Injuries .................. 4.8-34 Figure 4.8-3Storm Drain System in the Facility Vicinity ...................................................... 4.8-37 Figure 4.8-4Storm Drain System Pictures .......................................................................... 4.8-38 Figure 4.8-5Consequence Analysis Results: Fatality and Serious Injury ............................ 4.8-70 Figure 4.8-6Areas That Could Be Potentially Exposed ....................................................... 4.8-71 Figure 4.8-7Risk Profiles for the Fixed Facility and Gas Pipeline: Fatalities ....................... 4.8-75 Figure 4.8-8Risk Profiles for the Fixed Facility and Pipeline: Injuries.................................. 4.8-76 Figure 4.8-9Pipeline Profile ................................................................................................ 4.8-82 Figure 4.9-1Flood Insurance Rate Map (FIRM) for the Proposed Project Area..................... 4.9-3 Figure 4.9-2Location of Barrier Injection Wells in the Proposed Project Area ....................... 4.9-4 Figure 4.10-1Proposed Project Location ............................................................................ 4.10-4 Figure 4.10-2Project Site and Area Land Uses ................................................................ 4.10-11 Figure 4.11-1Noise Monitoring Locations around the Project Site ...................................... 4.11-8 Figure 4.11-2Typical Noise Monitor Installation .................................................................. 4.11-9 Figure 4.11-4Noise Monitoring Locations along the Truck and Pipe Routes (2012 Study) 4.11-12 Figure 4.11-5Noise Monitoring Locations along the Truck and Pipe Routes (2012 Study) 4.11-12 Figure 4.11-6Noise Monitoring Locations along the Truck and Pipe Routes (2012 Study) 4.11-13 Figure 4.11-7Noise Monitoring Locations along the Truck and Pipe Routes (2012 Study) 4.11-13 Figure 4.11-8Noise Monitoring Locations around the City Yard Relocation Site ............... 4.11-15 Figure 4.11-9Phase 1 - Predicted Daily Leq Noise Contours during DEMOLITION for a Receiver Height of 5-ft ................................................................................................................. 4.11-37 Figure 4.11-10Phase 1 - Predicted Daily Leq Noise Contours during CONSTRUCTION for a Receiver Height of 5-ft ..................................................................................................... 4.11-38 Figure 4.11-11Phase 1 - Predicted Daily Leq Noise Contours during DEMOLITION for a Receiver Height of 20-ft ................................................................................................... 4.11-39 Figure 4.11-12Phase 1 - Predicted Daily Leq Noise Contours during CONSTRUCTION for Receiver Height of 20-ft ................................................................................................... 4.11-40 Figure 4.11-13Phase 1 - Predicted Daily Leq Noise Contours during DEMOLITION with Mitigation for a Receiver Height of 5-ft ............................................................................. 4.11-42 Figure 4.11-14Phase 1 - Predicted Daily Leq Noise Contours during CONSTRUCTION with Mitigation for a Receiver Height of 5-ft ............................................................................. 4.11-43 Figure 4.11-15Phase 1 - Predicted Daily Leq Noise Contours during DEMOLITION with Mitigation for a Receiver Height of 20-ft ........................................................................... 4.11-44 Figure 4.11-16Phase 1 - Predicted Daily Leq Noise Contours during CONSTRUCTION with Mitigation for a Receiver Height of 20-ft ........................................................................... 4.11-45 Figure 4.11-17Phase 2 - Leq Noise Contours during DRILLING & TEST PRODUCTION for a Receiver Height of 5-ft ..................................................................................................... 4.11-49 Figure 4.11-18Phase 2 - Leq Noise Contours during DRILLING & TEST PRODUCTION for a Receiver Height of 20-ft ................................................................................................... 4.11-50 Figure 4.11-19Phase 2 - Leq Noise Contours during TEST PRODUCTION (ONLY) for a Receiver Height of 5-ft ..................................................................................................... 4.11-53 Draft Environmental Impact Report xvii E&B Oil Drilling & Production Project
  • 19. Table of Contents Figure 4.11-20Phase 2 - Leq Noise Contours during TEST PRODUCTION (ONLY) for a Receiver Height of 20-ft ................................................................................................... 4.11-54 Figure 4.11-21Phase 2 - Leq Noise Contours during DRILLING & TEST PRODUCTION with Mitigation for a Receiver Height of 5-ft ............................................................................. 4.11-57 Figure 4.11-22Phase 2 - Leq Noise Contours during DRILLING & TEST PRODUCTION with Mitigation for a Receiver Height of 20-ft ........................................................................... 4.11-58 Figure 4.11-23Phase 3 - Leq Noise Contours during SITE CONSTRUCTION for a Receiver Height of 5-ft ................................................................................................................. 4.11-61 Figure 4.11-24Phase 3 - Leq Noise Contours during SITE CONSTRUCTION for a Receiver Height of 20-ft ................................................................................................................. 4.11-62 Figure 4.11-25Phase 3 - Leq Noise Contours during SITE CONSTRUCTION with Mitigation for a Receiver Height of 5-ft .................................................................................................. 4.11-66 Figure 4.11-26Phase 3 - Leq Noise Contours during SITE CONSTRUCTION with Mitigation for a Receiver Height of 20-ft ................................................................................................ 4.11-67 Figure 4.11-27Phase 3 - Leq Noise Contours during Pipeline Construction Valley Drive Scenario, Receiver Height of 5-feet.................................................................................. 4.11-70 Figure 4.11-28Phase 3 - Leq Noise Contours during Pipeline Construction Valley Drive Scenario, Receiver Height of 20-feet................................................................................ 4.11-70 Figure 4.11-29Phase 3 - Leq Noise Contours during Pipeline Construction Anita Street Westbound Scenario, Receiver Height of 5-feet ............................................................... 4.11-71 Figure 4.11-30Phase 3 - Leq Noise Contours during Pipeline Construction Anita Street Westbound Scenario, Receiver Height of 20-feet ............................................................. 4.11-71 Figure 4.11-31Phase 3 - Leq Noise Contours during Pipeline Construction Anita Street Eastbound Scenario, Receiver Height of 5-feet ................................................................ 4.11-72 Figure 4.11-32Phase 3 - Leq Noise Contours during Pipeline Construction Anita Street Eastbound Scenario, Receiver Height of 20-feet .............................................................. 4.11-72 Figure 4.11-33Phase 3 - Leq Noise Contours during Pipeline Construction Redondo Beach Edison Corridor Scenario, Receiver Height of 5-feet ........................................................ 4.11-73 Figure 4.11-34Phase 3 - Leq Noise Contours during Pipeline Construction Redondo Beach Edison Corridor Scenario, Receiver Height of 20-feet ...................................................... 4.11-73 Figure 4.11-35Phase 3 - Leq Noise Contours during Pipeline Construction 190th Street Westbound Scenario, Receiver Height of 5-feet ............................................................... 4.11-74 Figure 4.11-36Phase 3 - Leq Noise Contours during Pipeline Construction 190th Street Eastbound Scenario, Receiver Height of 5-feet ................................................................ 4.11-74 Figure 4.11-37Phase 3 - Leq Noise Contours during Pipeline Construction Torrance Edison Corridor Scenario, Receiver Height of 5-feet .................................................................... 4.11-75 Figure 4.11-38Phase 4 - Leq Noise Contours during Long Term DRILLING & PRODUCTION for a Receiver Height of 5-ft .................................................................................................. 4.11-80 Figure 4.11-39Phase 4 - Leq Noise Contours during Long Term DRILLING & PRODUCTION for a Receiver Height of 20-ft ................................................................................................ 4.11-81 Figure 4.11-40Phase 4 - Leq Noise Contours during Long Term DRILLING & PRODUCTION with Mitigation for a Receiver Height of 5-ft ...................................................................... 4.11-83 Figure 4.11-41Phase 4 - Leq Noise Contours during Long Term DRILLING & PRODUCTION with Mitigation for a Receiver Height of 20-ft .................................................................... 4.11-84 Figure 4.11-42Phase 4 - Leq Noise Contours during Long Term PRODUCTION for a Receiver Height of 5-ft ................................................................................................................. 4.11-87 Figure 4.11-43Phase 4 - Leq Noise Contours during Long Term PRODUCTION for a Receiver Height of 20-ft ................................................................................................................. 4.11-88 Figure 4.11-44Phase 4 - Leq Noise Contours during Long Term PRODUCTION with Mitigation for a Receiver Height of 5-ft ............................................................................................. 4.11-91 E&B Oil Drilling & Production Project xviii Draft Environmental Impact Report
  • 20. Table of Contents Figure 4.11-45Phase 4 - Leq Noise Contours during Long Term PRODUCTION with Mitigation for a Receiver Height of 20-ft ........................................................................................... 4.11-92 Figure 4.11-46Relocated City Maintenance Yard - Leq Noise Contours during DEMOLITON for a Receiver Height of 5-feet............................................................................................... 4.11-99 Figure 4.11-47Relocated City Yard - Leq Noise Contours during CONSTRUCTION for a Receiver Height of 5-feet ................................................................................................4.11-100 Figure 4.11-48Relocated City Yard - Leq Noise Contours during DEMOLITON for a Receiver Height of 20-feet .............................................................................................................4.11-101 Figure 4.11-49Relocated City Yard - Leq Noise Contours during CONSTRUCTION for a Receiver Height of 20-feet ..............................................................................................4.11-102 Figure 4.11-50Relocated City Yard - Leq Noise Contours during DEMOLITON with Mitigation for a Receiver Height of 5-feet..............................................................................................4.11-107 Figure 4.11-51Relocated City Yard - Leq Noise Contours during CONSTRUCTION with Mitigation for a Receiver Height of 5-feet ........................................................................4.11-108 Figure 4.11-52Relocated City Yard - Leq Noise Contours during DEMOLITON with Mitigation for a Receiver Height of 20-feet............................................................................................4.11-109 Figure 4.11-53Relocated City Yard - Leq Noise Contours during CONSTRUCTION with Mitigation for a Receiver Height of 20-feet ......................................................................4.11-110 Figure 4.11-54Relocated City Yard - Leq Noise Contours during OPERATIONS For a Receiver Height of 5-feet ...............................................................................................................4.11-114 Figure 4.11-55Relocated City Yard - Leq Noise Contours during OPERATIONS for a Receiver Height of 20-feet .............................................................................................................4.11-115 Figure 4.11-56 Relocated City Yard - Leq Noise Contours during OPERATIONS with Mitigation for a Receiver Height of 5-feet ........................................................................................4.11-116 Figure 4.11-57Relocated City Yard - Leq Noise Contours during OPERATIONS with Mitigation for a Receiver Height of 20-feet ......................................................................................4.11-117 Figure 4.11-58Temporary City Yard - Leq Noise Contours during OPERATIONS for a Receiver Height of 5-feet ...............................................................................................................4.11-122 Figure 4.11-59Temporary City Yard - Leq Noise Contours during OPERATIONS for a Receiver Height of 20-feet .............................................................................................................4.11-123 Figure 4.11-60Temporary City Yard - Leq Noise Contours during OPERATIONS with Mitigation for a Receiver Height of 5-feet ........................................................................................4.11-124 Figure 4.11-61Temporary City Yard - Leq Noise Contours during OPERATIONS with Mitigation for a Receiver Height of 20-feet ......................................................................................4.11-125 Figure 4.13-1Traffic Study Intersections Locations............................................................. 4.13-5 Figure 4.13-2Location of Roadway Segments Studied ....................................................... 4.13-6 Figure 4.13-3Existing and Proposed Bike Paths in Hermosa Beach ................................ 4.13-10 Figure 4.13-4Safe Routes to School ................................................................................ 4.13-12 Figure 4.13-5Alternative Heavy Truck Traffic Routes ....................................................... 4.13-48 Figure 5-1Percent of Crude Recovery and Alternative Locations ............................................ 5-6 Figure 5-2Rosecrans Alternative Location Detail..................................................................... 5-8 Figure 5-3Exxon/Mobil Refinery Alternative Location Detail .................................................. 5-10 Figure 5-4AES Site Location Detail ....................................................................................... 5-13 Figure 6-1Simulated View of Drilling Rig at AES Site .............................................................. 6-5 Draft Environmental Impact Report xix E&B Oil Drilling & Production Project
  • 21. Table of Contents Acronyms °F AB ANSI APEHA API AQMP bbl BOP BOP bpd CAL FIRE Cal/EPA Cal-ARP CalISO CARB CCAA CCPS CDFG CDMG CEC CEQA CESA CFR CFR CGS CNDDB CNPS CO CPUC CRR CSFM CSR CUP D/C dBA DOGGR DPM DPR eGRID EIR EPA degrees Fahrenheit Assembly Bill American National Standards Institute Alquist-Priolo Earthquake Hazards Act American Petroleum Institute Air Quality Management Plans barrels blow out prevention blowout prevention barrels per day California Department of Forestry and Fire Prevention California Environmental Protection Agency California Accidental Release Program California Independent System Operator California Air Resources Board California Clean Air Act Center for Chemical Process Safety California Department of Fish and Game California Division of Mines and Geology California Energy Commission California Environmental Quality Act California Endangered Species Act Code of Federal Regulations Code of Federal Regulations California Geological Survey California Department of Fish and Wildlife, Natural Diversity Database California Native Plant Society carbon monoxide California Public Utilities Commission Cyclic Resistance Ratio California State Fire Marshal Cyclic Stress Ratio conditional use permit demand to capacity ratio A-weighted decibel Division of Oil, Gas and Geothermal Resources diesel particulate matter Department of Parks and Recreation Emissions & Generation Resource Integrated Database Environmental Impact Report Environmental Protection Agency E&B Oil Drilling & Production Project xx Draft Environmental Impact Report
  • 22. Table of Contents Acronyms ERME fc FERC FESA FMZ Fs ft3 g/cc GHG GIS gpm h2s HARP HCM HHMD HRA ICU IRI ITE km kV kW LACoFD LACSD Ldn Leq LNG LOS LPG LTs m/s m3 MATES MBTA mmscfd MMTCE mph MRZ N2O NAAQS NFPA No. NO2 NOx NPDES O3 OCR OEHHA Environmental Resource Management Element footcandles Federal Energy Regulatory Commission Federal Endangered Species Act fuel modification zone factor of safety cubic feet grams per cubic centimeter greenhouse gas geographical information system gallons per minutes hydrogen sulfide Hotspots Analysis and Reporting Program Highway Capacity Manual Health Hazardous Materials Division health risk assessment Intersection Capacity Utilization Industrial Risk Insurers Institute of Traffic Engineers kilometers kilovolt kilowatt County of Los Angeles Fire Department Sanitation Districts of Los Angeles County day-night noise level equivalent sound level natural gas liquids level of service liquefied petroleum gases low temperature separation meters per second cubic meters Multiple Air Toxics Exposure Study Migratory Bird Treaty Act million standard cubic feet per day million metric tons of carbon equivalent miles per hour Mineral Resources Zone nitrous oxide national ambient air quality standards National Fire Protection Association number nitrogen dioxide nitrogen oxides National Pollutant Discharge Elimination System Program ozone overconsolidation ratio Office of Environmental Health Hazard Assessment Draft Environmental Impact Report xxi E&B Oil Drilling & Production Project
  • 23. Table of Contents Acronyms OS PCE PM10 PM2.5 ppm PRC psia psig QRA RMP RWQCB SCAQMD SCCIC SCE SCGC SIP SO2 SRA SWRCB TNT UFC URBEMIS USACE USFWS V/C VOC vpd vph yd3 μg/m3 open space Passenger Car Equivalent particulate matter less than 10 micrometers in diameter particulate matter less than 2.5 micrometers in diameter parts per million Public Resources Code pounds per square inch, absolute pounds per square inch, gauge Quantitative Risk Analysis Resource Management Plan Regional Water Quality Control Board South Coast Air Quality Management District South Central Coastal Information Center Southern California Edison Southern California Gas Company State Implementation Plan sulfur dioxide source receptor area State Water Resources Control Board Trinitrotoluene Uniform Fire Code Urban Emissions Software US Army Corps of Engineers US Fish and Wildlife Service Vehicles to capacity ratio volatile organic compounds Vehicles per day Vehicles per hour cubic yards micrograms per cubic meter E&B Oil Drilling & Production Project xxii Draft Environmental Impact Report